Page 1: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

SNOLAB and its programmeNigel Smith (plus many others)

Page 2: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

OutlineScope of talk:

Focus from the deep underground facilities perspectiveEspecially new/planned expansions to u/ground facilities

Why go underground?BackgroundsBackground suppression

Science questionsStatus update on underground facilities

Europe - Asia - North America SNOLAB

Infrastructure developmentScience programme

Page 3: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Why go underground?

Studies for rare events, either decays (eg proton or 0νββ), low σ measurements or weak interactions (dark matter, natural or generated neutrino), require very radio-quiet environments to undertake searchesDeep underground facilities provide significant rock overburden and commensurate reduction in c.r. flux, and c.r.-spallation induced neutronsReduction in gamma backgrounds from reduction in c.r.s and neutrons

Additional science programmes possible with such infrastructure - extreme biosystems, geology, geophysics, gravitational waves...

10-20

10-18

10-16

10-14

10-12

10-10

10-8

10-6

10-4

1011 1013 1015 1017 1019 1021

Cosmic Ray Energy Spectrum

Proton-4Tien ShenAkenoHaverah ParkYakutskSydney

Inte

nsity

(cm

-2s-1

sr-1)

Cosmic Ray Energy (eV)

Experiment:

1 per square metre per second

1 per square metre per day

1 per square metre per year

1 per square kilometre per year

1 per square metre per century

1 per square kilometre per century

Page 4: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Muon backgrounds

2km rock overburden(6000mwe)‏

UndergroundLaboratory

SurfaceFacility

Muon Flux = 0.27/m2/day

Page 5: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Neutron backgrounds

Neutron production fromc.r. muon spallationU/Th fissionα, n reactions

Spectrum in laboratory depends on local geology (rock composition)

both for fast and thermal neutronsU/Th + moderatorsmuons + moderatorssmall levels of high neutron cross-section make a big difference

Persiani / Selvi

Kudryavtsev

Page 6: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Gamma Backgrounds

Reduction in gamma background at higher energies from c.r. and neutron reductionBelow 3.5MeV dependent on local geology and rock material

Boulby (red)Gran Sasso (blue)surface (black)

Page 7: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Background Suppressionc.r. µ and n spallation (depth, µ veto, self veto)γ,β (traditional gamma shielding or gamma blind)radon (clean room operations, atmospheric and material selection and radon suppression)U/Th (α,n) in rock and detector materials (shield, veto)Cosmogenics (underground fabrication)gravitational gradient (massive rock bed, away from surface)

SNO+ @ SNOLAB γ in Pb @ Boulby (Carson) EURECA @ LSM (Kudryavtsev)

Page 8: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Dark matter searches

Nuclear astrophysics

Sola

r/SN

neu

trino

Geo/reactor neutrinos

Gravity wave searches

Double beta decay

neutrino

Extrem

e biosphere

s

Geo

logy

, ge

ophy

sics

Long baseline

neutrino oscillation

Prot

on d

ecay

Science questions...

Low neutron background

Low gamma background

FacilityEnvironment

How do stars burn?

What constitutes most of the mass of the Universe?

How do fault slips develop?

Where does the matter-antimatter asymmetry in the Universe come from?

Where does the heat of the Earth

come from?

What is the physics beyond

the standard model?

What is the nature of the

neutrino?

What is the mass, and

mixing parameters, of the neutrino?

How do the most extreme astronomical

events evolve?

How do they explode?

How does life evolve in extreme

environments?

Page 9: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

LNGS

1400 m rock overburden (3.2 km w.e.)Flat cross-sectionNeutron flux = 3.8±0.3 10–2 m–2s–1

µ flux = 3 x 10–4 m–2s–1 (angular depend. measured) γ flux= 1 104 m–2s–1

Volume 180 000 m3, area 17 300 m2

Ventilation: 1 lab volume/3.5 hRadon in air 50-120 Bq/m3 (less @ experiments)Support facilities on the surfaceDrive in to the experimentsThe largest international scientific communityPermanent staff = 80 permanent +23

Broad neutrino/NA programme:ν beam from CERN: ICARUS, OPERA, Solar νs: BOREXINO, SuperNOVA νs: LVD,

0νββ: CUORICINO, CUORE, GERDA

Page 10: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

Centre for Underground Physics in Pyhäsalmi CUPP. Finland

Neutron flux being measuredPersonnel: 3 on site + 3 @ OuluOffices, labs and guest rooms on surfaceAccess via lifts or inclined road tunnel

Old mine - Operational 1962-2001Cavities available at several levels from 95 m to 980 mLab facilities may be excavated @ 1440 m, 4 km w.e.

10

EMMA experiment at 75m depthComposition of atmospheric µ @ kneeDrift chamber and plastic scintillators

Page 11: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

11

Romanian underground laboratory in Unirea salt mine,

Slanic Prahova-ROMANIA

View of underground laboratory view from Unirea salt mine

The Underground Laboratory for Measurement in Ultra-low Radiation Background is situated in Unirea salt mine, in Slanic Prahova town, in Prahova County, Romania. Slanic town, Prahova County is situated in sub-Carpathians hills, about 100 km N from Bucharest and 150 km SE from Brasov. The town is placed in Slanic River valley, tributary of Varbilau River. In this environment, we have constructed the Low Background Radiation Laboratory situated at a depth of 208 m beneath the surface at water equivalent thickness of ~600 m. This mine consists of a hivelike structure composed of more galleries 32 or 36 meters wide, 52 to 57 m height and hundreds of meter long. Also it must be pointed out the remarkable stability of the microenvironment characterized by a constant temperature all over the years of 120 C and relative humidity of 60 to 65 %.

Page 12: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

12

The Polkowice-Sieroszowice mine in Poland - one of the sites proposed for LAGUNA and ArDM

The Sieroszowice mine (178 km2 of underground excavation area), belongs to the KGHM holding of copper mines and metallurgic plants - 6th position in the world’s copper production and 2nd position for silver.

Near Wrocław, south-west of Poland - easily accessible from the Wroclaw airport and from the A4 motor-way, 950 km from CERN

Geological cutoff – layers of anhydrite, dolomite and salt rocks at depths from 600 till >1400 m below the surface

Page 13: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

Boulby Science Facility• Boulby is a working potash mine in the North East

of England. Operated by Cleveland Potash Ltd – a major local employer.

• 1100m deep (2805 mwe giving ~106 reduction in CR muons).

• Surrounding rock-salt = low activity giving low gamma and radon backgrounds.

Middlesborough

Whitby

Staithes

York

JIF facilities - 2003 .> 1000 m2, fully equipped underground ‘Palmer lab’> Surface support facility.

Boulby Mine

June 2009: New facility manager & science

coordinator Sean Paling

Page 14: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

A. Bettini.

600 m2 (40x15x12)

Depth: 800 m

Muons: 0.47 µ x 10-2 m m-2 s-1

Ventilation: 11.000 m3/h

Hall A

Hall B

Hall C

150 m2 (15x10x7)

Experimental halls A, B and C

Operative budget: ≈1600 k€/yr

Completion of the reinstallation of the infrastructure. June 2010

Page 15: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

LSM  Extension  project  

Fréjus  tunnel

Safety  gallery

Present  LSM

Extension  project

Page 16: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

16

Univ. of TohokuKamLANDKamLAND

Ge

Super-Kamiokande

Ge!"## $% &'(')(')*!"## $% &'(')(')*++

!"## ,% ''(-(''*!"## ,% ''(-(''*++

New Experimental Hall

Clean roomICP-MSXMASS R&D

HallXMASS, CANDLES

XMASS R&D

N AGE(D k M tt )IPMU Labo.API-MS, Ge

To Atotsuentrance

CLIO (Grav. Wave) 100m Lazer Strain Meter

NewAGE(Dark Matter)Super conductive

Gravity meter

API MS, Ge

Proprietaryarea

Page 17: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

17

!"# "$%"&'(")*+, -+,,!"# "$%"&'(")*+, -+,,%%./(%,"*"0 ') 1223./(%,"*"0 ') 1223

4+(56!74+(56!7

-89:(-89:( ;<%"&4;<%"&4

!"# -+,,!"# -+,,!"# -+,,!"# -+,,5819(5819(

=89:(=89:(=+*"& *+)> '? @/(%,"*"0 ') 122A=+*"& *+)> '? @/(%,"*"0 ') 122A

Page 18: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

18

Korea Middleland Power Co.Yangyang Pumped Storage Power Plant

Yangyang Underground Laboratory

Minimum depth : 700 m / Access to the lab by car (~2km)

Kim

IWD

D09

Page 19: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

19

!"

#$"

Kim

IWD

D09

Page 20: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

• Jinping Mountain Peak:4193m

• Maximum rock overburden: ~2500m• Length of Jinping transportation tunnel: 17.5km• Rock cover larger than 1500m:>70%

Page 21: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

Layout of CJPL and its Phase-I space (red square)

6.5m*6.5m*40m main hall A

The construction of infrastructure of CJPL Phase-1 will be finished in April,2010.The Low background measurement facility will be established in Sept. 2010.

2009, Hall-A cavity OK!

Page 22: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

Tunnnel to main hall

Main hall is ready! Electronics Layer and Crane

Painting Radon-proof Layer

Page 23: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

23

Page 24: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

1 Homestake DUSEL

DUSEL Facility Design Advancing Following Interactions with Agencies and Collaborations

• World-Class Facility– Research Campuses

• Surface• 4850 (~4200 mwe)• 7400 (~7100 mwe)• Other Levels and Ramps

– Dual Access to Research Campuses– Best-practices Life Safety Systems

and Programs– Experimental Support Groups– Design Enabling Future Expansion – Project Enabling Participation by Other

Agencies• Suite of Transformational Experiments

– Diverse and Compelling Suite– Integral Education and Outreach Efforts

Page 25: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

2 Homestake DUSEL

NSF and DOE Cooperation In Creating DUSEL and its Scientific Program

• Initial NSF Guidance - $750M to include:– DUSEL Facility (our goal is for FY13 construction start)– Diverse and Compelling Suite of Experiments

• Dark Matter Searches• Long Baseline Neutrinos• Proton Decay• Neutrinoless Double Beta Decay• Additional Physics Experiments such as:

– Nuclear Astrophysics– Solar Neutrinos

• Biology, Geology, Engineering Experiments including topics such as:– Geomicrobiology– Fault Rupture and geophysics– Coupled Processes

• DOE Established CD0 for Long Baseline Neutrinos Experiment January 2010– Range established $660 - $940M– Joint oversight group (JOG) meeting regularly (DOE OHEP ,DOE ONP, NSF PHY)

• We anticipate maintaining Sanford Lab science program through DUSEL construction– LUX dark matter and Majorana Demonstrator neutrinoless double beta decay

Page 26: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

DUSEL Programme

Current status - Sanford LabExcavation of infrastructure for Majorana underwayLUX surface deployment underwayBeneficial occupancy expected 2011

MREFC Proposal in Dec 2010Decision by Spring 2011Construction starts (T0) by 2013/4Beneficial occupancy of full 4850 and 7400 levels would occur at T0+4 yearse.g. DUSEL DM Community focussed on several third generation target technologies (Ge, Ar, Xe, directional, ...)DIANA nuclear astrophysics, twin accelerators

Page 27: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Facility developments

Several expansions of deep underground facilities completed, in construction or well progressed in planning

Site Size Status Available

Kamioka + 5.5x103m3 Complete 2008

SNOLAB 3x104m3 Complete 2009

LSC 8x103m3 In Construction 2010

SUSEL >3x104m3 In Construction 2010

CJPL 1.7x103m3 In Construction 2011

Yangyang 1.6x104m3 In Construction 2011+

LSM 4x104m3 Planned 2013

DUSEL >105m3 Planned 2015

Page 28: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

SNOLAB Overall StatusSurface Facility

Operational from 2005.Provides offices, conference room, dry, warehousing, IT servers, clean-room labs, detector construction labs, chemical + assay lab

Underground Construction (Cube Hall, Cryopit, Ladder Labs, Lab Entrance)

Excavation complete and outfitting began June 2007. All main infrastructure (Chiller, MPC, HVAC, waste water plant) commissionedGeneral outfitting in Phase I areas almost complete + Cryopit 5T crane/access.Ladder Labs final cleaning complete, first experiment going inFirst experimental infrastructure installation in Cube Hall, fully clean

Experimental ProgrammeContinued operation of DEAP-1 and PICASSO. Current allocations to: PICASSO-III, DEAP-I, SNO+, DEAP-3600, MiniCLEAN, SuperCDMS TF, SuperCDMS, COUPP, HALO. Anticipated and under discussion: EXO-gas, DarkSide, low background counters to measure 39Ar, future Cobra upgrade…

Page 29: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Laboratory Space

All clean spaces will be operated as Class2000 clean rooms (or better).

ExcavationExcavation Clean RoomClean Room LaboratoryLaboratoryArea (m2) Volume (m3) Area (m2) Volume (m3) Area (m2) Volume (m3)

Original SNO Areas

Phase I

Phase II

1860 16500 1130 13300 750 11700

6070 38750 3900 29750 2430 23700

7220 46650 4940 37250 3060 29550

Page 30: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Chiller

Page 31: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Chiller

Page 32: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Lab Entry

Page 33: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

LabEntrance

Page 34: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

PersonnelFacility

Page 35: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

LabEntry

SNO Access Drift

Page 36: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Galley/Refuge

Facilities 3 Feb 2009

Page 37: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Galley/Refuge

Page 38: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

MeetingRoom

Page 39: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

CryopitAccess

Page 40: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Cryopit

Page 41: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Cryopit

Page 42: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

CubeHall

Page 43: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

CubeHall

Page 44: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

CubeHall

Page 45: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

CubeHall

Page 46: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

The Cube Hall Goes CleanCubeHall

Page 47: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010Unsealing door to Ladder Labs 5th Aug

Page 48: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

LadderLabs

Page 49: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Personnel facilities

SNOCavern

Ladder Labs

Cube Hall

Cryopit

SouthDrift

HaloStub

UtilityDrift

DEAP-3600MiniCLEAN

HALO

Current PICASSO-II, DEAP-I (Dark Matter)

PUPS (Seismicity)

2009+

DEAP-3600, MiniCLEAN,

PICASSO-III (Dark Matter)

SNO+, HALO,

(Neutrino)

2010+SuperCDMS,

COUPP, DarkSide (Dark Matter)

Exo-Gas (Neutrino)

PICASSO-II

DEAP-I PUPS

SNO+

SuperCDMS

PICASSO-III

DarkSide

COUPP-60

COUPP-4

Page 50: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Dark Matter at SNOLABNoble Liquids: Deap-I, MiniCLEAN, & DEAP-3600, DarkSide

Single Phase Liquid Argon uses pulse shape discrimination. Two-phase (DarkSide)

Prototype DEAP-I operational in SNOLAB now. Successful demonstration of PSD and test bench for DEAP/CLEAN design/operations.

Construction for DEAP-3600 and MiniCLEAN underway. Full DEAP-3600 capital funding granted (with SNO+)

Will measure Spin Independent cross-section.

Superheated Liquid / Bubble chamber: PICASSO, COUPPSuperheated droplet detectors and bubble chambers. Insensitive to MIPS radioactive background at operating temperature, threshold devices

PICASSO currently operational in SNOLAB, demonstration of alpha rejection and test bench for scale-up of detector volumes.

COUPP on its way...

Will measure Spin Dependent cross-section primarily, COUPP has SI sensitivity

Solid State: SuperCDMSState of the art Ge crystals with ionisation and phonon readout.

Currently operational in Soudan. Next phase will benefit from SNOLAB depth to reach desired sensitivity. Test facility in Ladder Labs under development.

Mostly sensitive to Spin Independent cross-section.

Page 51: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

SuperCDMS

Brink DM2010

Page 52: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

DEAP3600/miniCLEAN

Page 53: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

CubeHall - DEAP/

miniCLEAN

Page 54: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

DEAP-3600 DirectorMark Boulay

standing at the location of theDEAP-3600 Shield tank.

Page 55: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Nigel Smith with DEAP-3600 DirectorMark Boulay standing at the location

of the DEAP-3600 experiment.

Page 56: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Acceptance testing of theMiniCLEAN Vacuum Vessel.

Page 57: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Aligning the anchors for the

MiniCLEAN detector stand.

Page 58: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

The PICASSO detector

Page 59: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

PICASSO Stages

Page 60: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

COUPP

‘Rapid deployment’ of COUPP-4kg anticipated this summerShielding design underwayRegulatory checks in progressSpace allocated and service delivery in progressCOUPP-60kg to follow later this year/early next

Page 61: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Double beta decay2νββ expected in SM

half life > 1019 years 0νββ forbidden in SM (ΔL=2)

allowed in BSM models half life > 1025 years

requires ν massrequires Majorana nature

Inverted hierarchy: m3 << m1 ≈ m2

Normal hierarchy: m1 << m2 ≈ m3

Degenerate hierarchy: m1 ≈ m2 ≈ m3

KKDC range

Page 62: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

0νββ at SNOLABSNO+ : 150Nd → 150Sm + e- + e-

Uses existing SNO detector. Heavy water replaced by scintillator loaded with 150Nd. Modest resolution compensated by high statistical accuracy.

EXO-gas : 136Xe → 136Ba++ + e- + e-Developing technique to tag Ba daughter with electron tracking.

Chen/Nakamura

Page 63: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Measuring the SNO+ Acrylic Vessel

flange in preparation

Page 64: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Measuring the SNO+ Acrylic Vessel

flange in preparation

Page 65: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Excavating a larger space in the

SNO+ Utility room to

Page 66: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Page 67: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Other systems

SNO+ : Will also measure solar neutrino pep, geo-neutrinos, supernovae bursts and reactor neutrinos.

HALO: Dedicated Supernova watch experimentCharged/neutral current interactions in leadMaterials prepared for underground installation (Pb, NCD, DAQ)Infrastructure design completedInstallation in 2010.

PUPS: Seismicity Deep UndergroundCompleted operational cycle and now decommissioningSeismic wave propagation at various levels deep underground

Page 68: SNOLAB and its programme - PPD · SNOLAB and its programme Nigel Smith ... EURECA @ LSM (Kudryavtsev) N.J.T.Smith STFC RAL 2010 July 2010 ... Broad neutrino/NA programme:" beam from

N.J.T.Smith STFC RAL 2010 July 2010

Status of SNOLAB

SNOLAB Phase I infrastructureSurface facility, Cube Hall, Ladder LabsFinal outfitting and cleaning underway

Facility is now in transition to experimental programmeDeployment of support systems for first experiments underway (SNO+, DEAP-3600, MiniCLEAN, HALO)Smaller scale experiments continue operations (DEAP-I, PICASSO)Infrastructure requirements for additional systems being developed (COUPP, CDMS, DarkSide)

Additional space available now, Phase II (Cryopit)SNOLAB is looking forwards to contributing to the world programme of underground research facilities