Page 1: SOFTWARE PROJECT MANAGEMENT LAB # 04 · 2012. 3. 16. · SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007) LAB # 04 LAB # 04 SOFTWARE PROJECT MANAGEMENT LAB # 04 Instructor: Engr. Khurram

 

Download Manual                                        http://web.uettaxila.edu.pk/CMS/AUT2011/seSPMbs/index.asp Engr. Khurram Ashfaq Qazi 

SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007)  LAB # 04 

LAB #

 04 

SOFTWARE PROJECT MANAGEMENT

LAB # 04

Instructor: Engr. Khurram Ashfaq Qazi

Page 2: SOFTWARE PROJECT MANAGEMENT LAB # 04 · 2012. 3. 16. · SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007) LAB # 04 LAB # 04 SOFTWARE PROJECT MANAGEMENT LAB # 04 Instructor: Engr. Khurram

SOFT  

DownloadEngr. Khu

TWARE P

TASK INF

Double clibox contadiscussed

ADVACN

This tab aconstraints

d Manual        rram Ashfaq 

PROJECT

FORMATION

ick the particuains many tablater in the m

E OPTIONS T

allows the uses.

                       Qazi 

T MANAG

ular task. A dis including Ge

manual.

TAB

r (Project Ma

          http://w

GEMENT

ialog box is oeneral inform

nager) to set

web.uettaxila

(MS PRO

opened as shoation, Advanc

the Deadline

a.edu.pk/CMS

OJECT 20

own in the figuce option, Tas

es for the Pro

S/AUT2011/se

07) 

ure given belsk Notes etc ta

ject, Declare

eSPMbs/inde

LAB

ow. This dialoags which are

the milestone

ex.asp 

B # 04 

LAB

#04

og e

es and

LAB #

 04 

Page 3: SOFTWARE PROJECT MANAGEMENT LAB # 04 · 2012. 3. 16. · SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007) LAB # 04 LAB # 04 SOFTWARE PROJECT MANAGEMENT LAB # 04 Instructor: Engr. Khurram

SOFT  

DownloadEngr. Khu

TWARE P

TASK NO

Tasks notenotes. The

TASK DU

Mostly tasand otherthen he/scompleted

d Manual        rram Ashfaq 

PROJECT

OTES

es also knownese notes are i

RATION AND

sk duration isr factors that he unchecks

d task percent

                       Qazi 

T MANAG

n as task inforimportant not

D COMPLETIO

s estimated a may effect tthe check botage is chang

          http://w

GEMENT

rmation are wtes relating to

ON PERCENT

s no one knowtask. If Manaox as shown ged from field

web.uettaxila

(MS PRO

written in the o task that sho

TAGE

ws about the ger is 100% in the figure

d shown below

a.edu.pk/CMS

OJECT 20

Notes tab whould be remem

exact days sure about t. Otherwise

w.

S/AUT2011/se

07) 

here there is ambered during

for task comphe duration fduration is e

eSPMbs/inde

LAB

a text field fog task perform

pletion due tofor task compstimated. Sim

ex.asp 

B # 04 

LAB

#04

or the ming.

o risks pletion milarly

LAB #

 04 

Page 4: SOFTWARE PROJECT MANAGEMENT LAB # 04 · 2012. 3. 16. · SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007) LAB # 04 LAB # 04 SOFTWARE PROJECT MANAGEMENT LAB # 04 Instructor: Engr. Khurram

SOFT  

DownloadEngr. Khu

TWARE P

If task is 1

DEADLIN

Deadlinesa deadline

The decla

Deadlines

d Manual        rram Ashfaq 

PROJECT

00% comple

ES

s are importae is missed, the

red deadline

s are shown b

                       Qazi 

T MANAG

eted then a tic

ant in a projeere's no longe

is shown by d

y the empty d

          http://w

GEMENT

ck marks appe

ect as if projeer any point in

diamond sym

downward ar

web.uettaxila

(MS PRO

ears in the ind

ect doesnot mn completing

bol as shown

rrow head wh

a.edu.pk/CMS

OJECT 20

dicator indicat

meets its deathe commitme

in figure

hich is shown in

S/AUT2011/se

07) 

ting task com

dline then itsent.

n figure given

eSPMbs/inde

LAB

pletion.

all in vain. W

n below.

ex.asp 

B # 04 

LAB

#04

When

LAB #

 04 

Page 5: SOFTWARE PROJECT MANAGEMENT LAB # 04 · 2012. 3. 16. · SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007) LAB # 04 LAB # 04 SOFTWARE PROJECT MANAGEMENT LAB # 04 Instructor: Engr. Khurram

SOFT  

DownloadEngr. Khu

TWARE P

MILESTON

A milestonby a highlevel revie

Milestone after doub

d Manual        rram Ashfaq 

PROJECT

NES

ne is the end oh level event ew meeting.

in MS projeble clicking ta

                       Qazi 

T MANAG

of a stage tha such as comp

ct 2007 are ask or by decl

          http://w

GEMENT

at marks the cpletion, endo

set by clickinglaring its dura

web.uettaxila

(MS PRO

completion of rsement or si

g the check bation 0 as sho

a.edu.pk/CMS

OJECT 20

a work packgning of a d

box present inown.

S/AUT2011/se

07) 

kage or phaseeliverable, d

n the genera

eSPMbs/inde

LAB

e, typically maocument or a

l tab that ap

ex.asp 

B # 04 

LAB

#04

arked a high

pears

LAB #

 04 

Page 6: SOFTWARE PROJECT MANAGEMENT LAB # 04 · 2012. 3. 16. · SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007) LAB # 04 LAB # 04 SOFTWARE PROJECT MANAGEMENT LAB # 04 Instructor: Engr. Khurram

SOFT  

DownloadEngr. Khu

TWARE P

TIMESCAL

Time scale

1. To2. M3. Bo

d Manual        rram Ashfaq 

PROJECT

LING

e of the MS P

op tire………Middle tire …ottom trie ……

                       Qazi 

T MANAG

roject as show

….Top line of T… Middle line… bottol line

          http://w

GEMENT

wn comprises o

Time Scale coe shows days shows hours a

web.uettaxila

(MS PRO

of 3 –tire but

onsists of Date of week and minutes a

a.edu.pk/CMS

OJECT 20

t moslty 2-tire

e and Year

as desired

S/AUT2011/se

07) 

e is shown.

eSPMbs/inde

LAB

ex.asp 

B # 04 

LAB

#04

LAB #

 04 

Page 7: SOFTWARE PROJECT MANAGEMENT LAB # 04 · 2012. 3. 16. · SOFTWARE PROJECT MANAGEMENT (MS PROJECT 2007) LAB # 04 LAB # 04 SOFTWARE PROJECT MANAGEMENT LAB # 04 Instructor: Engr. Khurram

SOFT  

DownloadEngr. Khu

TWARE P

Time scale

d Manual        rram Ashfaq 

PROJECT

e units can be

                       Qazi 

T MANAG

changed with

          http://w

GEMENT

h respect to c

web.uettaxila

(MS PRO

oncerning tire

a.edu.pk/CMS

OJECT 20

e by click drop

S/AUT2011/se

07) 

pdown box a

eSPMbs/inde

LAB

as shown.

ex.asp 

B # 04 

LAB

#04

LAB #

 04