    DSR REPORT

    Name Roads & Bridges Uttarakhand Year 2014-2015

    PWD UTTRAKHAND

    Chapter Name CARRIAGE OF MATERIALS (Based on MORD)

    Rate In (Rs.)

    UnitItem Description Rate

    Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate,Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual

    Means

    1-1

    cu.mLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building

    Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a leadupto 30 m

    74807 1-1-1 65.50

    cu.mLoading of Earth, Sand, Stone chips,Moorum, Manure, Flyash by manual meansincluding a lead upto 30 m

    74808 1-1-2 32.80

    cu.mUnloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, BuildingRubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead

    upto 30 m

    74809 1-1-3 32.80

    cu.mUnloading of Earth, Sand,Stone chips, Moorum, Manure, Flyash by manual means

    including a lead upto 30 m74810 1-1-4 19.80

    Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar,Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical Means

    1-2

    cu.mLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building

    Rubbish, Crushed Slag, Stone for Masonry Work by mechanical means including alead upto 30 m

    748111-2-1 39.50

    cu.mLoading of Earth, Sand, Stone chips ,Moorum, Manure, Flyash by mechanicalmeans including a lead upto 30 m.

    74812 1-2-2 20.50

    cu.mUnloading of Earth, Sand,Stone chips, Lime, Moorum, Aggregate, Stone Boulder,Brick Aggregate, Kankar, Building Rubbish, Manure, Crushed Slag, Flyash, Stone

    for Masonry Work by mechanical means.

    74813 1-2-3 7.80

    Loading, Unloading and Stacking of Bricks by Manual Means1-3

    1000 NosLoading of Bricks by manual means including a lead upto 30 m74814 1-3-1 108.30

    1000 NosUnloading and Stacking of Bricks by manual means including a lead upto 30 m74815 1-3-2 108.30

    Loading and Unloading of Cement by Manual Means1-4

    tonneLoading of Cement by manual means including a lead upto 30 m74816 1-4-1 85.50

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 1 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    2/99

    Rate In (Rs.)

    UnitItem Description Rate

    tonneUnloading of Cement by manual means including a lead upto 30 m74817 1-4-2 85.40

    Loading and Unloading of Structural Steel and Steel Bars by manual means1-5

    tonneLoading of Structural Steel, Steel Bars by manual means including a lead upto 30 m74818 1-5-1 93.40

    tonneUnloading of Structural Steel, Steel Bars by manual means including a lead upto 30

    m74819 1-5-2 93.40

    Loading and Unloading of Bitumen Drums by Manual Means1-6

    tonneLoading of Bitumen Drums by manual means including a lead upto 30 m74820 1-6-1 99.30

    tonneUnloading of Bitumen Drums by Manual Means including a lead upto 30 m74821 1-6-2 88.80

    Loading and Unloading of Timber by Manual Means1-7

    tonneLoading of Timber by manual means including a lead upto 30 m74822 1-7-1 144.10

    tonneUnloading of Timber by manual means including a lead upto 30 m74823 1-7-2 144.10

    Loading and Unloading of C.C. Blocks, Kerb, etc.1-8

    cu.mLoading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb,Channel, Bond Stone, etc. by manual means including a lead upto 30 m

    74824 1-8-1 220.80

    cu.mUnloading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb,Channel, Bond Stone, etc. by manual means including a lead upto 30 m

    74825 1-8-2 220.80

    Loading and Unloading of Hume Pipes1-9

    Loading of RCC Hume pipes by mechanical means including a lead upto 30 m1-9-1

    Per Pipe1000 / 1200 mm dia Hume pipe74826 1-9-1-A 46.70

    Per Pipe750 mm dia Hume pipe74827 1-9-1-B 28.00Per Pipe600/450 mm dia Hume pipe74828 1-9-1-C 20.00

    Unloading of RCC Hume pipe by manual means including a lead upto 30 m1-9-2

    Per Pipe1000/1200 mm dia RCC Hume pipes74829 1-9-2-A 236.10

    Per Pipe750 mm dia Hume pipe74830 1-9-2-B 196.70

    Per Pipe600/450 mm dia Hume pipe74831 1-9-2-C 147.60

    Unloading of RCC Hume pipes by mechanical means including a lead upto 30 m1-9-3

    Per Pipe1000/1200 mm dia Hume pipe74832 1-9-3-A 34.20

    Per Pipe750 mm dia Hume pipe74833 1-9-3-B 20.50

    Per Pipe600/450 mm dia Hume pipe74834 1-9-3-C 14.60

    Haulage excluding Loading & Unloading

    1-10

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 2 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    3/99

    Rate In (Rs.)

    UnitItem Description Rate

    Haulage of materials by tipper excluding cost of loading, unloading and stacking(taking output 10t load and lead 10 km = 100 t.km)

    Tonne.Km

    Surfaced Road74835 1-10-1 3.70

    Tonne.Km

    Unsurfaced Gravel Road74836 1-10-2 4.50

    Tonne.Km

    Katcha Track and Track in River Bed/Nallah Bed and Choe Bed74837 1-10-3 9.00

    Supply of Quarried stone and hand breaking1-11

    cu.mSupply of quarried stone and hand breaking into coarse aggregate to Grading 1 (90

    mm to 45 mm) as per Table 400.8 of Technical Specifications.74838 1-11-1 916.00

    cu.mSupply of quarried stone and hand breaking into coarse aggregate to Grading 2 (63

    mm to 45 mm) as per Table 400.8 of Technical Specifications.74839 1-11-2 996.10

    cu.mSupply of quarried stone and hand breaking into coarse aggregate to Grading 3 (53

    mm to 22.4 mm) as per Table 400.8 of Technical Specifications.74840 1-11-3 1,076.10

    cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of200 t/h capacity comprising of primary and secondary crushing units, belt conveyor

    and vibrating screens to obtain stone aggregates 100 per cent passing through 53mm sieve as per Table 500.6 of Technical Specifications including the cost of stone.

    74841 1-12 649.90

    cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of

    200 t/h capacity comprising of primary and secondary crushing units, belt conveyorand vibrating screens to obtain stone aggregates 100 per cent passing through 22.4

    mm sieve as per Table 500.6 of Technical Specifications including the cost of stone.

    74842 1-13 749.30

    cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of200 t/h capacity comprising of primary and secondary crushing units, belt conveyor

    and vibrating screens to obtain stone aggregates of 13.2 mm nominal size as perTable 500.9 of Technical Specifications including the cost of stone.

    74843 1-14 883.20

    cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of

    200 t/h capacity comprising of primary and secondary crushing units, belt conveyorand vibrating screens to obtain stone aggregates of 9.5 mm nominal size as per

    Table 500.9 of Technical Specifications including the cost of stone.

    74844 1-15 883.20

    Setting Out1-16

    kmThe rate analysis for a typical benchmark as per Drawing 200.174845 1-16-5 3,391.90

    kmThe rate analysis for a typical reference pillar as per Drawing 200.274846 1-16-6 1,529.40

    S ecification:

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 3 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    4/99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    5/99

    Rate In (Rs.)

    UnitItem Description Rate

    eachGirth above 1800 mm to 2700 mm74856 2-3-A-4 1,162.20

    eachGirth above 2700 mm to 4500 mm74857 2-3-A-5 2,360.80

    eachGirth above 4500 mm74858 2-3-A-6 7,122.10

    Lead upto 1000 m2-3-B

    eachGirth above 300 mm to 600 mm74859 2-3-B-1 182.70

    eachGirth above 600 mm to 900 mm74860 2-3-B-2 308.20

    eachGirth above 900 mm to 1800 mm74861 2-3-B-3 624.30

    eachGirth above 1800 mm to 2700 mm74862 2-3-B-4 1,203.10

    eachGirth above 2700 mm to 4500 mm74863 2-3-B-5 2,406.20

    eachGirth above 4500 mm74864 2-3-B-6 6,895.10

    Uprooting and Removing Stumps & Roots

    Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of

    servicable material by manual means as per Technical Specification Clause 201.

    2-4

    Lead upto 100 m2-4-A

    eachGirth above 300 mm to 600 mm74865 2-4-A-1 110.80

    eachGirth above 600 mm to 900 mm74866 2-4-A-2 171.40

    eachGirth above 900 mm to 1800 mm74867 2-4-A-3 370.60

    eachGirth above 1800 mm to 2700 mm74868 2-4-A-4 736.30

    eachGirth above 2700 mm to 4500 mm74869 2-4-A-5 1,477.50

    eachGirth above 4500 mm74870 2-4-A-6 4,171.10

    Lead upto 1000 m2-4-B

    eachGirth above 300 mm to 600 mm74871 2-4-B-1 111.50

    eachGirth above 600 mm to 900 mm74872 2-4-B-2 177.10

    eachGirth above 900 mm to 1800 mm74873 2-4-B-3 377.40

    eachGirth above 1800 mm to 2700 mm74874 2-4-B-4 744.60

    eachGirth above 2700 mm to 4500 mm74875 2-4-B-5 1,488.80

    eachGirth above 4500 mm74876 2-4-B-6 4,227.90Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other

    structure comprising of masonry, cement concrete, wood work, steel work, includingT&P and scaffolding wherever necessary, sorting the dismantled material, disposal

    of unserviceable material and stacking the serviceable material with all lifts and lead

    2-5

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 5 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    6/99

    Rate In (Rs.)

    UnitItem Description Rate

    of 1000 m as per Technical Specification Clause 202.

    By Manual Means2-5-1

    cu.mLime Concrete74877 2-5-1-A 262.40

    metreCement Concrete74878 2-5-1-B 315.80

    cu.mReinforced Cement Concrete74879 2-5-1-C 892.30

    By Mechanical Means2-5-2

    cu.mCement Concrete74880 2-5-2-A 383.70

    cu.mReinforced Cement Concrete74881 2-5-2-B 683.80

    Dismantling Brick/Tile WorkDismantling of existing structures like culverts, bridges, retaining walls and other

    structures comprising of brick masonry, including disposal of unserviceable materialand stacking the serviceable material with all lift and lead of 1000 m as per

    Technical Specification Clause 202.

    2-6

    cu.mLime mortar74882 2-6-A 155.70

    cu.mCement mortar74883 2-6-B 209.10cu.mMud Mortar74884 2-6-C 134.40

    cu.mDry Brick Pitching or Brick Soling74885 2-6-D 123.70

    Dismantling stone masonry

    Dismantling of existing structures like culverts, bridges, retaining walls and other

    structure comprising of stone masonry, including disposal of unserviceable materialand stacking the serviceable material with all lift and lead of 1000 m as per

    Technical Specification Clause 202.

    2-7

    cu.mRubble Stone Masonry in Lime Mortar74886 2-7-A 177.10

    cu.mRubble Stone Masonry in Cement Mortar74887 2-7-B 209.10

    cu.mRubble Stone Masonry in Mud Mortar74888 2-7-C 155.70

    cu.mDry Rubble Masonry74889 2-7-D 145.10

    cu.mDismantling Stone Pitching / Dry Stone Spalls74890 2-7-E 134.40

    cu.mDismantling boulders laid in wire crates including opening of crates and stackingdismantled materials

    74891 2-7-F 155.70

    cu.mWood work wrought and planed fixed in frames of trusses upto a height of 5m

    above plinth level

    74892 2-8 455.40

    Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth

    Level excluding Cutting of rivet as per Technical Specification Clause 202.

    2-9

    tonneIncluding dismembering74893 2-9-A 1,213.30

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 6 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    7/99

    Rate In (Rs.)

    UnitItem Description Rate

    tonneExcluding dismembering74894 2-9-B 830.50

    eachExtra over Items (A) and (B) for cutting rivets74895 2-9-C 9.70

    Nos.Scraping of bricks dismantled from brick work including stacking as per TechnicalSpecification Clause 202.

    74896 2-10 0.90

    cu.mScraping of Stone from Dismantled Stone Masonry as per Technical SpecificationClause 202.

    74897 2-11 374.60

    sq.mScraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as perTechnical Specification Clause 202.74898

    2-12 11.40

    Removing all types of Hume pipes and stacking within a lead of 1000 m includingEarthwork and Dismantling of Masonry Works as per Technical Specification

    Clause 202.

    2-13

    metreUpto 600 mm dia Hume pipe74899 2-13-A 138.50

    metreAbove 600 mm to 900 mm dia Hume pipe74900 2-13-B 187.30

    metreAbove 900 mm dia Hume pipe74901 2-13-C 320.60

    Dismantling of Flexible PavementsDismantling of flexible pavements and disposal of dismantled materials upto a lead

    of 100 m, stacking serviceable and unserviceable materials separately as perTechnical Specification Clause 202

    2-14

    By Manual Means2-14-1

    cu.mBituminous Courses74902 2-14-1-A 486.30

    cu.mGranular Courses74903 2-14-1-B 341.60

    By Mechanical Means2-14-2

    cu.mBituminous Courses74904

    2-14-2-A 168.60

    cu.mDismantling of Cement Concrete Pavements

    Dismantling of cement concrete pavements by mechanical means using pneumatictools breaking to pieces not exceeding 0.02 cum in volume and stock piling at

    designated locations and disposal of dismantled materials upto a lead of 1000 m,stacking serviceable and unserviceable materials separately

    74905 2-15 1,730.90

    metreDismantling Guard Rails

    Dismantling guard rails by manual means and disposal of dismantled material withall lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable

    materials separately as per Technical Specification Clause 202.

    74906 2-16 51.40

    metreDismantling Kerb Stones

    Dismantling kerb stones by manual means and disposal of dismantled material with

    all lifts and upto a lead of 1000 m as per Technical Specification Clause 202.

    74907 2-17 8.50

    metreDismantling Kerb Stone Channels

    74908 2-18 13.00

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 7 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    8/99

    Rate In (Rs.)

    UnitItem Description Rate

    Dismantling kerb stone channels by manual means and disposal of dismantledmaterial with all lifts and upto a lead of 1000 m as per Technical Specification

    Clause 202.

    Dismantling Kilometre Stones

    Dismantling of kilometre stones including cutting of earth, foundation and disposalof dismantled material with all lifts and lead upto 1000 m and backfilling of pit as

    per Technical Specification Clause 202.

    2-19

    each5th km Stone74909 2-19-A 234.10

    eachOrdinary km Stones74910 2-19-B 151.50

    each200 m Stones74911 2-19-C 31.20

    metreDismantling of Fencing

    Dismantling of barbed wire fencing / wire mesh fencing including posts, foundation

    concrete, backfilling of pit by manual means including disposal of dismantledmaterial with all lifts and upto a lead of 1000 m, stacking serviceable material and

    unserviceable material separately as per Technical Specification Clause 202.

    74912 2-20 39.90

    metreDismantling of CI Water Pipe Line

    Dismantling of CI water pipe line 600 mm dia including disposal with all lifts andlead upto 1000 m and stacking of serviceable material and unserviceable materialseparately under supervision of concerned department as per Technical Specification

    Clause 202.

    74913 2-21 97.20

    metreRemoval of Cement Concrete Pipe of Sewer Gutter

    Removal of cement concrete pipe of sewer gutter 1500 mm dia under thesupervision of concerned department including disposal with all lifts and upto a lead

    of 1000 m and stacking of serviceable and unserviceable material separately butexcluding earth excavation and dismantling of masonry works as per Technical

    Specification Clause 202.

    74914 2-22 124.60

    Specification:

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 8 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    9/99

    Chapter Name EARTHWORK, EROSION CONTROL AND DRAINAGE (Based on MORD)

    Rate In (Rs.)UnitItem Description Rate

    Preparation of Foundation for Embankmentby manual means3-1

    sq.mScarifying Existing Granular Surface to a Depth of 50 mm by Manual Means

    Scarifying existing granular surface to a depth of 50 mm and disposal of scarified

    material with a lift upto 3 m and leads upto 1000 m as per Technical SpecificationClause 301.4. 1

    74915 3-1-1 14.10

    Preparation of Foundation for Embankment by mechanical means.3-2

    sq.mScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical

    MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal

    of scarified material with a lift upto 3 m and lead upto 1000 m as per TechnicalSpecification Clause 301.4.

    74916 3-2-1 4.20

    cu.mConstruction of Embankment with Material Obtained from Roadway CuttingConstruction of embankment with approved materials deposited at site from

    roadway cutting and excavation from drain and foundation of other structuresgraded and compacted to meet requirement of Tables 300.1 and 300.2 as per

    Technical Specification Clause 301.5

    74917 3-3 51.70

    cu.mConstruction of embankment with approved material obtained from borrow pits(including cost of compensation for earth taken from private land) with a lift upto

    1.5 m, transporting to site, spreading, grading to required slope and compacting to

    meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause301.5

    74918 3-4 308.50

    Excavation in Cutting in Soil3-5

    cu.mExcavation in Soil with Dozer with lead upto 100 m :Excavation for roadway insoil by mechanical means including cutting and pushing the earth to site of

    embankment upto a distance of 100 m, including trimming bottom and side slopes inaccordance with requirements of lines, grades and cross-sections.

    74919 3-5-1 35.90

    cu.mExcavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000m: Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket

    capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross-sections, and transporting

    to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3

    74920 3-5-2 34.20

    cu.mExcavation in Marshy SoilExcavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucketcapacity including cutting and loading in tippers and disposal with a lift upto 1.5 m

    and lead upto 1000 m, trimming of bottom and side slopes in accordance withrequirements of lines, grades and cross- sections as per Technical Specification

    Clause 302.3.6.

    74921 3-6 44.70

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 9 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    10/99

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mRemoval of Unsuitable Soil with Disposal

    Removal of unsuitable soil including excavation, loading and disposal upto 1000mlead but excluding compaction ground supporting embankment subgrade

    replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 asper Technical Specification Clause 302.3.11

    74922 3-7 34.20

    Excavation in ordinary Rock3-8

    cu.mExcavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal

    upto 1000 m

    Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucketcapacity including cutting and loading in tippers, transporting to embankment site

    with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes inaccordance with requirements of lines, grades and cross-sections as per Technical

    Specification Clause 302.3.5

    74923 3-8-2 52.50

    cu.mExcavation in Ordinary Rock with Dozer with lead upto 100 m Excavationfor roadway in ordinary rock by deploying a dozer D-50 including cutting and

    pushing the cut earth to site of embankment upto a distance of 100 m (average lead50 m), trimming bottom and side slopes in accordance with the requirements of

    lines, grades and cross-sections with lift upto 1.5 m.

    74924 3-8-1 40.30

    Excavation in Hard Rock (requiring blasting) with disposal upto 1000 m3-9

    cu.mExcavation in Hard Rock (requiring blasting) with disposal upto 1000 m

    Excavation for roadway in hard rock (requiring blasting) by drilling, blasting andbreaking, trimming of bottom and side slopes in accordance with requirements of

    lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5

    m and leads upto 1000 m as per Technical Specification Clause 302.3.5

    74925 3-9-1 50.60

    Excavation in Hard Rock (blasting prohibited)Excavation for roadway in hard rock (blasting prohibited) with rock breakers

    including breaking rock, loading in tippers and disposal with a lift upto 1.5 m andlead upto 1000 metres, trimming bottom and side slopes in accordance with

    requirements of lines, grades and cross- sections as per Technical SpecificationClause 302.3.5

    3-9-2

    cu.mMechanical Means74926 3-9-2-B 175.70

    cu.mExcavation in Hard Rock (controlled blasting) with disposal upto 1000 mExcavation for roadway in hard rock with controlled blasting by drilling, blasting

    and breaking, trimming of bottom and side slopes in accordance with requirements

    of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5

    74927 3-9-3 75.60

    cu.mStripping, Storing and Relaying Top Soil from Right-of-Way (R.O.W)Stripping,

    storing and preservation of top soil by keeping it damp in stock piles and keep wettill it is used by road side at 15 m internal and re-application on embankment slopes,

    cut slopes and other areas in localities where the available embankment material is

    74928 3-10 149.80

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 10 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    11/99

    Rate In (Rs.)

    UnitItem Description Rate

    not conducive to plant growth as per Technical Specification Clause 302.3.2

    cu.mStripping, Storing and Relaying Top Soil from Borrow Areas in Agricultural Fields

    Stripping of top soil from borrow areas located in agriculture fields, storing at a

    suitable place, spreading and relaying after taking the borrow earth to maintainfertility of the agricultural field, finishing it to the required levels to the satisfaction

    of the farmer/land owner as per Technical Specification Clause 302.3.2.

    74929 3-11 121.80

    sq.mTurfing with Sods

    Furnishing and laying of the live sods of perennial turf forming grass onembankment slope, verges or other locations shown on the drawing or as directed

    by the Engineer including preparation of ground, fetching of sods and watering asper Technical Specification Clause 309.

    74930 3-12 75.60

    sq.mSeeding and Mulching

    Preparation of seed bed on previously laid top soil, furnishing and placing of seeds,fertilizer, mulching material, applying bituminous emulsion @ 0.23 litre per sqm

    and laying and fixing jute netting, including watering for 3 months all as per Technical Specification Clause 310.

    74931 3-13 119.90

    cu.mConstruction of subgrade and earthen shoulders with approved material obtainedfrom borrow pits with all lifts and leads, transporting to site, spreading, grading to

    required slope and compacted to meet requirements of Table 300.2 with lead upto1000mas per Technical Specification Clause 303.1.

    74932 3-14 325.10

    Compacting Original Ground3-15

    cu.mCompacting original ground supporting embankment

    Loosening, Levelling and Compacting original ground supporting embankment tofacilitate placement of first layer of embankment, scarified to a depth of 150 mm,

    mixed with water at OMC and then compacted by rolling so as to achieve minimum

    dry density as given in Tables 300.1 and 300.2 for embankment construction as perTechnical Specification Clause 301.4.1.

    74933 3-15-1 16.60

    cu.mCompacting original ground supporting subgradeLoosening of the ground upto a level of 300 mm below the subgrade level, watered,

    graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 forsubgrade construction as per Technical Specification Clause 303.5.2.

    74934 3-15-2 48.30

    sq.mRepairs of damages caused by rain/spillage of waterPreparation and surface treatment of formation by removing mud and slurry,

    watering to the extent needed to maintain the desired moisture content, trimming tothe required line, grade, profile and rolling with three wheel 80-100 kN static roller,

    complete as per Technical Specification Clause 301.5.5.1

    74935 3-16 1.70

    sq.mPresplitting Rock Excavation Slopes

    Carrying out excavation in hard rock to achive a specified slope of the rock face bycontrolled use of explosives and blasting accessories in properly aligned and spaced

    drill holes, collection of the excavated rock by a D-50 dozer, loading in tipper by a

    74936 3-17 100.90

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 11 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    12/99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    13/99

    Chapter Name GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS (Based on MORD)

    Rate In (Rs.)UnitItem Description Rate

    Granular Sub-base with Well Graded Material (Table 400.1)4-1

    By Mix in Place Method

    Construction of granular sub-base by providing well graded material, spreading in

    uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with smooth wheel roller to

    achieve the desired density, complete as per Technical Specification Clause 401.

    4-1-A

    cu.mFor Grading I Material74945 4-1-A-1 1,377.00

    cu.mFor Grading II Material74946 4-1-A-2 1,373.80

    cu.mFor Grading III Material74947 4-1-A-3 1,375.70

    Plant Mix MethodConstruction of granular sub-base by providing well graded material, mixing in a

    mechanical mix plant at OMC, carriage of mixed material to work site upto lead of1000 m spreading in uniform layers with motor grader on prepared surface and

    compacting with smooth wheel roller to achieve the desired density, complete as

    per Technical Specification Clause 401

    4-1-B

    cu.mFor Grading I Material74948 4-1-B-1 1,489.50

    cu.mFor Grading II Material74949 4-1-B-2 1,492.10

    cu.mFor Grading III Material74950 4-1-B-3 1,492.10

    Gravel/Soil-Aggregate Base (Table 400.2) Grading A4-2

    cu.mGravel/Soil-Aggregate Base (Table 400.2) Grading A

    Construction of gravel/soil-aggregate base by providing well graded material,

    spreading in uniform layers with motor grader on prepared surface, mixing by mixin place method with rotavator at OMC, and compacting with three wheel 80-100kN static roller to achieve the desired density, complete as per Technical

    Specifications Clause 402

    74951 4-2-1 1,375.20

    cu.mGravel/Soil-Aggregate Base (Table 400.2) Grading BConstruction of granular sub-base by providing well graded material, spreading in

    uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kN static

    roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402

    74952 4-2-2 1,375.20

    cu.mGravel/Soil-Aggregate Base (Table 400.2) Grading CConstruction of granular sub-base by providing well graded material, spreading in

    uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kN static

    roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402

    74953 4-2-3 1,375.20

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 13 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    14/99

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mGravel/Soil-Aggregate Surface Course (Table 400.3)

    Construction of granular surface course by providing well graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix

    in place method with rotavator at OMC, and compacting with three wheel 80-100kN static roller capacity to achieve the desired density, complete as per Technical

    Specification Clause 402

    74954 4-3 1,311.20

    Lime Stabilisation for Improving Subgrade

    Laying and spreading available soil in the subgrade on a prepared surface,

    pulverising, mixing the spread soil in place with rotavator with 2 per cent slakedlime having minimum 70 per cent of contents of CaO, grading with motor grader

    and compacting with the smooth wheel road roller at OMC to the desired density toform a layer of improved Sub-grade as per Technical Specification Cluase 403.

    4-4

    cu.mBy Manual Means74955 4-4-A 333.40

    cu.mBy Mechanical Means74956 4-4-B 337.30

    cu.mLime Treated Soil for Sub-BaseProviding, laying and spreading soil on a prepared sub-grade, pulverising, mixing

    the spread soil in place with rotavator with 4 per cent slaked lime with minimumcontent of 50 per cent of CaO, grading with motor grader and compacting with the

    road roller at OMC to achieve atleast 98 per cent of the max dry density to form alayer of sub-base as per Technical Specification Clause 403.

    74957 4-5 621.20

    cu.mCement Treated Soil Sub-Base/BaseProviding, laying and spreading soil on a prepared sub-grade, pulverising, adding

    the designed quantity of cement to the spread soil, mixing in place with rotavator,grading with the motor grader and compacting with the road roller at OMC to

    achieve the desired unconfined compressive strength and to form a layer of sub-base/base as per Technical Specification Clause 404.

    74958 4-6 700.60

    Water Bound Macadam Sub-base/base4-7WBM Grading 1Providing, laying, spreading and compacting stone aggregates of specific sizes to

    water bound macadam specification including spreading in uniform thickness, handpacking, rolling with three wheel 80-100 kN static roller in stages to proper grade

    and camber, applying and brooming, stone screening/binding materials to fill-up theinterstices of coarse aggregate, watering and compacting to the required density

    Grading 1 as per Technical Specification Clause 404.

    4-7-1

    cu.mBy Manual Means74959 4-7-1-A 1,861.70

    cu.mBy Mechanical Means74960 4-7-1-B 1,743.30

    WBM Grading 2Providing, laying, spreading and compacting stone aggregates of specific sizes to

    water bound macadam specification including spreading in uniform thickness, handpacking, rolling with smooth wheel roller 80-100 kN in stages to proper grade and

    camber, applying and brooming, stone screening/binding materials to fill-up the

    4-7-2

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 14 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    15/99

    Rate In (Rs.)

    UnitItem Description Rate

    interstices of coarse aggregate, watering and compacting to the required densitygrading 2 as per Technical Specification Clause 405.

    cu.mBy Manual Means74961 4-7-2-A 1,939.50

    cu.mBy Mechanical Means74962 4-7-2-B 1,821.00

    WBM Grading 3

    Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, hand

    packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and

    camber, applying and brooming, stone screening to fill-up the interstices of coarseaggregate, watering and compacting to the required density Grading 3 as perTechnical Specification Clause 405.

    4-7-3

    cu.mBy Manual Means74963 4-7-3-A 1,967.00

    cu.mBy Mechanical Means74964 4-7-3-B 1,848.50

    Water Bound Macadam with Crushable Screenings4-8

    WBM Grading 1Providing, laying, spreading and compacting stone aggregates of specific sizes to

    water bound macadam specification including spreading in uniform thickness, handpacking, rolling with three wheel 80-100 kN static roller in stages to proper grade

    and camber, applying and brooming, crushable screening to fill-up the interstices ofcoarse aggregate, watering and compacting to the required density Grading 1 as per

    Technical Specification Clause 405.

    4-8-1

    cu.mBy Manual Means74965 4-8-1-A 1,894.40

    cu.mBy Mechanical Means74966 4-8-1-B 1,775.90

    WBM Grading 2

    Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, hand

    packing, rolling with three wheel 80-100 kN static roller in stages to proper gradeand camber, applying and brooming, crushable screening to fill-up the interstices of

    coarse aggregate, watering and compacting to the required density Grading 2 as perTechnical Specification Clause 405.

    4-8-2

    cu.mBy Manual Means74967 4-8-2-A 1,967.70

    cu.mBy Mechanical Means74968 4-8-2-B 1,849.20

    WBM Grading 3

    Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, hand

    packing, rolling with three wheel 80-100 kN static roller in stages to proper gradeand camber, applying and brooming, crushable screening to fill-up the interstices of

    coarse aggregate, watering and compacting to the required density Grading 3 as perTechnical Specification Clause 405.

    4-8-3

    cu.mBy Manual Means74969 4-8-3-A 2,036.40

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 15 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    16/99

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mBy Mechanical Means74970 4-8-3-B 1,917.90

    cu.mWet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix

    macadam specification including premixing the material with water at OMC in

    mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying inuniform layers in sub-base/base course on a well prepared sub-base and compacting

    with smooth wheel roller of 80 to 100kN weight to achieve the desired densityincluding lighting, barricading and maintenance of diversion, etc as per Tables

    400.11 & 400.12 and Technical Specification Clause 406.

    74971 4-9 1,998.00

    Construction of Shoulders as per Technical Specification Clause 407.4-10

    Granular sub-base/base/surface course with local materials (Table 400.13) by mix inplace method normal Construction of granular sub-base by providing local material

    spreading in uniform layers with motor grader on prepared surface, mixing by mixin place method with rotavator at once and compacting with smooth wheel roller to

    achieve the desired density complete as per Clause 401.4 as per TechnicalSpecification Clause 408.

    4-11

    cu.mUsing naturally occuring gravel74972 4-11-1 453.10

    cu.mUsing Gravel mix soil using74973 4-11-2 451.30

    cu.mConstruction of Water Bound Macadam using locally available material (Table

    400.13)

    Providing, laying spreading and compacting local material in block or large discreteparticles, such as kankar, Laterite, Dhandla etc. as per Table 400.13 to water bound

    macadam specification including spreading in uniform thickness, hand packing,rolling with three wheel 80-100 kN static roller in stages to proper grade and

    camber, applying and brooming requisite type of screening /binding materials tofill-up the interstices of laid material watering and compacting to the required

    density as per Clause 405.3 and Technical Specification Cluase 408.

    74974 4-12 496.30

    cu.mLime-Flyash Stablised Soil Sub-baseConstruction of sub-base using lime-flyash admixture with granular soil, free from

    organic matter/deleterious material or clayey silts and low plasticity clays having PIbetween 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked at

    site or pre-slaked with CaO content not less than 50 per cent, flyash to conform togradation as per Clause 4.3 of IRC:SP:20, lime+flyash content ranging between 10

    to 30 per cent, the minimum un-confined compressive strength and CBR value after28-days curing and 4-days soaking to be 0.75 MPa and 25 per cent respectively, all

    as specified in IRC:88 including a lead upto 1000 m as per Technical Specification

    Cluase 409.

    74975 4-13 703.60

    cu.mConstruction of Sub-base/Course Using Crushed Slag as per Table

    400.19Construction of Sub-base by providing crushed slag spreading in uniformlayer with motor grader on prepared surface mixing by mix-in-place method with

    Rotavator @ OMC, and compacting with three wheel 80-100 kN static roller toachieve the desired density complete as per Technical Specifications Cluase 402.4

    74976 4-14 1,071.90

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 16 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    17/99

    Rate In (Rs.)

    UnitItem Description Rate

    and 410.3.2

    cu.mWater Bound Macadam using crushed slagProviding, laying, spreading and compacting crushed slag to water Bound Macadam

    specification including spreading in uniform thickness, hand packing rolling withsmooth wheel roller 80-100 kN in stages to proper grade and camber, applying and

    brooming requisite type of screening/binding materials to fill up the interstees ofcrushed slag watering and compacting to the required density as per Clause 405.3

    and Technical Specification Cluase 410.3.2.

    74977 4-15 1,576.60

    cu.mCement Bound Granular Material sub-base/base

    Providing laying and spreading granulated blast furnace slag on a preparedsub-grade pulverising adding the designed quantitity of cement to the spread

    granulated blast furnace slag mixing in place with rotavator grading with the mortargrader and compacting with smooth wheel roller 80-100 kN at OMC to achieve the

    desired unconfined compressive strength and to form a layer of sub-base/base as per

    Technical Specification Clauses 404.3 and 410.4.2.

    74978 4-16 692.60

    Crusher Run Macadam Base

    Providing crushed run stone aggregate greading conforming to table 400.20depositing on a prepared surface by hauling vehicles, spreading and mixing with a

    motor grader, watering and compacting with a three wheel 80-100 kN static rolleras per Technical Specification Clause 411 to form a layer of sub-base/base

    4-17

    By mix-in-place method4-17-A

    cu.mWith 53 mm maximum size of aggregates74979 4-17-A-1 1,572.60

    cu.mWith 37.5 mm maximum size of aggregates74980 4-17-A-2 1,866.70

    By mixing plant method4-17-B

    cu.mWith 53 mm maximum size of aggregates74981 4-17-B-1 1,886.00

    cu.mWith 37.5 mm maximum size of aggregates74982 4-17-B-2 1,997.00

    sq.mBrick Soling

    Laying brick soling layer on prepared sub-grade with brick on end edging accordingto lines, graded and cross-section shown on the drawing filling joints with sand and

    earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliingthe same with three wheel road roller 80-100 kN as per Technical Specification

    Clause 412

    74983 4-18 507.70

    sq.mStone Set Pavement

    Providing and laying stone set pavement on prepared surface with sub-base 100 mm

    thick compacted Granular Sub-base as per Clause 401.4 and base 75 mm thickcompacted water bound macadam grading 2 as per Clause 405.3. The 150 mm thick

    hammer desired stones are laid in the herring one or stretched bond pattern. Thestones are compacted into the bedding sand of 40 mm over the WBM base bounded

    by edge stone using suitable compacting device. The gaps are filled with fine sandstone dust as per Technical Specification Clause 413.4

    74984 4-19 1,809.20

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 17 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    18/99

    Rate In (Rs.)

    UnitItem Description Rate

    Water Bound Macadam Sub-base/base without screening material (As per PWD

    Uttarakhand Specification)

    4-20

    cu.mProviding, laying, spreading & compaction of stone aggregates of specific sizes to

    WBM specifications including spreading in uniform thickness, hand packing, rollingwith power roller 8-10 tonn in stages to proper grade & camber, applying &

    brooming requisite type of binding material to fill up the intristices of coarseaggregates,watering & rolling, making necessary earthen bund to protect edges

    lighting, guarding & barricadings, & maintenance of diversions etc.[Grading ofno-1] (45-90 mm size).

    74985 4-20-1 1,512.20

    cu.mProviding, laying, spreading & compaction of stone aggregates of specific sizes to

    WBM specifications including spreading in uniform thickness, hand packing, rollingwith power roller 8-10 tonn in stages to proper grade & camber, applying &

    brooming requisite type of binding material to fill up the intristices of coarseaggregates,watering & rolling making necessary earthen bund to protect edges

    lighting, guarding & barricatings, &maintenance of diversions etc.[Grading of no-2](45-63 mm size).

    74986 4-20-2 1,594.30

    cu.mProviding, laying, spreading & compaction of stone aggregates of specific sizes toWBM specifications including spreading in uniform thickness, hand packing, rolling

    with power roller 8-10 tonn in stages to proper grade & camber, applying &brooming requisite type of binding material to fill up the intristices of coarse

    aggregates,watering & rolling making necessary earthen bund to protect edgeslighting, guarding & barricatings, &maintenance of diversions etc.[Grading of no-3]

    (22.4 - 53 mm size).

    74987 4-20-3 1,656.70

    Specification:

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 18 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    19/99

    Chapter Name BASES AND SURFACE COURSES (BITUMINOUS) (Based on MORD)

    Rate In (Rs.)UnitItem Description Rate

    Prime Coat5-1

    sq.mLow porosity

    Providing and applying primer coat with bitumen emulsion (SS-1) on prepared

    surface of granular base including cleaning of road surface and spraying primer atthe rate of 0.70 kg/sqm using mechanical means as per Technical Specification

    Clause 502

    74988 5-1-1 31.60

    sq.mLow porosityProviding and applying primer coat with bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at

    the rate of 1.00 kg/sqm using mechanical means as per Technical SpecificationClause 502

    74989 5-1-2 44.40

    sq.mMedium porosityProviding and applying primer coat with Bitumen emulsion (SS-1) on prepared

    surface of granular base including cleaning of road surface and spraying primer atthe rate of 0.90 kg/sqm using mechanical means as per Technical Specification

    Clause 502.

    74990 5-1-3 40.30

    sq.mMedium porosity

    Providing and applying primer coat with Bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at

    the rate of 1.20 kg/sqm using mechanical means as per Technical Specification

    Clause 502.

    74991 5-1-4 53.20

    sq.mHigh porosity

    Providing and applying primer coat with Bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at

    the rate of 1.2kg/sqm using mechanical means as per Technical Specification Clause502.

    74992 5-1-5 53.30

    sq.mHigh porosityProviding and applying primer coat with Bitumen emulsion (SS-1) on prepared

    surface of granular base including cleaning of road surface and spraying primer atthe rate of 1.5 kg/sqm using mechanical means as per Technical Specification

    Clause 502.

    74993 5-1-6 66.20

    Tack Coat5-2

    sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned

    with hydraulic broom as per Technical Specification Clause 503.

    74994 5-2-1 10.30

    sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned

    with hydraulic broom as per Technical Specification Clause 503.

    74995 5-2-2 12.50

    sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsion

    distributor at the rate of 0.25 kg per sqm on the prepared dry and hungry bituminous74996 5-2-3 12.50

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 19 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    20/99

    Rate In (Rs.)

    UnitItem Description Rate

    surface cleaned with hydraulic broom as per Technical Specification Clause 503.

    sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous

    surface cleaned with hydraulic broom as per Technical Specification Clause 503.

    74997 5-2-4 14.80

    sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated

    with primer & cleaned with hydraulic broom as per Technical Specification Clause503.

    74998 5-2-5 12.50

    sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated

    with primer & cleaned with hydraulic broom as per Technical Specification Clause503.

    74999 5-2-6 14.80

    sq.mProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion

    pressure distributor at the rate of 0.30 kg per sqm on the prepared non-bituminoussurfaces (cement concrete pavement) cleaned with Hydraulic broom as per

    Technical Specification Clause 503.

    75000 5-2-7 14.80

    sq.mProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsionpressure distributor at the rate of 0.35 kg per sqm on the prepared non-bituminoussurfaces (cement concrete pavement)cleaned with Hydraulic broom as per Technical

    Specification Clause 503.

    75001 5-2-8 17.00

    Providing and laying bituminous macadam with 60-90 TPH hot mix plant producing

    an average output of 75 tonnes per hour using crushed aggregates of specifiedgrading premixed with bituminous binder, transported to site, laid over a previously

    prepared surface with paver finisher to the required grade, level and alignment androlled as per clauses 501.6 and 501.7 to achieve the desired compaction

    5-3

    Bituminous Macadam using VG 10 (80/100 Pen. Grade) Bitumen5-3-1

    Bituminous Macadam Grading I (40 mm) using VG - 10 Grade Bitumen5-3-1-1

    cu.mBituminous Macadam (Grading I) using 3.1% VG-10 Bitumen(By weight of total

    mix)75002 5-3-1-1-1 6,737.50

    cu.mBituminous Macadam (Grading I) using 3.3% VG-10 Bitumen(By weight of total

    mix)75003 5-3-1-1-2 6,985.50

    cu.mBituminous Macadam (Grading I) using 3.4% VG-10 Bitumen(By weight of total

    mix)75004 5-3-1-1-3 7,109.40

    Bituminous Macadam Grading II (19 mm) using VG - 10 grade bitumen5-3-1-2

    cu.mBituminous Macadam (Grading II) using 3.3% VG-10 Bitumen(By weight of totalmix)

    75005 5-3-1-2-1 6,985.50

    cu.mBituminous Macadam (Grading II) using 3.4% VG-10 Bitumen(By weight of totalmix)

    75006 5-3-1-2-2 7,109.40

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 20 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    21/99

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mBituminous Macadam (Grading II) using 3.5% VG-10 Bitumen(By weight of total

    mix)75007 5-3-1-2-3 7,233.40

    Bituminous Macadam using VG 30 (60/70 Pen. Grade) Bitumen5-3-2

    Bituminous Macadam Grading I (40 mm) using VG - 30 Grade Bitumen5-3-2-1

    cu.mBituminous Macadam (Grading I) using 3.1% VG-30 Bitumen(By weight of total

    mix)75008 5-3-2-1-1 6,809.70

    cu.mBituminous Macadam (Grading I) using 3.3% VG-30 Bitumen(By weight of total

    mix)

    75009 5-3-2-1-2 7,062.20

    cu.mBituminous Macadam (Grading I) using 3.4% VG-30 Bitumen(By weight of total

    mix)75010 5-3-2-1-3 7,188.50

    Bituminous Macadam Grading II (19 mm) using VG - 30 Grade Bitumen5-3-2-2

    cu.mBituminous Macadam (Grading II) using 3.3% VG-30 Bitumen75011 5-3-2-2-1 7,062.20

    cu.mBituminous Macadam (Grading II) using 3.4% VG-30 Bitumen75012 5-3-2-2-2 7,188.50

    cu.mBituminous Macadam (Grading II) using 3.5% VG-30 Bitumen75013 5-3-2-2-3 7,314.80

    Built-Up Spray GroutProviding, laying and rolling of built-up spray grout layer over prepared baseconsisting of a two layer composite construction of crushed coarse aggregates using

    motor grader for aggregates. Key stone chips spreader may be used with applicationof bituminous binder after each layer, and with key aggregates placed on top of the

    second layer to serve as a base, conforming to the line, grades and cross-section

    specified, the compacted layer thickness being 75 mm as per Technical SpecificationClause 505.

    5-4

    By Manual Means5-4-A

    sq.mBitumen (S-90)75014 5-4-A-1 371.90

    sq.mBitumen (S-65)75015 5-4-A-2 375.10

    sq.mBy Mechanical Means75016 5-4-B 331.30

    Modified Penetration Macadam

    Construction of penetration macadam over prepared base by providing a layer ofcompacted crushed coarse aggregate using chips spreader with alternate applications

    of bituminous binder and key aggregates and rolling with a three wheel 80-100 kNstatic roller to achieve the desired degree of compaction as per Technical

    Specification Clause 506.

    5-5

    50 mm thick5-5-A

    sq.mBitumen (S-90)75017 5-5-A-1 190.80

    75 mm thick5-5-B

    sq.mBitumen (S-90)75018 5-5-B-1 236.30

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 21 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    22/99

    Rate In (Rs.)

    UnitItem Description Rate

    sq.mBitumen (S-65)75019 5-5-B-2 177.80

    Surface Dressing using Bituminous (Penetrations grade / modified bitumen) BinderProviding and laying surface dressing as wearing course consisting of a layer of

    bituminous binder laid on the prepared surface, followed by a cover of crushed stone

    aggregates of specified size and rolling with three wheel 80-100 kN static rollerincluding cleaning the road surface as per Technical Specification Clause 507.

    5-6

    By Manual Means Case I: Nominal chipping size 13.2 mm5-6-A

    Case I: Nominal chipping size 13.2 mm5-6-A-1

    sq.mBitumen (S-90)75020 5-6-A-1-1 91.70

    sq.mBitumen (S-65)75021 5-6-A-1-2 92.80

    sq.mPolymer Modified Bitumen75022 5-6-A-1-3 74.20

    sq.mCrumb Rubber Modified Bitumen75023 5-6-A-1-4 94.80

    sq.mNatural Rubber Modified Bitumen75024 5-6-A-1-5 77.80

    Case II: Nominal chipping size 9.5 mm5-6-A-2

    sq.mBitumen (S-90)75025 5-6-A-2-1 81.00

    sq.mBitumen (S-65)75026 5-6-A-2-2 81.90

    sq.mPolymer Modified Bitumen75027 5-6-A-2-3 65.30

    sq.mCrumb Rubber Modified Bitumen75028 5-6-A-2-4 83.70

    sq.mNatural Rubber Modified Bitumen75029 5-6-A-2-5 68.50

    By Mechanical Means5-6-B

    Case I: Nominal chipping size 13.2 mm5-6-B-1

    sq.mBitumen (S-90)75030 5-6-B-1-1 75.80

    sq.mBitumen (S-65)75031 5-6-B-1-2 76.80

    sq.mPolymer Modified Bitumen75032 5-6-B-1-3 58.30

    sq.mCrumb Rubber Modified Bitumen75033 5-6-B-1-4 78.80

    sq.mNatural Rubber Modified Bitumen75034 5-6-B-1-5 61.90

    Case II: Nominal chipping size 9.5 mm5-6-B-2

    sq.mBitumen (S-90)75035 5-6-B-2-1 67.10

    sq.mBitumen (S-65)75036 5-6-B-2-2 68.10

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 22 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    23/99

    Rate In (Rs.)

    UnitItem Description Rate

    sq.mPolymer Modified Bitumen75037 5-6-B-2-3 51.40

    sq.mCrumb Rubber Modified Bitumen75038 5-6-B-2-4 69.90

    sq.mNatural Rubber Modified Bitumen75039 5-6-B-2-5 54.70

    Surface Dressing using Bitumen Emulsion

    Providing and laying surface dressing as wearing course consisting of a layer of

    bitumen emulsion laid on the prepared surface, followed by a cover of crushed stonechippings of specified size and rolling with 80-100 kN roller including cleaning the

    road surface as per Technical Specification Clause 507.

    5-7

    By Manual Means5-7-A

    sq.mCase I: Nominal aggregate size 13.2 mm75040 5-7-A-1 102.20

    sq.mCase II: Nominal chipping size 9.5 mm75041 5-7-A-2 92.50

    By Mechanical Means5-7-B

    sq.mCase I: Nominal chipping size 13.2 mm75042 5-7-B-1 85.50

    sq.mCase II: Nominal chipping size 9.5 mm75043 5-7-B-2 78.20

    Pre-coating ChipsPre-coating of chips with 1 per cent of paving bitumen by weight of chips in asuitable mixer duly heated to 160 degree C as per Technical Specification Clause

    507.2.5

    5-8

    cu.mBitumen (S-90)75044 5-8-1 1,413.90

    cu.mBitumen (S-65)75045 5-8-2 1,430.90

    20mm thick Open-Graded Premix Carpet using Bituminous (penetrationgrade/modified bitumen) BinderProviding, laying and rolling of open-graded premix

    carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either usingpenetration grade bitumen or emulsion to required line, grade and level to serve as

    wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with a three wheel 80-100 kN static roller capacity, finished to

    required level and grades to be followed by seal coat of either Type A or Type B orType C as per Technical Specification Clause 508.

    5-9

    Case - I By Manual Means5-9-1

    sq.m20 mm thick open graded premix carpet using Bitumen (S-90)75046 5-9-1-1 150.40

    sq.m20 mm thick open graded premix carpet using Bitumen (S-65)75047 5-9-1-2 151.90

    sq.m20 mm thick open graded premix carpet using Polymer Modified Bitumen75048 5-9-1-3 124.90

    sq.m20 mm thick open graded premix carpet using Crumb Rubber Modified Bitumen75049 5-9-1-4 154.90

    sq.m20 mm thick open graded premix carpet using Natural Rubber Modified Bitumen75050 5-9-1-5 130.10

    Case - II By Mechanical Means5-9-2

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 23 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    24/99

    Rate In (Rs.)

    UnitItem Description Rate

    sq.mBitumen (S-90)75051 5-9-2-1 146.70

    sq.mBitumen (S-65)75052 5-9-2-2 148.20

    sq.mPolymer Modified Bitumen75053 5-9-2-3 121.20

    sq.mCrumb Rubber Modified Bitumen75054 5-9-2-4 151.20

    sq.mNatural Rubber Modified Bitumen75055 5-9-2-5 126.40

    sq.m20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical

    Specification Clause 508.2

    75056 5-10 141.20

    Mix Seal Surfacing

    Providing, laying and rolling of close-graded premix surfacing material of 20 mmthickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm

    (Type-B) aggregates using penetration grade bitumen to required line, grade andlevel to serve as wearing course on a previously prepared base, including mixing in

    a suitable plant, laying and rolling with a three wheel 8-10 kN static roller andfinishing to required level and grades as per Technical Specification Clause 509

    5-11

    By Manual Means5-11-1

    Type A5-11-1-A

    sq.mBitumen (S-90)75057 5-11-1-A-1 205.20

    sq.mBitumen (S-65)75058 5-11-1-A-2 207.50

    sq.mPolymer Modified Bitumen75059 5-11-1-A-3 166.80

    sq.mCrumb Rubber Modified Bitumen75060 5-11-1-A-4 211.90

    sq.mNatural Rubber Modified Bitumen75061 5-11-1-A-5 174.60

    Type B5-11-1-B

    sq.mBitumen (S-90)75062 5-11-1-B-1 187.90

    sq.mBitumen (S-65)75063 5-11-1-B-2 190.00

    sq.mPolymer Modified Bitumen75064 5-11-1-B-3 154.80

    sq.mCrumb Rubber Modified Bitumen75065 5-11-1-B-4 193.80

    sq.mNatural Rubber Modified Bitumen75066 5-11-1-B-5 161.60

    By Mechanical Means5-11-2

    Type A5-11-2-A

    sq.mBitumen (S-90)75067 5-11-2-A-1 189.30

    sq.mBitumen (S-65)75068 5-11-2-A-2 191.60

    sq.mPolymer Modified Bitumen75069 5-11-2-A-3 150.90

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 24 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    25/99

    Rate In (Rs.)

    UnitItem Description Rate

    sq.mCrumb Rubber Modified Bitumen75070 5-11-2-A-4 196.10

    sq.mNatural Rubber Modified Bitumen75071 5-11-2-A-5 158.80

    Type B5-11-2-B

    sq.mBitumen (S-90)75072 5-11-2-B-1 172.10

    sq.mBitumen (S-65)75073 5-11-2-B-2 174.20

    sq.mPolymer Modified Bitumen75074 5-11-2-B-3 139.00

    sq.mCrumb Rubber Modified Bitumen75075 5-11-2-B-4 178.00

    sq.mNatural Rubber Modified Bitumen75076 5-11-2-B-5 145.80

    Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the

    specified levels, grade and cross fall using Type A, Type B and Type C as per

    Technical Specification Clause 510

    5-12

    By Manual Means5-12-A

    Case - I : Type A5-12-A-A

    sq.mSeal coat using Bitumen (S-90)75077 5-12-A-A-1 76.50

    sq.mSeal coat using Bitumen (S-65)75078 5-12-A-A-2 77.60

    sq.mSeal coat using Polymer Modified Bitumen75079 5-12-A-A-3 59.40

    sq.mSeal coat using Crumb Rubber Modified Bitumen75080 5-12-A-A-4 79.50

    sq.mSeal coat using Natural Rubber Modified Bitumen75081 5-12-A-A-5 62.90

    Case - II : Type B5-12-A-B

    sq.mSeal Coat Using Bitumen (S-90)75082 5-12-A-B-1 55.30

    sq.mSeal Coat Using Bitumen (S-65)75083 5-12-A-B-2 56.00

    sq.mSeal Coat Using Polymer Modified Bitumen75084 5-12-A-B-3 43.40

    sq.mSeal Coat Using Crumb Rubber Modified Bitumen75085 5-12-A-B-4 57.40

    sq.mSeal Coat Using Natural Rubber Modified Bitumen75086 5-12-A-B-5 45.80

    Case - III : Type C5-12-A-C

    sq.mSeal Coat Using Bitumen (S-90)75087 5-12-A-C-1 57.30

    sq.mSeal Coat Using Bitumen (S-65)75088 5-12-A-C-2 58.00

    sq.mSeal Coat Using Polymer Modified Bitumen75089 5-12-A-C-3 46.00

    sq.mSeal Coat Using Crumb Rubber Modified Bitumen75090 5-12-A-C-4 59.30

    sq.mSeal Coat Using Natural Rubber Modified Bitumen75091 5-12-A-C-5 48.30

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 25 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    26/99

    Rate In (Rs.)

    UnitItem Description Rate

    By Mechanical Means5-12-B

    Case - I : Type A5-12-B-A

    sq.mSeal Coat Using Bitumen (S-90)75092 5-12-B-A-1 72.20

    sq.mSeal Coat Using Bitumen (S-65)75093 5-12-B-A-2 73.30

    sq.mSeal Coat Using Polymer Modified Bitumen75094 5-12-B-A-3 55.10

    sq.mSeal Coat Using Crumb Rubber Modified Bitumen75095 5-12-B-A-4 75.20

    sq.mSeal Coat Using Natural Rubber Modified Bitumen75096 5-12-B-A-5 58.60

    Case - II : Type B5-12-B-B

    sq.mSeal Coat Using Bitumen (S-90)75097 5-12-B-B-1 54.70

    sq.mSeal Coat Using Bitumen (S-65)75098 5-12-B-B-2 55.40

    sq.mSeal Coat Using Polymer Modified Bitumen75099 5-12-B-B-3 42.80

    sq.mSeal Coat Using Crumb Rubber Modified Bitumen75100 5-12-B-B-4 56.80

    sq.mSeal Coat Using Natural Rubber Modified Bitumen75101 5-12-B-B-5 45.30

    Case - III : Type C5-12-B-C

    sq.mSeal Coat Using Bitumen (S-90)75102 5-12-B-C-1 53.50

    sq.mSeal Coat Using Bitumen (S-65)75103 5-12-B-C-2 54.20

    sq.mSeal Coat Using Polymer Modified Bitumen75104 5-12-B-C-3 42.10

    sq.mSeal Coat Using Crumb Rubber Modified Bitumen75105 5-12-B-C-4 55.50

    sq.mSeal Coat Using Natural Rubber Modified Bitumen75106 5-12-B-C-5 44.40

    cu.mSupply of Stone Aggregates for Pavement Courses

    Supply of stone aggregates from approved sources conforming to the physicalrequirement, specified in the respective clauses, including royalties, fees rents,collection, transportation, stacking and testing and measured in cum as per Clause

    511.5.

    75107 5-13 0.00

    Surface Dressing using Bitumen Emulsion

    Providing and laying surface dressing as wearing course consisting of a layer ofbitumen laid on the prepared WBM surface, followed by a cover of crushed stone

    chippings of specified size(excluding Precoating ) and rolling with 80-100 kN rollerincluding cleaning the road surface as per PWD Specification.

    5-14

    By Mannual Means5-14-A

    sq.m19 mm size Grit for P1 Surface75108 5-14-A-1 149.30

    sq.m13 mm size grit for P2 surface75109 5-14-A-2 92.50

    Semi-Dense Bituminous Concrete

    5-15

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 26 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    27/99

    Rate In (Rs.)

    UnitItem Description Rate

    Providing and laying semi dense bituminous concrete with 60-90 TPH batch typHMP producing an average output of 75 tonnes per hour using crushed aggregate

    of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mixand filler, transporting the hot mix to work site, laying with a hydrostatic pave

    finisher with sensor control to the required grade, level and alignment, rolling witsmooth wheeled, vibratory and tandem rollers to achieve the desired compaction a

    per MoRTH specification clause No. 508 complete in all respects

    SDBC using VG - 10 (80/100 pen. grade) Bitumen5-15-1

    SDBC Grading I(13mm) using VG - 105-15-1-1

    cu.mSDBC Grading I using 4.5% VG-10 bitumen(By weight of total mix)75110 5-15-1-1-1 9,185.90

    cu.mSDBC Grading I using 4.75% VG-10 bitumen(By weight of total mix)75111 5-15-1-1-2 9,512.40

    cu.mSDBC Grading I using 5% VG-10 bitumen(By weight of total mix)75112 5-15-1-1-3 9,836.00

    SDBC Grading II(10mm) using VG - 105-15-1-2

    cu.mSDBC Grading II using 4.5% VG-10 bitumen(By weight of total mix)75113 5-15-1-2-1 9,185.90

    cu.mSDBC Grading II using 4.75% VG-10 bitumen(By weight of total mix)75114 5-15-1-2-2 9,512.40

    cu.mSDBC Grading II using 5% VG-10 bitumen(By weight of total mix)75115

    5-15-1-2-3 9,836.00

    SDBC using VG - 30 (60/70 pen. grade) Bitumen5-15-2

    SDBC Grading I(13mm) using VG - 305-15-2-1

    cu.mSDBC Grading I using 4.5% VG-30 bitumen75116 5-15-2-1-1 9,296.00

    cu.mSDBC Grading I using 4.75% VG-30 bitumen75117 5-15-2-1-2 9,628.60

    cu.mSDBC Grading I using 5% VG-30 bitumen75118 5-15-2-1-3 9,958.30

    SDBC Grading II(10mm) using VG - 305-15-2-2

    cu.mSDBC Grading II using 4.5% VG-30 bitumen75119 5-15-2-2-1 9,296.00cu.mSDBC Grading II using 4.75% VG-30 bitumen75120 5-15-2-2-2 9,628.60

    cu.mSDBC Grading II using 5% VG-30 bitumen75121 5-15-2-2-3 9,958.30

    Specification:

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 27 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    28/99

    Chapter Name CEMENT CONCRETE PAVEMENT (Based on MORD)

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mLime Treated Soil75122 6-2 661.60

    Water Bound Macadam (WBM) - Sub-base6-3

    cu.mBy Manual Means75123 6-3-A 1,863.80

    cu.mBy Mechnical Means75124 6-3-B 1,745.20

    cu.mCement Concrete PavementConstruction of un-reinforced, dowel jointed at expansion and construction joint

    only, plain cement concrete pavement, thickness as per design, over a prepared subbase, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade),

    coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregatenot exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity

    and appropriate weigh batcher using approved mix design, laid in approved fixedside formwork (steel channel, laying and fixing of 125 micron thick polythene film,

    wedges, steel plates including levelling the formwork as per drawing), spreading theconcrete with shovels, rakes, compacted using needle, screed and plate vibrators and

    finished in continuous operation including provision of contraction and expansion,construction joints, applying debonding strips, primer, sealant, dowel bars, near

    approaches to bridge/culvert and construction joints, admixtures as approved, curingof concrete slabs for 14-days,using curing compound (where specified) and water

    finishing to lines and grade as per drawing and Technical Specification Clause 1501

    75125 6-4 6,379.90

    cu.mRoller Compacted Concrete PavementConstruction of Roller Compacted Concrete Pavement (RCCP) with coarse and fine

    aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mmwith minimum aggregate cement ratio of 5:1 mm and with minimum cemnt content

    of 310 kg per cum, aggregate gradation to be as per Table 602.2 after blending,mixing in concrete mixer at optimum moisture content, transporting to site, laying

    with wheel barrows or steel pans or with mechanical paver, compacting with 80-100kN smooth wheel, tandem vibratory roller, to achieve, the designed flexural

    strength, finishing and curing as per drawings and Technical Specification Clause1502

    75126 6-5 5,611.50

    sq.mRectangular Concrete Block PavementManufacturing, laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15

    m of Cement Concrete (C.C.) M30 garde and spreading 25 mm thick sand underneath and filling joints with sand on existing W.B.M. base as per Technical

    Specification Clause 1503.

    75127 6-6 593.80

    Interlocking Concrete Block PavementProviding and Laying of Interlocking Concrete Block Pavements having thickness

    80 mm as per drawings and Technical Specification Clause 1504.

    6-7

    sq.mProviding and Laying of Interlocking Concrete Block Pavements having thickness

    80 mm as per drawings and Technical Specification Clause 1504.75128 6-7-1 707.30

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 28 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    29/99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    30/99

    Chapter Name CAUSEWAY AND SUBMERSIBLE BRIDGES (Based on MORD)

    Rate In (Rs.)

    UnitItem Description Rate

    Construction of Cut-off Walls/Head Walls7-1

    cu.mEarthwork in excavation for structures as per drawing and technical specification

    Clause 305.75131 7-1-1 213.60

    cu.mPlain cement concrete M15 grade75132 7-1-2 4,585.10

    cu.mBrick masonry in cement mortar 1:475133 7-1-3 5,391.20

    cu.mStone masonry in cement mortar 1:475134 7-1-4 3,863.40

    cu.mProviding P.C.C M20 architectural coping on top of wall75135 7-1-5 346.40

    cu.mPreparation of Subgrade75136 7-2 48.30

    cu.mGranular Sub-base75137 7-3 1,377.00

    cu.mW.B.M. Base Course75138 7-4 1,861.70

    cu.mCement Concrete Slab75139 7-5 6,379.90

    Providing and Laying Apron7-6

    cu.mProviding and Laying Apron with Stone Boulders as per Drawings & TechnicalSpecification Clause 1301

    75140 7-6-1 981.30

    cu.mProviding and Laying of Boulder Apron Laid in Wire Crates as per Drawing and

    Technnical Specification Clause 130175141 7-6-2 1,789.30

    cu.mProviding and Laying of Apron with Cement Concrete Blocks as per Drawing and

    Technical Specification Clause 130175142 7-6-3 4,630.50

    cu.mConstruction of R.C.C. guide posts of 250 mm dia, M25 grade as per drawing and

    technical specification Clause 1401.675143 7-7 67,752.40

    Bedding for Causeway7-8cu.mType A (concrete cradle) Bedding Clause 1402.575144 7-8-1 4,631.00

    cu.mType B (first class) Bedding Clause 1402.575145 7-8-2 1,636.10

    metreLaying Reinforced Cement Concrete Pipe NP3 as per drawing and technical

    specification Clause 1402.675146 7-9 7,382.30

    metreLaying Reinforced Cement Concrete Pipe NP4 as per technical specification Clause

    1402.675147 7-10 8,935.10

    Specification:

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 30 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    31/99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    32/99

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mFilter material behind retaining wall / breast wall as per Specification 1204.3.8 in a

    width of 600 m75162 8-4-6 1,794.00

    cu.mBack filling behind retaining wall/breast wall75163 8-4-7 560.20

    Construction of Hill Side Drain

    Construction of hill side drain in accordance with the requirement of specifications

    true to lines and grades. Dimesions and other particulars as per drawing andTechnical Specification Clause 1606.1

    8-5

    cu.mEarthwork in excavation for structures as per drawing and technical specification75164 8-5-1 213.60

    cu.mPlain cement concrete M10 grade75165 8-5-2 4,565.10

    cu.mStone masonry in cement mortar 1:575166 8-5-3 3,094.30

    cu.mPlain cement concrete M15 grade75167 8-5-4 4,570.10

    sq.mCement plaster 15 mm thick 1:4 on stone masonry75168 8-5-5 117.20

    metreProviding P.C.C. M20 architectural coping on top of wall75169 8-5-6 346.40

    Construction of Catch Water / Intercepting Drain

    Construction of catch water/intercepting drain in random rubble masonry in 1:5cement mortar true to the specified lines grades levels and dimensions as per the

    requirement of the specifications Clause 1606.2

    8-6

    cu.mEarthwork in excavation for structures as per drawing and technical specification75170 8-6-1 213.60

    cu.mPlain cement concrete M10 grade75171 8-6-2 4,565.10

    cu.mStone masonry in cement mortor 1:575172 8-6-3 3,094.30

    cu.mPlain cement concrete M15 grade75173 8-6-4 4,570.10

    sq.mCement plaster 15 mm thick 1:4 on stone masonry75174 8-6-5 117.20

    metreProviding P.C.C. M 20 architectural coping on top of wall75175 8-6-6 346.40

    Construction of Scupper

    Construction of scupper with dry stone masonry as per drawing and technical

    specifications as per Clause 1606.5.

    8-7

    metreEarthwork in excavation for structures as per drawing and technical specifications75176 8-7-1 4,094.00

    metreRandom rubble dry stone masonry75177 8-7-2 10,581.20

    metreRandom course rubble dry stone masonry in corbelling75178 8-7-3 2,160.60

    metreStone filling in foundation trenches as per drawing and technical specification75179 8-7-4 1,218.30

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 32 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    33/99

    Rate In (Rs.)

    UnitItem Description Rate

    metreConstruction of Scupper Totally75180 8-7-5 18,054.10

    Construction of RCC guide posts of 250 mm dia M15 grade cast-in-situ with 20 mmnominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to

    exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2

    8-8

    cu.mEarth work in excavation for structures75181 8-8-(i) 215.70

    cu.mRCC M15 grade75182 8-8-(ii) 4,585.10

    tonneHYSD steel bars75183 8-8-(iii) 62,857.70

    sq.mPainting two coats including prime coat on new concrete surface75184 8-8-(iv) 93.90

    metreProviding edge stones on valley side of formation as per drawing and Technical

    Specification Clause 1608.2.675185 8-9 108.70

    sq.mTurfing with Sods

    Furnishing and laying of the live sods of perennial turf forming grass on

    embankment slope, verges or other locations shown on the drawing or as directed bythe Engineer including preparation of ground, stacking the sods and watering as per

    Clause 309

    75186 8-10 56.70

    sq.mSeeding and Mulching

    Preparation of seed bed on previously laid top soil, furnishing and placing of seeds,

    fertilizer, multching material, applying bituminous emulsion at the rate of 0.23 l persqm and laying and fixing jute netting, including watering for 3 months all as per

    Clause 310.

    75187 8-11 124.80

    Specification:

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 33 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    34/99

    Chapter Name PIPE CULVERTS (Based on MORD)

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mExcavation for StructuresEarthwork in excavation for foundation of structures upto 3 m depth as per drawing

    and technical specification Clause 1104 includding setting out, construction ofshoring and bracing, removal of stumps and other deleterious matter, dressing of

    sides and bottom and backfilling with approved material.

    75188 9-1 215.70

    Bedding for Pipe9-2

    cu.mType A (Concrete Cradle) Bedding

    Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause1105 (i)

    75189 9-2-(i) 4,585.10

    cu.mType B (First Class) BeddingLaying (First Class) bedding on well compacted sand, moorum or approved granular

    material as per Clause 1105 (ii)

    75190 9-2-(ii) 1,619.90

    Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single

    Row

    Providing and laying reinforced cement concrete pipe NP3 for culverts on first classbedding of granular material in single row including fixing collar with cement

    mortar 1:2 but excluding excavation, protection works, backfilling, concrete andmasonry works in head walls and parapets Clause 1106.

    9-3

    metre1200 mm dia75191 9-3-A 7,309.20

    metre1000 mm dia75192 9-3-B 7,213.50

    metre750 mm dia75193 9-3-C 3,462.40

    Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in SingleRow

    Providing and laying reinforced cement concrete pipe NP4 for culverts on first class

    bedding of granular material in single row including fixing collar with cementmortar 1:2 but excluding excavation, protection works, backfilling, concrete and

    masonry works in head walls and parapets Clause 1106.

    9-4

    metre1200 mm dia75194 9-4-A 8,846.60

    metre1000 mm dia75195 9-4-B 6,572.00

    metre750 mm dia75196 9-4-C 4,181.60

    Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design inDouble RowProviding and laying reinforced cement concrete pipe NP3 for culverts on first class

    bedding of granular material in double row including fixing collar with cementmortar 1:2 but excluding excavation, protection works, backfilling, concrete and

    masonry works in head walls and parapets as per Clause 1106.

    9-5

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 34 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    35/99

    Rate In (Rs.)

    UnitItem Description Rate

    metre1200 mm dia75197 9-5-A 14,675.80

    metre1000 mm dia75198 9-5-B 10,826.10

    metre750 mm dia75199 9-5-C 6,923.80

    Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design in

    Double RowProviding and laying reinforced cement concrete pipe NP4 for culverts on first class

    bedding of granular material in double row including fixing collar with cement

    mortar 1:2 but excluding excavation, protection works, backfilling, concrete andmasonry works in head walls and parapets as per Clause 1106.

    9-6

    metre1200 mm dia75200 9-6-A 17,750.50

    metre1000 mm dia75201 9-6-B 13,612.20

    metre750 mm dia75202 9-6-C 6,923.80

    metreLaying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of

    granular material including fixing collar with cement sand mortar 1:2 but excluding

    excavation, protection works, backfilling, concrete and masonary work in head walland parapets

    75203 9-7 2,468.60

    metreLaying Cement Concrete Pipe NP4 (burried conduits) on first class bedding of

    granular material including fixing collar with cement sand mortar 1:2 but excludingexcavation, protection works, backfilling, concrete and masonary work in head wall

    and parapets

    75204 9-8 2,468.60

    cu.mPlain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below openfoundation of Head walls as per drawings & Technical Specification Clause 1109

    75205 9-9 4,580.00

    Brick Masonry Work in cement mortar in foundation of Head walls complete

    exculding pointing and plastering as per drawing and technical specification Clause1109

    9-10

    cu.mBrick Masonry in 1:4 cement mortar75206 9-10-A 5,391.20

    cu.mBrick Masonry in cement-lime mortar (1:0.5:4.5)75207 9-10-B 5,816.20

    Stone Masonry Work in cement mortar in foundation of Head walls complete as per

    drawing and technical specification Clasue 1109

    9-11

    cu.mIn 1:4 cement mortar75208 9-11-A 3,728.70

    cu.mIn cement-lime mortar (1:0.5:4.5)75209

    9-11-B 2,174.00

    sq.mPointing with Cement Mortar (1:3) on brickwork as per technical specificationClause 613.3

    75210 9-12 60.30

    sq.mPlastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure asper technical specification

    75211 9-13 118.40

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 35 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    36/99

    Rate In (Rs.)

    UnitItem Description Rate

    cu.mBackfilling in Foundation Trenches as per drawing and technical specification

    Clause 110875212 9-14 138.70

    metreProviding PCC M20 Architectural Coping on the top of wing wall, return wall etc.

    complete as per drawing and technical specification Clause 61575213 9-15 349.90

    Specification:

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 36 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    37/99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    38/99

    Rate In (Rs.)

    UnitItem Description Rate

    each800 mm x 600 mm rectangular75226 10-2-A-(2)-(iv) 2,919.40

    each600 mm x 450 mm rectangular75227 10-2-A-(2)-(v) 2,427.90

    each600 mm x 600 mm square75228 10-2-A-(2)-(vi) 2,638.50

    each900 mm sides octagon75229 10-2-A-(2)-(vii) 3,368.80

    Providing and fixing of retro-reflectorised cautionary, mandatory and informatory

    sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on RCC Post 100

    mm x 100 mm firmly fixed to the ground by means of properly designed foundationwith M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below

    ground level as per approved drawing Clause 1701

    10-2-A-(3)

    each900 mm equilateral triangle75230 10-2-A-(3)-(i) 2,259.50

    each600 mm equilateral triangle75231 10-2-A-(3)-(ii) 1,818.60

    each600 mm circular75232 10-2-A-(3)-(iii) 2,107.20

    each800 mm x 600 mm rectangular75233 10-2-A-(3)-(iv) 2,554.90

    each600 mm x 450 mm rectangular75234 10-2-A-(3)-(v) 2,204.90

    each600 mm x 600 mm square75235 10-2-A-(3)-(vi) 2,409.40

    each900 mm sides octagon75236 10-2-A-(3)-(vii) 3,118.50

    Semi Reflective Traffic Signs

    Providing and fixing of semi reflective cautionary, mandatory and informatory sign

    board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour infront and gray colour on back with red reflective border of 65 mm width and

    required letters and figures with reflective tape engineering grade as per Clause

    1701.3.9 of MORD for Rural Roads of required shade and colour supported andwelded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by meanof properly designed foundations with M-15 grade cement concrete 450x450x600

    mm, 600 mm below ground level as per approved drawing Clause 1701.2.2

    10-2-B

    each900 mm equilateral & triangle75237 10-2-B-(i) 2,607.40

    each600 mm equilateral & triangle75238 10-2-B-(ii) 2,153.40

    each600 mm circular75239 10-2-B-(iii) 2,489.90

    each800 mm x 600 mm rectangular75240 10-2-B-(iv) 2,911.70

    each600 mm x 450 mm rectangular75241 10-2-B-(v) 2,420.20each600 mm x 600 mm75242 10-2-B-(vi) 2,630.90

    each900 mm side octagon75243 10-2-B-(vii) 3,361.10

    Direction and Place Identification signs upto 0.9 sqm size board10-3

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 38 of 99

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    39/99

    Rate In (Rs.)

    UnitItem Description Rate

    Retro-reflectorised Traffic Signs10-3-A

    sq.mProviding and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,

    fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqmsupported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the

    ground by means of properly designed foundation with M-15 grade cement concrete450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and

    Technical Specification Clause 1701

    75244 10-3-A-(i) 4,541.90

    sq.mProviding and erecting direction and place identification retro-reflectorised sign as

    per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,

    fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqmsupported on 2 inch dia GI Pipe firmly fixed to the ground by means of properly

    designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600mm below ground level as per approved drawing and Tehnical Specification Clause

    1701.

    75245 10-3-A-(ii) 4,265.10

    sq.mProviding and erecting direction and place identification retro-reflectorised sign as

    per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm

    supported on RCC Post 100 mm x 100 mm firmly fixed to the ground by means of

    properly designed foundation with M-15 grade cement concrete 450 x 450 x 600mm, 600 mm below ground level as per approved drawing and TechnicalSpecification Clause 1701

    75246 10-3-A-(iii) 3,970.30

    metreSemi-Reflective Traffic signsDirection and place indentification signs up to 0.9 sqm size board

    Providing and erecting direction and place identifications of semi reflective sign

    boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint inwhite colour in front and grey colour on back with red reflective border of 70 mm

    width and required message, letters, figures with reflective engineering grade tape asper MORD specifications of required shade and colour. Supported and welded on

    47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means

    of properly designed foundations with M-15 grade cement concrete 450 mm x 450mm x 600 mm, 600 mm below ground level as per approved drawing and Technical

    Specification Clause 1701

    75247 10-3-B 2,846.50

    Direction and Place Identification signs with size more than 0.9 sqm size board10-4

    Retro-reflectorised Traffic Signs10-4-A

    sq.mProviding and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,

    fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm

    supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to theground by means of properly designed foundation with M-15 grade cement concrete

    450 x 450 x 600 mm, 600 mm below ground level as per approved drawing andTechnical Specification Clause 1701

    75248 10-4-A-1 4,806.40

    Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014

    Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014

    23/05/14 10:50Page 39 of 99

    Bl k 94 L k (HARIDWAR) 16/05/2014

  • 8/10/2019 Sor Laksar r&b 16.5.2014

    40/99

    Rate In (Rs.)

    UnitItem Description Rate

    sq.mProviding and erecting direction and place identification retro-reflectorised sign as

    per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm

    supported on 2 inch dia GI Pipe firmly fixed to the ground by means of properlydesigned foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600

    mm below ground level