slide psm 1 azam edit

Upload: caj7687

Post on 07-Jul-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/18/2019 Slide Psm 1 Azam Edit

    1/35

    ELECTRICAL ENGINEERING FACULTY

    SEE4812 – PSM1

    STUDENT : MUHAMAD AZAM BIN HAMZAH

    IC NO : 890427-01-6245

    MATRIC NO : SX110558EES04

    SUPERVISOR : EN. IZAM AMISIAN

    TESTER FOR LINEAR INDUCTION MOTOR COOLING FAN IN LIGHTRAPID TRANSIT INDUSTRY

  • 8/18/2019 Slide Psm 1 Azam Edit

    2/35

    7. METHODOLOGY

    8. TIME LINE

    9. PRELIMARYRESULT

    10. EXPECTEDOUTCOME

    11. CONCLUSION

    12. Q&A

    OUTLINE

    1. INTRODUCTION

    2. PROBLEMSTATEMENTS

    3. OBJECTIES

    !. SCOPE O" PROJECT

    #. LITERATURE REIE$

    %. PROJECTBACGROUND

  • 8/18/2019 Slide Psm 1 Azam Edit

    3/35

    LINEAR INDUCTION MOTOR 

    1. INTRODUCTION

    Figure 1.1 Linear Induci!n M!!r 

  • 8/18/2019 Slide Psm 1 Azam Edit

    4/35

    1. INTRODUCTION

    1" Power Conversion unit (PCU)

    • Si#e $21%% && ' 12%% && ' 48% &&

    • (eig) $4*%+g

    • Pri&ar, P!-er $%% ! /%% 0dc *% 0dc n!&ina3"

    • C!nr!3 0!3age $. ! % 0dc

    2" Liner In!u"tion Motor (LIM)

    • Raed 0!3age $**% 0ac r&5 T)ree6P)a5e 3ine ! 3ine"

    • Curren $4%% A r&5

    • P!-er $1*2+( raed" 1 +( 7ea+"

    • (eig) $/4+g

    " Liner In!u"tion Motor Coo#in$ Fns

    • Raed 0!3age $4 0dc &in % 0dc &a'

      48 0dc n!&ina3• Fan de3ier, $.2/ cu9ic &:5 a 4 Pa

    • S7eed $*4%%r7& ;6 2%%r7&

    • Su773, Curren $*. ;6 %. A

    • (eig) $*+g

    EQUIPMENT OPERATING SPECIFICATIONS

    Figure 1.2 PCU T)e!r,

  • 8/18/2019 Slide Psm 1 Azam Edit

    5/35

    LIM %LIM &

    1. INTRODUCTION

    > T)e ?a5ic Train Uni ?TU" c!n5i55 7r!7u35i!n 5,5e& i5e3=. Pr!7u35i!n

    5,5e&@ e55enia33, )e 5a&e !n a33 car5@ c!n5i55 != -! 7!-er c!ner5i!n Uni5

    PCU"@ -! ruc+&!uned LIM5@ )e a55!ciaed rain c!nr!35@ and )e

    iner=ace5 -i) )e !)er 5u95,5e&5. A reaci!n rai3@ in5a33ed !n )e guide-a,

    9e-een )e running rai35@ reac5 -i) )e LIM ! c!&73ee )e &!!r circui

    > T)e 7ur7!5e != )e 7r!7u35i!n

    5,5e& i5 ! c!ner )e -a,5ide

    7!-er in! rain &!e&en. T)e

    &!e&en i5 in re57!n5e !

    5igna35 5u773ied 9, )e rainc!nr!3 5,5e& and a+e5 )e

    =!r& != acce3erai!n &!!ring"

    and dece3erai!n 9ra+ing"

    SYSTEM OVERVIEW

  • 8/18/2019 Slide Psm 1 Azam Edit

    6/35

    2. PROBLEM STATEMENT

    Serice Bi5ru7i!n5

    Figure 2.1: The Newspaper cuttings

    regarding on service disruptions on

    11th Dec 2013

  • 8/18/2019 Slide Psm 1 Azam Edit

    7/35

    Li' Fi#ure

    • DLIM =an a3ar& -a5 deeced a ea3)

    M!ni!r Uni MU" 9, c!nr!3 cener.

    Train -i33 9e de7ar and Lig)

    Mainenance Tea& -i33 a+e !u )e

    LIM -)ic) i5 -eig) != /4+g. A5re5u3@ )i5 7r!93e& LIM -i33 5end !

    ea, Mainenance Tea& !

    r!u93e5)!! and re7air )e LIM. LIM

    a5 &eni!n i5 =!rced6air c!!3ed 9, -!

    c!!3ing =an5. T)e -! c!!3ing =an in6

    9!ard and !u69!ard !7erae in

    7ara33e3@ dra-ing un=i3ered a9!e )e

    LIM and e')au5ing i d!-n3!ad !er)e LIM c!i35.

    • ence@ ! deec 5eera3 7r!93e&5 -i)

    RTB and =au3, =an@ )e e5er i5

    needed in !rder ! =u3=i33 )eir

    reuire&en in r!u93e5)!!ing H!9 -i)

    5&!!)3,@ nice3, and e==icienc,

    2. PROBLEM STATEMENT

    Figure 2.2 LIM a9!u ! a+e !u

    Figure 2. LIM Fan A3ar& a MU

    Figure 2.2 Figure 2.

  • 8/18/2019 Slide Psm 1 Azam Edit

    8/35

    3. OBJECTIVE

    Min Purose

    • T! i&7r!e )e !7erai!n != r!u93e5)!!ing LIM

    • T! 7r!7!5e and de5ign a LIM C!!3ing Fan Te5er =!r r!u93e5)!!ing

    &aer 

    • T)e e5er LIM de5ign c!&73ee -i) Ac:Bc P!-er Su773,@ LEB

    indica!r LIM =an n! running@ Li& =an L0GF@ and RTB =au3 Ter&ina3

    • T! 5ud, 3a, !u -iring =!r LIM c!!3ing =an in LIM

  • 8/18/2019 Slide Psm 1 Azam Edit

    9/35

    4. SCOPE PROJECT

     AC:BC 7!-er 5u773,@

    Te5er Li& C!!3ing =an@

    RTB@ Fan n! =unci!n@

    and L0GF

    S!urce

    S!c+e

    !u3e

    Te5er LIMLinear Induci!n M!!r 

    irin$ s"*e'ti"

  • 8/18/2019 Slide Psm 1 Azam Edit

    10/35

    • Fn See! Contro##e! +, Te'erture n! Ar!uino

    )7$::---.e3ecr!5c)e&aic5.c!&:/*4%:arduin!6=an657eed6c

    !nr!33ed6e&7eraure: 9, P. Marian

    5. LITERATURE REVIEW

    > T)e LM*

    e&7eraure

    5en5!r and red

    3ed are 7!-ered

    -i) *0 =r!& )e

     Arduin! 9!ard> u5ed )e -e336

    +n!-n ?B1/

    ran5i5!r and a

    /0 9aer, !

    7r!ide 7!-er !

    )e =an and

    ran5i5!r > u5ed an LCB

    5)ie3d ! di573a,

    )e curren

    e&7eraure and

    57eed != )e =an

    http://www.electroschematics.com/9540/arduino-fan-speed-controlled-temperature/http://www.electroschematics.com/9540/arduino-fan-speed-controlled-temperature/http://www.electroschematics.com/9540/arduino-fan-speed-controlled-temperature/http://www.electroschematics.com/9540/arduino-fan-speed-controlled-temperature/http://www.electroschematics.com/9540/arduino-fan-speed-controlled-temperature/http://www.electroschematics.com/9540/arduino-fan-speed-controlled-temperature/

  • 8/18/2019 Slide Psm 1 Azam Edit

    11/35

    5. LITERATURE REVIEW

    LIM c!!3ing =an e5er =!r 4 car rain@ ?!&9ardier 9, Sc)neider 

    Linear Induci!n M!!r Pr!7u35i!n 5,5e& A55e&93, $ ?

  • 8/18/2019 Slide Psm 1 Azam Edit

    12/35

    5. LITERATURE REVIEW

    REFERENCES

    Tit#e o- er N'e o- Aut*or Yer T,e

    1 LIM Pr!7u35i!n S,5e& Bee3!7&enS,5e& F!r Tran5i

    J.. Par+er Ur9an Tran57!rai!nBee3!7&en

    C!r7!rai!n Ld.andG. E. Ba-5!nKueen5 Unier5i,

    1// Aric3e

    2 T)e E==ec != Fan6Re3ia9i3i, andC!!3ing6Per=!r&ance !nE3ecr!nic6C)a55i5 Re3ia9i3i,

    J!)n M. !gan 1// J!urna3

    Energ, E==icien C!!3ing Fan =!r PCc)a5i5

    R!dne, . G. Tan@ Y.. G!)@ Y. K. (!ng@and 0. . M!+

    2%%/ c!n=erence

    4 Linear M!!r6P!-ered Tran57!rai!n$i5!r,@ Pre5en Sau5@ and Fuure

  • 8/18/2019 Slide Psm 1 Azam Edit

    13/35

    Liner In!u"tion 'otor s rou#sion

    .ui#t +, .o'+r!ier

    S+,Train in 0anc!uer@ Canada 1/8*" S+,9!r!ug) RT in T!r!n!@ Canada 1/8*"Ber!i Pe!73e M!er in Ber!i 1/8" /e#n 0, Line in /u# Lu'ur (%112)Mi33enniu& Line in 0anc!uer 2%%2" AirTrain JF in Ne- Y!r+ 2%%" Air7!rE'7re55 in ?eiHing 2%%8" ?eiHing Su9-a, Ca7ia3 Air7!r Trac+ in ?eiHing 2%%8"EerLine Ra7id Tran5i S,5e& in Y!ngin@ !rea 2%%/"

    .ui#t +, /ws3i Hev, In!ustries

    Naga)!ri T5uru&i – R,!+i Line in

  • 8/18/2019 Slide Psm 1 Azam Edit

    14/35

    Megger e5er  Li& =an

    6. PROJECT BACKGROUND

    MU and P!-er Su773,

     Indiidua3 =an e5er PT1%% RTB 1%%!)&

  • 8/18/2019 Slide Psm 1 Azam Edit

    15/35

    6. PROJECT BACKGROUND

    Par nu&9er 3i& =an$ 414112*/ Fan@ &!de3 O112*/Re=. Seci!n 2" 9, ?!&9ardier 

    C!nnec!r LIM Fan 7ar nu&9er $

    CIRL6%F614S6*P6 C!nnec!r@ *

    7in

    ua3a Lu&7ur S,5e& -! I33u5raed Par Caa3!gue@ DC)a7er Pr!7u35i!n@

    Marc) 2%% Re c. 77 $ 61612 – 6262

  • 8/18/2019 Slide Psm 1 Azam Edit

    16/35

    6. PROJECT BACKGROUND

    Par nu&9er &!du3e@ 112% M

  • 8/18/2019 Slide Psm 1 Azam Edit

    17/35

    Indiidua3 LIM c!!3ing =an e5er > MU and 7!-er 5u773, )ig) dc curren

     

    6. PROJECT BACKGROUND

    Figure .1 Indiidua3 LIM C!!3ing =an e5er 

  • 8/18/2019 Slide Psm 1 Azam Edit

    18/35

    . MET!ODOLOGY

    S"#$"

    P$%&%'#( )%$ P$%*+," T-"(+

    L-"+$#"$+ R+/-+0

    T+,-,#( E/#(#"-% O

    +""- #"#

    S" &$%(+7 %) #(#$7

    D#"# A#('-'

    E

    R+&%$" W$-"-

    PROJECT FLOW

  • 8/18/2019 Slide Psm 1 Azam Edit

    19/35

    MET!ODOLOGY

    Te"*ni"# ev#ution on $ettin$ !t 4

    • Sud, !n -iring 3a, !u != Li& =an 9a5e !n 5c)e&aic 7re=erred

    • Re=erence I33u5raed Par5 Caa3!gue ! geing daa a9!u LIM

    • U5ing BGMM and C3a&7 Meer =!r &ea5ure&en dc !3age i:7 !:7@

    and re5i5ance =!r RTB

    •  Ana3,#e daa c!33eced

  • 8/18/2019 Slide Psm 1 Azam Edit

    20/35

    F3u+e rue r&5 c3a&7 &eer 

    > U5e ! ge a&7ere daa =r!& -iring

    >  A773ica93e ! ge ac curren and dc curren

    > T! ge daa =!r L0GF

    >  Ana3,#e =r!& geing daa

    . MET!ODOLOGY

    FLUE BGMM rue r&5

    • U5e ! ge dc !3age =!r

    L0GF@ er&ina3 in7u and !u

    7u@ re5i5ance RTB

  • 8/18/2019 Slide Psm 1 Azam Edit

    21/35

    Figure $ .1 (iring 5c)e&aic != LIM

    ua3a Lu&7ur S,5e& -! I33u5raed Par Caa3!gue@ DC)a7er Pr!7u35i!n@Marc) 2%% Re c. 77 $ 61612 – 6262

    . MET!ODOLOGY

  • 8/18/2019 Slide Psm 1 Azam Edit

    22/35

    FYP 1 Project Schedule (Year 2015)

    No Description

    Sept Oct Nov DecWee Wee Wee Wee  

    % & 5 6 % & 5 6 % & 5 6 % & 5 6

    1 P$%&%'#( )%$ &$%*+," "-"(+  

    2 P$%*+," &$%&%'#( #&&$%/#(  

    D-',''-% 0-" '&+$/-'%$   

    4 C%((+," #"#  

    *S+#$, -)%$7#"-% #%" &$%*+,"

     &$%&%'#(   S" &$%*+," &$%&%'#( -)%$7#"-%  

    PSM1 $+&%$" &$+$#"-%  

    8 PSM 1 &$+'+"#"-%  

    / S7-''-% %) PSM 1 $+&%$"  

    1! FYP 1 "antt #hart

    8. TIME LINE

  • 8/18/2019 Slide Psm 1 Azam Edit

    23/35

    WORK SC!EDULE

    2! FYP 2 "antt #hart $ ( Note $ Schedule o% PS& 2 presentation and

    report su'ission is 'ased on assuption onl)

    FYP 2 Project Schedule (Year 201*)

    No Description+an Fe' &arch ,pril

    Wee Wee Wee Wee  

    1 2 - . 1 2 - . 1 2 - . 1 2 - .

    1 D+/+(%& %) "+,-,#( +/#(#"-%  

    2 D+/+(%& %) ++$ #-" #''+''7+"  

    3 P$%(+7 S%(/-  

    4 R+'(" ##(9-  

    5 PSM 2 $+&%$" &$+$#"-%  

    6 PSM 2 &$+'+"#"-%  

    S7-''-% %) PSM 2 $+&%$"  

    8. TIME LINE

  • 8/18/2019 Slide Psm 1 Azam Edit

    24/35

    Figure /.1 (iring 3a, !u LIM =an a LIM

     :. PRELIMARY RESULTS

  • 8/18/2019 Slide Psm 1 Azam Edit

    25/35

    Figure /.2 (iring : 3a, !u 5ing3e =an e5er 

    :. PRELIMARY RESULTS

  • 8/18/2019 Slide Psm 1 Azam Edit

    26/35

    > R" F#("

     :. PRELIMARY RESULTS

  • 8/18/2019 Slide Psm 1 Azam Edit

    27/35

    > L0GF =an

     :. PRELIMARY RESULTS

  • 8/18/2019 Slide Psm 1 Azam Edit

    28/35

     :. PRELIMARY RESULTS

    0aria93e !3age =i' a&7

    0aria93e a&7 =i' !3age

    > Fan aai3a9i3,

  • 8/18/2019 Slide Psm 1 Azam Edit

    29/35

     :. PRELIMARY RESULTS

    Mini&a3 !3age and curren ! =an 5ar u7

  • 8/18/2019 Slide Psm 1 Azam Edit

    30/35

    Increa5e )e 5,5e& e==icienc, != r!u93e5)!!ing 5+i335

    En)ance5 )e a9i3i, ! 73an and 9udge !7erai!n@ and &ainenanceacc!un5

    Can 9e u5e =!r a33 ec)nician in e3ecrica3 5)!7

    I&7r!e&en5 F!r

  • 8/18/2019 Slide Psm 1 Azam Edit

    31/35

    11. CONCLUSION

    Fin!in$s o- t*e investi$tion4

    •  A=er a33 daa and eui7&en =!r e5er !9ain@ i5 &a+e -!r+er !

    r!u93e5)!! &!re =a5 and )ig) e==icienc,

    • In addii!n@ ! add 5!&e 9u##er a5 5!und ! a3er -!r+er i= )ere i5 an,

    7r!93e& -i) LIM C!!3ing Fan

    • T)i5 e5er can 9e &!re )ig) ec) =!r =ur)er ine5igai!n

  • 8/18/2019 Slide Psm 1 Azam Edit

    32/35

    12. REFERENCES

    1 ua3a Lu&7ur S,5e& -! I33u5raed Par Caa3!gue@ DC)a7er

    Pr!7u35i!n@ Marc) 2%% Re c. 77 $ 61612 – 6262

    2 ?!&9ardier@ De3ana Ja,a Line F3ee E'7an5i!n Pr!Hec@I33u5raed Par5 Caa3!gue@ Fina3 C!7,@ Rei5i!n Fe9ruar,2%14"@ C)a7er Pr!7u35i!n@ 77 $ 62 – 61%

    R!3= e33inger and Peer Mnic)@ DLinear M!!r6P!-ered Tran57!rai!n$

    i5!r,@ Pre5en Sau5@ and Fuure

  • 8/18/2019 Slide Psm 1 Azam Edit

    33/35

  • 8/18/2019 Slide Psm 1 Azam Edit

    34/35

    12. REFERENCES

    / A. (a33ace@ J. Par+er@ G.E Ba-5!n@ DS3i7 C!nr!3 Li&Pr!7e33ed Tran5i 0e)ic3e5@ IEEE Tran5aci!n5

  • 8/18/2019 Slide Psm 1 Azam Edit

    35/35

    T!ANK YOU