solvingplumbingsoilwasteandventilationsystems-relatedproblemseffectivelyconcorde shah alam) sept

Upload: jehemaahad

Post on 03-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 SolvingPlumbingSoilWasteandVentilationSystems-RelatedProblemsEffectivelyConcorde Shah Alam) Sept

    1/3

    Centre for Professional Development

    In-House

    Training

    Available

    Solving Plumbing, Soil, Waste andVentilation Systems-Related Problems

    EffectivelySeptember 19 - 20, 2012

    In the areas of plumbing, there are many types of pipe materials andselecting the suitable type is important to ensure the least maintenancerequirement. Water hammer is one of the key problems in pumpingsystem damages, which arise from selecting the incorrect pump andwrong pipe size. Poor installation techniques also aggravate the

    problems.

    CONTENTS

    Fundamental of Fluid Dynamics

    Pump Sizing

    Cold Water Demand and Storage Tanks

    System Design and Pneumatic

    Sizing of Pneumatic Tanks

    Plastic Pipes and Friction Loss

    Hot Water Pipe Design for Expansion

    Joining Methods of Plastic Pipe

    Water Hammers and Preventive Measures

    Calculate Pipe Size

    Installation Pitfalls

    FMM Institute

  • 8/12/2019 SolvingPlumbingSoilWasteandVentilationSystems-RelatedProblemsEffectivelyConcorde Shah Alam) Sept

    2/3

    Ir Gary Lim is an experienced and

    qualified Professional Engineer with over20 years of manufacturing experience inthe areas of industrial engineering,project management, maintenance,production and factory management. Heis the Advisor of the Building Services

    Technical Division and a member oforganisations such as Fire Advisory Boardof the Institution of Engineers, Malaysia,Malaysia Fire Protection Association andMinority Shareholder Watchdog Group. Heis an active member of SIRIM Work Groupin drawing up Malaysian Standards onPlastic Pipes. He obtained his degree inMechanical Engineering from the

    University of Canterbury, New Zealand.He is a Professional Engineer registeredwith the Board of Engineers, Malaysia anda Fellow of the Institution of Engineers,Malaysia (IEM). He has conducted manypublic seminars for Malaysia Fire

    Protection Association, Institution ofEngineers, Malaysia and the insuranceindustry. His areas of specialisation

    include Plumbing Engineering, FireEngineering, Risk Management, BusinessContinuity Management and PropertyUnderwriting.

    FACILITATOR

    Dates : September 19 - 20, 2012Time : 9.00 am 5.00 pm

    Venue : Concorde Hotel Shah Alam

    3, Jalan Tengku Ampuan Zabedah C9/C

    40100 Shah Alam, Selangor Darul Ehsan

    Fees : FMM Members RM 950 per participantNon Members RM1,200 per participant

    (Fees include course materials, Certificate of

    Attendance, lunch and refreshments)

    SBL SCHEME

    ADMINISTRATIVE DETAILS

    Registration is on a first-come first-served basis. Cheques

    made in favour of the FMM Institute should be forwardedone week before the commencement of the programme.Completed registration form, that is faxed, mailed or e-mailedto FMM Institute, would be deemed as confirmed.

    All cancellations must be made in writing. There will be nocharge for cancellation received 10 or more working daysbefore the start of the programme. Cancellation received 6 9 working days before the start of the programme is subjectto a cancellation fee of 50% of the course fees. Cancellationreceived 5 working days and below before the start of theprogramme is subject to a cancellation fee of 100% of thecourse fees. If the participant fails to attend the programme,

    the full course fees are payable. However, replacement canbe accepted at no additional cost.

    10% discount is applicable for registration of three (3) ormore participants from the same organisation and of thesame billing source.

    The FMM Institute reserves the right to change the facilitator,reschedule or cancel the programme and all efforts will betaken to inform participants of the changes.

    For further enquiries, please contact:Cik Nazihah / Pn Hafifah

    FMM Institute

    Tel: 03-55692950Fax: 03-55694346Visit us at www.fmm.edu.my

    At the end of the programme, participantsshould be able to: calculate pipe size and calculate duty

    point of transfer pump select the suitable type of pumping

    system to meet water usagerequirements

    apply the correct method to installpump and the fittings

    minimise the impact of water hammerto the pipe lines

    calculate the stack size of soil, wasteand vent using discharge unitmethodology

    OBJECTIVES WHO SHOULD ATTEND

    Facilities Manager, Engineers, Architects,Technicians and those involved in pipingsystems

  • 8/12/2019 SolvingPlumbingSoilWasteandVentilationSystems-RelatedProblemsEffectivelyConcorde Shah Alam) Sept

    3/3

    The Manager Please tick () accordingly:FMM Institute PSMB Scheme:SBL Non ContributorTel: 03-55692950 Required vegetarian meal:Yes NoFax: 03-55694346

    Dear Sir/Madam,

    Please register the following participant(s) for the above programme.(To be completed in BLOCK LETTERS)

    1. Name Designation E-mail

    ____________________________________________________________________________________________________________

    Nationality IC No.

    ____________________________________________________________________________________________________________

    2. Name Designation E-mail

    ____________________________________________________________________________________________________________

    Nationality IC No.

    ____________________________________________________________________________________________________________

    3. Name Designation E-mail

    ____________________________________________________________________________________________________________

    Nationality IC No.

    ____________________________________________________________________________________________________________(If space is insufficient, please attach a separate list)

    Enclosed cheque/bank draft No. ____________________________________ for RM ________________________________

    being payment for _________________ participant(s) made in favour of the FMM Institute.

    Submitted by:

    Name:_____________________________________________________________________________________________________

    Designation: ___________________________________E-mail: _____________________________________________________

    Company: _________________________________________________________________________________________________

    Address:___________________________________________________________________________________________________

    ____________________________________________________________________________________________________________

    Tel No.: ______________________________ Fax No.: ________________________ Date: _______________________________

    FMM Membership No.: ______________ My Corporate Identity No.: _____________________________________________

    REGISTRATION FORM

    Solving Plumbing, Soil, Waste and Ventilation

    Systems-Related Problems Effectively

    September 19 - 20 , 2012 (Wednesday - Thursday) Concorde Hotel, Shah Alam