Page 1: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 1

Slatina CHP:

CHP fired by biomass with wood chips drying system

V međunarodna konferencija o OIESava Centar, Beograd. 12.10.2017.

Page 2: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 2

Slatina CHP: CHP fired by biomass

Investment: 26 Million EURO

Contractual period: 14 years

Expected timeframe:

─ project implementation start : June 2018

─ invoicing start: 2018, 4Q

Page 3: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 3

Slatina CHP: CHP fired by biomass

General info:

GGE invested into “woodchip drying plant” in connection with 5,0 MW CHP

plant, located in northern part of Croatia (Municipality of Slatina, closed to

Vitorvitica). The plant will produce heat energy in order to dry the woodchips

and electrical energy which will be distributed into electrical grid.

• CHP size: 5 MWe / 12 MWth

• Location: Norhern part of Croatia (Municipality of Slatina)

Page 4: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 4

Slatina CHP: CHP fired by biomass

General info:

GGE bought existing SPV company, which had all needed documentation for the Feed in tarriffapproval and permits for construction. Legal due diligence was already done, no negativeissues were found. Due to GGE philosophy to use BAT and plants with highest possibleefficiency, we gone through process of changing Construction permit of CHP plant, add newpermit for Drying plant and totally changed previous project in order to get 50% of total plantefficiency and get 20% of bonus on Feed-in tariff.

Received documentation:

- Construction permits for CHP, Drying plant and 35kV l=2,1km cable

- Contract with HERO

- Contract with HROTE

- Cntract with HEP

- Contract with Hrvatske šume

- Grid contract period: 14 years

- Feed in tarriff: 192 €/MWh

Page 5: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 5

Slatina CHP: CHP fired by biomass

Technical facts:

• Number of working hours: 8.000

• Woodchip consumption p.a.: 60.000 t

• Boiler cpacity: 27 t/h, 72bar

• Generator max power: 5,7 MWe

• Selfconsumption: 0,6 MWe

• Termal max power: 12 MWth

• Woodchip logistics

‒ Supplier: Hrvatske Šume

‒ Long term supply contracts

‒ supplier radius: 150 km

Page 6: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 6

Slatina CHP: new CHP on biomass

Activity 2016 2017 2018

Building permit

Feasibility study

Legal Due Diligence

Design

Buying Energy 9

Getting turnkey offers

Sign the turnkey contract

Construction

Equipmet delivery

Connection to the grid

Installation

Commissoning

Operating Permit

Feed-in-tariff approval

1 august 2016 30 november 2016 30 June 2018

Page 7: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

Biomass Plant Slatina

Page 8: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 8

Dryer Plant - building design drawings

Page 9: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 9

Power Plant - building design drawings

Page 10: Slatina CHP: CHP fired by biomass with wood chips drying ... · Slatina CHP: CHP fired by biomass Technical facts: • Number of working hours: 8.000 • Woodchip consumption p.a.:

GGE 10

GGE Heat & Powergorenje · energetika ljubljana

Resavska 23/6B, 11000 BeogradSrbija (Serbia)

Tel: +381 (0) 11 785 00 95 (local 205)GSM:

SRB: +381 (0) 63 252 492+381 (0) 60 545 00 94

CG: +382 (0) 68 052 492sinisa.janjusevic@gge.siwww.gge.co.mewww.ggesrbija.rswww.gge.si