Page 1: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

04.09.13 FOOTER: EDIT OR DELETE THIS AND THE DATE IN THE “MASTER” > “SLIDE MASTER” UNDER THE “INSERT” MENU.

04.09.13: EDIT OR DELETE THIS IN THE “MASTER” > “SLIDE MASTER” UNDER THE “INSERT” MENU.

Page 2: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

© 2015. Intergraph Corporation. All Rights Reserved.

SmartPlant Instrumentation Roadmap

Process, Power & Marine Division

Zur Bar, VP – Global Business Development, Schematics May 31st , 2015

Page 3: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Agenda

SPI roadmap on glance Releases schedule (tentative) on glance SPI v2016

– Integration – Query Builder / EDE – Project / As Build (PAB) – UDF / UDT Editor

SPI v2016 R1 SPI v2018

Page 4: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

© 2015. Intergraph Corporation. All Rights Reserved.

NOTE: This document is designed to communicate a perspective of likely R&D prioritization based on the current indicators of client demand. It will change both in scope and timing in response to industry demand, which is quite dynamic. Intergraph retains all decision rights as to what will be included in a particular release, and does not make binding commitments outside of a written commercial contract.

INTERGRAPH CONFIDENTIAL

• Production Client Support Working on v2016R1 and v2018 releases • Export / Import external projects

– project management • Adaptation of new technology to

replace InforMaker • Adopt ESL.net • MTR phase 1 support • Extending Web services

support for SPEP (Easy access) and vendor interfaces

• Control Logic Diagram support • Engineering Dash Board

• Production Client Support

Release v2016 • Query Wizard (reduce

InfoMaker dependency) - UX • EDE (browser replacement) -

UX • Improve To-Do-List • Project As Built enhancements -

UX • ICC2 • SPI – S3D cables integration • Infrastructure for Web services • Complying to SPE 2015

Platform • WiX setup

• Production Client Support

• Continue extending ATP’s

• Complying to SPE 2013

Platform

Working on v2016 release • Query Wizard (reduce

InfoMaker dependency) - UX • EDE (browser replacement) -

UX • Improve To-Do-List • Project As Built enhancements -

UX • ICC2 • SPI – S3D cables integration • Infrastructure for Web services • WiX setup

Completed 2015 2016/2017

SP Instrumentation

Page 5: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, Integration

Enhanced To-Do List (E-TDL), business drives and benefits Improve the readability of retrieved information Enhanced Functionality and user experience

Page 6: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – Document List

Page 7: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – Document List

Document List

Page 8: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – Document List

Document List

Double Click

Yellow - Create

Green - Update

Color Coded

Page 9: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – Document List

Document List

Double Click

Yellow - Create

Green - Update

Page 10: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – P&ID Navigation

P&IDs

Page 11: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – TDL Layout

Task properties

Drag & Drop for adding a column

EDE Actions

Page 12: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – TDL Views

Flat view

3 Different views

Page 13: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – TDL Views

Flat view

Tree view

3 Different views

Page 14: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Enhanced To-Do List Design – TDL Views

Flat view

Task view

Tree view

3 Different views

Page 15: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

The Views have the EDE functionality

Like Grouping

Sorting

Searching

Page 16: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Need to determine which document types to publish

Choosing for each of the chosen document types which documents to publish

Very limited scroll area for selecting the document for publish

Publish Documents User Experience improvements

Page 17: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Free search + highlight

Any customized query can be used

Incl. all UDFs (document, revision)

All document types

Publish Documents User Experience improvements

Page 18: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Publish Document

type

Publish Cable to S3D via SPF

OOTB

Publish Documents User Experience improvements

Page 19: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, SPI – S3D Cable integration

SPI – S3D Cable integration, business drives and benefits

Allows to auto route Instrumentation and Control (I&C) cables in S3D

Improve the design accuracy by retrieve the routed length of the cable

from the S3D model

Harmonization - similar to SPEL – S3D integration but for I&C cables

Page 20: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, Inter Company Collaboration (ICC) – Phase II

ICC 2, business drives and benefits

Extension to current supported ICC1 – supporting Publish / Retrieve

capabilities of As Build information by:-

– Enable Projects to be integrated with SPF

– Publish and Compare is supported (not able to retrieve data) on project

level

Page 21: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, Query Builder & Engineering Data Editor (EDE)

Query Builder, business drives and benefits

Allows users to create instantly flexible queries within SPI Knowledge of SPI is required but not data model

Simple to use and provides engineering and design context

Replace the need for 3rd party tools as Infomaker etc…

Page 22: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Query Builder - main screen

Relationship definition

Item Properties

Browser Columns

Type Selection

Sort

Page 23: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Query Builder – Data Preview

Floating Preview

SPI main window

Page 24: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Query Builder – SQL Editor

25

Create a New SQL or

Import a PSR/SQL

SQL Editor Open

Page 25: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Query Builder – SQL Editor

26

View Only EDE Has Reporting/ Filtering /Sorting capabilities

Covert to an editable EDE using the QB. User will need to relate each item type couple

Actions for SQL

Page 26: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor, business drives and benefits – Improve usability

– Ease of use

– Intuitive, no need for training (like MS Excel)

– Enhanced functionality (over current browser module)

SPI v2016, Query Builder & Engineering Data Editor (EDE)

Page 27: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Main Windows

EDE Actions EDE Explorer Double Click to

open

Page 28: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Main Windows

EDE Actions

Click to open report

Click to add column

Layout History

Cross Column Filter

Search

Page 29: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Layout Control

Column Filter

Float window

Page 30: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Layout Control

Column Filter

Page 31: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Layout Control

Grouped EDE

Page 32: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Definition Manager

Page 33: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Compare

User has the ability to compare between any two EDE revisions (Does not have to be the SAME EDE) – Current to previous

Page 34: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Compare

User has the ability to compare between any two EDE revisions (Does not have to be the SAME EDE) – Current to previous

Mark Changes Report

Page 35: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor – Compare

User has the ability to compare between any two EDE revisions (Does not have to be the SAME EDE) – Current to previous

Mark Changes Report

Delta Report between 2 different EDEs

Page 36: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor - Default view

Setting “My I.I” EDE to be a specific user’s default EDE.

Page 37: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor - Default view

Each time the user will click on the EDE module button, this EDE and its view actions will be opened .

Page 38: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor - Default view

Each time the user will click on the EDE module button, this EDE and its view actions will be opened .

Note: If no default is selected, only the EDE explorer will be opened

Page 39: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor - Expression

The Expression command in the EDE Action pane.

Page 40: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor - Expression

The Expression command in the EDE Action pane.

Create your Expression column

Page 41: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor - Expression

Create your Expression column

Page 42: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor - Expression

Expression Results

Page 43: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Engineering Data Editor, business drives and benefits – Improve usability

– Ease of use

– Intuitive, no need for training (like MS Excel)

– Enhanced functionality (over current browser module)

Caveat:- Not all custom browsers (from older versions) are upgradable to Edit , may

required manual adaptation after upgrade

SPI v2016, Query Builder & Engineering Data Editor (EDE)

Page 44: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, Projects / As Build

Project / As Build, Business drives and benefits Improve visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports like ESL

etc… Improve the robustness of supported workflows Harmonize the process with the below operations

– Claim – Merge

Remove the constraint of multi users operations when data is claimed or merged

Predictability

Recommending to view the following Webinar http://forms.intergraph.com/20150415-PPM-Efficiently-Managing-Project-SmartPlant-Instrumentation

Page 45: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, Projects To-Do List

Graphic view Scope – Tree view Scope – Table view Domain Explorer

Page 46: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, Projects / As Build

Project / As Build, Business drives and benefits Improve visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports like ESL etc… Improve the robustness of supported workflows Harmonize the process with the below operations

– Claim – Merge

Remove the constraint of multi users operations when data is claimed or merged Predictability Caveat:- External project (Export/Import) functionality is not supported in v2016 With upgrade from older version, not all delete instructions (of none root items) can

be captured and may required manual work after project is merged

Recommending to view the following Webinar http://forms.intergraph.com/20150415-PPM-Efficiently-Managing-Project-SmartPlant-Instrumentation

Page 47: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, UDF/UDT Editor

UDF / UDT Editor, Business drives and benefits Harmonize the definitions of UDF (beside Spec’s) / UDT captions across the

domain Allow to build custom select lists Expose the use of select list for UDF fields for EDE use

Page 48: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

UDF/UDT Editor

Admin

UDT

SPI

Admin

Page 49: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

UDF/UDT Editor

Admin

UDT

SPI

Page 50: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

UDF/UDT Editor

Admin

UDF

Admin

Page 51: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

UDF/UDT Editor

Admin

UDF Query Builder Admin

Page 52: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

UDF/UDT Editor

Admin

UDF Query Builder

Page 53: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

UDF/UDT Editor

Admin

UDF

EDE

Page 54: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, UDF/UDT Editor

UDF / UDT Editor, Business drives and benefits Harmonize the definitions of UDF* / UDT captions across the domain Allow to build custom select lists Expose the use of select list for UDF fields for EDE use

Caveat:- Spec’s UDF remain supported by “Spec DD” When multi plants are in used (same domain), special attention is required

after upgrade

Page 55: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016, Overhaul of SPI – Fisher CV interface

Based on new Spec form Revised links (for import module) Includes DDP data Caveat:- Old Spec form (#70) and links will not be

supported for the interface (only)

Page 56: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2016 R1

Tentatively scheduled for Q4, 2016 – Master Tag Registry (MTR) - phase I support – ESL fully converted to .net – Offsite projects handling (overhaul) – Expose Web Services to support:-

Vendor integration SP Enterprise Portal (SPEP - replacement for SPEx)

Page 57: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI – Vendor Interface

Vendor Interface, Business drives and benefits

• Seamless interface between Projects (EPC) and Suppliers (vendors)

• Use of SPI To-Do-List as staging to compare and verify the supplier design

and device selection – Highly important

• Will support also the device Dimension Data (DDP) to ease the 3D modelling

• Cloud or On premise solution

Page 58: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

SPI v2018

Tentatively scheduled for H2 - 2017 / H1 - 2018 Introduce replacement technology to Infomaker forms for:-

– Flexible Process Data module functionality Control Logic Diagram Engineering dashboard ICC3 – allow full publish / retrieve of projects in Integrated environment

Page 59: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Discontinue INtools v6

INtools version v6 and versions before that will be discontinued by December 31, 2015

The software will no longer be in delivery from the product center order desk

after that date. Reasoning is the technical platform is no longer available for these versions &

very low usages Support can help with any upgrade questions/services Contact support or product Center if you have an questions or concerns

6/18/2015 60

Page 60: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports

Q&A

?

6/18/2015 61

Page 61: SmartPlant Instrumentation - SPI LTUF 2016 RoadMap.pdfImprove visibility of the scoped when claiming or merging Part of SPI (not Admin) to get most of SPI tasks benefits as reports