Project SLOPE

Final Review Meeting 1 Feb

17

WP 1 – Definition of requirements and system analysis

Brussels, February 1st, 2017

Page 2: Slope Final Review Meeting - WP1

Overview

Final Review Meeting 1 Feb 17

• Status: Completed(100%)• Length: 12 Months (From M1 to M12)• Leader: MHG

Page 3: Slope Final Review Meeting - WP1

WP1. Objectives

Final Review Meeting 1 Feb 17

• Identify the users and specifically their needs and requirements• Define processes • Detail the data and metadata model covering the use of SLOPE• Define the hardware, equipment, sensors and mobile devices• Define the user Interface requirements• Define the system architecture to be used• Define the technical requirements

Page 4: Slope Final Review Meeting - WP1

WP1. Tasks

Final Review Meeting 1 Feb 17

•Task 1.1 - Users and System requirements – ITENE• Partners: GRAPHITECH, CNR, COAST, MHG, BOKU, FLY, GRE, TRE

• Task 1.2 Hardware and equipment definition – GRAPHITECH• Partners: CNR, COAST, MHG, BOKU, FLY, GRE, ITENE

• Task 1.3 Human Machine Interface (HMI) definition – GRAPHITECH• Partners: MHG, GRE, TRE, ITENE

• Task 1.4 Mountainous Forest inventory data model definition – CNR• Partners: GRAPHITECH, COAST, MHG, BOKU, FLY, GRE, TRE

• Task 1.5 - System Architecture - MHG• Partners: GRAPHITECH, FLY, TRE, ITENE

Page 5: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T 1.1 Users and System requirements

Length: 3 Months (From M1 to M3)Partners: ITENE, GRAPHITECH, CNR, COAST, MHG, BOKU, FLY, GRE, TREOutput: D.1.01 Users Requirements ReportStatus: Deliverable submitted

Define users and system requirements : • Defines users and user groups and functionalities• Gathers information about user requirements to guide further

development of the SLOPE Forest Information System (FIS)• Total: 23 questionnaires created and documented. Locations: Austria,

Italy (Trento), Finland, Ireland

Page 6: Slope Final Review Meeting - WP1

T1.1 User group specifications

Functions and user groups mapped

Final Review Meeting 1 Feb 17

Page 7: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T 1.2 Hardware and equipment definition

Length: 3 Months (From M1 to M3)Partners: GraphiTech, CNR, COAST, MHG, BOKU, FLY, GRE, ITENEOutput: D.1.04 Technical Requirements ReportStatus: Deliverable submitted

Define the Hardware and Software equipment: • Defines tools to collect forest information before harvesting• Defines tools to collect timber information during the harvesting• Defines tools for resources tracking

Page 8: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T1.2 Hardware specificationsIdentify for each workflow step:

• Instruments• Tools• Hardware• Data types

Page 9: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T 1.3 Human Machine Interface (HMI) definition

Length: 3 Months (From M2 to M4)Partners: GraphiTech, MHG, GRE, TRE, ITENEOutput: D.1.02 Human Machine InterfaceStatus: Deliverable submitted

Define the user interface for the whole SLOPE system: • Defines user interface needs• Defines web user interface requirements• Defines in-vehicle and on-field devices interfaces• Specifies all user interfaces that will be in slope platform

Page 10: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T1.3 UI specifications

Desktop

Mobile In-vehicle

Page 11: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T 1.4 Mountainous Forest inventory data model definition

Length: 4 Months (From M2 to M6)Partners: CNR, GRAPHITECH, COAST, MHG, BOKU, FLY, GRE, TREOutput: D.1.03 Data and metadata model reportStatus: Deliverable submitted

Define data and metadata model for the FIS: • Defines data and metadata model requirements that will be

implemented in T5.1• Describes data format standards to be used• Defines datasets and input sources for database population

Page 12: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T 1.4 Data specificationsTABLE A1: FOREST

Page 13: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

T 1.5 System Architecture

Length: 11 Months (From M2 to M12)Partners: MHG, GraphiTech, FLY, TRE, ITENEOutput: D.1.05 System architecture specificationsStatus: Deliverable submitted

Design the technology specification of the system architecture:• Specify applications and technologies to be used• Specify design principles• Design model and interfaces for application integrations in

different integration levels• Design deployment platform

Page 14: Slope Final Review Meeting - WP1

T1.5 Architecture overview

Final Review Meeting 1 Feb 17

Page 15: Slope Final Review Meeting - WP1

T1.5 Component diagram

Final Review Meeting 1 Feb 17

Page 16: Slope Final Review Meeting - WP1

WP1 Deliverable submissions

01 02 03 04 05 06 07 08 09 10

ITENE:Task 1.1: D1.01Users Requirements Report

Technical meeting in

Mikkeli

GRAPHITECH:Task 1.3: D1.02HumanMachine Interface

MHG:Task 1.5: D1.05System ArchitectureSpecifications

Final Review Meeting 1 Feb 17

CNR:Task 1.4: D1.03Data and Meta Data modelReport

GRAPHITECH :Task 1.2: D1.04TechnicalRequirementsReport

Page 17: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

WP1 Summary• All deliverables can be found from 04_Final_Deliverables folder on Dropbox• All deliverables finalized correctly

• Some problems on start of the project:• One partner (Kesla) left from consortium. Kesla was Task 1.2 leader and

contributor in many WP1 tasks.• Some feedback and communication delays on first 6 months

• Objectives reached:• Specifies user groups and user requirements• Specifies tools and hardware to use• Specifies user interface guidelines• Specifies data model and used standards• Specifies technology and scalable SOA based system architecture for the

SLOPE FIS development

Page 18: Slope Final Review Meeting - WP1

Open Discussion

Final Review Meeting 1 Feb 17

Page 19: Slope Final Review Meeting - WP1

Final Review Meeting 1 Feb 17

Contact info

Veli-Matti Plosila [email protected]

Seppo Huurinainen [email protected]

Thank you for your attention