1 05/11/2015 SMART METERING PILOT TESTING G3 PLC TECHNOLOGY

Upload: hoanglien

Post on 27-Mar-2018

225 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

1 05/11/2015

SMART METERING PILOT TESTING G3 PLC TECHNOLOGY

Page 2: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

2

Introduction

05/11/2015

Cities served 198

Electricity supply points

1.445.660

Gas supply points

523.065

Gas Network

9.003 km

Electricity Network

50.757 km

ORES is the main network operator in Wallonia for electricity, gas and public lighting and is owned at 75% by the municipalities.

In a nutshell

Page 3: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

3

Smart Metering

Pilots launched

05/11/2015

Technology pilots

G1 PLC

GPRS

G3 PLC

Radio 169 MHz (Gas)

Public lighting

Different types of pilots and collaborations have been launched so far…

Faculty Chair

Water company

French DSO

Technology Alliance

Collaboration

Page 4: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

4

G3 PLC Pilot

Objectives & limitations

05/11/2015

Pilot on a limited volume of substation

Limited integration with IT (housing of the AMI within ORES infrastructure only)

Low volumes of deployed meters

Limitations

Testing bidirectional communication performance in G3 PLC

Testing impacts on performance of a progressive deployment

Identifying impacts of setting up a AMI headend in ORES IT infrastructure

Testing the use G3 PLC for public lighting

Objectives of the pilot

Page 5: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

5

G3 PLC Pilot

Design solution

05/11/2015

ORES electrical network

Multi-source solution

Interoperability

Electricity meter

Concentrator AMI

Home Area Network (HAN)

Local Area Network(LAN)

Wide Area Network(WAN)

Remote reading

G3 PLC GPRS

Increased immunity to noise perturbance

Technology pilots

G1 PLC

GPRS

G3 PLC

Radio 169 MHz (Gas)

Public lighting

Page 6: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

6

G3 PLC Pilot

Technical performance – High level results

05/11/2015

100%

100%

99%

% installed meters registered in the system

% meters collecting 6 index per day (with recovery)

% meters collecting 6 load curve per day (with recovery)

Source – Results from 19/06/2015

71%

81%

87%

Polling test every 30 minutes (simulation prepayment

meters)

Average from 7am to 10pm

Average from 10pm to 3am

Average from 3am to 7am

Met

er

read

ing

Bro

adca

stin

g te

st

We obtained a good performance from both meter reading and broadcasting test.

Page 7: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

7

G3 PLC Pilot

Deployment strategy

05/11/2015

Area A Area B Area C Area D Medium-

Low Voltage substation

We have tested a partial deployment of G3 PLC on a transformer to assess the impact on communication performance.

Page 8: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

8

G3 PLC Pilot

Required density of meters on a cabin

05/11/2015 Source – Results from 19/06/2015

Density < 60% Density = 60% Density > 60%

Below 60% of smart meters installed on a cabin, the risk of non communication is rather high and stability of the solution can not be guaranteed.

With a minimum of 60% installed on a cabin, the risk of non communication is minimized but non zero.

With 100% of meters installed on a cabin, the risk of non communication is close to zero.

A high performance has been obtained with a density down to 60% of smart meters installed on a substation.

Page 9: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

9

G3 PLC Pilot

AMI – delays of detection

05/11/2015 Source – Results from 19/06/2015

The more meters installed, the faster they are detected by the AMI.

0

1

2

3

4

5

6

7

8

9

15/0

1/20

15

20/0

1/20

15

22/0

1/20

15

27/0

1/20

15

29/0

1/20

15

5/0

2/2

01

5

10/0

2/20

15

18/0

2/20

15

27/0

2/20

15

5/0

3/2

01

5

18/0

3/20

15

5/0

5/2

01

5

7/0

5/2

01

5

11/0

5/20

15

13/0

5/20

15

20/0

5/20

15

26/0

5/20

15

28/0

5/20

15

1/0

6/2

01

5

3/0

6/2

01

5

5/0

6/2

01

5

9/0

6/2

01

5

11/0

6/20

15

16/0

6/20

15

18/0

6/20

15

23/0

6/20

15

1/0

7/2

01

5

Detected in a few minutes

Detected in < 24h

Undetected in 24h

Detection time

# o

f in

sta

lled

met

ers

Installation dates

Page 10: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

10

G3 PLC Pilot

Technical performance – Influencing sources

05/11/2015 Source – Results from 19/06/2015

60%

70%

80%

90%

100%

6/05

/201

5 12

:00

6/05

/201

5 13

:00

6/05

/201

5 14

:00

6/05

/201

5 15

:00

6/05

/201

5 16

:00

6/05

/201

5 17

:00

6/05

/201

5 18

:00

6/05

/201

5 19

:00

6/05

/201

5 20

:00

6/05

/201

5 21

:00

6/05

/201

5 22

:00

6/05

/201

5 23

:00

7/0

5/2

01

5

7/05

/201

5 1:

00

7/05

/201

5 2:

00

7/05

/201

5 3:

00

7/05

/201

5 4:

00

7/05

/201

5 5:

00

7/05

/201

5 6:

00

7/05

/201

5 7:

00

7/05

/201

5 8:

00

7/05

/201

5 9:

00

7/05

/201

5 10

:00

7/05

/201

5 11

:00

7/05

/201

5 12

:00

Success rate of instructions sending on a 24 hours timeframe

Succ

ess

rate

Date/Time of sending

Afternoon / Evening Morning Night

We identified a negative impact of the domestic equipments and of the photovoltaic panels on the telecommunication performance.

Continued tests to improving the performance during the day. Example: - Test G3 PLC Load NG - Test in FCC Band

Analyses

Actions

Page 11: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

11

G3 PLC Pilot

Network flexibility

05/11/2015

G3 PLC allows quick detection of the meters even after network reconfiguration.

1 Low voltage circuit

1 Datacontrator

33 Smart Meters

INITIAL network configuration 3 Low voltage circuits

3 Datacontrators

33 Smart Meters

NEW network configuration

Page 12: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

12

G3 PLC Pilot

G3 PLC for Public Lighting

05/11/2015

G3 PLC has been successfully tested for Public Lighting. The solution tested looked at replacing the ripple control receiver by a G3 PLC smart meter.

IT ORES

PLC Concentrator

Smart Meter

GPRS Proximus

G3 PLC

Middle voltage network

Middle-Low voltage cabin

Low-voltage network

Public Lighting network

Topology set up for the testing

IT ORES

PLC Concentrator

Smart Meter

GPRS Proximus

G3 PLC

Middle voltage network

Middle-Low voltage cabin

Contactor

Low-voltage network

Public Lighting network

Topology set up for the testing

Page 13: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

13

G3 PLC Pilot

Next steps

05/11/2015

Extend G3PLC tests for smart public lighting (remote control relays, dimming,…)

Adapt the G3PLC solution for Belgian technical specificities (3 wires network) Investigate the use

of G3PLC on FCC band

Analyze furthermore the perturbance generated by PV inverter

Test the solution on a larger scale pilot and with the integration with ORES IT systems to prepare for rollout

Page 14: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

14

G3 PLC Pilot

Conclusions

05/11/2015

Our pilot demonstrated that the performance G3 PLC in the field is fulfilling the needs of ORES

G3PLC solution also proved to be robust in terms of noise perturbance as well as allowing for a progressive deployment.

G3PLC can be used for multiple DSO applications : Smart metering, Smart public lighting,…

G3PLC is interoperable and supported by large industry players ensuring long term vendor support

Page 15: SMART METERING PILOT TESTING G3 PLC · PDF fileG1 PLC GPRS G3 PLC Radio 169 MHz (Gas) Public lighting Different types of pilots and collaborations have been launched so far ... Slide

15

Jean-Christophe Bouchez Project Manager Pilots & Deployment

Smart Metering & Users

[email protected]

05/11/2015

Questions

Contacts

Henri Grandjean Project Manager Engineering

Smart Metering & Users

[email protected]

Olgan Durieux Program Manager

Smart Metering & Users

[email protected]