Radio Navigation SystemRadio Navigation System

Software Project ManagementSoftware Project Management presented by Nicula Mariapresented by Nicula Maria

Page 2: SMP Project Presentation

Radio Navigation System DescriptionRadio Navigation System Description

The SW project that is implemented on the hardware system is going to The SW project that is implemented on the hardware system is going to provideprovide a smart, customer friendly and high quality Radio Navigation a smart, customer friendly and high quality Radio Navigation systemsystem. .

The SW project is very complex and it requires a large amount of resources. The SW project is very complex and it requires a large amount of resources. In this presentation, the human resources are assigned for a smaller version In this presentation, the human resources are assigned for a smaller version of the project.of the project.

Page 3: SMP Project Presentation

Project ObjectivesProject Objectives

The main objective was to develop a Software Management Plan for The main objective was to develop a Software Management Plan for the RNS projectthe RNS project

The Software Management Plan was elaborated using Open Proj.The Software Management Plan was elaborated using Open Proj.

The Software Management Plan contains all the important phases of The Software Management Plan contains all the important phases of a Software Project.a Software Project.

Page 4: SMP Project Presentation

Project Awareness

Ways of avoiding workload:– good task assignment good task assignment – workload computation before allocating human resourcesworkload computation before allocating human resources– using optimization model in human resource managementusing optimization model in human resource management

Human Resources Analytics:– Manage labor hours and productivity and understand Manage labor hours and productivity and understand

staffing trends.staffing trends.– Identify areas of risk with what-if planning.Identify areas of risk with what-if planning.– Audit Equal Opportunity Employer (EOE) issues such as Audit Equal Opportunity Employer (EOE) issues such as

gender and race.gender and race.

Page 5: SMP Project Presentation

SW Project PhasesSW Project Phases

Page 6: SMP Project Presentation

SW Project Phases – PlanningSW Project Phases – Planning

Page 7: SMP Project Presentation

SW Project Phases – detailes tasksSW Project Phases – detailes tasks

Page 8: SMP Project Presentation

OpenProj Benefits

• OpenProj is a free, open source project management solutionOpenProj is a free, open source project management solution.

• OpenProj is OpenProj is OS independent because it runs on Java platform so can  independent because it runs on Java platform so can run in different operating systems.run in different operating systems.

• Open Proj supports different views, each based on a specified Open Proj supports different views, each based on a specified attribute. attribute.

• The tool has four simple reports: project details, resource The tool has four simple reports: project details, resource

information, task information, and who does what. information, task information, and who does what. 

Page 9: SMP Project Presentation

Open Proj - Gantt view

It is a bar chart which is used for project scheduling. It breaks down It is a bar chart which is used for project scheduling. It breaks down the task into several subtasks and shows their relations, start and the task into several subtasks and shows their relations, start and end dates.end dates.

Page 10: SMP Project Presentation

OpenProj - Network view

It shows the “before” “after” and “intermediate” tasks in graphical It shows the “before” “after” and “intermediate” tasks in graphical manner. Its also called manner. Its also called PERT chart.  chart.

Page 11: SMP Project Presentation

OpenProj - Resources view

Resources Chart: Details of available recourses are listed here. Once

listed, the resources can be assigned in Gantt chart.

Page 12: SMP Project Presentation

OpenProj - Histogram

• Open Proj offers various advantages provided by different options Open Proj offers various advantages provided by different options selectable by user. One of the is the histogram, where you can track selectable by user. One of the is the histogram, where you can track down your resources availability on a specific period.down your resources availability on a specific period.

Page 13: SMP Project Presentation

Project extension for SPM

Detailed Maintenance Process

Page 14: SMP Project Presentation

Maintenance Phase - Fundamentals

• Nature of MaintenanceNature of Maintenance• Need for MaintenanceNeed for Maintenance• Responsibility for Performing Software MaintenanceResponsibility for Performing Software Maintenance• Majority of Maintenance CostsMajority of Maintenance Costs• Key Issues in Software MaintenanceKey Issues in Software Maintenance• Maintenance ProcessMaintenance Process• Maintenance Phase Length ManagementMaintenance Phase Length Management• Maintenance Phase ConclusionMaintenance Phase Conclusion

Page 15: SMP Project Presentation

SW Project Phases - MaintenanceSW Project Phases - Maintenance

Page 16: SMP Project Presentation

Conclusions

In order to deliver a successful SW Project is necessary to know and keep track of the tasks that need to be performed.

With OpenProj, a project manager establishes the list of project tasks. Each can be assigned to resources and given an estimate of the completion effort. Tasks can be indented to be sub-tasks of a parent. OpenProj allows dynamic adjustment of tasks. By changing a duration, the effect on the whole project schedule can be viewed at a glance.

Sub-project durations are accumulated into their parents. It is a simple matter to either add a new project task at any level or to change a task into a sub-task. The project resources can be maintained in a list showing the resource name and availability. Additional resource details can be entered such as name, email address, hourly cost, overtime or cost per use.