TEXAS DEPARTMENT OF TRANSPORTATIO Npage 1 of 2
S. M. WRIGHT PROJECT
352
352
310
310
175
175
30
45
45
DALLAS
Fair Park
OaklandCemetery
OpportunityPark
UPRR
BNSF
UPRR
DART
DART
DART
DART
RochesterPark
DallasHeritageVillage
ForestPark
SFitzh
ugh
Ave
.
SMalcolm
X
Blvd.
SGoodLa
timer
SMalcolm
XBlvd.
SouthBlv
d.
Martin
Luth
erKing
Blvd.
ForestAv
e.
Grand
Ave
.
Grand
Ave
.
Hatche
rSt.
PineSt.
Metropo
litanAv
e.
Penn
sylva
niaAve
.
SLam
arSt.
SLa
marSt.
SErva
ySt.
SErvaySt.
.tSraxeB
.tSraxeB
Martin
Luthe
rKin
gBlv
d.
SCeasa
rC
havezBlvd
.
RobertB
Cullum
Blvd.
S.M.W
rightFreeway
TrinityRiver
TrinityRive
r
C.F. Hawn
Frwy.
SLam
arSt.
CedarC
rest
Blv
d.
1 mile
N
2miles
from
Down
town
1m
ilefrom
Downt
own
PROJECTAREA
30
Budd St.
TxDOTgraphic
175
45
NOTE: Datesma y chang e, subject to agenc y review times.
Nov. 2012 Hold Public Hea ring
Oct. Nov.Sept.Aug.July 2012 201720162015 2012014Jan. 2013Dec.
S. M. WRIGHT PRELIMINARY ENGINEERING TIMELINE
Oct. 2012 Draft EA app roval
(SFP) b y TxDOTand FHWA
Jan. 2013 Final Schem atic App roved /
Environmental Clearanc e
1st Quarter 2017Open to Traffic
S. M. Wright Phase I
1st Quarter 2014Construction StartS. M. Wrigh t Phase I
1st Quarter 2017Construction StartS. M. Wright Phase II
Aug. 2012 Hold TxDOT
Public Meeting # 4
July 2012 Hold Com munityWork Group Meeting
July 2012 Comp lete Dra ftEnviro. Assess. fo r FHWA Review
S.M. WRIGHT PROJECT - CONCEPT DOCUMENT
The Texas Depa rtment of Transportat ion (TxDOT) isunde rtaking de sign p lansa nd e nvironmental studies for improveme ntsto US175 / S. M. Wright Freew ay. T
shown at left and includes improvem entst o IH 45 from S. M. Wright Freewa y (US175) to south o f Lamar Street (1.7 miles); S. M. Wright Freew ay from IH 45 to SH
Street (2.5 miles); and providing d irect co nnec ting (DC) ramp sbe twee n C. F. Hawn Freewa y (US175) and IH 45 (1.5 miles). The S. M. Wright Project would inc
and imp rove safety by eliminating the ac cide nt prone C. F. Hawn Freew ay to S. M. Wright Freew ay curve.
S. M. WRIGHT PROJECT STATUS
Total Projec t Cost: $151.6M
Funding: Local and Regional officialshave prioritized
programming and funding of the C. F. Hawn-to-IH 45
ramps in order to acce lerate the S. M. Wright
construction, w ith $151M ant icipat ed from RTR,
STP-MM, Cat. 2 & ot her funding sources.
Environmental Assessment: 90%complete.
Environmental Clearance : January, 2013
PS&E: 20%complete (S. M. Wright Phase I only)
S.M. Wright Phase I Letting: January, 2014
SM Wright Phase II Letting: Spring, 2017
RECOMMENDATIONS:
S. M. WRIGHT PHASEI
(Formerly Trinity Parkway Phase 1)
Construct new direct-connecting rampsfrom C. F.Hawn Freeway to IH 45, and widen IH 45 to the inside
from Lama r St. to the S. M. Wright Freewa y ramp s.
The direct-connecting ramps provide allowance for
a pot ential future conne ction from Trinity Parkway
under study by t he NTTA.
S. M. WRIGHT PHASEII
(Existing S. M. Wright Reconstruc tion)
Reco nstruct S.M. Wright from IH 45 to Budd St. as a
low speed, land scaped six (6) lane arterial.
S. M. Wright Phase IIS. M. Wright Reconstruction
S. M. Wright Phase IProposed US175
Connection to IH 45
S. M. Wright Phase IProposed IH 45 Improvem ents
OVERALL SCHEDULE
S. M. WRIGHTPHASEI ( Formerly Trinity Parkwa y Phase 1), (IH45 and U.S. 175 Conne cto rs) AND
S. M. WRIGHTPHASEII (Existing S. M. Wright Recon struction )
Q4Q3Q2Q1 Q4Q3Q2Q1 Q4Q3Q2Q1 Q4Q3Q2Q1 Q4Q3Q2Q1 Q4Q3Q2Q1 Q3Q2Q1
LET
LET
2017 201820162015201420132012
PH
PH
S. M. WrightPhase II
S. M. WrightPhase II
S. M. WrightPhase I
S. M. WrightPhase I
S. M. WrightPhase I
Construction
Right-of-WayAcquisition and
Utility Relocation
Construction Plans
ImplementationPhases
EnvironmentalClearancePermitting
S. M. WrightPhase II
S. M. WrightPhase I*
S. M. WrightPhase II**
NO TES:
*HazMat remediation with ROW acquisition.
**Utility relocationso nly.
LET- Project Letting, i.e. c onstruction initiatedPH- Public HearingHazMat Permit Clearance
For more information go to: www.smwrightproject.org
MOREINFORMATION
TxDOT-Dallas District A PD
4777 E. Hwy 80
Mesquite , Texas 75150-6643
www.smwrightproject.org
214-320-6100
-
7/31/2019 SM Wright Tabloid Document 2012-08-01 Compressed
2/2
TEXAS DEPA RTMENT OF TRAN SPORTATIO N
S. M. WRIGHT PROJECT
page 2 of 2
THE PROJEC T
The TexasDepa rtment of Transportation (TxDOT) isund ertaking d esign
plansa nd environmental studiesfor improvement sto US175 / S. M.
Wright Freeway. The study area isshown on page 1 and includes
improvement sto IH 45 from S. M. Wright Freeway (US175) to south of
Lamar Street (1.7 miles); and p roviding direct c onnect ing (DC) ramps
betwe en C. F. Hawn Freeway (US175) and IH 45 (1.5 miles), termed
the S. M. Wright Pha se 1, forme rly known as Trinity Parkway Phase 1,
and S. M. Wright Freeway rec onstruction from IH 45 to SH 310 near
Budd Street (2.5 miles) also known as S.M Wright Phase II.
THE BENEFITS
The planned ramps conne cting C. F. Hawn to IH 45 would divert
com muter traffic of f S. M. Wright and reduc e its107,000 daily vehicles
to about 40,000: a reduc tion that allowsTxDOTto c onvert the
elevated , 10-lane high-speed S. M. Wright Freewa y to a 6-lane
low-speed, signalized, at-grade a rterial without bridges. No purcha se
of right-of-way (ROW) would be required along S. M. Wright. In fac t,
TxDOTs proposed d esign could creat e surplusROW that in turn could
buffer the road from adjacent neighborhoods, allow installation of a
pedestrian trail, gateway monumentsand landscape features, and
increase the size of Kimble Park. Foremost, thisfreew ay-to-arterial
transformation could be a transportation catalyst for community
rejuvenation. Note that in order to c onnect C . F. Hawn Freeway to
IH 45, ROW would be req uired to construct the direct -connec ting
ramps. ROW may be req uired along IH 45 aswell.
The prop osed S. M. Wright Project would allow room fo r the future
Trinity Parkway improvement s. TxDOTc ontinuest o work alongside the
NTTA, City of Dallas, the U.S. Army Corp so f Engineers, NCTCOG and
FHWA on ma ny improvement sin the a rea. For Trinity Parkway
information, visit www.ntta.org. For other related Trinity corridor
projects, visit the City of Da llas w eb site www.trinityrivercorridor.org.
For S. M. Wright related information, visit TxDOTsproject web site a t
www.smwrightproject.org .
THE PROC ESS
The alternatives analysis, schematic d esign and environmenta l study
for the S. M. Wright transformation a re ongoing. The studysp ublic
involvement proce sshasinc luded public officials briefings, four
com munity stakeholder meetings, and three Public Meetings
cond ucted in Octob er 2008, April 2009 and Ma rch 2010. A fourth
public me eting isplanne d for August 7, 2012 with a final public hea ring
planned for November 2012.
THE SOLUTIO N
The public involvement and design exploration processha sp ioneereda low-speed, landsca ped a rterial design for SM Wright with direct
connec ting ramps from C. F. Hawn to IH 45 asshown below. The
proposed Build de sign option, versusa No-Build / do nothing
option, will be presented for public comment at a Public Hearing
planned f or November 2012. The Build option will eliminate the
acc ident-prone C. F. Hawn Freeway to S. M. Wright Freewa y curve.
FREQUENTLY A SKED QUESTION S
How will acc esscha nge ac rossS. M. Wright?
Existing c rossingsa t Hatc her, Pine, Metropolitan, Pennsylvania, and
MLK Blvd. will be retained. New crossings at Lowery/Haven,
Marburg, Hickman/ Driskell, and Warren will be adde d as shown in
the map below.
How will the noise levelschang e along S. M. Wright?
A detailed noise analysisiscurrently being performed aspart of the
environmental assessment for the p roject. Resultswill be presented
to the public at the public hearing planned for November 2012.
With the reduction in traffic on S. M. Wright, it isanticipa ted tha t
noise levelswill also be reduced .
How will truck traffic be affected?
Although trucks will continue to be allowed to use S. M. Wright, it is
anticipated that some truckswill use other freewayssuch asIH 45
and C . F. Hawn Freewa y to avo id the prop osed signals on S. M.
Wright.
Who will maintain SM Wright and its proposed landsca pe and a esthetic
features?
Currently TxDOToperat esa nd ma intainsS. M. Wright Freewa y asit is
part of the state system of roadwa ys. TxDOTand the City of Dallas
are c urrently under discussionson the possibility for S. M. Wright from
C. F. Hawn to IH 45 be taken o ff the TxDOTsystem a nd be com e aCity of Dallasstreet maintained by the city after it isreconstructed.
How does the propo sed Trinity Parkway affec t the S. M. Wright Project?
The S. M. Wright Project ha sindep endent ut ility and d oes not rely on
any p art of the Trinity Parkway. The portion o f the S. M. Wright Project
that c onstructsthe new direct connecting rampsfrom the C. F. Hawn
Fwy. bend to IH 45 doesa llow an area fo r the proposed Trinity
Parkway to c onnect near IH 45. The Trinity Parkway environmenta l
impac t statement iscurrently under study by the NTTA. More informa-
tion on that separate project can be found at www.ntta.org.
When will the S. M. Wright Project be com pleted ?
Pending final environmental studiesand c onstructi
prepa ration, it isanticipa ted tha t S. M. Wright Phase
early 2014 and be c omplete d b y early 2017. S. M. W
construction could then commenc e and could be
by 2019.
How will the S.M. Wright Project help to educ ate the c
Throughout the S.M. Wright c orridor, the design ap p
on sustainability and low-impa ct d esign principles t
Green/ Comp lete Streets design idea s. Thisproc ess
mented through a seriesof landscape gardensthamaterial and soil to collect and cleanse stormwate
asc reate a safe, attractive and walkable neighbo
ment for pedestriansand c yclists. The hardscape a
design will also focuso n creating a design style tha
the history and c ulture of the comm unity. Informa t
located throughout the corridor asa m eansto ed u
com munity on sustainability and the unique history
the area.
For more information go to: www.smwrightproject.org