Page 1: Six Sigma Asse

Presented by: Tim Puyleart MPH, CSP

December 9, 2008© IEA, Inc. 2008© IEA, Inc. 2008

USING SIX SIGMA TOOLS TO IMPROVE SAFETY PROCESSES

Page 2: Six Sigma Asse

© IEA, Inc. 2008

Agenda

• FMEA• C &E

Page 3: Six Sigma Asse

© IEA, Inc. 2008

Overview of Six Sigma

Page 4: Six Sigma Asse

© IEA, Inc. 2008

Overview of Six Sigma

To be successful a Six Sigma, approach needs: Management Commitment Employee Participation Planning Involve all Aspects of the Organization Based on Continuous Improvement

Same basic principles as ANSI Z10 – Occupational Health and Safety Management

Systems

To be successful a Six Sigma, approach needs: Management Commitment Employee Participation Planning Involve all Aspects of the Organization Based on Continuous Improvement

Same basic principles as ANSI Z10 – Occupational Health and Safety Management

Systems

Page 5: Six Sigma Asse

© IEA, Inc. 2008

Continuous Improvement

Page 6: Six Sigma Asse

© IEA, Inc. 2008

Define

Page 7: Six Sigma Asse

© IEA, Inc. 2008

Define – Case Study

Objective – Improve overall safety performance. Recordable rate average 4.5 to 5 Annual workers compensation $2.5 million

(average) Data Sources – Plant statistics, incident reports,

workers compensation reports. Output – Team charter, EHS incident data by

location

Page 8: Six Sigma Asse

© IEA, Inc. 2008

Safety Performance – Flat Line

012345678

Oct FY05 Nov

DecJa

nFeb M

ar AprM

ay Jun Ju

lAug Sep

Oct FY06 Nov

DecJa

nFeb M

ar Apr

Goal OSHA Rolling 12 OSHA Rate

LT OSHA Rate FY05 OSHA Rate FY06 OSHA Rate

Page 9: Six Sigma Asse

© IEA, Inc. 2008

Measure

Page 10: Six Sigma Asse

© IEA, Inc. 2008

Measure – Case Study

Page 11: Six Sigma Asse

© IEA, Inc. 2008

Measure – Key Thoughts

Page 12: Six Sigma Asse

© IEA, Inc. 2008

Analyze - Objectives

Page 13: Six Sigma Asse

© IEA, Inc. 2008

Pareto Charts – Other Examples Shift Injury Type Injury Cause Body Part Length of

Employment Day of Week Tools Used

Product Made Supervisor Plant/Work Cell

Location Vehicle Type Task/Work Activity Worker Type

Page 14: Six Sigma Asse

© IEA, Inc. 2008

Analyze – Case Study

First level pareto

Page 15: Six Sigma Asse

© IEA, Inc. 2008

Analyze – Case Study

First level pareto

Second level pareto

Page 16: Six Sigma Asse

© IEA, Inc. 2008

Analyze – Case Study

Third Level Pareto defines the C&E.

2nd Level – use the C&E subtitles:

Man – Materials – Machines – Methods – Measurements - Environment

Page 17: Six Sigma Asse

© IEA, Inc. 2008

Paretos

Page 18: Six Sigma Asse

© IEA, Inc. 2008

C&E Diagram - Fishbone5

Why’s

Page 19: Six Sigma Asse

© IEA, Inc. 2008

C&E Diagram

Page 20: Six Sigma Asse

© IEA, Inc. 2008

C&E – Case Study

Man Training provided? Use of PPE? Use of knives?

Machines Types of knives used? Other options? PPE requirements? Core Slabbers not

used?

Methods Cutting away from

body? Why cutting plastics?

Measurements What measurements

impact the use of knives?

Environment Heat play a role?

Page 21: Six Sigma Asse

© IEA, Inc. 2008

Cause & Effect Diagram

Problem Statement(Unusual Variation in Process)

Major Cause Major Cause Major Cause

Major Cause Major Cause Major Cause

Why?

>> Identify Root Causes and Proposed Solutions

C&E Feeds FMEA

Example

Page 22: Six Sigma Asse

© IEA, Inc. 2008

FMEA

Page 23: Six Sigma Asse

© IEA, Inc. 2008

FMEA Outcomes – Case Study Standardized utility knives – Martor

Megasafe Standardized “J” knives Eliminated manual core slabbing Purchased core slabbing equipment Established Policies

Page 24: Six Sigma Asse

© IEA, Inc. 2008

Improve

Objective Prioritize, plan, and test corrective actions. Eliminate defects through process/product

redesign. Deploy effective corrective actions.

Output Redesigned process. Collect date/measurements on effectiveness.

Page 25: Six Sigma Asse

© IEA, Inc. 2008

Improve – Case Study

Tested variety of knives. ROI projections on core slabbing

equipment. Implemented policies on core slabbing,

knife usage, and PPE requirements.

Page 26: Six Sigma Asse

© IEA, Inc. 2008

Control Plan

Sets in place – rules for future practices. Often impacts many areas of the

organization: Operations, Purchasing, EHS Guidelines for each of these areas to follow

Identifies measurements to determine if the control plan is successful or needs to be revisited.

Sets accountabilities and timelines. Becomes policy or procedure.

Page 27: Six Sigma Asse

© IEA, Inc. 2008

Control Plan (continued)

Policies on standardized knives. Purchasing not allowed to purchase

alternatives. Policy on knife usage – disciplinary action

for improper use. All old knives removed and discarded by a

given date. Incident statistics used a measurement –

knife related incidents went from 40 injuries per year to less than 5!

Page 28: Six Sigma Asse

© IEA, Inc. 2008

Continuous Improvement

Page 29: Six Sigma Asse

© IEA, Inc. 2008

Key Lessons/Best Practices

Go through the steps – don’t let personal influences bias the process.

Use a team approach to the tools. Establish assumptions up front as an

organization. Cost Avoidance credit? ROI Criteria

Solid Incident Investigations are critical. Follow-up and Review. Use the data to drive the process.

Page 30: Six Sigma Asse

© IEA, Inc. 2008

End Result

Incident Rate – 1.8 average for FY07Workers Compensation – Projected costs $823,000

Page 31: Six Sigma Asse

© IEA, Inc. 2008

Questions