    A SYSTEMS APPROACH

    TO FUTURE SEABED

    OIL PRODUCTION

    Achievable possibilities within the next 5 years

    6332/01 01/03

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    2/39

    PRESENTATION

    1. INTRODUCTION -Wellheads / SpoolTrees

    - Coil Tubing / Wireline BOP Intervention

    3. Elect-Ro Actuator -Valves and Chokes - Control Actuation Module

    2. Pyramid Up Guidance System (PUGS)

    - Field Standardisation

    4. Well Completions -ESP, HSP, Condensate Pump

    A Systems Approach to Future Seabed Oil Production

    6332/02 01/03

    6. Drilling Scopes - Exploration - Production

    - Catwell and Sherdaps

    CONCLUSION

    5. Field Systems - Seabed Separation

    - MASPS

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    3/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    4/39

    WELLHEADS / SPOOLTREES

    CONVENTIONAL

    -Subsea, Mudline, Platform

    A Systems Approach to Future Seabed Oil Production

    6332/04 01/03

    COIL TUBING / WIRELINE INTERVENTION BOPVARIATION OPPORTUNITIES

    Drill Thru

    Bi Modal

    ESP or SmartHSP

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    5/39

    COMPARISON OF TREES

    A Systems Approach to Future Seabed Oil Production

    6332/05 01/03

    Dual Bore Tree SpoolTree

    2" Tubing 5.1/2" Tubing

    5.1/2", 7" or

    9.5/8" Tubing

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    6/39

    SPOOLTREE EVOLUTION

    A Systems Approach to Future Seabed Oil Production

    6332/06 01/03

    SUBSEA MUDLINE PLATFORM

    Original

    Design Drive

    Medium Subsea

    Deepwater

    Mudline

    Platform

    Patent Protected

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    7/39

    7.1/2" COIL TUBING/WIRELINE BOP SYSTEM FOR SPOOLTREES

    A Systems Approach to Future Seabed Oil Production

    6332/07 01/03

    CT/WLBOPSYSTEM

    Free StandingMonobore Riser

    Lower RiserPackage

    SpoolTree

    SubseaWellhead

    Prime mechanical barriers (valves, rams or cap)

    Open barrier

    Closed barrier

    LEGEND

    EmergencyDisconnect

    Package

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    8/39

    DRILL THRU HORIZONTAL / SPOOLTREE CONFIGURATION

    A Systems Approach to Future Seabed Oil Production

    6332/08 01/03

    Tree / WHD / WellAssembly

    Drill Thru Horizontal /SpoolTree

    18.3/4" StandardSTM WHD Housing

    10.3/4" ProductionCasing Hanger

    18.3/4" - 13" NomConversion Sleeve

    30" Housing

    30" or 36" Conductor

    (Optional 20" to 24.1/2"Surface String)

    13.3/8" or IntermediateString

    9.5/8" or 10.3/4"Production Casing

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    9/39

    DRILL THRU CT/ESP or CT/SMART SPOOLTREE

    A Systems Approach to Future Seabed Oil Production

    6332/09 01/03

    7" ProductionIsolation Valve

    2" AnnulusIsolation Valve

    7" Well Tubing Hanger

    2" AnnulusMaster Valve

    Debris Cover

    7" Production Master Valve

    Electrical HorizontalTelescopic Connector

    Isolation Plug

    Internal HP Cap2" Workover Valve

    2" Crossover Valve

    Coil Tubing ElectricalPower Hanger

    18.3/4" DrillThru SpoolTree

    18.3/4" Stepped WHD

    7" Tubing

    13.3/8" Intermediate String

    Optional 20" to 24.1/2"Surface String

    10.3/4" / 9.5/8"Special Hanger

    30" Housing

    30 " or 36" Conductor

    9.5/8" / 10.3/4"Production Casing

    Electrical Cable withinCoil Tubing

    To Retrievable Electrical Submersible Pump (ESP) or Coiled Tubing/Smart Sensors Equipment

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    10/39

    BI-MODAL COMPLETIONS

    A Systems Approach to Future Seabed Oil Production

    6332/10 01/03

    Bi-Modal Drill ThruSpoolTree Wellhead

    Assembly

    Stepped WHD Housing

    Outer Tubing Hanger

    Production Casing Hanger

    Production Casing

    Outer Tubing

    Inner Tubing Hanger

    Inner Tubing

    TYPE OF WELL

    Individual Dual Zone Producer

    Production Casing AnnulusMonitoring (HP/HT)

    Gas Lift Producer with Water

    (or Gas) Injection

    Non commingled HSP Producerwith Water Injection

    Closed Loop HSP Producer

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    11/39

    DRILL THRU HORIZONTAL/SPOOLTREE ONSTEPPED PRODUCTION WELLHEAD

    A Systems Approach to Future Seabed Oil Production

    6332/11 01/03

    Drill-ThruHorizontal / SpoolTree Stepped WHD Housing

    ProductionCasing Hanger

    Housing

    Tubing

    Conductor

    Intermediate StringProduction Casing

    (OptionalSurface String)

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    12/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    13/39

    FREE STANDING RISER SYSTEMS

    A Systems Approach to Future Seabed Oil Production

    6332/13 01/03

    ParkedPosition

    MonohullIntervention

    Vessel

    7.1/2" Riser

    MonohullIntervention

    Vessel

    IsolationBOP

    Shallowdepthemergencydisconnect

    Intervention BOP

    TreeWellhead

    7.1/2" Riser

    Semi SubmersibleDrilling Vessel

    Semi SubmersibleDrilling Vessel

    DrillString

    BOPStack

    TreeWellhead

    BOP StackRetrieval

    InterventionMode

    DisconnectPosition

    Emergency DisconnectPosition

    Floatation

    BOP StackLRP

    DrillingMode

    SpoolTreeWellhead

    Riser

    ShallowdepthemergencydisconnectIsolation

    BOP

    DRILLING INTERVENTION

    Well Drilling Emergency Disconnect BOP Retrieval Well Intervention Emergency Disconnect

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    14/39

    PYRAMID UP GUIDANCE SYSTEM (PUGS)

    A Systems Approach to Future Seabed Oil Production

    6332/14 01/03

    Catchment Orientated & Aligned Landed

    BOPGuidanceArrangement

    MaximumCatchment

    SquareFramework

    LowerModulee.g. PGB orTree Module

    Connectormade-up toHub

    Upper Modulee.g. BOP- Drilling- Wireline- Coil Tubing- ROV- ROT

    Telescopic Sleeve(Soft Landing& ControlledRelease)

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    15/39

    STANDARD FIELD PUG ASSEMBLIES

    A Systems Approach to Future Seabed Oil Production

    6332/15 01/03

    RIGHTOPEN IDE

    OPEN IDERIGHT

    OPEN IDERIGHTOPEN IDELEF T

    WELL

    INTERVENTION

    SYSTEM

    DRILLING BOP

    SPOOLTREE

    WELLHEAD / PGB

    CS0

    CS0

    WELL

    INTERVENTION

    BOP

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    16/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    17/39

    CONVENTIONAL ELECTRIC/HYDRAULIC CONTROL SYSTEM

    A Systems Approach to Future Seabed Oil Production

    6332/17 01/03

    HydraulicUmbilicalConnection

    Subsea Wellhead

    FlowlineConnection

    Open Valve

    Closed Valve

    HydraulicFail CloseActuators

    ConventionalTree

    CONVENTIONAL SUBSEA E/H TREE ARRANGEMENT HOST INSTALLATION

    E/H Umbilical

    Pressure &TemperatureSensors

    Master ControlSystem

    ElectricPower Unit

    Hydraulic

    Power Unit

    Control Pod

    Umbilical

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    18/39

    ELECT-RO PRODUCTION CONTROL SYSTEM

    A Systems Approach to Future Seabed Oil Production

    6332/18 01/03

    PT

    SCSSV

    Spool

    Tree

    Electrical Umbilical

    ROV CAM WorkoverConnection

    Subsea Hydraulic PumpUnit & Accumulator

    Subsea ElectricalModule (SEM)

    Tree to CAMInterface Plate

    PT

    MasterControl

    Station (MCS)

    ElectricalPower

    Unit (EPU)

    Production Facility

    SCSSV HydraulicReservoir

    ROV Tree WorkoverConnection

    CAM Mounting Base

    CAM

    WellheadConnector

    SubseaWellhead

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    19/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    20/39

    A Systems Approach to Future Seabed Oil Production

    6332/20 01/03

    P

    CLOSED LOOP WITH RETRIEVAL HYDRAULIC PUMP / PRODUCTIONCOMPLETION USING A BI-MODAL HORIZONTAL / SPOOLTREE

    Production

    Pumped Production

    Drive Fluid In

    Drive FluidOut

    Drive Fluid In

    Drive Fluid Out

    7" Tubing

    9 5/8" Casing

    10.3/4" Casing

    13.3/8" Casing

    Hydraulic Motor

    Pump

    PRODUCTION ZONE

    Pre-Packed Screens

    Inner Tubing

    Outer Tubing

    Horizontal SpoolTree

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    21/39

    A Systems Approach to Future Seabed Oil Production

    6332/21 01/03

    Flowrate &Densiometer Sensor

    Pressure & TemperatureSensor

    Electrical Power Cablewithin Coil Tubing

    ESP Pump

    ESP Motor

    7" or 9-5/8" Tubing

    PRODUCTION ZONE

    13-3/8" ProductionCasing

    Tubing Hanger

    HorizontalSpoolTree

    Pre-Packed Screens

    COIL TUBING SUSPENDED EQUIPMENTIN WELL COIL TUBING ESP PUMPING SYSTEM IN A 7" OR 9.5/8" COMPLETION

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    22/39

    A Systems Approach toFuture Seabed Oil Production

    6332/22 01/03

    Liquid pumped to surface

    Separated FluidHolding Sleeve

    P&T Monitoring

    2 Stage Separation(Number of Stagesas Specified)

    Perforations

    Shoe

    Downhole Gas Injection

    Pump System(DH-GIPS)

    Downhole Gas AnnulusSeparators (DH-GAS)

    Slotted Joint

    Production Packer

    Line Crossover

    SCSSV

    Present Wellhead

    Spool Tree

    Gas Operation LineLiquid Outlet

    Annulus

    Gas Export

    DOWNHOLEANNULUS

    SEPARATION &PUMPING SYSTEM(DHASPS)

    PRINCIPLES

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    23/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    24/39

    A Systems Approach toFuture Seabed Oil Production

    6332/24 01/03

    A COMPACTVASPS 2 PHASE

    (GAS/LIQUID orLIQUID/LIQUID)

    Enhance for 3 PhaseSeparation

    (Optional)PT

    PTFD

    Housing

    Housing

    Gas Annulus

    Gas Check Valve

    Outlet Liquid Flow

    Gas Outlet

    Electrical GasCompressor

    Production Tubing

    Coil Tubing

    Pressure

    Temperature

    Density

    Flow

    Conductor

    Liquid StabilizingSettling Depth

    Monitoring Sensors

    Sea Bed

    Helix Joints

    Inlet Vortex

    Electrical Power Cable3000V x 125A

    Inlet Multiphase

    Flow

    Electrical SubmersibleMotor with Protector

    ElectricalSubmersible Pump

    Debris Sump

    Gas

    Liquid(oil & water)

    PTFD

    PTF

    T

    P

    D

    F

    PT

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    25/39

    CONVENTIONAL SUBSEA PRODUCTION APPROACH

    A Systems Approach to Future Seabed Oil Production

    6332/25 01/03

    Hydrostatic

    2,000 PSI

    10 km

    Stable BuoyantProductionInstallation

    Gas

    Oil

    Water

    GasInjection

    Well

    ProductionWells

    (Gas Lift)

    WaterInjection

    Well

    Template

    Manifold Water InjectionGas/Oil/Water ProductionTest FlowlineGas Injection

    Riser Base

    CONFIDENTIAL

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    26/39

    CONVENTIONAL SUBSEA SEPARATION APPROACH

    A Systems Approach to Future Seabed Oil Production

    6332/26 01/03

    Hydrostatic

    2,000 PSI

    50 km

    Stable BuoyantProductionInstallation

    Manifold

    - HIPPS facility- Complex operation

    High power input- Variable speed controls

    Gas

    Oil

    Water

    GasInjection

    Well

    ProductionWells

    (Gas Lift)

    WaterInjection

    Well

    Template

    Choke

    Multiphase Field Separator- Complex controls- Online critical path

    RiserBase

    Ps = 400 PSI

    Oil

    Water

    Oil

    Common lowestfield pressure

    Common highest fieldinjection pressure

    WHFP reduced by 1,000 PSI -loss of power

    WaterInjection

    CONFIDENTIAL

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    27/39

    GOW-SAPS PROPOSED SOLUTION

    A Systems Approach to Future Seabed Oil Production

    6332/27 01/03CONFIDENTIAL

    Hydrostatic

    2,000 PSI50 km

    Stable BuoyantProductionInstallation

    Gas

    Oil

    Water

    Oil production

    GasInjection

    Well

    WaterInjection

    Well

    ProductionWells with

    Gas Lift(or HSP)

    Process Hub Base

    ProductionWells with

    Gas Lift(or HSP)

    GOW SAPS

    Water drive /injection

    WHD flowpressure

    GOW-SAPS Module perProduction Well

    - Power drives- 200-400 psi operating- Phase pumps- Self contained controls

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    28/39

    FIELD OPTION : GOW-SAPS FIELD LAYOUTPROCESS HUB ARCHITECTURE

    A Systems Approach to Future Seabed Oil Production

    6332/28 01/03CONFIDENTIAL

    PiggingLoop

    PiggingLoop

    ASSUMPTIONS

    - DP drilling & intervention operations

    - Electric Fail Closed Springless Actuators onvalves and chokes

    - Intelligent Dual Redundancy Control System

    FIELD 16 Producers

    4 Water Injection

    2 Gas Injection

    WELL PROCESS HUB

    Pipeline bundle from

    Export Facility

    - Oil line

    - Water drive / injection line

    - Chemical injection

    - Umbilical

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    29/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    30/39

    MASPS MATRIX SYSTEM RUNNING SEQUENCE

    A Systems Approach to Future Seabed Oil Production

    6332/30 01/03

    36" BHA

    36"CONDUCTORHOLE

    STEP 5 Land Drilling Guide Base

    STEP 6 Drill 36" Conductor Hole

    RUNNING PROCEDURE

    HUB GUIDE BASE

    SPACER ARM DRILLINGGUIDE BASE

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    31/39

    MASPS FULL SIDE ELEVATION

    A Systems Approach to Future Seabed Oil Production

    6332/31 01/03

    PRODUCTION

    FLOW BASE

    DRILLING

    FLOW BASE

    MANIFOLD / SEPARATION /

    PUMPING OPTIONS

    PRODUCTION

    BRIDGE

    SPACER

    ARM

    PRODUCTION

    FLOW BASE

    DRILLING

    FLOW BASE

    PRODUCTION

    BRIDGE

    SPACER

    ARM

    HUB

    GUIDE BASE

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    32/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    33/39

    DRILLING WELL CONFIGURATIONSA Systems Approach to

    Future Seabed Oil Production

    6332/33 01/03

    Drilling Vessel

    Riser

    BOP

    Wellhead& Tree

    Open Hole

    Drilling

    IntermediateCasing Strings

    Production

    Casing

    Liners

    Open Hole

    Completion

    Type of Well

    CONVENTIONAL

    7" Tubing

    Exploration &High Production

    Heavy Duty

    Semi Submersible

    Drilling Vessel

    Freestanding21" LP Riser

    18.3/4" LRP

    18.3/4" BOP

    18.3/4" SpoolTree

    18.3/4" Wellhead

    30"/36" Conductor

    20" Surface Casing

    16" Casing Optional

    13.5/8" Casing

    10.3/4" / 9.5/8"Production Casing

    7" Liner

    5.7/8" OH(Optional)

    LARGE BORE

    9.5/8" Tubing

    High Production &Bi Modal

    Heavy Duty

    Semi Submersible

    Drilling Vessel

    Freestanding21" LP Riser

    18.3/4" LRP

    18.3/4" BOP

    18.3/4" SpoolTree

    18.3/4" Wellhead

    36" Conductor

    24.1/2" Surface Casing

    20" Casing (Optional)

    16" Casing

    13.3/8"Production Casing

    9.5/8" Liner

    8.1/2" OH

    SLIM BORE

    5.1/2" Tubing

    Exploration &Medium Production

    Medium Duty

    Semi Submersible

    Drilling Vessel

    Freestanding16" LP Riser

    13.5/8" LRP

    13.5/8" BOP

    13.5/8" SpoolTree

    13.5/8" Wellhead

    30"/20" Conductor

    13.5/8" Surface Casing

    10.3/4" Casing

    8.5/8"Production Casing

    6" Liner

    5.1/4" OH

    SMALL BORE

    2.7/8" Coil Tubing

    Exploration,Monitoring & Sampling

    Monohull

    Coil Tubing

    Vessel

    Freestanding8.5/8" HP Riser

    7.1/2" LRP

    7.1/2" BOP

    7.1/2" SpoolTree7.1/16" Wellhead

    10.3/4" Conductor

    6.5/8" Surface Casing

    5.1/2" Coiled Casing

    4.1/2" Coiled Casing

    3.1/2" Coiled Liner

    2.7/8" OH

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    34/39

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    35/39

    A Systems Approach to Future Seabed Oil Production

    6332/35 01/03

    Stable Buoyant

    Production Installation

    3 - 5 km Max.Limited Horiz. Range

    3 - 5 km Max.3 - 5 km Max. 3 - 5 km Max.

    DP Heavy Duty

    Semi-submersible

    Drilling Rig

    SubseaBOP

    Production Riserfor Subsea Wells

    Tieback

    High Angle Build-up

    Drilling Riser

    Drilling Sensitive Well Control

    Mud Weights

    Circulation Pressures

    Kick Control

    Small Platform Reservoir Foot Print

    Large number of wells per field

    Complex field infrastructure

    HydrostaticPressure

    Low FormationPressure

    Low ReservoirPressure

    Shallow Reservoir

    SatelliteCluster System

    Flowlines

    MildEnvironment

    D

    eepwater

    60

    0m-

    2000m

    800m

    LEGEND

    Platform Wells with Dry Trees

    Subsea Wells with Wet Trees

    CONVENTIONAL DEEPWATER/SHALLOW RESERVOIR SCENARIO

    Catwell & Sherdaps for Deepwater Production Fields

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    36/39

    A Systems Approach to Future Seabed Oil Production

    6332/36 01/03

    CATWELL DESCRIPTION

    Catwell & Sherdaps for Deepwater Production Fields

    Platform SpoolTree

    10.3/4" TiebackHanger

    13.3/8" Tieback Hanger

    Platform Deck& Docking Unit20" Adjustable wellhead

    20" Well CarrierPipe

    10 3/4" TiebackProduction Casing

    13 3/8" Casing

    7" ProductionTube

    Option 20" HorizontalMudline Housing

    20" TowheadSecuring Piles

    13.3/8"Tieback Hanger

    10.3/4"Tieback Hanger

    7" MudlineSCSSV

    20" Exit Housing

    Carrier PipePivot

    Towskid

    16" Conductor

    Seabed

    10.3/4"- 9.5/8"Casing Bushing

    7" Downhole SCSSV

    13.3/8" Intermediate String

    9.5/8" Production

    Casing String

    7" Completion Tubing

    7" Liner or

    Screens

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    37/39

    A Systems Approach to Future Seabed Oil Production

    6332/37 01/03

    SHERDAPS CONCEPT (PLAN)

    Catwell & Sherdaps for Deepwater Production Fields

    Minimum 600m at 3 build-up per 30m

    BuoyantPlatformSHERDAPS

    CATWELL

    Branch 1

    Catenary Bundle

    Drilling Riser

    Choke & Kill Lines

    Utility Line

    Catwell

    Template

    Tree Bay

    BOP Bay

    Manifold

    Pipeline Bundle

    Pipelines

    Umbilicals

    Flowlines

    Catwell Catenary Conduit

    SherDaps Catenary Drilling Riser

    Conduit

    Subsurface W ell Conductor

    Template Connection

    Seabed Bundle

    Drilled Wells

    Triple Junct ionTemplate Dual J unct ionTemplate

    LEGEND

    Branch 2

    Branch 3

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    38/39

    6332/38 01/03

    A Systems Approach toFuture Seabed Oil ProductionA SUBSEA SYSTEMS INTER RELATION DIAGRAM

    NEWA

    DAPTATIONOFTECHNOLOGIES

    EXPLORATION PRODUCTION

    ECONOMICS

    BENEFI

    TS

    Bi-Modal

    LargeBore

    Gas Pumping/DH Separation

    Completions

    Large Bore Drill Thru

    Drilling

    Field Monitors

    Exploration Field

    AppraisalWells

    CT CasedWell

    Pre-EngineeredModular

    Construction

    Sherdaps Catwell

    GOSPS GOW-SAPSWOSPS

    Separation &Pumping

    WHD/SpoolTreeTool Box

    CT InterventionMonohull Vessel

    Manifolds

    ControlsHeavy DutySemi

    Free Standing Risers

    Monohull Vessel

    InterventionDrilling

    PUGS

    Optimum Field Design

    Higher return oninvestment

    Less wells drilled

    Higher production per well

    Low cost intervention

    Maximises FieldProduction flow

    Early First Oil

    Higher flow rates perhardware

    Reduced Topside facilities

    Lower cost development

    Lower cost sitehardware

    Speedy installation

    Efficientmanagement ofField

    Closed Loop

    Prod / WI

    Dual Producer

    Gas Lift Producerwith WI

    Direct

    DH Separation& WI

    Scope to operate

    High reliabilitySimplicity & flexibility

    Low power

    Reduces Topsideprocessing

    Site reinjection

    Reduction orelimination of certainpipelines/risers

    Standard installation

    Pre engineeredFast deployment

    Reduced

    platform sizeFull-time directwell access

    $

    $ $ $ $ $ $

    $$

    $

    $

    $

    $

    Higher well accessefficiency

    Lower Vessel times

    $

    $

    Standard FieldInterface

    Operational flexibility

    Correct Field Evaluation(Knowledge)

    Business DevelopmentPlan & Strategy

    HSP ESP

    Actuation Operation

    Prod'n

    Mini TensionedFPV

    TensionedFPSO

    MASPSMATRIX

  • 8/2/2019 Society of Underwater Technology Systems Approach 2003

    39/39

    A Systems Approach to Future Seabed Oil Production

    CONCLUSION

    SYSTEMS APPROACH TO SUBSEA

    OPTIMISE DESIGNS FOR A STEP CHANGE

    FULL MACRO FIELD APPROACH

    Well (Vertical Regime)Seabed :

    - Field (Wellhead vicinity)

    - Pipelines (Horizontal Regime)

    Risers (Vertical Regime)

    Discovery

    Development

    Production

    Critical Production Path

    Reservoir / Completion / Tree / Export