  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    1/61

    SIANG SIANG MALAM

    1 P. Padang Sambian 158 251 274

    297 336

    330 356

    322 355

    321 353

    2 SEKSI - II

    P. Perumnas 139 160

    P. Tegal Lantang 172 180

    P. Kerobokan 163 177

    P. Abian Base 164 179

    ST ND R OPER SI PROSEDUR

    PENYULANG PADANG SAMBIAN GARDU INDUK PADANG SAMBIAN

    MALAM

    176 P. Cargo 93 98

    OPERASI JARDIST. 20 KV PENYULANG PADANG SAMBIAN

    NO PENYULANGREFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG

    3 SEKSI - III AWAL : Rec. Feeder Buana Desa ( TUTUP )

    AKHIR : LBS POM Bensin ( TUTUP)

    AKHIR : Rec Tie Pdg. Udayana arah P.Cargo (BUKA)

    AWAL : LBS POM Bensin (TUTUP)

    AKHIR : LBS. Poltabes arah P. Kerobokan (BUKA)

    AKHIR : LBS Lepang arah Abian Base (BUKA)

    1 SEKSI - I AWAL : P. Padang Sambian ( TUTUP )

    AKHIR : Rec. Feeder Buana Desa ( TUTUP )

    AKHIR : LBS. Buana Raya arah P. Perumnas (

    BUKA )

    AKHIR : LBS. Br. Teges ( TUTUP )

    AWAL : LBS Br. Teges ( TUTUP )AKHIR : LBS. Tegal Buah arah P. Tegal Lantang  (

    BUKA )

    SEKSI - IV4

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.01

    P. PADANGSAMBIANRevisi 2

    Tgl.Terbit 01 Agustus 2012

    SINGLE LINE OPERASI NORMAL LOOP SCHAMEPENYULANG PADANG SAMBIAN >< P. CARGO

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    LBS Pole IRF

    Buana DesaRT PadangUdayana

    LBS Br. TegesLBS Pom Bensin Pdg

    Sambian

    LBS MCDLepangLBS Tegal Buah

    LBS BuanaRaya

    P.PD.SAMBIAN

    P.PERUMNAS

    LBS Poltabes

    P .KEROBOKAN

    P. TEGAL LANTANG P. ABIAN BASE

    LBS Pole IP.UBUNGLBS PinguinRF

    Buluh IndahLBS Lap. Buyung

    P.UMA ANYAR

    LBS Auto2000

    LBS Kubu Alit

    P.CARGO

    P.CARGO

    TRAFO IPADANGSAMBIAN

    60MVA

    TRAFO IIIKAPAL60MVA

    R RRR

    R

    R

    R

    R

    RR

    R

    R

      P. Padang Sambian  Hal : 1

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    2/61

    A

     A.1

    -

    2

    -

    3

    4

    5

    6

    7

     -

    8

    9

    10

    11

    12

    RT Padang Udayana di BUKA

    LBS Br.Tenges di TUTUP

    LBS Tegal Buah di BUKA

    P.Padang Sambian normal

    Operasi

     

    1

    Rec. Feeder Buana Desa akan mem-BUKA

    Pastikan beban P.Ubung naik

    LBS Pole 1 ke arah RF Buana Desa

    Seksi I normal

    P. Padang Sambian >< P. Ubung di

    Paralel sesaat

    LBS Pole I di-BUKA

    LBS Br. Teges di-BUKA

    LBS Tegal Buah di-TUTUP

     - beban P.Padang Sambian sebelum Trip

     - FIOHL / FI / RECLOSER

    Jika FI Pole 1 me-NYALA tetapi FI di LBS BR. Teges

    tidak me-NYALA maka gangguan dipastikan Seksi I

    setelah Pole 1

    Gangguan diperkirakan di Seksi I

    dari LBS Pole 1 ke arah RF Buana

    Desa

    Informasi ke Area Batan

    Cek Indikasi :

    P. Padang Sambian >< P. Tegal

    Lantang di Paralel sesaat

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.01

    P. PADANGSAMBIANRevisi 2

    Tgl.Terbit 01 Agustus 2012

    RF Buana Desa di TUTUP

    Lokalisir Seksi I setelah LBS Pole I

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. Padang Sambian ( TRIP )Buka One Line P. Padang Sambian

    di MMI

     - Jenis Gangguan (EF / OC / OC Moment)

     - Arus Gangguan ( I >> / I > / I 0 > )

    Selanjutnya Rec. Tie Padang Udayana akan me-

    NUTUP

    normalkan seksi yang tidak terganggu

    P. Padang Sambian di-TUTUP

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Pengusutan Gangguan dilaksanakan di SEKSI-I dari

    LBS Pole I sampai RF Buana Desa

    Penormalan Beban

    LBS Pole I di TUTUP

     

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    TRIP

    1

    A.1

    Ya

    Tidak

    2 - 6

    A.2

    7

    8 - 1 2

    NORMAL

      P. Padang Sambian  Hal : 2

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    3/61

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.01

    P. PADANGSAMBIANRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

     

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    A.2

     -

     -

    2

     -

    3

    4

    5

    -

    6

    -

    7

    -

    8

    9

    10

    A.3

    -

    2

    -

    3

    4

    5

    6

    7

     -

    8

    P. Padang Sambian >< P. Ubung di

     

    LBS Pole I di - TUTUP

    Rec. TIE Padang Udayana di-BUKA

    LBS Br. Teges di-BUKA

    P. Padang Sambian di-TUTUP

    RF. Buana Desa di-BUKA

    RT. Padang Udayana di-TUTUP

    LBS Br. Teges ke arah LBS Tegal

    Buah

    LBS Br. Teges di TUTUP Seksi II normal

    Jika FI / Fiohl Pole 1, FI di LBS BR. Teges tidak me-

    NYALA maka gangguan dipastikan dari Pole 1 ke arah

    GI

    Seksi I , II,& III dimanuver ke P.Ubung

    PMS. Ground 20 kV P.Padang Sambian di MASUKAN

    Dari GI s/d LBS Pole I

    Jika FI / Fiohl LBS Pole 1, FI di LBS BR. Teges me-

    NYALA maka gangguan dipastikan di Seksi II dari LBS

    Br. Teges

    Gangguan diperkirakan di Seksi II

    dar LBS Br. Teges ke arah LBS

    Tegal Buah

    PMS. 20 kV P. P_Padang Sambian diMASUKAN

    LBS Pole I di-TUTUP

    P. Padang Sambian di-TUTUPP. Padang Sambian>< P. Ubung di

    Paralel sesaat

    P. Padang Sambian normal

    Operasi

    Rec. Feeder Buana Desa akan mem-BUKA

    Selanjutnya Rec. Tie Padang Udayana akan me-

    NUTUP

    Lokalisir Seksi II setelah LBS Br. Teges

    normalkan seksi yang tidak terganggu

    P.Padang Sambian normal

    Operasi

    PMS. Ground 20 kV P.Padang Sambian di-

    KELUARKAN

    Selanjutnya Rec. Tie Padang Udayana akan me-

    NUTUP

    RF Buana Desa di TUTUP

    PMS. 20 kV P. Padang Sambian diKELUARKAN

    Penormalan Beban

    Lokalisir Seksi I sebelum LBS Pole I

    Pengusutan Gangguan dilaksanakan diSEKSI-I

    sebelum LBS Pole I

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Gangguan di Line Utama

    Rec. Feeder Buana Desa . berikutnya akan mem-BUKA

    Pengusutan Gangguan dilaksanakan di SEKSI-II dari

    LBS Br. Teges  sampai LBS Tegal Buah

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    Pastikan beban P.Ubung naik

     normalkan seksi yang t idak terganggu

    A.2

    NORMAL

    2-4

    5

    6

    7

    8-10

    B.1

    Tidak

    Ya

    2 - 6

    A.3

    7

    8

    NORMAL

      P. Padang Sambian  Hal : 3

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    4/61

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.01

    P. PADANGSAMBIANRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

     

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    B

    B.1

     -

     -

    2

    -

    3

    4

    5

    -

    - Penormalan Beban

    6

    7

    8

    B.2

     -

    -

    2

     -

    3

    4

    5

    -

    -

    6

    normalkan seksi yang tidak terganggu

    LBS Mcd Lepang di-TUTUP

    Lokalisir Seksi IV,

    P. Padang Sambian Normal

    Operasi

    Cek Indikasi :

    Recloser ( TRIP )

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK ATAU PETUGAS

     AREA JARINGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC. SECARA MANUAL BAIK DI GARDU INDUK , GARDU HUBUNG

    MAUPUN DI GARDU DISTRIBUSI

    JIKA INDIKATOR ( FI, FIOHL , GFD, HFD ) KEYPOINT TIDAK BERFUNGSI MAKA DISPATCHER APD BALI MEMBACA PETA ARUS GANGGUAN

    UNTUK MENENTUKAN LOKASI GANGGUAN.

    JIKA LOOP SCHEME BEKERJA DAN KONDISI BEBAN SUDAH DINORMALKAN MAKA RECLOSER FEEDER DAN RECLOSER TIE HARUS

    DIRESET ( MANUAL )

     LBS POM Bensin Padang Sambian di-BUKA

    Rec. Feeder Buana Desa Posisi BUKAPastikan RF Buana Desa Posisi

    Buka

    Selanjutnya Rec. Tie Padang Udayana akan me-

    NUTUP dan Trip (Lock Out)

    Lokalisir Seksi yang terganggu (Seksi III )

    Seksi III dimanuver ke P. Kerobokan

    RF Buana Desa ke Arah LBS POM

    Bensin Padang Sambian

    P. Padang Sambian normal

    Operasi

    Gangguan di Seksi IV antara LBS

    POM Bensin Padang Sambian s/d

    LBS Mcd Lepang

    LBS POM Bensin Padang Sambian di-TUTUP

    LBS Mcd Lepang di-BUKA

    RF Buana Desa di -TUTUP Seksi IV normal

    Pengusutan Gangguan dilaksanakan di SEKSI-IV Dari LBS POM Bensin

    Rec. Feeder Buana Desa Posisi BUKA

    Rec. TIE Padang Udayana akan me-NUTUP dan Trip

    (Lock Out)

    Normalkan seksi yang tidak terganggu

    RF Buana Desa diTUTUP

    Penormalan Beban

    Jika RF Buana Desa Trip, sedangkan FI di LBS POM

    Bensin Padang Sambian Tidak Menyala, maka

    Gangguan dipastikan di Seksi III

     - FIOHL / FI / RECLOSER

    Gangguan diperkirakan di Seksi III

    dari RF Buana Desa ke Arah LBS

    POM Bensin Padang Sambian

    LBS POM Bensin Padang Sambian di-TUTUP

    CATATAN :

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Pengusutan Gangguan dilaksanakan di SEKSI-II

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Pastikan RF Buana Desa Posisi

    Buka

    1 Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

    P. Padang Sambian >< P. Pegok

    Paralel sesaat

    ika RF Buana Desa Trip, sedangkan FI di LBS POM

    Bensin Padang Sambian me-NYALA, maka Gangguan

    dipastikan di Seksi IV

    LBS POM Bensin Padang Sambian di-BUKA

    B.1

    B.2

    2-4

    5

    6-8

    NORMAL

    2-4

    5

    6

    NORMAL

    Tidak

    Ya

    B.2

    TRIP

    1

      P. Padang Sambian  Hal : 4

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    5/61

    SIANG SIANG MALAM

    1 P. Kerobokan 163 277 313

    321 353

    312 328

    299 332

    149 151

    P. Tibubeneng 136 155

    PR.10.1

    Kode Penyulang PR.10.1.04.02

    P. KEROBOKANRevisi 3

    Tgl.Terbit 01 Agustus 2012

    3 SEKSI - III AWAL : LBS Silayukti ( TUTUP )AKHIR : LBS. Br.Anyar arah P. Tibu Beneng ( BUKA)

    AKHIR : LBS. Peliatan arah P. Uma Alas (BUKA)

    PROSEDUR OPERASIKode Unit  APD BALI

     No.Dok.

    177 P. Dalung 114 136

    2 SEKSI - II AWAL : Rec. Feeder Kerobokan ( TUTUP )

    AKHIR : Rec. Tie Gatsu Barat arah P. Dalung ( BUKA )

    AKHIR : LBS Silayukti ( TUTUP )

    AKHIR : LBS. Br. Padang arah P. Uma Alas (BUKA)

    KONDISI NORMAL

    1 SEKSI - I AWAL : P. Kerobokan ( TUTUP )

    AKHIR : Rec. Feeder Kerobokan ( TUTUP )

    AKHIR : LBS. Poltabes arah P. Padang Sambian (BUKA)

    AKHIR : LBS. Muding Batu arah P. Dalung ( BUKA )

    AKHIR : LBS. KUsambi arah P. Uma Alas ( BUKA )

    P. Padang Sambian 158 176

    P. Uma Alas

    ST ND R OPER SI PROSEDUR

    PENYULANG KEROBOKAN GARDU INDUK PADANG SAMBIAN

    OPERASI JARDIST. 20 KV PENYULANG KEROBOKAN

    NO PENYULANGREFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG MALAM

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    SINGLE LINE OPERASI NORMAL LOOP SCHAMEPENYULANG KEROBOKAN >< PENYULANG DALUNG

    TRAFO IIGI

    KAPAL60MVA

    P.DALUNG

    LBS PoleI

    LBS Gaji

    RFCeluk

    LBS PadangBali

    P.Tibubeneng

    LBS Dalung Permai

    RT GatsuBaratLBS Muding Batu

    R.FKerobokan

    P.ABIANBASE

    P.KEROBOKANLBS Pole I

    P.PadangSambian

    LBSPoltabes

    LBSBr. Anyar 

    P.Tibubeneng

    LBSSilayukti

    LBS PekandelanLBSBr.Padang

    P.Uma Alas

    LBSKusambi

    LBSMilinium

    P.Uma Alas P.Uma Alas

    TRAFO IGI PADANG SAMBIAN

    60MVAR

    R R

    R

    R

    R

    R

    R

    R

    P.ABIANBASE

    R

    R

    R

    R

    R

      P. Kerobokan Hal : 5

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    6/61

    A

    A.1

    -

    -

    -

    2

    3

    4

     -

    4

    5

    6

    A.2

     -

     -

    2

     -

    3

    4

    -

    5

    -Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

     

    PMS. 20 kV P. Kerobokan di-KELUARKAN

    PMS. Ground 20 kV P. Kerobokan di-MASUKAN

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    sebelum LBS Pole I Dari GI s/d LBS Pole I

    Rec. Feeder Pasar Kerobokan, akan mem-BUKA

    Rec. Tie Gatsu Barat akan me-NUTUP

    Lokalisir Seksi I sebelum LBS Pole I

    LBS Pole I di-BUKA, normalkan seksi yang tidak

    terganggu

    RF Pasar Kerobokan di-TUTUPSeksi I , II,& III dimanuver ke P.

    Dalung

    RF Pasar Kerobokan di TUTUPP. Kerobokan >< P. Dalung di

    Paralel sesaat

    RT Gatsu Barat di-BUKAP. Kerobokan Normal Operasi

    Jika FI RF LBS Pole 1 Tidak menyala, maka

    Gangguan dipastikan di Line Utama (arah GI)Gangguan di Line Utama

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    setelah LBS Pole I

    dari LBS Pole 1 sampai di RF

    Pasar Kerobokan

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    LBS Pole I di TUTUP Seksi I normal

    Rec. Tie Gatsu Barat akan me-NUTUP Pastikan Beban P_Dalung naik

    Lokalisir Seksi I sebelum LBS Pole I

    LBS Pole I di BUKA, normalkan seksi yang tidak

    terganggu

    P. Kerobokan di TUTUP

    Normalkan seksi yang tidak terganggu

     - beban P. Kerobokan sebelum Trip

     - FIOHL / FI / RECLOSER

    Jika P.Kerobokan Trip sedangkan FIOHL/FI di LBS

    Pole 1 Menyala, maka Gangguan dipastikan di

    Seksi I

    Rec. Feeder Pasar Kerobokan, akan mem-BUKA

    P. Kerobokan (TRIP) Buka One Line P. Kerobokan di

    1

    Cek Indikasi :

    Informasi ke Area Batan

     - Jenis Gangguan (EF / OC / OC Moment)

     - Arus Gangguan ( I >> / I > / I 0 > )

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    PR.10.1

    Kode Penyulang PR.10.1.04.02

    P. KEROBOKANRevisi 3

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASIKode Unit  APD BALI

     No.Dok.PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    A.1

    TRIP

    1

    2 - 3

    A.2

    Ya

    Tidak

    3

    4,5,6

    NORMAL

    A.2

    2-3

    4

    5

    B.1

    TidakYa

      P. Kerobokan Hal : 6

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    7/61

     

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    PR.10.1

    Kode Penyulang PR.10.1.04.02

    P. KEROBOKANRevisi 3

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASIKode Unit  APD BALI

     No.Dok.PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    6

    -

    7

    8

    9

    B

    B.1

     -

     -

    2

    3

    -

    -

    4

    5

    -

    Penormalan Beban

    6

    7

    8 LBS Silayukti diTUTUP

    9LBS Peliatan atau LBS

    Br.Anyar diBUKALepas paralel

    P. Kerobokan normal Operasi

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    RF Psr Kerobokan diTUTUP

    Rec. TIE Gatsu Barat di-BUKAP. Kerobokan >< P. Dalung Paralel

    sesaat

    P. Kerobokan >< P. Dalung Paralel

    sesaat

    Normalkan seksi yang tidak terganggu

    LBS Pak Silayukti di-BUKA, normalkan seksi yang

    tidak terganggu

    LBS Peliatan atau LBS Br.Anyar di-TUTUPSeksi III dimanuver ke P. Uma Alas

    atau P.Tibubeneng

    Pengusutan Gangguan dilaksanakan di SEKSI-IIDari RF Psr Kerobokan s/d RT

    Gatsu Barat & LBS Pak Silayukti

    Jika RF Pasar Kerobokan Trip dan FI LBS Pole 1

    Menyala, maka Gangguan dipastikan di Seksi II

    RF Psr Kerobokan Posisi-BUKAPastikan RF. Pasar Kerobokan

    Posisi BUKA

    Rec. Tie Gatsu Barat akan me-NUTUP dan Trip(Lock Out)

    P. Kerobokan di-TUTUP

    Lokalisir Seksi II

    Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

     - FIOHL / FI / RECLOSER

    Recloser ( TRIP )

    1

    Cek Indikasi :

    LBS Pole I di-TUTUP

    P. Kerobokan di-TUTUPP. Kerobokan >< P. Dalung di

    Paralel sesaat

    Rec. TIE Gatsu Barat diBUKAP. Kerobokan normal Operasi

    Penormalan Beban

    PMS. Ground 20 kV P. Kerobokan di-KELUARKAN

    PMS. 20 kV P. Kerobokan di-MASUKAN

    NORMAL

    6

    7-9

    B.1

    B.2

    2-4

    5

    6-9

    NORMAL

    Tidak

    Ya

    TRIP

    1

      P. Kerobokan Hal : 7

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    8/61

     

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    PR.10.1

    Kode Penyulang PR.10.1.04.02

    P. KEROBOKANRevisi 3

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASIKode Unit  APD BALI

     No.Dok.PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    B.2

     -

    -

    -

    2

    -

     -

    3

    4

    5

    -

    6 LBS Silayukti di-TUTUP

    P. Kerobokan Normal Operasi

    CATATAN :

    Rec.TIE Gatsu Barat akan me-NUTUP, dan Trip

    (Lock Out )

    Gangguan diperkirakan di Seksi III

    Lokalisir Seksi III

    Jika FI di LBS Silayukti Menyala, maka Gangguan

    dipastikan di Seksi III

    Gangguan di Seksi III antara LBS

    Silayukti s/d LBS Peliatan dan LBS

    Br.Anyar 

    Rec. Feeder Pasar Kerobokan, Posisi BUKAPastikan RF. Pasar Kerobokan

    Posisi BUKA

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK ATAU PETUGAS

    LAPANGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC/PMT/PMS DAN PMS`GROUND. SECARA MANUAL BAIK DI GARDU INDUK , GARDU

    HUBUNG MAUPUN DI GARDU DISTRIBUSI

    Pengusutan Gangguan dilaksanakan di SEKSI-IIIDari LBS Silayukti s/d LBS Peliatan

    dan LBS Br.Anyar 

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    LBS Silayukti di-BUKA

    Normalkan seksi yang tidak terganggu

    P. Kerobokan di-TUTUP Seksi I normal

    RF Pasar Kerobokan di-TUTUP Seksi II normal

    2 - 4

    5

    6

    NORMAL

    B.2

      P. Kerobokan Hal : 8

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    9/61

    SIANG SIANG MALAM

    1 P. Seminyak   145 152 155

    1 SEKSI - I

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KONDISI NORMAL

    AWAL :P. Seminyak ( TUTUP )AKHIR : GD. Imperial arah GD. Hano Bali

    ( BUKA )

    AKHIR :GH Legian arah P.Seminyak (TUTUP)

    AKHIR : GH. Legian arah P. Mandira (BUKA)

    AKHIR : GH. Legian arah P. Kuta Jaya (BUKA)

    AKHIR : Kopel GH. Legian (BUKA)

    AWAL : GD.Imperial arah GH. Legian (TUTUP)SEKSI - II2

    PENYULANG SIANG MALAM

    148 P. Exp. Legian 7 7

    ST ND R OPER SI PROSEDUR

    PENYULANG SEMINYAK GARDU INDUK PADANG SAMBIAN

    OPERASI JARDIST. 20 KV PENYULANG SEMINYAK

    NO PENYULANGREFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    WISFIN

    VILLASEMAYA

    H. IMPERIAL

    H. CENDANA

    PTT HEAD

    LEGIAN SUITE

    DEPO BANGUNAN

    BPC CITYHOTEL

    SEMINYAK RESORT

    H. OBEROI

    ELESION

    HANO BALI

    HOLIDAY RESORT

    H. PELANGI

    H. DYANA PURA

    H. ANANTARA

    EMERALPARADISE

    P.SEMINYAK

    R

    R

    H  F  D  

    P. KOPEL

    TRAFO VPESANGGARAN

    60 MVA

    Bali SaniKA 264

    R

    H  F  D  

    ArabicaDS 285

    White RoseKA 416

    MatahariBungalowKA 356

    Bali PadmaKA028

    MandiraKA 018

    KA 1147CAREFOUR

    Bali KutaResidenKA 1387

    Indra ResortKA 267

    P. Mandira

    GD JAYAKARTAKA 414

    GD MABISAKA 295

    GD MELASTIKA 294

    OCEANPERMATAKA

    TONE HOTELKA

    THE HEVENKA 1383

    VILLAS 2KA 624

    VILLASKUNTIKA 582

    P. NAKULA

    P. VILLAS

    R

    R

     GD

    K  UMA L A 

    P A NT A I  

    K A 7 2  5 

    GD Kuta Jaya

    GD Legian Beach

    GD Kulkul

    GD Bali Intan

    GD Wina Cottage

    GD Ramayana

    GD AllSeason

    KPL 2

    GD IBBIS H

    HFD

    P. KUTA JAYA

     GH

     S  UN S E T 

    R OA D

    P T I  A RA 

    GD. SAHID / HARISKA 178

    KPL 1

    R

    P .K  UT A  S  Q UA RE 

    P. EXP LEGIAN

    TRAFOIPADANG SAMBIAN

    TRAFOVPESANGGARAN

    R

    TRAFOIPEMECUTAN

    TRAFOIPEMECUTAN

    SINGLE LINE OPERASI NORMAL PENYULANG SEMINYAK

      P. Seminyak Hal : 9

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    10/61

    A

     A.1

     A.2

    -

    2

    3

    4

    5

    6

    7

    8

     -

    9

    10

    11

    GD Legian Suite arah Villa Semaya di-TUTUPP. Seminyak >< P. EXP

    Legian di Paralel sesaat

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    Pengusutan gangguan dilakukan pada seksi I

    (antara GD Villa Semaya dan GD Legian Suite)

    Gangguan ditemukan langsung diatasi sesuai SOPKerja Lapangan

    Penormalan Beban

    P. Seminyak normal

    Operasi

    GD Legian Suite arah Villa Semaya di-BUKA

    GD H Imperial arah GD Hanoi Bali di-TUTUP

    GD H Imperial arah Hano Bali di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUP

    Melokalisir titik gangguan

    GD Villa Semaya arah Legian Suite di-BUKA

    Beban ekor P.Seminyak

    dimanuver ke P.EXP

    Legian

    GD Villa Semaya arah Legian Suite di-TUTUP

    Lokalisir Seksi I

     - beban P. Seminyak sebelum Trip

     - FIOHL / FI / RECLOSER

    - Mereset relay penyulang

    Jika indikasi EF

    Jika GFD pada GD Legian Suite ,GD H.Oberoi dan

    GD Elesion, Hano Bali, dan HFD/FI GD H Imperialarah Hano Bali tidak menyala, GFD pada GD Villa

    Semaya menyala maka gangguan dipastikan di

    seksi I (antara GD Villa Semaya dan GD Legian

    Suite)

    Gangguan di seksi 1 antara

    GD Villa Semaya dan GD

    Legian Suite

    P.Seminyak di-TUTUP

    P. Seminyak ( TRIP )Buka One Line P.

    Seminyak di MMI

    Cek Indikasi :

    Informasi ke Area Batur - Jenis Gangguan (EF / OC / OC Moment)

     - Arus Gangguan ( I >> / I > / I 0 > )1

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    TRIP

    1

    A.2

    Ya Tidak

    2-5

    A.3

    4

    8 -10

    NORMAL

    5

    6

    7

    11

    A.1

    B.1

      P. Seminyak Hal : 10

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    11/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    A.3

    -

    2

    3

    4

    5

    6

    7

    8

     -

    9

    10

    11

    A.4

    2  

    3

    -

    4

    5

    GD H Oberoi arah GD Elesion di-BUKA

    P.Seminyak di-TUTUP

    Jika GFD pada GD Elesion, GD Hano Bali, dan

    HFD/FI GD H Imperial arah Hano Bali tidak

    menyala, GFD pada GD Villa Semaya, GD Legian

    Suite dan GD H.Oberoi menyala maka gangguan

    dipastikan di seksi I (antara GD H Oberoi dan GD

    Elesion)

    GD H Imperial arah GD Hano Bali di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUPBeban ekor P.Seminyak

    dimanuver ke P.EXP

    Lokalisir Seksi I

    Gangguan di Seksi I antara

    GD H Oberoi dan GD

    Elesion

    P.Seminyak normal sampai

    GD H Oberoi

    P. Seminyak >< P. EXP

    Legian di Paralel sesaat

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    P. Seminyak normalOperasi

    Jika GFD pada GD H.Oberoi dan GD Elesion, GD

    Hano Bali, dan HFD/FI GD H Imperial arah Hano

    Bali tidak menyala, GFD pada GD Villa Semaya, GD

    Legian Suite menyala maka gangguan dipastikan

    di seksi I (antara GD Legian Suite dan GD H

    Oberoi)

    Gangguan di seksi 1 antara

    GD Legian Suite dan GD H

    Oberoi

    Lokalisir Seksi I

    GD H Imperial arah Hano Bali di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUP

    Beban ekor P.Seminyak

    dimanuver ke P.EXP

    Legian

    Melokalisir titik gangguan

    GD Legian Suite arah Seminyak Resort di-BUKA

    P.Seminyak di-TUTUP

    GD H Oberoi arah Seminyak Resort di-BUKA

    GD H Imperial arah GD Hanoi Bali di-TUTUP

    Pengusutan gangguan dilakukan pada seksi I

    (antara GD Legian Suite dan GD H Oberoi)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    GD Villa Semaya arah Legian Suite di-TUTUP

    GD Legian Suite arah Villa Semaya di-TUTUP

    A.4

    2 -3

    A.5

    TidakYa

    A.3

    Ya Tidak

    2-5

    A.4

    4

    8 -10

    NORMAL

    5

    6

    7

    11

    4

    5

      P. Seminyak Hal : 11

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    12/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    -

    6

    7

    8

    -

    9

    10

    11

    A.5

    2  

    3

    -

    4

    5

    -

    6

    7

    8

    -

    9

    10

    11

    Penormalan Beban

    GD H Imperial arah GD Hano Bali di-TUTUP

    Pengusutan gangguan dilakukan pada seksi I

    (antara GD Elesion dan GD Hano Bali)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    GD Elesion arah GD Hano bali di-TUTUP

    GD Hano Bali arah GD Elesion di-TUTUPP. Seminyak >< P. EXP

    Legian di Paralel sesaat

    GD Elesion arah GD H Oberoi di-TUTUP P. Seminyak >< P. EXPLegian di Paralel sesaat

    Lokalisir titik gangguan

    GD Elesion arah GD H Oberoi di-BUKA

    Penormalan Beban

    GD H Imperial arah GD Hano Bali di-TUTUP

    Pengusutan gangguan dilakukan pada seksi I

    (antara GD H Oberoi dan GD Elesion)

    GD H Oberoi arah GD Elesion di-TUTUP

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    P. Seminyak normal

    Operasi

    GD Elesion arah GD Hano Bali di-BUKA

    P.Seminyak di-TUTUP

    Lokalisir titik gangguan

    GD Hano Bali arah GD Elesion di-BUKA

    Jika GFD pada GD Hano Bali, dan HFD/FI GD H

    Imperial arah Hano Bali tidak menyala, GFD pada

    GD Villa Semaya, GD Legian Suite GD

    H.Oberoi,dan GD Elesion, menyala maka gangguan

    dipastikan di seksi I (antara GD Elesion dan GD

    Hano Bali)

    Gangguan di Seksi I antara

    GD Elesion dan GD Hano

    Bali

    GD H Imperial arah GD Hano Bali di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUPBeban ekor P.Seminyak

    dimanuver ke P.EXP

    Lokalisir Seksi I

    P.Seminyak normal sampai

    GD Elesion

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    P. Seminyak normal

    Operasi

    NORMAL

    6

    7

    11

    8 -10

    A.5

    NORMAL

    2 -3

    6

    7

    11

    A.6

    TidakYa

    8 -10

    4

    5

      P. Seminyak Hal : 12

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    13/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    A.6

    2  

    3

    -

    4

    5

    -

    6

    -

    7

    8

    9

    A.7

    2  

    3

    -

    4

    5

    -

    6

    -

    7

    Beban ekor P.Seminyak

    dimanuver ke P.EXP

    Penormalan Beban

    GD H Imperial arah GD Hano Bali di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUPBeban ekor P.Seminyak

    dimanuver ke P.EXP

    Lokalisir Seksi I

    GD Hano Bali arah GD H Imperial di-BUKA

    Jika HFD/FI GD H Imperial arah Hano Bali tidak

    menyala, GFD pada GD Villa Semaya, GD Legian

    Suite GD H.Oberoi, GD Elesion, dan GD Hano Bali

    menyala maka gangguan dipastikan di seksi I

    (antara GD Hano Bali dan GD H Imperial)

    Gangguan di Seksi I antara

    GD Hano Bali dan GD H

    Imperial

    P.Seminyak di-TUTUP

    Lokalisir titik gangguan

    Pengusutan gangguan dilakukan pada seksi I

    (antara GD Elesion dan GD Hano Bali)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    GD Hano Bali arah GD H Imperial di-TUTUP

    GD H Imperial arah GD Hano Bali di-TUTUP

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    P.Seminyak di-TUTUPP.Seminyak normal sampai

    GD H. Imperial

    P. Seminyak normal

    Operasi

    Jika GFD pada GD H. Cendana, GD Holiday

    Resort, GD H.Pelangi, GD Dyana Pura, GD

     Anantara tidak menyala, GFD pada GD Villa

    Semaya, GD Legian Suite GD H.Oberoi, GD

    Elesion, GD Hano Bali dan HFD/FI GD H Imperial

    menyala maka gangguan dipastikan di seksi II

    (antara GD H Imperial dan GD H Cendana)

    Gangguan di Seksi II antara

    GD H Imperial dan GD H

    Cendana

    GD H Imperial arah GD H Cendana di-BUKA

    P.Seminyak normal sampai

    GD Elesion

    Penormalan Beban

    P. Seminyak >< P. EXP

    Legian di Paralel sesaat

    Lokalisir Seksi I

    GD H Cendana arah GD H Imperial di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUP

    Lokalisir titik gangguan

    Pengusutan gangguan dilakukan pada seksi II

    (antara GD H Imperial dan GD H Cendana)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    GD Imperial arah GD H Cendana di-TUTUP

    A.6

    NORMAL

    2 -3

    8 - 9

    A.7

    TidakYa

    6 - 7

    4

    5

    A.7

    2 -3

    7

    A.8

    TidakYa

    6

    4

    5

      P. Seminyak Hal : 13

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    14/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    8

    9

    A.8

    2  

    3

    -

    4

    5

    -

    6

    7

    8

    -

    9

    10

    11

    A.9

    2  

    3

    -

    P. Seminyak normal

    Operasi

    GD H.Cendana arah GD Holiday Resort di-BUKA

    GD H Imperial arah GD H Cendana di-TUTUP

    Jika GFD pada GD H.Pelangi, GD H Dyana Pura,

    GD Anantara tidak menyala, GFD pada GD Villa

    Semaya, GD Legian Suite GD H.Oberoi, GD

    Elesion, GD Hano Bali , GD H. Cendana, GD

    Holiday Resort, dan HFD/FI GD H Imperial menyala

    maka gangguan dipastikan di seksi II (antara GD

    Holiday Resort dan GD H Pelangi)

    Gangguan di Seksi II antara

    GD Holiday Resort dan GD

    H Pelangi

    GD H Imperial arah GD H Cendana di-BUKA

    P.Seminyak di-TUTUPP.Seminyak normal sampai

    GD H. Imperial

    Lokalisir Seksi I

    P.Seminyak normal sampai

    GD H. Imperial

    Kopel GH Legian arah .P.EXP Legian di-TUTUPBeban ekor P.Seminyak

    dimanuver ke P.EXP

    Pengusutan gangguan dilakukan pada seksi II

    (antara GD H Imperial dan GD H Cendana)

    P. Seminyak >< P. EXP

    Legian di Paralel sesaat

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    P.Seminyak di-TUTUP

    Lokalisir Seksi I

    GD Holiday Resort arah GD H Cendana di-BUKA

    Lokalisir titik gangguan

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    GD Cendana arah GD Holiday Resort di-TUTUP

    GD Holiday Resort arah GD H Cendana di-TUTUP

    P. Seminyak >< P. EXP

    Legian di Paralel sesaat

    P. Seminyak normal

    Operasi

    Gangguan di Seksi II antara

    antara GD H Cendana dan

    GD H Holiday Resort

    Jika GFD pada GD Holiday Resort, GD H.Pelangi,

    GD H Dyana Pura, GD Anantara tidak menyala,

    GFD pada GD Villa Semaya, GD Legian Suite GD

    H.Oberoi, GD Elesion, GD Hano Bali , GD H.

    Cendana, dan HFD/FI GD H Imperial menyala

    maka gangguan dipastikan di seksi II (antara GD H

    Cendana dan GD H Holiday Resort)

    GD H Cendana arah GD H Imperial di-TUTUP

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    GD H Imperial arah GD H Cendana di-BUKA

    NORMAL

    8

    9

    A.8

    NORMAL

    2 -3

    A.9

    TidakYa

    8 - 10

    4

    5

    11

    6

    7

    A.9

    2 -3

    A.10

    TidakYa

      P. Seminyak Hal : 14

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    15/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    4

    5

    -

    6

    7

    8

    -

    9

    10

    11

    A.10

    2  

    3

    -

    4

    5

    -

    6

    7

    8

    -

    9

    10

    11

    GD H Dyana Pura arah GD H Pelangi di-TUTUPP. Seminyak >< P. EXP

    Legian di Paralel sesaat

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    Lokalisir titik gangguan

    GD H. Pelangi arah GD H. Dyana Pura di-BUKA

    GD H Imperial arah GD H Cendana di-TUTUP

    Pengusutan gangguan dilakukan pada seksi II

    (antara GD Pelangi dan GD Dyana Pura)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    GD H Pelangi arah GD H Dyana Pura di-TUTUP

    Jika GFD pada GD H Dyana Pura, GD Anantara

    tidak menyala, GFD pada GD Villa Semaya, GD

    Legian Suite GD H.Oberoi, GD Elesion, GD HanoBali , GD H. Cendana, GD Holiday Resort, GD

    H.Pelangi, dan HFD/FI GD H Imperial menyala

    maka gangguan dipastikan di seksi II (antara GD

    Pelangi dan GD H Dyana Pura)

    Gangguan di Seksi II antaraGD H Pelangi dan GD H

    Dyana Pura

    GD H Imperial arah GD H Cendana di-BUKA

    P.Seminyak di-TUTUPP.Seminyak normal sampai

    GD H. Imperial

    Lokalisir Seksi I

    GD H.Dyana Pura arah GD H Pelangi di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUP

    Beban ekor P.Seminyak

    dimanuver ke P.EXP

    Penormalan Beban

    GD Holiday Resort arah GD H Pelangi di-TUTUP

    GD H Pelangi arah GD Holiday Resort di-TUTUPP. Seminyak >< P. EXP

    Legian di Paralel sesaat

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    P. Seminyak normal

    Operasi

    GD H.Pelangi arah GD Holiday Resort di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUPBeban ekor P.Seminyak

    dimanuver ke P.EXP

    Lokalisir titik gangguan

    GD Holiday Resort arah GD Pelangi di-BUKA

    GD H Imperial arah GD H Cendana di-TUTUP

    Pengusutan gangguan dilakukan pada seksi II

    (antara GD Holiday Resort dan GD H Pelangi)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    NORMAL

    8 - 10

    4

    5

    11

    6

    7

    A.10

    2 -3

    A.11

    TidakYa

    8 - 10

    4

    5

    11

    6

    7

      P. Seminyak Hal : 15

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    16/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    A.11

    2  

    3

    -

    4

    5

    -

    6

    7

    8

    -

    9

    10

    11

    A.12

    2  

    3

    -

    4

    5

    P. Seminyak normal

    Operasi

    Jika GFD/FI pada GD Villa Semaya, GD Legian

    Suite GD H.Oberoi, GD Elesion, GD Hano Bali , GD

    H. Cendana, GD Holiday Resort, GD H.Pelangi, GD

    H Dyana Pura, GD H Anantara, dan HFD/FI GD H

    Imperial menyala maka gangguan dipastikan di

    seksi II (antara GD H.Anantara dan GH Legian arah

    P.EXP Legian)

    Gangguan di Seksi II antara

    GD H.Anantara dan GH

    Legian arah P.EXP Legian

    GD H Imperial arah GD H Cendana di-BUKA

    P.Seminyak di-TUTUPP.Seminyak normal sampai

    GD H. Imperial

    Lokalisir Seksi I

    GD H.Anantara arah GH Legian di-BUKA

    GD H Imperial arah GD H Cendana di-TUTUPBeban ekor P.Seminyak

    dimanuver ke P.EXP

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    GD H Dyana Pura arah GD H Anantara di-TUTUP

    GD H Anantara arah GD H Dyana Pura di-TUTUPP. Seminyak >< P. EXP

    Legian di Paralel sesaat

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    Lokalisir Seksi I

    GD H.Anantara arah GD H Dyana Pura di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUPBeban ekor P.Seminyak

    dimanuver ke P.EXP

    Lokalisir titik gangguan

    GD H. Dyana Pura arah GD H. Anantara di-BUKA

    GD H Imperial arah GD H Cendana di-TUTUP

    Pengusutan gangguan dilakukan pada seksi II(antara GD H.Dyana Pura dan GD H Anantara)

    P. Seminyak normal

    Operasi

    Jika GFD pada GD H Anantara tidak menyala,

    GFD pada GD Villa Semaya, GD Legian Suite GD

    H.Oberoi, GD Elesion, GD Hano Bali , GD H.

    Cendana, GD Holiday Resort, GD H.Pelangi, GD H

    Dyana Pura, dan HFD/FI GD H Imperial menyala

    maka gangguan dipastikan di seksi II (antara GD

    H.Dyana Pura dan GD H Anantara)

    Gangguan di Seksi II antara

    antara GD H.Dyana Pura

    dan GD H Anantara

    GD H Imperial arah GD H Cendana di-BUKA

    P.Seminyak di-TUTUPP.Seminyak normal sampai

    GD H. Imperial

    NORMAL

    A.11

    NORMAL

    2 -3

    A.12

    TidakYa

    8 - 10

    4

    5

    11

    6

    7

    2 -3

    4

    5

    A.12

    A.13

    TidakYa

      P. Seminyak Hal : 16

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    17/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    -

    6

    -

    7

    A.13

    2

    3

    4

    5

    6

    7

    8

    -

    - Penormalan Beban

    9

    10

    11

    12

    13

    B.1

    B.2

    2

    3

    -

    4

    Gangguan di Seksi II antara

    GD H.Imperial dan Kopel

    GH Legian arah P.EXP

    Legian

    PMT P.Seminyak di-TUTUP

    P. Seminyak normal

    Operasi

    Pengusutan gangguan dilakukan pada Seksi I (line

    utama) antara GI sampai GD Villa Semaya

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    PMS. Ground 20 kV P. Seminyak di-LEPAS

    PMS. 20 kV P. Seminyak di-Masukkan

    PMT P.Seminyak di-TUTUP

    GD Villa Semaya arah GI di-TUTUP

    Kopel GH Legian arah .P.EXP Legian di-BUKA

    Jika Indikasi OC atau OC/M

    Jika FI pada GD H. Imperial menyala , maka

    gangguan dipastikan pada Seksi II (antara GD H

    Imperial dengan Kopel GH Legian arah P.EXP

    Legian)

    GD H.Imperial arah GI di- BUKA

    Lokalisir Seksi II

    Pengusutan gangguan dilakukan pada Seksi I

    (antara GD H Imperial dengan Kopel GH Legian

    arah P.EXP Legian)

    GD Villa Semaya arah GI di-BUKA

    GD H Imperial arah Hano Bali di-TUTUP

    JJika GFD/FI pada GD Villa Semaya, GD Legian

    Suite GD H.Oberoi, GD Elesion, GD Hano Bali , GD

    H. Cendana, GD Holiday Resort, GD H.Pelangi, GD

    H Dyana Pura, GD H Anantara, dan HFD/FI GD H

    Imperial tidak menyala maka gangguan dipastikan

    di seksi II (antara GD Vila Semaya dan GI)

    Ganguan di Line Utama

    P. Seminyak normal

    Operasi

    GD H Imperial arah Hano Bali di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUP

    PMS. 20 kV P. Seminyak di-KELUARKAN

    PMS. Ground 20 kV P. Seminyak di-MASUKAN

    Lokalisir titik gangguan

    Pengusutan gangguan dilakukan pada seksi II

    (antara GD H.Anantara dan GH Legian arah P.EXP

    Legian)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    GD H.Anantara arah GH Legian di- di-TUTUP

    B.1

    B.2

    B.3

    TidakYa

    2-3

    4

    NORMAL

    6 - 7

    A.13

    NORMAL

    2 - 3

    6-7

    11 -13

    8

    9-10

    4

    5

      P. Seminyak Hal : 17

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    18/61

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.03

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. SEMINYAKRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    -

    - Penormalan Beban

    5

    B.3

    2

    3

    4

    5

    6

    -

    - Penormalan Beban

    7

    8

    9

    10

    11

    P. Seminyak normal

    Operasi

    Ganguan di Line Utama

    Beban ekor P.Seminyak

    dimanuver ke P.EXP

    Legian

    P. Seminyak normal

    Operasi

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    GD H.Imperial arah GI di-TUTUP

    GD H. Imperial arah GI di-TUTUP

    Kopel GH Legian arah .P.EXP Legian di-TUTUP

    PMS. 20 kV P.Seminyak di MASUKKAN

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK

     ATAU PETUGAS AREA JARINGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC. SECARA MANUAL BAIK DI GARDU

    INDUK , GARDU HUBUNG MAUPUN DI GARDU DISTRIBUSI

    JIKA INDIKATOR ( FI, FIOHL , GFD, HFD ) KEYPOINT TIDAK BERFUNGSI MAKA DISPATCHER APD BALI MEMBACA PETA ARUS

    GANGGUAN UNTUK MENENTUKAN LOKASI GANGGUAN.

    JIKA LOOP SCHEME BEKERJA DAN KONDISI BEBAN SUDAH DINORMALKAN MAKA RECLOSER FEEDER DAN RECLOSER TIE

    HARUS DIRESET ( MANUAL )

    Jika FI pada GD H. Imperial tidak menyala , maka

    gangguan dipastikan pada Seksi II (antara GD H

    Imperial dengan GI )

    PMT P.Seminyak di-TUTUP

    GD H Imperial arah GI di-BUKA

    Kopel GH Legian arah .P.EXP Legian di-TUTUP

    PMS. 20 kV P. Seminyak di-KELUARKAN

    PMS. Ground 20 kV P. Seminyak di-MASUKAN

    Pengusutan gangguan dilakukan pada Seksi I

    (antara GD H Imperial dengan GI)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    PMS. Ground 20 kV P. Seminyak di LEPAS

    CATATAN :

    5

    NORMAL

    B.3

    2-3

    4-5

    7-8

    9-11

    NORMAL

    6

      P. Seminyak Hal : 18

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    19/61

    SIANG SIANG MALAM

    1 P. Perumnas 139 242 264

    158 176

    1 SEKSI - I

    2 SEKSI - II

    ST ND R OPER SI PROSEDUR

    PENYULANG PERUMNAS GARDU INDUK PADANG SAMBIAN

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.04

    P. PERUMNASRevisi 2

    Tgl.Terbit 01 Agustus 2012

    OPERASI JARDIST. 20 KV PENYULANG PERUMNAS

    NO PENYULANGREFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG MALAM

    160 P. Imam Bonjol 103 104

    KONDISI NORMAL

    AWAL : P. Perumnas ( TUTUP ) AKHIR : Rec. Buana Kubu ( TUTUP )

    AKHIR : LBS. Buana Raya arah P. Pdg Sambian (

    BUKA )

    AWAL : Rec. Buana Kubu ( TUTUP )AKHIR : Kopel 1 GH. Monang Maning arah P. Imam

    Bonjol ( BUKA )

    P.Padang Sambian 158 176

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No.17Denpasar - Bali

     

    SINGLE LINE OPERASI NORMAL PENYULANG PERUMNAS

    P. ABIAN BASE

    TRAFO IIIKAPAL60 MVA

    LBSPOLE I

    Rec. Psr Abian Base

    LBS Cica

    LBS Yeh Poh

    LBSGajiLBS Kebo Iwa

    LBS MileniumLBS McDLepang

    LBS G.Catur LBS Buluh Indah

    LBS Merpati

    P. TANGEB

    P. DALUNG

    P. CARGO

    P. PDG SAMBIAN

    R

    GH MONANG MANING

    R

    R

    R

    R

    R

    R

    R R

    R

    R

    R

    P. PERUMNAS

    R

    Rec. BuanaKubu

    R

    LBSPOLE I

    P. PDG SAMBIAN

    LBSBuana Raya

    P. IMAM BONJOL

    TRAFOIPDGSAMBIAN

    60 MVA

    P. BUAGAN

    TRAFOIIPDGSAMBIAN

    60 MVA

    P. MISOL

    LBSPole 1

    LBSBiak

    LBS Pemecutan

    RF Alangkajeng

    LBSWahidin

    RT AJ Batan

    R

    R

    R

    LBSBank Exim

    R

    P.MERDEKA

    P. SUDIRMAN

    P. GN AGUNG

    TRAFOIPDGSAMBIAN

    60 MVA

    IMAM BUAGAN F.KOTA ABIANBASE PERUMNAS

    P. DALUNG

    KOPEL1 KOPEL2

    R

    R

    R

    LBSLempuyang

    P.SRB/ GD SRB

    COArah GD SRB

    P. Perumnas Hal : 20

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    20/61

    A

     A.1

    2

    -

    3

    4

    5

    6

    7

     -

    8

    9

    10

    A.2

    2

     -

    3

    4

    5

    -

    6

    -

    Rec. Buana Kubu di-BUKA

    Kopel 1 di GH Monang- Maning di-TUTUP

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

     

    PMS. 20 kV P. Perumnas di-KELUARKAN

    PMS. Ground 20 kV P.Perumnas di-MASUKAN

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    sebelum LBS Pole IDari GI s/d LBS Pole I

    Lokalisir Seksi I sebelum LBS Pole I

     normalkan seksi yang tidak terganggu

    LBS Pole I di - TUTUP

    Kopel 1 di GH Monang Maning di-TUTUPSeksi I , II, dimanuver ke P.

    Imam Bonjol

    Jika FI LBS Pole 1 tidak me-NYALA maka gangguan

    dipastikan dari LBS Pole 1 ke arah GIGangguan di Line Utama

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.04

    P. PERUMNASRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    P. Perumnas ( TRIP )Buka One Line P. Perumnas di

    MMI

     - Jenis Gangguan (EF / OC / OC Moment)

     - Arus Gangguan ( I >> / I > / I 0 > )

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    1

    Cek Indikasi :

    normalkan seksi yang tidak terganggu

     - beban P.Perumnas sebelum Trip

     - FIOHL / FI / RECLOSER

    Jika FI Pole 1 me-NYALA maka gangguan dipastikan

    Seksi I setelah Pole 1

    Gangguan diperkirakan di Seksi

    I dari LBS Pole 1 ke arah Rec

    Buana KubuLokalisir Seksi I setelah LBS Pole I

    LBS Pole I di-BUKA

    P. Perumnas di-TUTUP

    Informasi ke Area Batan

    Pengusutan Gangguan dilaksanakan di SEKSI-I dari

    LBS Pole I sampai Rec. Buana Kubu

    LBS Pole 1 ke arah Rec. Buana

    Kubu

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    LBS Pole I di TUTUP Seksi I normal

    Rec Buana Kubu di TUTUPP. Perumnas >< P. Imam

    Bonjol di Paralel sesaat

    Kopel 1 di GH Monang- Maning di-TUTUP

    P.Padang Sambian normal

    Operasi

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No.17Denpasar - Bali

    TRIP

    1

    A.1

    Ya

    Tidak

    2 - 6

    A.2

    7

    8 - 1 0

    NORMAL

    2-4

    5

    6

    A.2

    P. Perumnas Hal : 21

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    21/61

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.04

    P. PERUMNASRevisi 2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No.17Denpasar - Bali

    7

    -

    8

    9

    10

    B

    B.1

    2

    -

    3

    -

    - Penormalan Beban

    4

    5

    JIKA LOOP SCHEME BEKERJA DAN KONDISI BEBAN SUDAH DINORMALKAN MAKA RECLOSER FEEDER DAN RECLOSER TIE HARUS

    DIRESET ( MANUAL )

    CATATAN :

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK ATAU

    PETUGAS AREA JARINGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC. SECARA MANUAL BAIK DI GARDU INDUK , GARDU

    HUBUNG MAUPUN DI GARDU DISTRIBUSI

    JIKA INDIKATOR ( FI, FIOHL , GFD, HFD ) KEYPOINT TIDAK BERFUNGSI MAKA DISPATCHER APD BALI MEMBACA PETA ARUS

    GANGGUAN UNTUK MENENTUKAN LOKASI GANGGUAN.

    Kopel 1 Arah P.Imam Bonjol di GH Monang-Maning di-

    BUKA

    P. Imam Bonjol normal

    Operasi

    Pengusutan Gangguan dilaksanakan di SEKSI-II

    Dari Rec Buana Kubu sampai

    Kopel 1 di GH Monang-Maning

    arah P.Imam Bonjol

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Rec Buana Kubu di-TUTUPP. Perumnas >< P. Imam

    Bonjol Paralel sesaat

    Lokalisir Seksi yang terganggu (Seksi III )

    normalkan seksi yang tidak terganggu

    Jika Rec Buana Kubu Trip maka Gangguan dipastikan

    di Seksi II

    Gangguan diperkirakan di Seksi

    II dari Rec Buana Kubu sampai

    Kopel 1 di GH Monang-Maning

    arah P.Imam Bonjol

    Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

     - FIOHL / FI / RECLOSER1

    Cek Indikasi :

    Recloser ( TRIP )

    Kopel 1 di GH Monang-maning di-BUKA

    P. Perumnas normal Operasi

    PMS. 20 kV P. P_Perumnas di-MASUKAN

    LBS Pole I di-TUTUP

    P. Perumnas di-TUTUPP. Perumnas >< P. Imam

    Bonjol di Paralel sesaat

    PMS. Ground 20 kV P.Perumnas di-KELUARKAN

    NORMAL

    7

    8-10

    B.1

    2

    3

    4 - 5

    NORMAL

    TRIP

    1

    P. Perumnas Hal : 22

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    22/61

    SIANG SIANG MALAM

    1 P. Imam Bonjol 103 259 250

    216 228

    259 250

    292 290

    2 SEKSI - II

    146

    P. Merdeka 189 186

    P. Gunung Agung 113 124

    P. Sudirman 156

    P. Buagan

    Tgl.Terbit 01 Agustus 2012

    3 SEKSI - III AWAL : Rec. Feeder Alang Kajeng ( TUTUP )

    AKHIR : Re. Tie AJ.Batan arah P. Sudirman

    (BUKA)

    AKHIR : LBS. Bank Exim arah P. Merdeka

    ( BUKA )

    AWAL : LBS Pemecutan (TUTUP)

    OPERASI JARDIST. 20 KV PENYULANG IMAM BONJOL

    ST ND R OPER SI PROSEDUR

    PENYULANG IMAM BONJOL GARDU INDUK PADANG SAMBIAN

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.05

    104 P. Sudirman 156 146

    KONDISI NORMAL

    AKHIR : LBS Pemecutan ( TUTUP )

    NO PENYULANGREFERENSI BEBAN (A)

    AKHIR : LBS Wahidin arah P.Gunung Agung

    (BUKA)

    P. IMAM BONJOLRevisi 2

    DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG MALAM

    1 SEKSI - I AWAL : P. Imam Bonjol ( TUTUP )

    AKHIR : Rec Alang Kajeng ( TUTUP )

    SINGLE LINE OPERASI NORMAL LOOP SCHAME

    PENYULANG IMAM BONJOL >< PENYULANG SUDIRMAN

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No.17Denpasar - Bali

    P. ABIAN BASE

    TRAFO IIIKAPAL60 MVA

    LBSPOLE I

    Rec. PsrLBS Cica

    LBS Yeh Poh

    LBSGajiLBS Kebo Iwa

    LBS MileniumLBS McDLepang

    LBS G.Catur LBS Buluh Indah

    LBS Merpati

    P. TANGEB

    P. DALUNG

    P. CARGO

    P. PDG SAMBIAN

    GH MONANG MANING

    R

    R

    P. PERUMNAS

    Rec. BuanaR

    LBSPOLE I

    P. PDG SAMBIAN

    LBS

    P. IMAM BONJOL

    TRAFOIPDGSAMBIAN

    60 MVA

    P. BUAGAN

    TRAFOIIPDGSAMBIAN

    60 MVA

    P. MISOL

    LBSPole

    LBSBiak

    LBS Pemecutan

    RF Alangkajeng

    LBSWahidin

    RT AJ Batan

    R

    LBSBank Exim

    P.MERDEKA

    P. SUDIRMAN

    P. GN AGUNG

    TRAFOIPDGSAMBIAN

    60 MVA

    IMAM BUAGAN F.KOTA ABIANBAS PERUMNA

    P. DALUNG

    KOPEL1 KOPEL2

    R

    R

    LBSLempuyang

    P.SRB/ GD SRB

    COArah GD

    P. Imam BonjolHal : 23

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    23/61

    A

    A.1

    -

    2

     -

    3

    4

    5

    -

    6

    -

    7

    -

    8

    9

    10

    11

    12

    Tgl.Terbit 01 Agustus 2012

    Dari GI s/d LBS Pemecutan

    P. Imam Bonjol>< P.

    Gunung Agung di Paralel

     

    LBS Pemecutan di-TUTUP

    Buka One Line P. Imam

    Bonjol di MMI

    1

    Cek Indikasi :

    Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

     - Arus Gangguan ( I >> / I > / I 0 > )

     - beban P.Imam Bonjol sebelum Trip

     - FIOHL / FI / RECLOSER

    LBS Wahidin di-TUTUP

    PMS. 20 kV P. Imam Bonjol di-KELUARKAN

    PMS. Ground 20 kV P.Imam Bonjol di-MASUKAN

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    sebelum LBS Pole I

    LBS Wahidin di-BUKA

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    Lokalisir Seksi I sebelum LBS Pemecutan

     normalkan seksi yang tidak terganggu

    LBS Pemecutan di - BUKA

    Jika Fiohl di LBS Pemecutan tidak me-NYALA

    maka gangguan dipastikan Seksi I sebelum LBS

    Pemecutan dan RF. Alang kajeng

    Gangguan di Line Utama

    RF.Alang Kajeng di-TUTUPP.Imam Bonjol >< P.

    Sudirman di Paralel sesaat

    RT. AJ Batan di-BUKA

    P.Imam Bonjol di-TUTUP

    PMS. Ground 20 kV P.Imam Bonjol di-

    KELUARKAN

    PMS. 20 kV P. P_Imam Bonjol di-MASUKAN

    P.Imam Bonjol normal

    Operasi

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.05

    P. IMAM BONJOLRevisi 2

    Rec. Feeder Alang Kajeng akan mem-BUKA

    Selanjutnya Rec. Tie AJ Batan akan me-NUTUPPastikan beban P.Sudirman

    naik

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

    P. Imam Bonjol( TRIP )

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No.17Denpasar - Bali

    TRIP

    1

    NORMAL

    2-4

    5

    6

    7

    A.1

    Ya Tidak

    A.2

      P. Imam BonjolHal : 24

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    24/61

    Tgl.Terbit 01 Agustus 2012

     

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.05

    P. IMAM BONJOLRevisi 2

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AJ BALI SELATAN

     

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No.17Denpasar - Bali

     A.2

    -

    -

    2

    -

    3

    4

    5

    6

    7

     -

    8

    B

    B.1

    -

    -

    2

    -

    3

    -

    - Penormalan Beban

    4

    JIKA INDIKATOR ( FI, FIOHL , GFD, HFD ) KEYPOINT TIDAK BERFUNGSI MAKA DISPATCHER APD BALI MEMBACA PETA ARUS

    GANGGUAN UNTUK MENENTUKAN LOKASI GANGGUAN.

    JIKA LOOP SCHEME BEKERJA DAN KONDISI BEBAN SUDAH DINORMALKAN MAKA RECLOSER FEEDER DAN RECLOSER TIE

    HARUS DIRESET ( MANUAL )

    1 Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

    CATATAN :

    Gangguan diperkirakan di

    Seksi III dari RF. Alang

    Kajeng sampai RT. AJ

    Batan dan LBS Bank Exim

    Lokalisir Seksi yang terganggu (Seksi III )

    normalkan seksi yang tidak terganggu

    Pengusutan Gangguan dilaksanakan di SEKSI-III

    Dari RF. Alang Kajeng

    sampai RT. AJ Batan dan

    LBS Bank Exim

    Jika RF. Alang Kajeng Trip maka Gangguan

    dipastikan di Seksi III

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK

     ATAU PETUGAS AREA JARINGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC. SECARA MANUAL BAIK DI

    GARDU INDUK , GARDU HUBUNG MAUPUN DI GARDU DISTRIBUSI

    P. Imam Bonjol normal

    Operasi

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    dari LBS Pemecutan sampai LBS Wahidin

    LBS Pemecutan ke arah

    LBS Wahidin

    Jika Fiohl di LBS Pemecutan me-NYALA maka

    gangguan dipastikan Seksi II setelah LBS

    Pemecutan

    Gangguan diperkirakan di

    Seksi II dari LBS Pemecutan

    ke arah LBS Wahidin

    Lokalisir Seksi I setelah LBS Pole I

    normalkan seksi yang tidak terganggu

    LBS Pemecutan di-BUKA

    P. Imam Bonjol di-TUTUP

    RF. Alang Kajeng di-BUKA

    RT. AJ Batan di-TUTUP

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    RF. Alang Kajeng di-TUTUP

    Rec. Feeder Alang Kajeng akan mem-BUKA

    Selanjutnya Rec. Tie AJ Batan akan me-NUTUP

    dan Trip ( Lock Out )

    Recloser ( TRIP )

    Cek Indikasi :

    - FIOHL / FI / RECLOSER

    Seksi I normal

    P.Imam Bonjol normal

    Operasi

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    LBS Pemecutan di TUTUP

    P. Imam Bonjol >< P.

    Sudirman di Paralel sesaat

    Rec. Feeder Alang Kajeng akan mem-BUKA

    Selanjutnya Rec. Tie AJ Batan akan me-NUTUP Pastikan beban P.Sudirman

    2 - 6

    A.2

    7

    8

    NORMAL

    B.1

    2

    3

    4

    NORMAL

    TRIP

    1

      P. Imam BonjolHal : 25

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    25/61

    SIANG SIANG MALAM

    1 P. Buagan 47 150 149

    191 203

    2

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    PR.10.1.04.06

    P. BUAGANRevisi

    45 P. Imam Bonjol 103 104

    Kode Penyulang

    P. Misol 144 158

    KONDISI NORMAL

    1 SEKSI - I AWAL : P. Buagan ( TUTUP )

    AKHIR : LBS PMDK ( Pole 1 ) ( TUTUP )

    AKHIR : GH. Monang Maning arah P. Buagan (

    BUKA )

    AKHIR : LBS Biak arah P. Misol ( BUKA )

    ST ND R OPER SI PROSEDUR

    PENYULANG BUAGAN GARDU INDUK PADANG SAMBIAN

    OPERASI JARDIST. 20 KV PENYULANG BUAGAN

    NO PENYULANGREFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG MALAM

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

     

    SINGLE LINE OPERASI NORMAL PENYULANG BUAGAN

    P. ABIAN BASE

    TRAFO IIIKAPAL

    60 MVA

    LBSPOLE I

    Rec. Psr Abian BaseLBS Cica

    LBS Yeh

    LBSGajiLBS Kebo Iwa

    LBS MileniumLBS McD Lepang

    LBS G.Catur 

    LBS Buluh Indah

    LBS Merpati

    P. TANGEB

    P. DALUNG

    P. CARGO

    P. PDG SAMBIAN

    GH MONANG MANING

    R

    R

    R

    P. PERUMNAS

    R

    Rec. Buana Kubu

    LBSPOLE I

    P. PDG SAMBIAN

    LBSBuana Raya

    P. IMAM BONJOL

    TRAFOIPDGSAMBIAN

    60 MVA

    P. BUAGAN

    TRAFOII

    PDGSAMBIAN30 MVA

    P. MISOL

    LBSPole 1

    LBSBiak

    LBSPemecutan

    RF Alangkajeng

    LBSWahidin RT AJ Batan

    LBSBank Exim

    P.MERDEKA

    P. SUDIRMANP. GN AGUNG

    TRAFOIPDGSAMBIAN

    60 MVA

    IMAM BONJOL BUAGAN F.KOTA  ABIANBASE PERUMNAS

    P. DALUNG

    KOPEL1 KOPEL2

    LBSLempuyang

      P. Buagan Hal : 26

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    26/61

    A

    A.1

    2

    a

    b

    3

     -

    4

    5 RT Pulau Kawe di-BUKA

    A.2

    2

     -

    3

    4

    -

    5

    -

    6

     

    PMS. Ground 20 kV P. Buagan di-KELUARKAN

    LBS Pole 1 di-BUKA, normalkan seksi yang tidakterganggu

    LBS Biak atau GH Monang-Maning arah P.Buagan

    di-TUTUP

    Seksi I dimanuver ke

    P.Misol atau P.Imam Bonjol

    lewat GH Monang-maning

    PMS. 20 kV P. Buagan di-KELUARKAN

    PMS. Ground 20 kV P. Buagan di-MASUKAN

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    sebelum LBS Pole 1Dari GI s/d LBS Pole 1

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    Lokalisir Seksi I sebelum LBS Pole 1

    LBS Pole 1 di-BUKA, normalkan seksi yang tidak

    terganggu

    P. Buagan di-TUTUP

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    setelah LBS Pole 1dari LBS Pole 1

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    LBS Pole 1 di-TUTUP Seksi I normal

    P.Pedungan normal

    Operasi

    Jika P.Buagan Trip dan FI LBS Pole 1 Tidak

    menyala, maka Gangguan dipastikan dari LBS

    Pole 1 sampai Line Utama (arah GI)

    Gangguan di LBS

    Br.Pemogan ke arah Line

    Utama

    Lokalisir Seksi I sesudah LBS Pole 1

    AJ BALI SELATAN

    P. Buagan ( TRIP )Buka One Line P. Buagan

    di MMI

    Informasi ke Area Batan - Arus Gangguan ( I >> / I > / I 0 > )

     - beban P. Buagan sebelum Trip

     - FIOHL / FI / RECLOSER

    Jika FI LBS Pole 1 menyala maka Gangguan

    dipastikan di Seksi I setelah LBS Pole 1

    LBS Pole 1 ke arah LBS

    Biak dan GH Monang-maning Arah P.Buagan

    1

    Cek Indikasi :

    - Jenis Gangguan (EF / OC / OC Moment)

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I

    2

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    PR.10.1.04.06

    P. BUAGANRevisi

    Kode Penyulang

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    TRIP

    1

    A.1

    2b

    A.2

    3

    4

    NORMAL

    A.2

    2-3

    4

    5

    2a

    Tidak

    Ya

      P. Buagan Hal : 27

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    27/61

     

    2

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    PR.10.1.04.06

    P. BUAGANRevisi

    Kode Penyulang

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    -

    7

    8

    9

    JIKA LOOP SCHEME BEKERJA DAN KONDISI BEBAN SUDAH DINORMALKAN MAKA RECLOSER FEEDER DAN RECLOSER TIE

    HARUS DIRESET ( MANUAL )

    PMS. 20 kV P. Buagan di-MASUKAN

    LBS Pole 1 di-TUTUP

    P. Buagan di-TUTUP

    P. Mimbul >< P. Misol atau

    P.Imam Bonjol di Paralel

    sesaat

    LBS Biak atau GH Monang-maning Arah P.Buagan

    di-BUKA P. Pedungan normal

    Operasi

    CATATAN :

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK ATAU

    PETUGAS AREA JARINGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC. SECARA MANUAL BAIK DI GARDU INDUK ,

    GARDU HUBUNG MAUPUN DI GARDU DISTRIBUSI

    JIKA INDIKATOR ( FI, FIOHL , GFD, HFD ) KEYPOINT TIDAK BERFUNGSI MAKA DISPATCHER APD BALI MEMBACA PETA ARUS

    GANGGUAN UNTUK MENENTUKAN LOKASI GANGGUAN.

    NORMAL

    6

    7-9

      P. Buagan Hal : 28

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    28/61

    SIANG SIANG MALAM

    1 P. Abian Timbul 200 326 358

    3 SEKSI - III

    206 P. Pedungan 126 152

    AWAL : Rec. Feeder Kak Man ( TUTUP )

    AWAL : LBS Pak Oles (TUTUP) AKHIR : LBS Jl.Buton ( BUKA ) dgn P. Pegok 

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.07

    P. ABIAN TIMBULRevisi

    ST ND R OPER SI PROSEDUR

    PENYULANG ABIAN TIMBUL GARDU INDUK PADANG SAMBIAN

    OPERASI JARDIST. 20 KV PENYULANG ABIAN TIMBUL

    NO PENYULANGREFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG MALAM

    AKHIR : Rec. Tie Pulau Kawe arah P. Pedungan

    ( BUKA )

    AKHIR : LBS Auto Graha ( BUKA ) dgn P. Misol

    AKHIR : LBS Pak Oles ( TUTUP )

    KONDISI NORMAL

    1 SEKSI - I AWAL : P. Abian Timbul ( TUTUP )

    AKHIR : Rec. Feeder Kak Man ( TUTUP )

    AKHIR : LBS SD Buagan ( BUKA ) dgn P.

    Seblanga

    2 SEKSI - II

    3

    Tgl.Terbit 01 Agustus 2012

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    SINGLE LINE OPERASI NORMAL LOOP SCAMEPENYULANG ABIAN TIMBUL >< P. PEDUNGAN

    KETERANGAN :

    = GFD

    = FI

    = FIOHL

    LBSPole I

    LBS SDBuagan

    P.SEBELANGA

    P. MISOL

    RF Kak Man

    LBS Pak Oles LBS Buton

    P. PEGOK

    P. ABIAN TIMBULLBSPole I

    H.Haris

    H. AllSeasion

    LBS Br PemoganRFBrPitik

    LBS BelitungLBS Br. Pande

    P. PEDUNGAN

    P. JADI PESONA

    P. TEGAL LANTANG

    TRAFO IVPESANGGARAN

    60 MVA

    RT P Kawe

    LBS AutoGraha

    P. JADI PESONA

    R R

    R

    R R R

    R

    R

    R

    TRAFO I PADANGSAMBIAN

    60 MVA

      P. Abian Timbul Hal : 29

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    29/61

    A

     A.1

    -

    2

    a

    b

    3

     -

    4

    5

    6 RT Pulau Kawe di BUKA

    A.2

     -

     -

    2

     -

    3

    4

    -

    5

    -

    6

    -

    7

    8

    9 Rec. TIE P.Kawe diBUKA

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    PMS. Ground 20 kV P. Abian Timbul di-KELUARKAN

    P. Abian Timbul diTUTUPP. Abian Timbul >< P.

    Pedungan di Paralel sesaat

    Pengusutan Gangguan dilaksanakan diSEKSI-I

    sebelum LBS Pole IDari GI s/d LBS Pole I

    Pengusutan Gangguan dilaksanakan di SEKSI-I dari

    LBS Pole I sampai RF Kak Man

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    PMS. Ground 20 kV P. Abian Timbul di MASUKAN

    LBS Pole I di BUKA, normalkan seksi yang tidak

    terganggu

    RF Kak Man di TUTUPSeksi I , II,& III dimanuver

    ke P. Pedungan

    LBS Pole I di TUTUP

    RF Kak Man di TUTUP

    Seksi I normal

    P. Abian Timbul >< P.

    Pedungan di Paralel sesaat

    Rec. Feeder Kak Man akan mem-BUKA

    Selanjutnya Rec. Tie P.Kawe akan me-NUTUP

    PMS. 20 kV P. Abian Timbul diKELUARKAN

    Jika FI Pole 1 tidak menyala maka gangguan

    dipastikan dari Pole 1 ke arah GIGangguan di Line Utama

    P. Abian Timbul di-TUTUP

    Lokalisir Seksi I sebelum LBS Pole I

    Lokalisir Seksi I setelah LBS Pole I

    Pastikan beban

    P.Pedungan naik

    Penormalan Beban

    LBS Pole 1 ke arah RF Kak

    Man

    P. Abian Timbul normal

    Operasi

    LBS Pole I di-BUKA, normalkan seksi yang tidak

    terganggu

     - Jenis Gangguan (EF / OC / OC Moment)

     - Arus Gangguan ( I >> / I > / I 0 > )

    PMS. 20 kV P. Abian Timbul diMASUKAN

    LBS Pole I di TUTUP

    Rec. Feeder Kak Man . berikutnya akan mem-BUKA

    Selanjutnya Rec. Tie P.Kawe akan meNUTUP

     - FIOHL / FI / RECLOSER

    P. Abian Timbul normal

    Operasi

     

    Jika FI Pole 1 menyala maka gangguan dipastikan

    Seksi I setelah Pole 1

    LBS Pole 1 ke arah RF Kak

    Man

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AREA BATAN

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.07

    P. ABIAN TIMBULRevisi

    1

    3

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    - beban P. Abian Timbul sebelum Trip

    P. Abian Timbul ( TRIP )

    Buka One Line P. Abian

    Timbul di MMI

    Cek Indikasi :

    Informasi ke Area Batan

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    TRIP

    1

    A.1

    Ya

    Tidak

    2a-b

    A.2

    3

    4-6

    NORMAL

    A.2

    NORMAL

    2-3

    4

    5

    6

    7-9

    B.1

    TidakYa

      P. Abian Timbul Hal : 30

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    30/61

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I AREA BATAN

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode Penyulang PR.10.1.04.07

    P. ABIAN TIMBULRevisi 3

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    B

    B.1

     -

     -

    2

    -

    3

    4 LBS Buton diTUTUP

    5

    -

    - Penormalan Beban

    6

    7 LBS Pak Oles diTUTUP

    8 LBS Buton diBUKA

    B.2

     -

    -

    2

     -3

    4

    -

    -

    5

    Jika RF Kak Man Trip, sedangkan FI di LBS Pak Oles

    Tidak Menyala, maka Gangguan dipastikan di Seksi II

    LBS Pak Oles ke Arah LBS

    Buton

    LBS Pak Oles di-BUKA

    Pengusutan Gangguan dilaksanakan diSEKSI-II

    CATATAN :

    LBS Pak Oles diTUTUP

    Pengusutan Gangguan dilaksanakan diSEKSI-III

    Lepas paralel

    P. Abian Timbul >< P.

    Pegok Paralel sesaat

    Rec. Feeder Kak Man Posisi BUKA

    Selanjutnya Rec. Tie P.Kawe akan meNUTUP danTrip (Lock Out)

    Lokalisir Seksi III, LBS Pak Oles diBUKA

    Normalkan seksi yang tidak terganggu

    Pastikan RF Kak Man

    Posisi Buka

    P. Abian Timbul Normal

    Operasi

    Normalkan seksi yang tidak terganggu

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK ATAU PETUGAS

     AREA JARINGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC. SECARA MANUAL BAIK DI GARDU INDUK , GARDU HUBUNG

    MAUPUN DI GARDU DISTRIBUSI

    JIKA INDIKATOR ( FI, FIOHL , GFD, HFD ) KEYPOINT TIDAK BERFUNGSI MAKA DISPATCHER APD BALI MEMBACA PETA ARUS GANGGUANUNTUK MENENTUKAN LOKASI GANGGUAN.

    JIKA LOOP SCHEME BEKERJA DAN KONDISI BEBAN SUDAH DINORMALKAN MAKA RECLOSER FEEDER DAN RECLOSER TIE HARUS DIRESET

    ( MANUAL )

    Rec. Feeder Kak Man Posisi BUKA

    RF Kak Man diTUTUP Seksi II normal

    Rec. TIE P.Kawe akan me-NUTUP dan Trip (Lock

    Out)

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Dari LBS Pak Oles s/d LBS

    Buton

    Lokalisir Seksi yang terganggu (Seksi II )

    Penormalan Beban

    Jika RF Kak Man Trip, sedangkan FI di LBS Pak Oles

    Menyala, maka Gangguan dipastikan di Seksi III

    Gangguan di Seksi III

    antara LBS Pak Oles s/d

    LBS Buton

    Pastikan RF Kak Man

    Posisi Buka

    Informasi ke Area Batan

    Recloser ( TRIP )

    P. Abian Timbul normal

    Operasi

    RF Kak Man diTUTUP

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Dari RF Kak Man s/d RT P.

    Kawe & LBS Pak Oles

    Seksi III dimanuver ke P.

    Pegok

    1

    Cek Indikasi :

    - Jenis Gangguan (EF / OC / OC Moment)

     - FIOHL / FI / RECLOSER

    B.2

    2-4

    5

    6-8

    NORMAL

    2-3

    4

    5

    NORMAL

    Tidak

    Ya

    B.2

    TRIP

    1

    B.1

      P. Abian Timbul Hal : 31

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    31/61

    SIANG SIANG MALAM

    1 P. Gunung Agung 96 268 279

    199 209

    1 SEKSI - I

    Kode Penyulang PR.10.1.04.08

    P. GUNUNG AGUNGRevisi 2

    Tgl.Terbit 01 Agustus 2012

    ST ND R OPER SI PROSEDUR

    PENYULANG GUNUNG AGUNG GARDU INDUK PADANG SAMBIAN

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    OPERASI JARDIST. 20 KV PENYULANG GUNUNG AGUNG

    NO PENYULANG

    REFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG

    AWAL : P. Gunung Agung ( TUTUP ) AKHIR : Rec. Feeder Siwa Plaza ( TUTUP )

    2 SEKSI - II AWAL : Rec. Feeder Siwa Plaza ( TUTUP )

    AKHIR : LBS. Wahidin arah P. Imam Bonjol

    ( F. Gajah Mada ) BUKA

    AKHIR : Rec. TIE Tiara Grosir   arah P. Sempidi

    ( BUKA )

    MALAM

    105 P. Sempidi 172 174

    KONDISI NORMAL

    P. Imam Bonjol 103 104

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    SINGLE LINE OPERASI NORMAL LOOP SCHAMEPENYULANG GUNUNG AGUNG >< P. SEMPIDI

    TRF IIIKAPAL60MVA

    P. UMA ANYAR LBS Pole 1

    LBS Indrajaya

    RF. Gandhi LBS STO

    P. GUNUNG AGUNGLBS Pole 1 RF. Siwa Plaza

    LBS Wahidin

    P.IMAM BONJOL

    LBS Astra

    RT. TiaraGrosir 

    LBS Setia Budi

    LBS Marutti

    P. KURNIA

    LBS Auto 2000

    P.UBUNG

    TRF IIPADANGSAMBIAN

    60MVA

    R

    R

    R

    R

    GH. STM

    RSU.WANGAYA

    P. SADING

    LBS Batu Mekeem

    R

    R

    R

    R

    R

    R

    LBS Taman MahayuR

    P. SEMPIDI

    R

      P. Gunung Agung Hal : 32

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    32/61

    A

     A.1

    -

    2

    -

    3

    4

    5

     -

    6

    7

    8

    A.2

     -

     -

    2

     -

    3

    4

    5

    -

    6

    -

    7

    -

    Kode Penyulang PR.10.1.04.08

    P. GUNUNG AGUNGRevisi 2

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    P. Gunung agung ( TRIP )Buka One Line P.Gunung Agung

    di MMI

     - Jenis Gangguan (EF / OC / OC Moment)

     - Arus Gangguan ( I >> / I > / I 0 > )

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGAN

    DISPAT APD OPERATOR G I AJ BALI SELATAN

    1

     - beban P.Gunung Agung sebelum Trip

     - FIOHL / FI / RECLOSER

    Jika FI / Fiohl Pole 1 me-NYALA  maka gangguan

    dipastikan Seksi I setelah Pole 1

    Gangguan diperkirakan di Seksi

    I dari LBS Pole 1 ke arah RF

    Siwa Plaza

    Lokalisir Seksi I setelah LBS Pole I

    LBS Pole I di-BUKA

    normalkan seksi yang tidak terganggu

    Cek Indikasi :

    Informasi ke Area Batan

    Rec. Feeder Siwa Plaza akan mem-BUKA

     

    PMS. Ground 20 kV P.Gunung Agung di MASUKAN

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    sebelum LBS Pole IDari GI s/d LBS Pole I

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Selanjutnya Rec. Tie Tiara grosir  akan me-NUTUPPastikan beban P.Uma Anyar

    naik

    P. Gunung Agung di-TUTUP

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    dari LBS Pole I sampai RF Siwa Plaza

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Penormalan Beban

    LBS Pole I di TUTUP

    RF Siwa Plaza di TUTUP

    RT Tiara Grosir di BUKA

    LBS Pole I di - TUTUP

    RF Siwa Plaza di TUTUP

    LBS Pole 1 ke arah RF Siwa

    Plaza

    Seksi I normal

    P.Gunung Agung normal

    Operasi

    Jika FI / Fiohl Pole 1 tidak me-NYALA maka

    gangguan dipastikan dari Pole 1 ke arah GI

    normalkan seksi yang tidak terganggu

    PMS. Ground 20 kV P.Gunung agung di-

    KELUARKAN

    PMS. 20 kV P. P_Gunung Agung diMASUKAN

    P. Gunung agung >< P. Uma Anyar di Paralel sesaat

    PMS. 20 kV P. Gunung Agung di-KELUARKAN

    Rec. Feeder Siwa Palaza . berikutnya akan mem-

    BUKA

    Selanjutnya Rec. Tie Tiara Grosir akan me-NUTUP

    Gangguan di Line Utama

    Lokalisir Seksi I sebelum LBS Pole I

    Seksi I , II dimanuver ke P. Uma

     Anyar 

    Penormalan Beban

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    TRIP

    1

    A.1

    Ya

    Tidak

    2 - 4

    A.2

    5

    6 - 8

    NORMAL

    A.2

    2-4

    5

    6

    7

    B.1

    TidakYa

      P. Gunung Agung Hal : 33

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    33/61

    Kode Penyulang PR.10.1.04.08

    P. GUNUNG AGUNGRevisi 2

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

     

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGAN

    DISPAT APD OPERATOR G I AJ BALI SELATAN

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    8

    9

    10

    B

    B.1

     -

     -

    2

    -

    3

    -

    - Penormalan Beban

    4

    5

    LBS Pole I di-TUTUP

    Rec. TIE Tiara Grosir di-BUKA

    P. Gunung Agung normal

    Operasi

    P. Gunung Agung di-TUTUPP. Gunung Agung>< P. Uma

     Anyar di Paralel sesaat

    1

    Cek Indikasi :

    Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

     - FIOHL / FI / RECLOSER

    Jika RF Siwa Plaza Trip, maka Gangguan dipastikan

    di Seksi II

    Gangguan diperkirakan di Seksi

    II dari RF Siwa Plaza ke Arah

    RT. Tiara Grosir dan LBS

    Wahidin

    Rec. Feeder Siwa Plaza Posisi BUKAPastikan RF Siwa Plaza Posisi

    Buka

    Selanjutnya Rec. Tie Tiara Grosir akan me-NUTUP

    dan Trip (Lock Out)

    Lokalisir Seksi yang terganggu (Seksi II )

    normalkan seksi yang tidak terganggu

    Recloser ( TRIP )

    CATATAN :

    JIKA REMOTE GAGAL , PETUGAS DISPATCHER APD BALI DAPAT LANGSUNG MELAKUKAN PERINTAH KEPADA OPERATOR GARDU INDUK ATAU

    PETUGAS AREA JARINGAN UNTUK MELAKUKAN PELEPASAN MAUPUN PEMASUKAN CB/ LBS/ REC. SECARA MANUAL BAIK DI GARDU INDUK ,

    GARDU HUBUNG MAUPUN DI GARDU DISTRIBUSI

    JIKA INDIKATOR ( FI, FIOHL , GFD, HFD ) KEYPOINT TIDAK BERFUNGSI MAKA DISPATCHER APD BALI MEMBACA PETA ARUS

    GANGGUAN UNTUK MENENTUKAN LOKASI GANGGUAN.

    JIKA LOOP SCHEME BEKERJA DAN KONDISI BEBAN SUDAH DINORMALKAN MAKA RECLOSER FEEDER DAN RECLOSER TIE

    HARUS DIRESET ( MANUAL )

    P.Gunung Agung normalOperasi

    Pengusutan Gangguan dilaksanakan di SEKSI-IIDari RF Siwa Plaza ke Arah RT.

    Tiara Grosir dan LBS Wahidin

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    RF Siwa Plaza di-TUTUP

    RT. Tiara Grosir di-BUKA

    NORMAL

    8-10

    B.1

    B.

    2

    3

    4 - 5

    NORMAL

    TidakYa

    TRIP

    1

      P. Gunung Agung Hal : 34

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    34/61

    SIANG SIANG MALAM

    1 P. Tegal Lantang 172 186 194

    330 356

    372 384

    415 437

    2 SEKSI -II

    2

    Tgl.Terbit 01 Agustus 2012

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode PR.10.1.04.09

    P. TEGAL LANTANGRevisi

    AWAL : Rec Gunung Salak (TUTUP) AKHIR : LBS Kunti (TUTUP)

    3 SEKSI - III AWAL : LBS. Kunti ( TUTUP )

    AKHIR : LBS. Seminyak arah P. Exp LP (BUKA)

    AKHIR : LBS. Fabios arah P. Nakula (BUKA)

    AKHIR : LBS. GH Sun Set Road arah P. Tegal

    Lantang ( BUKA )

    180 P. Exp. Sun Set 14 14

    KONDISI NORMAL

    1 SEKSI - I AWAL : P. Tegal Lantang ( TUTUP ) AKHIR : Rec. Gunung Salak ( TUTUP )AKHIR : LBS. Tegal Buah arah P. Padang Sambian

    ( BUKA )

    P. Nakula 243 257

    P. Padang Sambian 158 176

    P. Mertanadi 200 204

    ST ND R OPER SI PROSEDUR

    PENYULANG TEGAL LANTANG GARDU INDUK PADANG SAMBIAN

    OPERASI JARDIST. 20 KV PENYULANG TEGAL LANTANG

    NO PENYULANGREFERENSI BEBAN (A) DIMANUVER KE REFERENSI BEBAN (A) BEBAN MENJADI ( A )

    MALAM PENYULANG SIANG MALAM

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17

    Denpasar - Bali

    SINGLE LINE OPERASI NORMAL PENYULANG TEGAL LANTANG

    R

    LBS Pole I

    P.ABIAN TIMBUL

    LBS Tegal Buah

    P. PD SAMBIAN

    Rec. Gunung Salak

    LBS Kunti

    LBS Mertanadi

    LBS Seminyak

    P. MERTANADIP.MERTANADI

    R

    R

    R

    R

    RR

    TRAFO IIPADANG SAMBIAN

    60 MVA

    P.TEGAL LANTANG

    P.NAKULA

    P.BATUBELIG

    LBS Fabios

    GH SUNSETROAD

    R

      P. Tegal Lantang Hal : 35

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    35/61

    A

     A.1

    2

    -

    3

    4

    5

    6

    7

     -

    8

    9

    10

    A.2

    2

     -

    3

    4

    5

    -

    6

    -

    LBS Pole I di - TUTUP

    Jika FI Pole 1 tidak me-NYALA maka gangguan

    dipastikan dari Pole 1 ke arah GI Gangguan di Line Utama

    Rec Gunung Salak di TUTUPP. Tegal Lantang >< P. EXP

    Sunset di Paralel sesaat

    Feeder arah P.Tegal Lantang di GH SUNSET di-

    BUKA

    P.Tegal Lantang normal

    Operasi

     - FIOHL / FI / RECLOSER

    Lokalisir Seksi I sebelum LBS Pole I

    normalkan seksi yang tidak terganggu

    1

    Gangguan diperkirakan di Seksi

    I dari LBS Pole 1 ke arah Rec

    Gunung Salak

    P. Tegal Lantang di-TUTUP

    Pengusutan Gangguan dilaksanakan di SEKSI-I dari

    LBS Pole I sampai Rec. Gunung Salak

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Seksi I normal

    Lokalisir Seksi I setelah LBS Pole I

    normalkan seksi yang tidak terganggu

    LBS Pole I di-BUKA

    LBS Pole 1 ke arah Rec.

    Gunung Salak

    Penormalan Beban

    LBS Pole I di TUTUP

     - Arus Gangguan ( I >> / I > / I 0 > )

     - beban P.Tegal Lantang sebelum Trip

    Jika FI Pole 1 me-NYALA  maka gangguan

    dipastikan Seksi I setelah Pole 1

    AJ BALI SELATAN

    P. Tegal Lantang ( TRIP )Buka One Line P.Tegal Lantang

    di MMI

    Cek Indikasi :

    Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

    2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode PR.10.1.04.09

    P. TEGAL LANTANGRevisi

    Seksi I , II dimanuver ke P. EXP

    Sunset

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

     

    Feeder arah P.Tegal Lantang di GH SUNSET di-

    TUTUP

    PMS. 20 kV P.Tegal Lantang di-KELUARKAN

    PMS. Ground 20 kV P.Tegal Lantang di MASUKAN

    Pengusutan Gangguan dilaksanakan di SEKSI-I

    sebelum LBS Pole I Dari GI s/d LBS Pole I

    Rec Gunung Salak di-BUKA

    Feeder arah P.Tegal Lantang di GH SUNSET di-

    TUTUP

    Pastikan Beban P.EXP Sunset

    naik

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    TRIP

    1

    A.1

    Ya

    Tidak

    2 - 6

    A.2

    7

    8 -10

    NORMAL

    2-4

    5

    6

    A.2

      P. Tegal Lantang Hal : 36

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    36/61

    AJ BALI SELATAN

     

    2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode PR.10.1.04.09

    P. TEGAL LANTANGRevisi

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:17Denpasar - Bali

    7

    -

    8

    9

    10

    B

    B.1

    2

    -

    3

    4

    5

    -

    - Penormalan Beban

    6

    7

    8

    LBS Pole I di-TUTUP

    P. Tegal Lantang di-TUTUPP. Tegal Lantang>< P. EXP

    Sunset di Paralel sesaat

    Feeder arah P.Tegal Lantang di GH SUNSET di-

    BUKA

    P. Tegal Lantang normalOperasi

    PMS. 20 kV P. P_Tegal Lantang diMASUKAN

    Penormalan Beban

    PMS. Ground 20 kV P.Tegal Lantang di-

    KELUARKAN

    Recloser ( TRIP )

    1

    Cek Indikasi :

    Informasi ke Area Batan- Jenis Gangguan (EF / OC / OC Moment)

     - FIOHL / FI / RECLOSER

    Jika Rec Gunung Salak Trip, tetapi FI di LBS

    Mertanadi dan FI / Fiohl di LBS Kunti tidak me-

    NYALA maka Gangguan dipastikan di Seksi II setelahRec Gunung Salak

    Gangguan diperkirakan di Seksi

    II dari Rec Gunung Salak ke

     Arah LBS Kunti

    Lokalisir Seksi yang terganggu (Seksi II )

    normalkan seksi yang tidak terganggu

    Pengusutan Gangguan dilaksanakan di SEKSI-II

    sebelum LBS Kunti

    Dari Rec Gunung Salak ke Arah

    LBS Kunti

    Gangguan ditemukan langsung diatasi sesuai SOP

    Kerja Lapangan

    Rec Gunung Salak di-TUTUP

    Feeder arah P.Tegal Lantang di GH SUNSET di-

    BUKA

    P.Gunung Agung normal

    Operasi

    LBS Kunti di-BUKA

    Feeder arah P.Tegal Lantang di GH SUNSET di-

    TUTUP

    Pastikan Beban P.EXP Sunset

    naik

    LBS Kunti di-TUTUPP. Tegal Lantang>< P. EXP

    Sunset di Paralel sesaat

    NORMAL

    7

    8-10

    B.1

    B.2

    2 - 4

    5

    6 - 8

    NORMAL

    TRIP

    1

      P. Tegal Lantang Hal : 37

  • 8/19/2019 SOP GI Padang Sambian 2012 Final

    37/61

    AJ BALI SELATAN

     

    2

    Tgl.Terbit 01 Agustus 2012

    KRONOLOGIS MANUVER

    NO URAIANPETUGAS

    KETERANGANDISPAT APD OPERATOR G I

    PROSEDUR OPERASI

    Kode Unit  APD BALI

     No.Dok. PR.10.1

    Kode PR.10.1.04.09

    P. TEGAL LANTANGRevisi

    PT PLN (Persero) Distribusi Bali Area Pengatur Distribusi BaliJalan Diponegoro No:1