SOLIS CAPITOL HILL Solis Capitol Hill A case study in multifamily passive house design Emily Doe AIA, CPHC, LEED BD + C Architect, Weber Thompson Brian Heather CEO, Solterra

Upload: others

Post on 20-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Solis Capitol HillA case study in multifamily passive house design

Emily Doe AIA, CPHC, LEED BD + C

Architect, Weber Thompson

Brian HeatherCEO, Solterra

Page 2: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

• 20 minute project presentation, review passive house strategies and sharing some lessons learned

• 10 minute conversation with the owner, discuss the business case for passive house

• 10 minute audience Q&A

Presentation Format

Page 3: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

SolisCondominiums

Seattle, WA• 45-unit condominium

• 576 SF average unit size

• 1 level of underground parking

• 1 level of retail/commercial

• 5 levels of residential above

• Pursuing PHIUS+ 2015 Certification

Page 4: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Project TeamSolterraOwner / Developer

Weber Thompson Architect, Landscape & Interior Design

Cascade BuiltContractor

Decker Consulting EngineersCivil Engineer

Quantum Consulting EngineersStructural Engineer

CT EngineeringShoring

Pan GeoGeotech

ArchEcologyEnergy Modelling

BEEBuilding envelope

Page 5: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

• 2015 - Design start

• 2017 (summer) – Permitted

• 2017-2018 – Hold

• 2018 (fall) -- Construction start

• 2020 (winter) – Targeted construction completion

• Units pre-selling now! www.livesolis.com

Project Timeline

Page 6: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Project Goals

• Passive House Certification (PHIUS+ 2015)

• Market Rate

• Replicable / Standard Construction

Page 7: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Context

Page 8: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Site

• SE Corner Lot

• Zero-lot line to the North and East

• Power Lines on 13th Ave

Page 9: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Massing

• Maximize FAR

• West setback for power lines

• East setback for power lines

• Simple geometry allows for high exterior wall to floor area ratio & simple detailing

PowerlineSetback

Zero-lot line Setback

Page 10: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Character

Page 11: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

NORTH WALL MURAL PLACEHOLDER SOLTERRA BUILDING, PORTLAND

Art

Page 12: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

1. Enhanced Building Enclosure• Continuous Insulation• Airtight construction

2. Managed Solar Heat Gain

3. Balanced Mechanical Ventilation/Exhaust

Images source: Passive House Institute US

Passive House Strategies

Page 13: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House envelope/boundary is limited to the residential portion of

the building

Mechanical penthouse

Interior exit stair comes down to grade

Type V Wood Construction

Type I Concrete Construction

Passive House Strategy: Passive House Boundary

Page 14: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Exterior Circulation

Passive House Boundary

Passive House Strategy: Passive House Boundary

Page 15: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Passive House Boundary

Page 16: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Enhanced Building Enclosure

Page 17: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Enhanced Building Enclosure

Page 18: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Enhanced Building Enclosure

Page 19: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Enhanced Building Enclosure

Page 20: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Enhanced Building Enclosure

Page 21: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Exterior transformer room exhaust duct

Exterior garage exhaust duct

Note: no horizontal unit venting!

Exterior rain leaders

Passive House Strategy: Enhanced Building EnclosureReduced Envelope Penetrations

Page 22: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

SUN-SHADOW STUDY: SOUTH WALL IS ALWAYS IN SUNINTERNAL HEAT GAINS

WINTER SOLSTICE

SUMMER SOLSTICE

Passive House Strategy: Managed Solar Heat Gain

Page 23: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

SOUTH ELEVATION

Fixed Balconies

27% Glazing

Passive House Strategy: Managed Solar Heat Gain

Page 24: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Managed Solar Heat Gain

Page 25: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Passive House Strategy: Balanced Mechanical System

• Centralized Energy Recovery Ventilators (ERVs) on each floor provide filtered, fresh air.

• Exhaust needs are tuned to the size of the space, not over-ventilated.

• Minisplit heat pumps provide heating and cooling in each unit living space.

• Additional electric resistant heater in bedrooms for rare use.

Page 26: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Challenges and Takeaways

Page 27: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Industry Standard Assemblies = Competitive Bids

Page 28: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Design Challenge: Building Code (Proposed)

Page 29: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Design Challenge: Building Code (Proposed)

KEY:AIR BARRIER

THERMAL ENVELOPE

2-HR FIRE RATED WALL

Smoke Control Doors

Openings must meet air barrier, thermal and fire rating requirements

Air, Thermal & Fire ratings are consolidated

Page 30: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Design Challenge: Building Code (Approved)

Added 2-hr fire wall

Protect ground floor lobby as exit passageway

Page 31: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Design Challenge: Building Code (Accepted)

KEY:AIR BARRIER

THERMAL ENVELOPE

2-HR FIRE RATED WALL

Fire door

Openings into corridor must meet air barrier, thermal requirements only, no fire rating

Fire wall is separated from air barrier/thermal envelope

Added sprinkler standpipe

Page 32: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Design Challenge: Air Barrier vs Thermal Envelope vs Fire Barrier

KEY:AIR BARRIER

THERMAL ENVELOPE

2-HR FIRE RATED WALL

Proposed air barrier modification around mechanical room so that

duct cleanouts do not need to meet PH air barrier requirements

Page 33: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Design Challenge: Products going out of business

Page 34: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Design Challenge: Condo-ization

• WA State stringent condo laws • High exposure to entire

developer/construction/design team • Increased Envelope Risk • Increased Acoustic Expectations• Decreased Accessibility Risk

Page 35: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Costs: 3-5% increased cost from industry standard, primarily for: - Mechanical System

- Exterior Shades

- Windows

- Labor for air barrier/ thermal details

- Oversight and Verification

Passive House Cost Premium

Page 36: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

• Unparalleled thermal comfort• Superb indoor air quality –o Continuous fresh filtered air

o Meets the EPA’s Indoor Airplus standard

o High indoor air quality is linked with measurable health benefits

• Resilient building –o A/C provides comfort in a warming climate

o Filtered air provides healthy air during times of summer fires/ increased air pollution

• Quiet interiors• Ultra energy efficient

Passive House Benefits

Page 37: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

60.0

35.0

18.0

Average ExistingMultifamily

Seattle NewConstruction

Passive HouseTarget

Energy Use Intensity (kBtu/sqft)

Passive House Benefits: Ultra Energy Efficient

Page 38: Solis Capitol Hill - MemberClicks · SOLIS CAPITOL HILL • 20 minute project presentation, review passive house strategies and sharing some lessons learned • 10 minute conversation

SOLIS CAPITOL HILL

Thank you.