six modules micromegas tpc beam test & test bench

15
Six modules Micromegas TPC beam test & Test bench 12/4/2012 W.Wang_RD51 mini week 1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang

Upload: read

Post on 06-Feb-2016

31 views

Category:

Documents


0 download

DESCRIPTION

Six modules Micromegas TPC beam test & Test bench. D. Attié , P. Colas, M . Dixit, P. Hayman, W . Wang. 7 Micromegas modules with integration of electronics. 2012-. 2008-2011. 6 Modules Test. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 1

Six modules Micromegas TPC beam test & Test bench

12/4/2012

D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang

Page 2: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 2

7 Micromegas modules with integration of electronics2008-2011 2012-

12/4/2012

Page 3: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 3

6 Modules Test

Cosmic event

In July 2012, 6 modules were installed on the endplate of LP-TPC at DESY and tested at the same time. Data were taken with cosmic rays and 5 GeV e- beam.

12/4/2012

Page 4: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 412/4/2012

Event display (the first 100 triggers of a good run)

Each module has 1726 pads (24 rows x72 columns)

Page 5: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 5

Outside crack

In crack

Upper crack Lower crackPadrow number (3x24=72)

5 GeV e- Beam

Crack scan

x

12/4/2012

Page 6: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 6

Number of hits vs x (72 pad-rows)

Study the hit reconstruction efficiency at or near the crack: take data with beam, moving by steps of 2mm

Crack scan

12/4/2012

Page 7: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 7

Gain studyUsing the fitted MPV of the (Landau) distribution of the measured charge

Effective gain vs mesh voltage (compared with the direct gain measurements using 55Fe source on a bulk detector without resistive foil)

Effective gain vs drift distance (Vmesh=380V, Vdrift=140V/cm, peaking time 100 ns and 400 ns)

12/4/2012

Page 8: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 8

Track fit

12/4/2012

Page 9: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 9

(b): After alignmentdf= 2.9 , 2.1 and 2.2 mrad dx = 47 µm, -43 µm and -52 µm

Row Number: 3 x 24 = 72 Displacement in mm(a): Before alignment

Residuals by padrow

One module has 1726 pads (24 rows x72 columns)

12/4/2012

Page 10: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 10

Test Bench

The 55Fe source is put in an aluminum collimation tube and fixed on a set of two mechanical arms (X-Y).

12/4/2012

Page 11: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 11

Test Bench

Module S1D - ~30 disconnected pads

Module S8G - ~30 disconnected pads12/4/2012

Module S7H - ~5 disconnected pads + some at the boarder

Module S4E - ~100 disconnected pads

Page 12: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 1212/4/2012

Evt with uncollimated source(each cluster is an X-ray photon)

Page 13: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 13

Energy Resolution (preliminary) :~15% rms

Test Bench

12/4/2012

Page 14: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 14

• Successful test of 6 modules simultaneously with full integration of the electronics flat behind the panels. The analysis work is on-going.

• Test bench is on-going to study the modules one by one: energy resolution, calibration, cross-talk…

• Next step: 7 modules high quality test at the end of January 2013

12/4/2012

Summary

Page 15: Six modules  Micromegas  TPC beam test & Test bench

W.Wang_RD51 mini week 15

Thank you!

12/4/2012