SMART METERING PILOT TESTING G3 PLC TECHNOLOGY
2
Introduction
05/11/2015
Cities served 198
Electricity supply points
1.445.660
Gas supply points
523.065
Gas Network
9.003 km
Electricity Network
50.757 km
ORES is the main network operator in Wallonia for electricity, gas and public lighting and is owned at 75% by the municipalities.
In a nutshell
3
Smart Metering
Pilots launched
05/11/2015
Technology pilots
G1 PLC
GPRS
G3 PLC
Radio 169 MHz (Gas)
Public lighting
Different types of pilots and collaborations have been launched so far…
Faculty Chair
Water company
French DSO
Technology Alliance
Collaboration
4
G3 PLC Pilot
Objectives & limitations
05/11/2015
Pilot on a limited volume of substation
Limited integration with IT (housing of the AMI within ORES infrastructure only)
Low volumes of deployed meters
Limitations
Testing bidirectional communication performance in G3 PLC
Testing impacts on performance of a progressive deployment
Identifying impacts of setting up a AMI headend in ORES IT infrastructure
Testing the use G3 PLC for public lighting
Objectives of the pilot
5
G3 PLC Pilot
Design solution
05/11/2015
ORES electrical network
Multi-source solution
Interoperability
Electricity meter
Concentrator AMI
Home Area Network (HAN)
Local Area Network(LAN)
Wide Area Network(WAN)
Remote reading
G3 PLC GPRS
Increased immunity to noise perturbance
Technology pilots
G1 PLC
GPRS
G3 PLC
Radio 169 MHz (Gas)
Public lighting
6
G3 PLC Pilot
Technical performance – High level results
05/11/2015
100%
100%
99%
% installed meters registered in the system
% meters collecting 6 index per day (with recovery)
% meters collecting 6 load curve per day (with recovery)
Source – Results from 19/06/2015
71%
81%
87%
Polling test every 30 minutes (simulation prepayment
meters)
Average from 7am to 10pm
Average from 10pm to 3am
Average from 3am to 7am
Met
er
read
ing
Bro
adca
stin
g te
st
We obtained a good performance from both meter reading and broadcasting test.
7
G3 PLC Pilot
Deployment strategy
05/11/2015
Area A Area B Area C Area D Medium-
Low Voltage substation
We have tested a partial deployment of G3 PLC on a transformer to assess the impact on communication performance.
8
G3 PLC Pilot
Required density of meters on a cabin
05/11/2015 Source – Results from 19/06/2015
Density < 60% Density = 60% Density > 60%
Below 60% of smart meters installed on a cabin, the risk of non communication is rather high and stability of the solution can not be guaranteed.
With a minimum of 60% installed on a cabin, the risk of non communication is minimized but non zero.
With 100% of meters installed on a cabin, the risk of non communication is close to zero.
A high performance has been obtained with a density down to 60% of smart meters installed on a substation.
9
G3 PLC Pilot
AMI – delays of detection
05/11/2015 Source – Results from 19/06/2015
The more meters installed, the faster they are detected by the AMI.
0
1
2
3
4
5
6
7
8
9
15/0
1/20
15
20/0
1/20
15
22/0
1/20
15
27/0
1/20
15
29/0
1/20
15
5/0
2/2
01
5
10/0
2/20
15
18/0
2/20
15
27/0
2/20
15
5/0
3/2
01
5
18/0
3/20
15
5/0
5/2
01
5
7/0
5/2
01
5
11/0
5/20
15
13/0
5/20
15
20/0
5/20
15
26/0
5/20
15
28/0
5/20
15
1/0
6/2
01
5
3/0
6/2
01
5
5/0
6/2
01
5
9/0
6/2
01
5
11/0
6/20
15
16/0
6/20
15
18/0
6/20
15
23/0
6/20
15
1/0
7/2
01
5
Detected in a few minutes
Detected in < 24h
Undetected in 24h
Detection time
# o
f in
sta
lled
met
ers
Installation dates
10
G3 PLC Pilot
Technical performance – Influencing sources
05/11/2015 Source – Results from 19/06/2015
60%
70%
80%
90%
100%
6/05
/201
5 12
:00
6/05
/201
5 13
:00
6/05
/201
5 14
:00
6/05
/201
5 15
:00
6/05
/201
5 16
:00
6/05
/201
5 17
:00
6/05
/201
5 18
:00
6/05
/201
5 19
:00
6/05
/201
5 20
:00
6/05
/201
5 21
:00
6/05
/201
5 22
:00
6/05
/201
5 23
:00
7/0
5/2
01
5
7/05
/201
5 1:
00
7/05
/201
5 2:
00
7/05
/201
5 3:
00
7/05
/201
5 4:
00
7/05
/201
5 5:
00
7/05
/201
5 6:
00
7/05
/201
5 7:
00
7/05
/201
5 8:
00
7/05
/201
5 9:
00
7/05
/201
5 10
:00
7/05
/201
5 11
:00
7/05
/201
5 12
:00
Success rate of instructions sending on a 24 hours timeframe
Succ
ess
rate
Date/Time of sending
Afternoon / Evening Morning Night
We identified a negative impact of the domestic equipments and of the photovoltaic panels on the telecommunication performance.
Continued tests to improving the performance during the day. Example: - Test G3 PLC Load NG - Test in FCC Band
Analyses
Actions
11
G3 PLC Pilot
Network flexibility
05/11/2015
G3 PLC allows quick detection of the meters even after network reconfiguration.
1 Low voltage circuit
1 Datacontrator
33 Smart Meters
INITIAL network configuration 3 Low voltage circuits
3 Datacontrators
33 Smart Meters
NEW network configuration
12
G3 PLC Pilot
G3 PLC for Public Lighting
05/11/2015
G3 PLC has been successfully tested for Public Lighting. The solution tested looked at replacing the ripple control receiver by a G3 PLC smart meter.
IT ORES
PLC Concentrator
Smart Meter
GPRS Proximus
G3 PLC
Middle voltage network
Middle-Low voltage cabin
Low-voltage network
Public Lighting network
Topology set up for the testing
IT ORES
PLC Concentrator
Smart Meter
GPRS Proximus
G3 PLC
Middle voltage network
Middle-Low voltage cabin
Contactor
Low-voltage network
Public Lighting network
Topology set up for the testing
13
G3 PLC Pilot
Next steps
05/11/2015
Extend G3PLC tests for smart public lighting (remote control relays, dimming,…)
Adapt the G3PLC solution for Belgian technical specificities (3 wires network) Investigate the use
of G3PLC on FCC band
Analyze furthermore the perturbance generated by PV inverter
Test the solution on a larger scale pilot and with the integration with ORES IT systems to prepare for rollout
14
G3 PLC Pilot
Conclusions
05/11/2015
Our pilot demonstrated that the performance G3 PLC in the field is fulfilling the needs of ORES
G3PLC solution also proved to be robust in terms of noise perturbance as well as allowing for a progressive deployment.
G3PLC can be used for multiple DSO applications : Smart metering, Smart public lighting,…
G3PLC is interoperable and supported by large industry players ensuring long term vendor support
15
Jean-Christophe Bouchez Project Manager Pilots & Deployment
Smart Metering & Users
05/11/2015
Questions
Contacts
Henri Grandjean Project Manager Engineering
Smart Metering & Users
Olgan Durieux Program Manager
Smart Metering & Users