site test reports
TRANSCRIPT
-
7/26/2019 Site Test Reports
1/2
Site test Reports
Sl
No
Equipments Test
equipments
Type of test
(Installation)
Type of test
(Commissioning)
Remarks
1 Switchboard
(HT)
Bus bar IR
Hipot
General
Breaker 1. Breaker racking (IN!"T)#. $acuu% check&. !peration&.1. Nor%al closing Tripping&.#. '%ergenc Tripping&.&. nti*pu%ping&.+. ,ocalRe%ote operation
IR
-ontact Resistance TestTi%er Ti%ing test
-oil resistance %easure%ent
Hipot
Sche%e (ON/OFF/TRIP/LED/ ANNUINCIATOR)
-T $isual inspection
Ter%inal coer
IR
/olarit test
Secondar winding Resistance
-urrent ratio test (Relay/ MFM/ Ammeter)
0nee point $oltage test
/anel dr wise
/T IR/olarit test
Secondar winding Resistance
$oltage ratio test (Relay/ MFM/ Ammeter)
0nee point $oltage test
/anel dr wise
, IR /anel dr wise
%%eter -alibration test -urrent ratio test
Selector switch check
/ri%ar current
in2ection to be done.
$olt%eter -alibration test $oltage ratio testSelector switch check
Rela 1. 3easured alue test1.1. -urrent1.#. $oltage#. Snchroni4ation check&. !-5 ' protection+. Breaker 6ailure protection7. "$ protection8. Rela checklist (BIB!,'9Trip inal
-
7/26/2019 Site Test Reports
2/2
setting):. !ther an
33 Ratio test
# -ables HT -able 1. IR ( Before & after layin) 1. /hase se;uence -ontinuit#. IR ( Before & after !i"ot)&. Hi*pot
,T -able 1. IR ( Before & after layin) #. IR ( Before & after Conne#tion)&. /hase se;uence -ontinuit
-ontrol cable 1. -ore identi6ication.#. -ore continuit.
&. -ore identi6ication.+. -ore continuit.
& Trans6or%er
+ -apacitor
bank