Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
SSIX MONTHLY COMPLIANCE REPORT
DECEMBER- 2016
“GROUP HOUSING COMPLEX”
MAHAGUN MANTRA - II
AT
GH-01, Sector-10, Greater Noida, U.P.
Being developed by
M/s Hebe Infrastructure Pvt. Ltd.
The Corenthum Tower-B, Office no. B-44,
Plot no.-A-41, Sector-62,
Noida, U.P-201301
Prepared by
M/s Perfact Services
(ISO9001:2008& ISO14001:2004 Certified)
501-507, 5th Floor, NN Mall,
Mangalam Palace, Sector 3 Rohini, New Delhi
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
LIST OF ANNEXURE
ANNEXURE DETAILS
ANNEXURE -I COPY OF GRANTED ENVIRONMENTAL CLEARANCE
ANNEXURE – II COPY OF RECEIPT OF CTE APPLIED
ANNEXURE – III MONITORING REPORTS OF AIR, WATER, SOIL, NOISE
& STACK
ANNEXURE - IV HEALTH CERTIFICATES OF FEW WORKERS ENGAGED
DURING CONSTRUCTION WORK
ANNEXURE – V PUC CERTIFICATES OF FEW VEHICLES HIRED FOR
CONSTRUCTION
ANNEXURE - VI COPY OF HEIGHT CLEARANCE FROM AAI
ANNEXURE-VII COPY OF ELECTRICITY BILL
ANNEXURE-VIII COPY OF FIRE APPROVAL
ANNEXURE-IX COPY OF FLY ASH PURCHASE BILL
ANNEXURE-X COPY OF WATER SUPPLY BILL
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
1. Introduction:
The “Group Housing” Project is located at Plot no. GH-01A, Sector-10, Greater Noida, U.P being
developed by M/s Hebe Infrastructure Pvt. Ltd.
Name of the project Group Housing “Mahagun Mantra II”
Site address Plot no. GH-01A, Sector-10, Greater Noida,
U.P.
Developed By M/s Hebe Infrastructure Pvt. Ltd.
Environment Clearance Letter No 1522/Praya/SEAC/2481/2013-14/AD(S)
Dated 8 December, 2015
Period of Compliance Six monthly compliance: Period April-2016
to September-2016, Submission due in
December-2016
Project Description Project involves the construction of Group
Housing on a plot area of 23657.31 Sqm.
Built up area of the project is 135,405.18
Sqm.
Construction Status Construction under progress
Proposed Year of Commencement 2014
Proposed year of completion 2018
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
2. Project Description
The Group Housing Project will have the following salient features: -
Particulars Details
Total Plot Area 23657.31 m2
Built up Area 135405.18 m2
Green Area 9540.27 m2
No. of Towers 3
No. of RWH pits 6
Power requirement 4820 KVA
Height of Building 87.1 m
Parking space proposed 1322ECS
Total water requirement 428 KLD
Total no. of D.G sets 4 D.G sets of capacity of 600 KVA
Estimated Solid waste generation
2426 Kg per day
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
3. Construction Progress Status:
S. No. Component Construction status as per December-16
1 Civil construction
(Structural work, Brick work & Plaster work)
35% Completed
2 Plumbing 12% Completed
3 Electrical work 15% Completed
4 Fire Fighting Not yet Started
5 Sewage Treatment Plant Not yet Started
6 Rain Water Harvesting Not yet Started
7 Sewerage, Drainage etc. Not yet Started
8. D.G Room, AC Plant Room Not yet Started
9. Landscape work Not yet Started
10. Finishing work Not yet Started
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
Site Photographs
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
Six Monthly Compliance Report – June-2016 M/s Hebe Infrastructure Pvt. Ltd
Green Area Present at the site
December-2016
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
4. Current Status of point – wise compliance of the stipulated environmental conditions/safeguards.
S. No General Conditions: Reply
1. It shall be ensured that all standards related to
ambient environmental quality and the
emission/ effluent standards as prescribed by
the MOEF are strictly compiled with.
Standards related to ambient environmental
quality & emission / effluent standards
prescribed by the MoEF are being complied.
Test reports are enclosed as Annexure-III.
2. It shall be ensured that obtain the no
objection certificate from the U.P. Pollution
Control Board before start of construction.
Noted
3. It shall be ensured that no construction work
or preparation of land by the project
management except for securing the land is
started on the project or the activity without
the prior environmental clearance.
We have obtained Environmental Clearance
vide letter no. 1522/Praya/SEAC/2481/2013-
14/AD(S) Dated 8 December, 2015
Construction was started after getting
Environmental Clearance. Copy for the EC is
enclosed as Annexure-I.
4. The proposed land use shall be in accordance
to the prescribed land use. A land use
certificate issued by the competent authority
shall be obtained in this regards.
The site is earmarked for development of
Group Housing Complex and hence no land
use change is anticipated.
5. All trees felling in the project area shall be as
permitted by the forest department under the
prescribed rules. Suitable clearance in this
regard shall be obtained from the competent
Authority.
Not applicable as no tree exists at the project
site.
6. Impact of drainage pattern on environment
should be provided.
No impact of drainage pattern on
environment.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
7. Surface hydrology and water regime of
Project area within 10 Km. should be
provided.
10 km radius Topographical map has already
been submitted.
8. A suitable plan for providing shelter, light
and fuel, water and waste disposal for
construction labor during the construction
phase shall be provided along with the
number of proposed workers.
Local workers have been engaged in
construction work. No workers are allowed to
stay in the night at project site. Necessary
basic facilities like temporary toilets, and
wash area have been provided for the
construction workers.
9. Measures shall be undertaken to recycle and
reuse treated effluents for the horticulture and
plantation. A suitable plan for waste water
recycling should be submitted.
The waste water generated during operation
phase shall be treated in In-house Sewage
Treatment Plant & treated effluent will be
reused for horticulture & Plantation within
the complex.
10. Obtain proper permission from competent
authorities regarding enhanced traffic during
and due to construction and operation of
project.
Necessary permission from competent
authorities shall be taken regarding enhanced
traffic during and due to construction and
operation of project, if required.
Traffic circulation Plan in this regard has
already submitted.
11. Obtain necessary clearances from the
competent authority on the abstraction and
use of ground water during the construction
and operation phases.
We are not using ground water during
construction phase, hence clearance is not
required. Tanker supply water is being used
for construction work purpose.
12. Hazardous/inflammable/ Explosive materials
likely to be stored during the construction and
operation phases shall be as per standard
procedure as prescribed under law, Necessary
Only hazardous waste generated during
construction/operation phase is used oil from
D.G sets which is being stored in leak proof
containers and shall be given to approve
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
clearances in this regards shall be obtained. recycler.
13. Solid waste shall be suitably segregated and
disposed. A separated and isolated municipal
waste collection center should be provided.
Necessary plans should be submitted in this
regards.
Solid waste generated during Operation
phase shall be suitably segregated and
disposed-off at isolated municipal waste
collection Centre.
14. Suitable rainwater harvesting systems as per
designs of groundwater department shall be
installed. Complete proposals in this regard
should be submitted.
Rainwater harvesting & Ground water
recharging shall be done as per our
submittals. Oil & Grease trap to remove oil &
Grease from the surface runoff shall been
provided.
Complete details had been submitted.
15. The emissions and effluents etc. from
machines, Instruments and transport during
construction and operation phases should be
according to the prescribed standards.
Necessary plans in this regard shall be
submitted.
Necessary care is being taken to control
emissions & effluents etc. from machines
instruments & transport during construction
phase & will be taken during operation phase
also.
Covered transportation of material is being
practiced.
16. Water sprinklers and other dust control
measures should be undertaken to take care
of dust generated during the construction and
operation phases. Necessary plans in this
regard shall be submitted.
Dust control measures are being adopted to
take care of dust generated during the
construction phase.
Water sprinkling is being done on regular
basis.
Construction material stored at site is being
covered with the cloth/plastic sheet to avoid
the dust emission.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
17. Suitable noise abatement measures shall be
adopted during the construction and operation
phases in order to ensure that the noise
emissions do not violate the prescribed
ambient noise standards. Necessary plans in
this regard shall be submitted.
All suitable noise abatement measures are
being adopted. The DG sets used during
construction/Operation phase are acoustically
enclosed as per the Central Pollution Control
Board norms. All D.G sets during operation
phase will be also kept acoustically enclosed.
18. Separate stockpiles shall be maintained for
excavated topsoil and the topsoil should be
utilized for preparation of green belt.
Soil excavated during construction phase has
been stored separately under tarpaulin cover.
Excavated soil is being used in the backfilling
and top fertile soil shall be used for
development of the horticulture/landscape at
site.
19. Sewage effluents shall be kept separate from
rainwater collection and storage system and
separately disposed. Other effluents should
not be allowed to mix with domestic
effluents.
Separate lines are being laying down for
sewage effluents & carrying storm water. No
other effluent shall be allowed to mix with
Domestic effluent.
20. Hazardous/ Solid wastes generated during
construction and operation phases should be
disposed-off as prescribed under law.
Necessary clearances in this regard shall be
obtained.
No hazardous waste is being generated during
construction phase except used oil generated
from DG set. Only lesser amount of used oil
from D.G Sets is generated and shall be
disposed-off through approved recycler.
21. Alternate technologies for the solid waste
disposals (like vermin-culture etc.) should be
used in consultation with expert organization.
For disposal of solid waste, biodegradable
waste shall be treated in Organic waste
converter.
22. No wetland should be infringed during
construction and operational phases. Any
wetland coming in the project area should be
No wetland exists at the site.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
suitably rejuvenated and conserved.
23. Pavements shall be so constructed as to allow
infiltration of surface run-off of rain water.
Fully impermeable pavements shall not be
constructed. Construction of pavements
around trees shall be as per scientifically
accepted principles in order to provide
suitable watering, aeration and nutrition to
the tree.
Pavements are being constructed so as to
allow infiltration of surface run off of
rainwater. All necessary cares shall be taken.
24. The Green Building Concept suggested by
Indian Green Building Council, which is a
part of CII-Godrej GBC, shall be studied and
followed as far as possible.
The project is registered and pre-certified
under IGBC Green Homes, Green Building
rating system.
25. Compliance with the safety procedures,
norms and guidelines as outlined in National
Building Code 2005 shall be compulsorily
ensured.
We are complying with all safety procedures
norms & and guidelines as per National
Building Code 2005.
Safety slogans and hoardings have been
provided at the site.
26. Ensure usage of dual flush system for flush
cisterns and explore option to use sensor
We will use dual flush systems for flush
cisterns. Use of sensor based fixtures, sensor
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
based fixates, waterless urinals and other
water saving techniques.
based urinals & other water saving
techniques at our project site will be followed
as far as possible.
27. Explore options for the use of dual pipe
plumbing for use of water with different
qualities such as municipal supply, recycled
water, ground water etc.
Dual pipe plumbing is being laid down for use
of water with different qualities.
28. It is to ensure use of measures for reducing
water demand for landscaping and using
xeriscaping, efficient irrigation equipments &
controlled watering systems.
Necessary measures shall be taken to reduce
the water demand for landscaping .
We will try to improve irrigation efficiency.
29. Make suitable provisions for using solar
energy as alternative source of energy. Solar
energy application should be incorporated for
illumination of common areas, lighting for
the gardens and street lighting in addition to
provision for the solar water heating. Present
a detailed report showing how much
percentage of backup power for institution
can be provided through solar energy so that
use and polluting effects of DG sets can be
minimized.
Suitable provisions for using solar energy as
alternative source of energy shall be provided
during the operational phase.
30. Make separate provision for the segregation,
collection, transport and disposal of E-waste.
Separate provisions for segregation,
collection, transport & disposal of e-waste
shall be done through approved vendors.
31. Educate citizens and other stake-holders by
putting up hoardings at different places to
create environmental awareness.
Necessary hoardings shall be provided at
different places to create environmental
awareness.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
32. Traffic congestion near the entry and exit
points from the roads adjoining the proposed
project site must be avoided. Parking should
be fully internalized and no public space
should be utilized.
Proper measure like road width, entry width
etc. has been taken care, so that there is no
Traffic congestion near the entry and exit
points from the roads adjoining the project
site.
Parking shall be fully internalized and no
public space shall be utilized. Movement of
vehicles is being carried out during non-peak
hour.
33. Prepare and present disaster management
plan.
Disaster management plan has already been
submitted.
34. A report on the energy conservation measures
confirming to energy conservation norms
finalize by Bureau of Energy efficiency
should be prepared incorporating details
about building materials and technology, R &
U Factors etc.
Energy conservation report has been already
submitted.
35. Fly ash should be used as building material in
the construction as per the provision of fly
ash notification of September, 1999 and
amended as on August, 2003 (The above
condition is applicable only if the project lies
within 100 km of Thermal Power Station).
We are using fly ash bricks in the
construction and fly ash blocks shall be used
in the construction of pathways and boundary
walls as per the provisions of Fly Ash
Notification of September, 1999 and amended
as on 27th August, 2003.
36. The DG sets to be used during construction
phase should use low Sulphur diesel type and
should conform to E.P. rules prescribed for
air and noise emission standards.
Acoustically enclosed DG sets have been
installed during construction phase which
uses low Sulphur diesel and conform to E.P.
rules prescribed for air and noise emission
standards.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
37. Alternate technologies to chlorination (for
disinfection of water) including methods like
ultra-violate radiation, ozonation, etc. shall be
examined and a report submitted with
justification for selected technology.
We shall install UV Treatment system for
disinfection of the treated waste water.
38. The green belt design along the periphery of
the plot shall achieve attenuation factor
conforming to the day and night noise
standards prescribed for residential land use.
The open spaces inside the plot should be
suitably landscaped and covered with
vegetation of indigenous variety.
Green area of 9540.27 m2 shall be developed
in and around the project. The open spaces
inside the plot shall be suitably landscaped
and covered with vegetation of indigenous
variety.
Landscape plan in this regard has already
submitted.
39. The construction of the building and the
consequent increased traffic load should be
such that the microclimate of the area is not
adversely affected.
Adequate measures are being taken to ensure
that microclimate of the area is not adversely
affected.
40. The building should be designed so as to take
sufficient safeguards regarding seismic zone
sensitivity.
Adequate measures have been taken for
structural stability of the building for seismic
zone sensitivity.
41. High rise buildings should obtain clearance
from aviation department or concerned
authority.
Building height approval has been obtained.
Copy of Approval from AAI is enclosed as
Annexure –VI.
42. Suitable measures shall be taken to restrain
the development of small commercial
activities or slums in the vicinity of the
complex. All commercial activities should be
restricted to special areas earmarked for the
purpose.
We are ensuring that slums will not develop
in the vicinity of the complex due to the
construction of the project. All commercial
activities shall be restricted to special areas
earmarked for the purpose.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
43. It is suggested that literacy program for
weaker sections of society/ women/ adults
(including domestic help) and under
privileged children could be provided in a
formal way.
Noted.
44. The use of compact fluorescent lamps should
be encouraged, a management for the safe
disposal of used /damaged CFLs should be
submitted.
We will use CFL’s in the complex. Proper
disposal method shall be designed.
45. It shall be ensured that all street and park
lighting is solar powered. 50% of the same
may be provided with dual (solar/electrical)
alternatives.
Noted.
46. Solar water heater shall be installed to
maximum possible capacity. Plans may be
drawn up accordingly and submitted with
justification.
Solar water heater shall be provided.
Plans in this regard have been already
submitted.
47. Treated effluents shall be maximally reused
to aim for Zero discharge. Whenever no
possible a detailed management plan for
disposal should be provided with quantities
and quality of waste water.
Treated effluent from the STP shall be
maximally reused to aim for zero discharge
for flushing, Gardening and Miscellaneous
purposes.
48. The treated effluents should normally not be
discharged into public sewers with terminal
treatment facilities as they adversely affect
the hydraulic capacity of STP. If unable,
necessary permission from authorities should
be taken.
The treated water from STP will be
maximally utilized in the project. If required
permission from concerned authority will be
taken.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
49. Construction activities including movements
of vehicles should be so managed so that no
disturbance is caused to nearby residents.
Necessary care is being taken to ensure that,
no disturbance is caused to nearby residents
due to construction activity.
Construction Vehicles movement is being
done during non-peak hours.
50. All necessary statutory clearance should be
obtained and submitted before start of any
construction activity and if this condition is
violated the clearance, if and when given,
shall be automatically deemed to have been
cancelled.
All necessary statutory clearances shall be
obtained whichever applicable.
51. Parking areas should be in accordance with
the norms of MOEF, Government of India.
Plans may be drawn up accordingly and
submitted.
Parking area has been provided as per the
details submitted and in accordance with the
norms of MOEF, GOI. Parking plan in this
regard has already submitted.
52. The location of the STP should be such that it
is away from human habilitation and does not
cause problem of odor. Odorless technology
options should be examined and a report
submitted.
STP shall be located away from the human
habilitation; hence no odor problem is
expected.
53. The Environment Management plan should
also include the break up costs on various
activities and the management issues also so
that the residents also participate in the
implementation of the environment
management plan.
Environment Management plan including
break up costs on various activities has
already been submitted.
54. Detailed plans for safe disposal of STP
sludge shall be provided along with ultimate
disposal location, quantitative estimates and
STP Sludge after drying shall be used as
manure and rest of unused manure shall be
given to nursery/farmers.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
measures proposed.
55. Status of the project as on date shall be
submitted along with photographs from
North, South, West and East side facing
camera and adjoining areas should be
provided.
Photographs showing construction status of
the project is enclosed.
56. Specific location along with dimension with
reference to STP, parking, open areas and
green should be provided on the layout plan.
Layout Plan has been already submitted.
57. The DG sets shall be so installed so as to
conform to prescribed stack heights and
regulations and also to the noise standards as
prescribed. Details should be submitted.
Acoustically enclosed D.G sets will be
installed for the operational towers with
adequate stack height as per norms.
58. E-waste management should be done as per
MoEF guidelines
E-waste Management shall be as per MOEF
guidelines.
59. Electrical waste should be segregated and
disposed suitably as not to impose
Environmental risk.
There shall be provision for segregation of
electrical waste & disposal of the same
through approved recyclers.
60. The use of suitably processed plastic waste in
the construction of roads should be
considered.
Processed plastic waste in construction shall
be used where feasible.
61. Displaced persons shall be suitably
rehabilitated as per prescribed norms.
No displacements of person have been
involved.
62. Dispensary for first aid shall be provided. First aid facility has been provided during
construction phase and also shall be provided
for operational phase.
Regular Health Checkup of construction
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
labours is being done.
Medical Certificates of few workers are
enclosed as Annexure – IV.
63. Safe disposal arrangement of used toiletries
items in Hotels should be ensured. Toiletries
items could be given complementary to
guests, adopting suitable measures.
Safe disposal arrangement of used toiletries
items shall be ensured in the Group Housing
complex.
64. Diesel generating set attacks should be
monitored for CO and HC.
D.G. set monitoring is being regularly done.
65. Ground Water downstream of Rain Water
Harvesting pit nearest to STP should be
monitored for bacterial contamination.
Necessary Hand Pumps should be provided
for sampling. The monitoring is to be done in
pre-and post-monsoon, seasons.
STP shall be installed away from Rain water
Harvesting pits. So, that ground water
contamination does not occur.
66. The green belt shall consist of 50% trees,
25% shrubs and 25% grass as per MOEF
norms.
Proper Green belt shall be maintained as per
MOEF norms.
67. A separate electric meter shall be provided to A separate electric meter has been provided
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
monitor consumption of energy for the
operation of sewage/effluent treatment in
tanks.
for the STP.
68. An energy audit should be annually carried
out during the operational phase and
submitted to the authority.
Noted.
69. Project proponents shall endeavor to obtain
ISO:14001 certifications. All general and
specific conditions mention under this
environmental clearance should be included
in the environment manual to be prepared for
the certification purposes and compliances.
Noted.
70. Appropriate safety measures should be made
for Accidental fire.
Appropriate safety measures shall be taken.
71. Smoke meters should be installed as warning
measures for accidental fire.
Smoke meters shall be installed as warning
measures for accidental fire.
72. Plan for safe disposal of R.O reject is to be
submitted.
As it is a Group Housing project. No RO shall
be proposed. So, there is no RO reject.
73. Project falling within 10 K.M. area of Wild
Life Sanctuary should obtain a clearance
from National Board for Wild Life (NBWL)
even if the eco-sensitive zone is not
earmarked.
No Eco sensitive zone falls within 10 km
radius of the project. Hence it is not
applicable.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
SPECIFIC CONDITIONS
1. Provision of setback on all sides should be
made as per G.B. Nagar bye -laws.
Set back of all the side shall be made as per
G.B. Nagar bye-laws.
2. Municipal solid waste shall be disposed
/managed as per Municipal Solid Waste
(Management and Handling) Rules, 2000 (as
amended).
Noted.
3. 03m peripheral green belt shall be provided
around the project inside the project
boundary. Add Astonia in list of trees.
Noted.
4. 15% area of the total plot area shall be
compulsorily made available for the green
belt development including the peripheral
green belt.
It shall be followed.
5. Project falling within 10 Km. area of Wild
Life Sanctuary is to obtain a clearance from
National Board Wild Life (NBWL) even if
the eco- sensitive zone is not earmarked.
Not Applicable.
6. Criteria/ norms provided by competent
Authority regarding the seismic zone be
followed for construction work. Provision of
alarm system, to timely notify the residents, in
case of occurrence of earthquake/other natural
disasters/fire should be provided. A well-
defined evacuation plan should also be
prepared and regular mock drills should be
arranged for the residents. Rise of stairs
should be constructed in a way, so that it
The project is located at seismic zone-IV
There are no chances of floods and landslides.
An onsite emergency plan and evacuation
plan shall be made.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
should provide smooth movement.
7. For the treatment for total sewage, a full-
fledged STP is to be provided with 20% more
capacity than waste water generated during
operation phase. 100% waste water is to be
treated in captive STP conforming to
prescribed standards of receiving body for
designated use. Monitoring of STP to be done
daily till its stabilization.
Sewage treatment plant of full-fledged
capacity shall be installed.
Regular monitoring shall be done during
operation phase.
8. Dual plumbing should be adopted. Recycling
of water as proposed shall be undertaken with
regular testing and monitoring of treated
water.
Dual Plumbing line shall be provided in the
complex for reuse of treated water.
9. Dedicated power supply for STPs is to be
ensured during operation. Sludge of STP is to
be used in-house as manure and surplus
manure should be managed by giving it to end
users. STP shall be suitably located nearest to
back side boundary with shortest out let.
Operation and the maintenance cost of the
STP shall also be informed along with the
compliance of the E-waste and municipal
solid waste disposal.
Dedicated power supply for STPs shall be
provided during operation period. Dried
sludge generated from STP within complex
during operation phase shall be dewatered/
dried to form a cake and then will be used as
manure in green areas.
10. Environmental Corporate Responsibility
(ECR) plan along with budgetary provision
on amounting to 2% of total project cost shall
be prepared and approved by Board of
Directors of the company. A copy of
resolution as above shall be submitted to the
Environmental Corporate Responsibility
(ECR) plan along with budgetary provision
amounting to 2% of total project cost is
already submitted.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
authority. A list of beneficiaries with their
mobile nos./address should be submitted
along with six monthly compliance reports.
11. LEDs should be used in all common areas and
corridors. 100% solar lighting is to be
provided in the open areas/ stairs cases.
Energy conservation measures shall be taken
and LEDs will be used for lighting systems.
Solar lights shall be provided in open area.
12. Parking guideline as per G.B. Nagar
Development Authority should be followed.
Parking for disabled persons should be
explored.
Parking guidelines shall be followed.
13. All of them entry/exit point should be bell
mouth shaped.
Noted.
14. To discharge excess treated waste water into
public drainage system, permission from the
competent authority to be taken prior to any
discharge.
Permission for discharge of waste water into
sewer line shall be taken.
15. I00% provision of Rain Water Harvesting is
to be made. RWH shall be initially done only
from the roof-top. RWH from green and other
open areas shall be done only after permission
from CGWB.
Noted. Rainwater Harvesting System shall be
provided as per CGWB designs.
16. An underground Pucca tank for
collection/reuse of rain water may be
constructed.
Noted.
17. Height of the stack should be provided based
on combined DG sets capacity and be 6mt
higher than the tallest building.
Adequate stack height of 6 m above roof level
of DG sets shall be maintained.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
18. Post project monitoring for air, water (surface
+ ground), Stack noise of D.G. sets, STP to be
carried out as CPCB Guidelines.
Air, water, noise & STP Monitoring during
operational phase of the project shall be
carried out.
19. Crèche to be provided during the
construction/operation phase.
Noted.
20. Provision of separate room for senior citizen
with proper amenities shall be made.
Noted and will be complied.
21. Protection shall be provided on the windows
of the high-rise flats for security of residents
Noted.
22. Unless and until all the environmental issues
are sorted out the occupancy will be restricted
and would be only allowed after achieving the
Permission from the competent authority.
We will ensure Occupancy certificate from
competent authority shall be obtained before
giving any occupancy.
23. The project proponent shall ensure that the
project site does not attract/infringe any
buffer zone of no activity identified/declared
under law.
We shall ensure that the project site does not
attract/infringe any buffer zone of no activity
identified/declared under law.
24. For any extraction of ground water, prior
permission from CGWB shall be taken.
Noted.
25. Sprinkler to be listed for curing and
quenching and ready mix concrete may be
used for construction.
Sprinkler is being used for curing and
quenching during construction phase. We are
in use of Ready Mix Concrete for
construction purpose.
26. Possibilities of use of treated waste water for
irrigation purposes should be explored. Drip
irrigation should be tried up to extent
possible. No fresh water will be used for
Treated water from STP will be used for
irrigation purpose.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
irrigation purpose.
27. Mobile toilets, safe drinking water facility,
sanitation facility and eco -friendly fuels etc.
Shall be made available to the temporary
residents/workers at the project site including
the proper treatment and the disposal of the
wastes.
Mobile toilets, safe drinking water facility,
sanitation facility shall be made available to
the temporary workers at the project site. We
have also made arrangement of proper
treatment and the disposal of the wastes.
28. Revised NOC from fire department &.
Airport Authority of India is to be Submitted.
Already submitted.
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE-I
COPY OF ENVIRONMENTAL CLEARANCE
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE – II
COPY OF RECEIPT OF CTE APPLIED
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE – III
MONITORING REPORTS OF AIR, WATER, SOIL, NOISE & STACK
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE-IV
HEALTH CERTIFICATES OF FEW WORKERS ENGAGED FOR CONSTRUCTION
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE-V
PUC CERTIFICATES OF FEW VEHICLES HIRED FOR CONSTRUCTION
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE-VI
COPY OF HEIGHT CLEARANCE FROM AAI
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE-VII
COPY OF ELECTRICITY BILL
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE-VIII
COPY OF FIRE APPROVAL
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE – IX
COPY OF FLY ASH PURCHASE BILL
Six Monthly Compliance Report – December-2016 M/s Hebe Infrastructure Pvt. Ltd
ANNEXURE – X
COPY OF WATER SUPPLY BILL