SOIL MIX PIER UNDERPINNING | TIEBACKS | SOIL NAILING Project Report TRIBECA CONDOS - WASHINGTON D.C. Owner: UIP Asset Management, Inc. General Contractor: UIP Asset Management, Inc. Design/Build Specialty Contractor: Schnabel Geostructural Design & Construcon For more informaon on this project or any other of our projects please contact Schnabel at: (703) 742-0020 or visit our website at www.schnabel.com The Tribeca Condos project in Washington, DC was a 13 level above-grade residenal structure with a paral below-grade level. Schnabel was hired by the project’s general contractor, UIP General Contracng, Inc., to perform the earth retenon on this project. The work consisted of drilled soldier piles, hollow-core bar ebacks/soil nails, and soil mix pier underpinning. Like many earth retenon projects in Washington, DC, the earth retenon for this project was on wall line. On the west side of the site, there was a 100+ year old exisng 2-story brick building, which needed to be supported to achieve subgrade for the proposed Tribeca Condos structure. To achieve subgrade and not interfere with the proposed construcon, Schnabel needed to underpin the adjacent brick building anywhere from 3ſt to 20ſt below the boom of foong. The soil mix pier underpinning method was used to underpin the building. The use of the Soil Mix Pier Underpinning (SMPU) method made sense for this project. The adjacent brick building did not have a concrete reinforced foong; therefore, the use of tradional underpinning would have been risky and dangerous. Soil Mix Pier Underpinning (SMPU) provided an alternate method to underpin the building, without having to put anyone underneath the foong. This method proved to be effecve and allowed Schnabel to install more than 40 LF of underpinning a day on several occasions. This project presented a variety of challenges while installing the soil mix underpinning piers. The main challenge was installing piers deeper than 12ſt in a single liſt. The below-grade soil condions consisted of clayey FILL material, which made it difficult to create a homogeneous soil-cement mixture, and the CAT 313 excavator did not have enough hydraulic flow to mix the soil and cement effecvely. Any pier greater than 12ſt deep had to be installed in two liſts. The challenges Schnabel faced on this project provided valuable lessons that can be used on future projects.

Upload: others

Post on 27-Dec-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SOIL MIX PIER UNDERPINNING | TIEBACKS | SOIL NAILING

SOIL MIX PIER UNDERPINNING | TIEBACKS | SOIL NAILING

Project Report

TRIBECA CONDOS - WASHINGTON D.C.

Owner: UIP Asset Management, Inc.General Contractor: UIP Asset Management, Inc.Design/Build Specialty Contractor:Schnabel Geostructural Design & Construction

For more information on this project or any other of our projectsplease contact Schnabel at:

(703) 742-0020 or visit our website at www.schnabel.com

The Tribeca Condos project in Washington, DC was a 13 level above-grade residential structure with a partial below-grade level. Schnabel was hired by the project’s general contractor, UIP General Contracting, Inc., to perform the earth retention on this project. The work consisted of drilled soldier piles, hollow-core bar tiebacks/soil nails, and soil mix pier underpinning. Like many earth retention projects in Washington, DC, the earth retention for this project was on wall line. On the west side of the site, there was a 100+ year old existing 2-story brick building, which needed to be supported to achieve subgrade for the proposed Tribeca Condos structure. To achieve subgrade and not interfere with the proposed construction, Schnabel needed to underpin the adjacent brick building anywhere from 3ft to 20ft below the bottom of footing. The soil mix pier underpinning method was used to underpin the building. The use of the Soil Mix Pier Underpinning (SMPU) method made sense for this project. The adjacent brick building did not have a concrete reinforced footing; therefore, the use of traditional underpinning would have been risky and dangerous. Soil Mix Pier Underpinning (SMPU) provided an alternate method to underpin the building, without having to put anyone underneath the footing. This method proved to be effective and allowed Schnabel to install more than 40 LF of underpinning a day on several occasions. This project presented a variety of challenges while installing the soil mix underpinning piers. The main challenge was installing piers deeper than 12ft in a single lift. The below-grade soil conditions consisted of clayey FILL material, which made it difficult to create a homogeneous soil-cement mixture, and the CAT 313 excavator did not have enough hydraulic flow to mix the soil and cement effectively. Any pier greater than 12ft deep had to be installed in two lifts. The challenges Schnabel faced on this project provided valuable lessons that can be used on future projects.