Rate In (Rs.)
UnitItem Description Rate
Loading and Unloading of Lime, Aggregate, Stone Boulder, Brick Aggregate,Kankar, Building Rubbish, Crushed Slag, Stone for Masonry Work by Manual
Means
1-1
cu.mLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building
Rubbish, Crushed Slag, Stone for Masonry Work by manual means including a leadupto 30 m
74807 1-1-1 65.50
cu.mLoading of Earth, Sand, Stone chips,Moorum, Manure, Flyash by manual meansincluding a lead upto 30 m
74808 1-1-2 32.80
cu.mUnloading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, BuildingRubbish, Crushed Slag, Stone for Masonry Work by manual means including a lead
upto 30 m
74809 1-1-3 32.80
cu.mUnloading of Earth, Sand,Stone chips, Moorum, Manure, Flyash by manual means
including a lead upto 30 m74810 1-1-4 19.80
Loading and Unloading Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar,Building Rubbish, Crushed Slag, Stone for Masonry Work by Mechanical Means
1-2
cu.mLoading of Lime, Aggregate, Stone Boulder, Brick Aggregate, Kankar, Building
Rubbish, Crushed Slag, Stone for Masonry Work by mechanical means including alead upto 30 m
748111-2-1 39.50
cu.mLoading of Earth, Sand, Stone chips ,Moorum, Manure, Flyash by mechanicalmeans including a lead upto 30 m.
74812 1-2-2 20.50
cu.mUnloading of Earth, Sand,Stone chips, Lime, Moorum, Aggregate, Stone Boulder,Brick Aggregate, Kankar, Building Rubbish, Manure, Crushed Slag, Flyash, Stone
for Masonry Work by mechanical means.
74813 1-2-3 7.80
Loading, Unloading and Stacking of Bricks by Manual Means1-3
1000 NosLoading of Bricks by manual means including a lead upto 30 m74814 1-3-1 108.30
1000 NosUnloading and Stacking of Bricks by manual means including a lead upto 30 m74815 1-3-2 108.30
Loading and Unloading of Cement by Manual Means1-4
tonneLoading of Cement by manual means including a lead upto 30 m74816 1-4-1 85.50
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 1 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
2/99
Rate In (Rs.)
UnitItem Description Rate
tonneUnloading of Cement by manual means including a lead upto 30 m74817 1-4-2 85.40
Loading and Unloading of Structural Steel and Steel Bars by manual means1-5
tonneLoading of Structural Steel, Steel Bars by manual means including a lead upto 30 m74818 1-5-1 93.40
tonneUnloading of Structural Steel, Steel Bars by manual means including a lead upto 30
m74819 1-5-2 93.40
Loading and Unloading of Bitumen Drums by Manual Means1-6
tonneLoading of Bitumen Drums by manual means including a lead upto 30 m74820 1-6-1 99.30
tonneUnloading of Bitumen Drums by Manual Means including a lead upto 30 m74821 1-6-2 88.80
Loading and Unloading of Timber by Manual Means1-7
tonneLoading of Timber by manual means including a lead upto 30 m74822 1-7-1 144.10
tonneUnloading of Timber by manual means including a lead upto 30 m74823 1-7-2 144.10
Loading and Unloading of C.C. Blocks, Kerb, etc.1-8
cu.mLoading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb,Channel, Bond Stone, etc. by manual means including a lead upto 30 m
74824 1-8-1 220.80
cu.mUnloading with care C.C. Blocks, km Stone, 200 m Stone, Boundary Pillar, Kerb,Channel, Bond Stone, etc. by manual means including a lead upto 30 m
74825 1-8-2 220.80
Loading and Unloading of Hume Pipes1-9
Loading of RCC Hume pipes by mechanical means including a lead upto 30 m1-9-1
Per Pipe1000 / 1200 mm dia Hume pipe74826 1-9-1-A 46.70
Per Pipe750 mm dia Hume pipe74827 1-9-1-B 28.00Per Pipe600/450 mm dia Hume pipe74828 1-9-1-C 20.00
Unloading of RCC Hume pipe by manual means including a lead upto 30 m1-9-2
Per Pipe1000/1200 mm dia RCC Hume pipes74829 1-9-2-A 236.10
Per Pipe750 mm dia Hume pipe74830 1-9-2-B 196.70
Per Pipe600/450 mm dia Hume pipe74831 1-9-2-C 147.60
Unloading of RCC Hume pipes by mechanical means including a lead upto 30 m1-9-3
Per Pipe1000/1200 mm dia Hume pipe74832 1-9-3-A 34.20
Per Pipe750 mm dia Hume pipe74833 1-9-3-B 20.50
Per Pipe600/450 mm dia Hume pipe74834 1-9-3-C 14.60
Haulage excluding Loading & Unloading
1-10
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 2 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
3/99
Rate In (Rs.)
UnitItem Description Rate
Haulage of materials by tipper excluding cost of loading, unloading and stacking(taking output 10t load and lead 10 km = 100 t.km)
Tonne.Km
Surfaced Road74835 1-10-1 3.70
Tonne.Km
Unsurfaced Gravel Road74836 1-10-2 4.50
Tonne.Km
Katcha Track and Track in River Bed/Nallah Bed and Choe Bed74837 1-10-3 9.00
Supply of Quarried stone and hand breaking1-11
cu.mSupply of quarried stone and hand breaking into coarse aggregate to Grading 1 (90
mm to 45 mm) as per Table 400.8 of Technical Specifications.74838 1-11-1 916.00
cu.mSupply of quarried stone and hand breaking into coarse aggregate to Grading 2 (63
mm to 45 mm) as per Table 400.8 of Technical Specifications.74839 1-11-2 996.10
cu.mSupply of quarried stone and hand breaking into coarse aggregate to Grading 3 (53
mm to 22.4 mm) as per Table 400.8 of Technical Specifications.74840 1-11-3 1,076.10
cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of200 t/h capacity comprising of primary and secondary crushing units, belt conveyor
and vibrating screens to obtain stone aggregates 100 per cent passing through 53mm sieve as per Table 500.6 of Technical Specifications including the cost of stone.
74841 1-12 649.90
cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of
200 t/h capacity comprising of primary and secondary crushing units, belt conveyorand vibrating screens to obtain stone aggregates 100 per cent passing through 22.4
mm sieve as per Table 500.6 of Technical Specifications including the cost of stone.
74842 1-13 749.30
cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of200 t/h capacity comprising of primary and secondary crushing units, belt conveyor
and vibrating screens to obtain stone aggregates of 13.2 mm nominal size as perTable 500.9 of Technical Specifications including the cost of stone.
74843 1-14 883.20
cu.mCrushing of stone boulders of 150 mm size in an integrated stone crushing unit of
200 t/h capacity comprising of primary and secondary crushing units, belt conveyorand vibrating screens to obtain stone aggregates of 9.5 mm nominal size as per
Table 500.9 of Technical Specifications including the cost of stone.
74844 1-15 883.20
Setting Out1-16
kmThe rate analysis for a typical benchmark as per Drawing 200.174845 1-16-5 3,391.90
kmThe rate analysis for a typical reference pillar as per Drawing 200.274846 1-16-6 1,529.40
S ecification:
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 3 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
4/99
-
8/10/2019 Sor Laksar r&b 16.5.2014
5/99
Rate In (Rs.)
UnitItem Description Rate
eachGirth above 1800 mm to 2700 mm74856 2-3-A-4 1,162.20
eachGirth above 2700 mm to 4500 mm74857 2-3-A-5 2,360.80
eachGirth above 4500 mm74858 2-3-A-6 7,122.10
Lead upto 1000 m2-3-B
eachGirth above 300 mm to 600 mm74859 2-3-B-1 182.70
eachGirth above 600 mm to 900 mm74860 2-3-B-2 308.20
eachGirth above 900 mm to 1800 mm74861 2-3-B-3 624.30
eachGirth above 1800 mm to 2700 mm74862 2-3-B-4 1,203.10
eachGirth above 2700 mm to 4500 mm74863 2-3-B-5 2,406.20
eachGirth above 4500 mm74864 2-3-B-6 6,895.10
Uprooting and Removing Stumps & Roots
Uprooting and Removing Stumps & roots, compaction of backfilling and stacking of
servicable material by manual means as per Technical Specification Clause 201.
2-4
Lead upto 100 m2-4-A
eachGirth above 300 mm to 600 mm74865 2-4-A-1 110.80
eachGirth above 600 mm to 900 mm74866 2-4-A-2 171.40
eachGirth above 900 mm to 1800 mm74867 2-4-A-3 370.60
eachGirth above 1800 mm to 2700 mm74868 2-4-A-4 736.30
eachGirth above 2700 mm to 4500 mm74869 2-4-A-5 1,477.50
eachGirth above 4500 mm74870 2-4-A-6 4,171.10
Lead upto 1000 m2-4-B
eachGirth above 300 mm to 600 mm74871 2-4-B-1 111.50
eachGirth above 600 mm to 900 mm74872 2-4-B-2 177.10
eachGirth above 900 mm to 1800 mm74873 2-4-B-3 377.40
eachGirth above 1800 mm to 2700 mm74874 2-4-B-4 744.60
eachGirth above 2700 mm to 4500 mm74875 2-4-B-5 1,488.80
eachGirth above 4500 mm74876 2-4-B-6 4,227.90Dismantling of StructuresDismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of masonry, cement concrete, wood work, steel work, includingT&P and scaffolding wherever necessary, sorting the dismantled material, disposal
of unserviceable material and stacking the serviceable material with all lifts and lead
2-5
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 5 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
6/99
Rate In (Rs.)
UnitItem Description Rate
of 1000 m as per Technical Specification Clause 202.
By Manual Means2-5-1
cu.mLime Concrete74877 2-5-1-A 262.40
metreCement Concrete74878 2-5-1-B 315.80
cu.mReinforced Cement Concrete74879 2-5-1-C 892.30
By Mechanical Means2-5-2
cu.mCement Concrete74880 2-5-2-A 383.70
cu.mReinforced Cement Concrete74881 2-5-2-B 683.80
Dismantling Brick/Tile WorkDismantling of existing structures like culverts, bridges, retaining walls and other
structures comprising of brick masonry, including disposal of unserviceable materialand stacking the serviceable material with all lift and lead of 1000 m as per
Technical Specification Clause 202.
2-6
cu.mLime mortar74882 2-6-A 155.70
cu.mCement mortar74883 2-6-B 209.10cu.mMud Mortar74884 2-6-C 134.40
cu.mDry Brick Pitching or Brick Soling74885 2-6-D 123.70
Dismantling stone masonry
Dismantling of existing structures like culverts, bridges, retaining walls and other
structure comprising of stone masonry, including disposal of unserviceable materialand stacking the serviceable material with all lift and lead of 1000 m as per
Technical Specification Clause 202.
2-7
cu.mRubble Stone Masonry in Lime Mortar74886 2-7-A 177.10
cu.mRubble Stone Masonry in Cement Mortar74887 2-7-B 209.10
cu.mRubble Stone Masonry in Mud Mortar74888 2-7-C 155.70
cu.mDry Rubble Masonry74889 2-7-D 145.10
cu.mDismantling Stone Pitching / Dry Stone Spalls74890 2-7-E 134.40
cu.mDismantling boulders laid in wire crates including opening of crates and stackingdismantled materials
74891 2-7-F 155.70
cu.mWood work wrought and planed fixed in frames of trusses upto a height of 5m
above plinth level
74892 2-8 455.40
Dismantling Steel Work in all Types of Sections upto a height of 5 m above Plinth
Level excluding Cutting of rivet as per Technical Specification Clause 202.
2-9
tonneIncluding dismembering74893 2-9-A 1,213.30
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 6 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
7/99
Rate In (Rs.)
UnitItem Description Rate
tonneExcluding dismembering74894 2-9-B 830.50
eachExtra over Items (A) and (B) for cutting rivets74895 2-9-C 9.70
Nos.Scraping of bricks dismantled from brick work including stacking as per TechnicalSpecification Clause 202.
74896 2-10 0.90
cu.mScraping of Stone from Dismantled Stone Masonry as per Technical SpecificationClause 202.
74897 2-11 374.60
sq.mScraping Plaster in Lime or Cement Mortar from Brick / Stone Masonry as perTechnical Specification Clause 202.74898
2-12 11.40
Removing all types of Hume pipes and stacking within a lead of 1000 m includingEarthwork and Dismantling of Masonry Works as per Technical Specification
Clause 202.
2-13
metreUpto 600 mm dia Hume pipe74899 2-13-A 138.50
metreAbove 600 mm to 900 mm dia Hume pipe74900 2-13-B 187.30
metreAbove 900 mm dia Hume pipe74901 2-13-C 320.60
Dismantling of Flexible PavementsDismantling of flexible pavements and disposal of dismantled materials upto a lead
of 100 m, stacking serviceable and unserviceable materials separately as perTechnical Specification Clause 202
2-14
By Manual Means2-14-1
cu.mBituminous Courses74902 2-14-1-A 486.30
cu.mGranular Courses74903 2-14-1-B 341.60
By Mechanical Means2-14-2
cu.mBituminous Courses74904
2-14-2-A 168.60
cu.mDismantling of Cement Concrete Pavements
Dismantling of cement concrete pavements by mechanical means using pneumatictools breaking to pieces not exceeding 0.02 cum in volume and stock piling at
designated locations and disposal of dismantled materials upto a lead of 1000 m,stacking serviceable and unserviceable materials separately
74905 2-15 1,730.90
metreDismantling Guard Rails
Dismantling guard rails by manual means and disposal of dismantled material withall lifts and upto a lead of 1000 m, stacking serviceable materials and unserviceable
materials separately as per Technical Specification Clause 202.
74906 2-16 51.40
metreDismantling Kerb Stones
Dismantling kerb stones by manual means and disposal of dismantled material with
all lifts and upto a lead of 1000 m as per Technical Specification Clause 202.
74907 2-17 8.50
metreDismantling Kerb Stone Channels
74908 2-18 13.00
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 7 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
8/99
Rate In (Rs.)
UnitItem Description Rate
Dismantling kerb stone channels by manual means and disposal of dismantledmaterial with all lifts and upto a lead of 1000 m as per Technical Specification
Clause 202.
Dismantling Kilometre Stones
Dismantling of kilometre stones including cutting of earth, foundation and disposalof dismantled material with all lifts and lead upto 1000 m and backfilling of pit as
per Technical Specification Clause 202.
2-19
each5th km Stone74909 2-19-A 234.10
eachOrdinary km Stones74910 2-19-B 151.50
each200 m Stones74911 2-19-C 31.20
metreDismantling of Fencing
Dismantling of barbed wire fencing / wire mesh fencing including posts, foundation
concrete, backfilling of pit by manual means including disposal of dismantledmaterial with all lifts and upto a lead of 1000 m, stacking serviceable material and
unserviceable material separately as per Technical Specification Clause 202.
74912 2-20 39.90
metreDismantling of CI Water Pipe Line
Dismantling of CI water pipe line 600 mm dia including disposal with all lifts andlead upto 1000 m and stacking of serviceable material and unserviceable materialseparately under supervision of concerned department as per Technical Specification
Clause 202.
74913 2-21 97.20
metreRemoval of Cement Concrete Pipe of Sewer Gutter
Removal of cement concrete pipe of sewer gutter 1500 mm dia under thesupervision of concerned department including disposal with all lifts and upto a lead
of 1000 m and stacking of serviceable and unserviceable material separately butexcluding earth excavation and dismantling of masonry works as per Technical
Specification Clause 202.
74914 2-22 124.60
Specification:
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 8 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
9/99
Chapter Name EARTHWORK, EROSION CONTROL AND DRAINAGE (Based on MORD)
Rate In (Rs.)UnitItem Description Rate
Preparation of Foundation for Embankmentby manual means3-1
sq.mScarifying Existing Granular Surface to a Depth of 50 mm by Manual Means
Scarifying existing granular surface to a depth of 50 mm and disposal of scarified
material with a lift upto 3 m and leads upto 1000 m as per Technical SpecificationClause 301.4. 1
74915 3-1-1 14.10
Preparation of Foundation for Embankment by mechanical means.3-2
sq.mScarifying Existing Bituminous Surface to a Depth of 150 mm by Mechanical
MeansScarifying the existing bituminous road surface to a depth of 150 mm and disposal
of scarified material with a lift upto 3 m and lead upto 1000 m as per TechnicalSpecification Clause 301.4.
74916 3-2-1 4.20
cu.mConstruction of Embankment with Material Obtained from Roadway CuttingConstruction of embankment with approved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structuresgraded and compacted to meet requirement of Tables 300.1 and 300.2 as per
Technical Specification Clause 301.5
74917 3-3 51.70
cu.mConstruction of embankment with approved material obtained from borrow pits(including cost of compensation for earth taken from private land) with a lift upto
1.5 m, transporting to site, spreading, grading to required slope and compacting to
meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause301.5
74918 3-4 308.50
Excavation in Cutting in Soil3-5
cu.mExcavation in Soil with Dozer with lead upto 100 m :Excavation for roadway insoil by mechanical means including cutting and pushing the earth to site of
embankment upto a distance of 100 m, including trimming bottom and side slopes inaccordance with requirements of lines, grades and cross-sections.
74919 3-5-1 35.90
cu.mExcavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000m: Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket
capacity including cutting and loading in tippers, trimming bottom and side slopes,in accordance with requirements of lines, grades and cross-sections, and transporting
to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3
74920 3-5-2 34.20
cu.mExcavation in Marshy SoilExcavation for roadway in marshy soil with hydraulic excavator 0.9 cum bucketcapacity including cutting and loading in tippers and disposal with a lift upto 1.5 m
and lead upto 1000 m, trimming of bottom and side slopes in accordance withrequirements of lines, grades and cross- sections as per Technical Specification
Clause 302.3.6.
74921 3-6 44.70
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 9 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
10/99
Rate In (Rs.)
UnitItem Description Rate
cu.mRemoval of Unsuitable Soil with Disposal
Removal of unsuitable soil including excavation, loading and disposal upto 1000mlead but excluding compaction ground supporting embankment subgrade
replacement by suitable soil, which shall be paid separately as per Clause 303.5.2 asper Technical Specification Clause 302.3.11
74922 3-7 34.20
Excavation in ordinary Rock3-8
cu.mExcavation in Ordinary Rock using Hydraulic Excavator and Tippers with disposal
upto 1000 m
Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucketcapacity including cutting and loading in tippers, transporting to embankment site
with a lift upto 1.5 m and lead upto 1000 m, trimming bottom and side slopes inaccordance with requirements of lines, grades and cross-sections as per Technical
Specification Clause 302.3.5
74923 3-8-2 52.50
cu.mExcavation in Ordinary Rock with Dozer with lead upto 100 m Excavationfor roadway in ordinary rock by deploying a dozer D-50 including cutting and
pushing the cut earth to site of embankment upto a distance of 100 m (average lead50 m), trimming bottom and side slopes in accordance with the requirements of
lines, grades and cross-sections with lift upto 1.5 m.
74924 3-8-1 40.30
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 m3-9
cu.mExcavation in Hard Rock (requiring blasting) with disposal upto 1000 m
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting andbreaking, trimming of bottom and side slopes in accordance with requirements of
lines, grades and cross-sections, loading and disposal of cut rock with a lift upto 1.5
m and leads upto 1000 m as per Technical Specification Clause 302.3.5
74925 3-9-1 50.60
Excavation in Hard Rock (blasting prohibited)Excavation for roadway in hard rock (blasting prohibited) with rock breakers
including breaking rock, loading in tippers and disposal with a lift upto 1.5 m andlead upto 1000 metres, trimming bottom and side slopes in accordance with
requirements of lines, grades and cross- sections as per Technical SpecificationClause 302.3.5
3-9-2
cu.mMechanical Means74926 3-9-2-B 175.70
cu.mExcavation in Hard Rock (controlled blasting) with disposal upto 1000 mExcavation for roadway in hard rock with controlled blasting by drilling, blasting
and breaking, trimming of bottom and side slopes in accordance with requirements
of lines, grades and cross-sections, loading and disposal of cut rock with a lift upto1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5
74927 3-9-3 75.60
cu.mStripping, Storing and Relaying Top Soil from Right-of-Way (R.O.W)Stripping,
storing and preservation of top soil by keeping it damp in stock piles and keep wettill it is used by road side at 15 m internal and re-application on embankment slopes,
cut slopes and other areas in localities where the available embankment material is
74928 3-10 149.80
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 10 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
11/99
Rate In (Rs.)
UnitItem Description Rate
not conducive to plant growth as per Technical Specification Clause 302.3.2
cu.mStripping, Storing and Relaying Top Soil from Borrow Areas in Agricultural Fields
Stripping of top soil from borrow areas located in agriculture fields, storing at a
suitable place, spreading and relaying after taking the borrow earth to maintainfertility of the agricultural field, finishing it to the required levels to the satisfaction
of the farmer/land owner as per Technical Specification Clause 302.3.2.
74929 3-11 121.80
sq.mTurfing with Sods
Furnishing and laying of the live sods of perennial turf forming grass onembankment slope, verges or other locations shown on the drawing or as directed
by the Engineer including preparation of ground, fetching of sods and watering asper Technical Specification Clause 309.
74930 3-12 75.60
sq.mSeeding and Mulching
Preparation of seed bed on previously laid top soil, furnishing and placing of seeds,fertilizer, mulching material, applying bituminous emulsion @ 0.23 litre per sqm
and laying and fixing jute netting, including watering for 3 months all as per Technical Specification Clause 310.
74931 3-13 119.90
cu.mConstruction of subgrade and earthen shoulders with approved material obtainedfrom borrow pits with all lifts and leads, transporting to site, spreading, grading to
required slope and compacted to meet requirements of Table 300.2 with lead upto1000mas per Technical Specification Clause 303.1.
74932 3-14 325.10
Compacting Original Ground3-15
cu.mCompacting original ground supporting embankment
Loosening, Levelling and Compacting original ground supporting embankment tofacilitate placement of first layer of embankment, scarified to a depth of 150 mm,
mixed with water at OMC and then compacted by rolling so as to achieve minimum
dry density as given in Tables 300.1 and 300.2 for embankment construction as perTechnical Specification Clause 301.4.1.
74933 3-15-1 16.60
cu.mCompacting original ground supporting subgradeLoosening of the ground upto a level of 300 mm below the subgrade level, watered,
graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 forsubgrade construction as per Technical Specification Clause 303.5.2.
74934 3-15-2 48.30
sq.mRepairs of damages caused by rain/spillage of waterPreparation and surface treatment of formation by removing mud and slurry,
watering to the extent needed to maintain the desired moisture content, trimming tothe required line, grade, profile and rolling with three wheel 80-100 kN static roller,
complete as per Technical Specification Clause 301.5.5.1
74935 3-16 1.70
sq.mPresplitting Rock Excavation Slopes
Carrying out excavation in hard rock to achive a specified slope of the rock face bycontrolled use of explosives and blasting accessories in properly aligned and spaced
drill holes, collection of the excavated rock by a D-50 dozer, loading in tipper by a
74936 3-17 100.90
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 11 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
12/99
-
8/10/2019 Sor Laksar r&b 16.5.2014
13/99
Chapter Name GRANULAR SUB-BASES, BASES (NON-BITUMINOUS) AND SHOULDERS (Based on MORD)
Rate In (Rs.)UnitItem Description Rate
Granular Sub-base with Well Graded Material (Table 400.1)4-1
By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in
uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with smooth wheel roller to
achieve the desired density, complete as per Technical Specification Clause 401.
4-1-A
cu.mFor Grading I Material74945 4-1-A-1 1,377.00
cu.mFor Grading II Material74946 4-1-A-2 1,373.80
cu.mFor Grading III Material74947 4-1-A-3 1,375.70
Plant Mix MethodConstruction of granular sub-base by providing well graded material, mixing in a
mechanical mix plant at OMC, carriage of mixed material to work site upto lead of1000 m spreading in uniform layers with motor grader on prepared surface and
compacting with smooth wheel roller to achieve the desired density, complete as
per Technical Specification Clause 401
4-1-B
cu.mFor Grading I Material74948 4-1-B-1 1,489.50
cu.mFor Grading II Material74949 4-1-B-2 1,492.10
cu.mFor Grading III Material74950 4-1-B-3 1,492.10
Gravel/Soil-Aggregate Base (Table 400.2) Grading A4-2
cu.mGravel/Soil-Aggregate Base (Table 400.2) Grading A
Construction of gravel/soil-aggregate base by providing well graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by mixin place method with rotavator at OMC, and compacting with three wheel 80-100kN static roller to achieve the desired density, complete as per Technical
Specifications Clause 402
74951 4-2-1 1,375.20
cu.mGravel/Soil-Aggregate Base (Table 400.2) Grading BConstruction of granular sub-base by providing well graded material, spreading in
uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kN static
roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402
74952 4-2-2 1,375.20
cu.mGravel/Soil-Aggregate Base (Table 400.2) Grading CConstruction of granular sub-base by providing well graded material, spreading in
uniform layers with motor grader on prepared surface, mixing by mix in placemethod with rotavator at OMC, and compacting with three wheel 80-100 kN static
roller capacity to achieve the desired density, complete as per TechnicalSpecification Clause 402
74953 4-2-3 1,375.20
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 13 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
14/99
Rate In (Rs.)
UnitItem Description Rate
cu.mGravel/Soil-Aggregate Surface Course (Table 400.3)
Construction of granular surface course by providing well graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix
in place method with rotavator at OMC, and compacting with three wheel 80-100kN static roller capacity to achieve the desired density, complete as per Technical
Specification Clause 402
74954 4-3 1,311.20
Lime Stabilisation for Improving Subgrade
Laying and spreading available soil in the subgrade on a prepared surface,
pulverising, mixing the spread soil in place with rotavator with 2 per cent slakedlime having minimum 70 per cent of contents of CaO, grading with motor grader
and compacting with the smooth wheel road roller at OMC to the desired density toform a layer of improved Sub-grade as per Technical Specification Cluase 403.
4-4
cu.mBy Manual Means74955 4-4-A 333.40
cu.mBy Mechanical Means74956 4-4-B 337.30
cu.mLime Treated Soil for Sub-BaseProviding, laying and spreading soil on a prepared sub-grade, pulverising, mixing
the spread soil in place with rotavator with 4 per cent slaked lime with minimumcontent of 50 per cent of CaO, grading with motor grader and compacting with the
road roller at OMC to achieve atleast 98 per cent of the max dry density to form alayer of sub-base as per Technical Specification Clause 403.
74957 4-5 621.20
cu.mCement Treated Soil Sub-Base/BaseProviding, laying and spreading soil on a prepared sub-grade, pulverising, adding
the designed quantity of cement to the spread soil, mixing in place with rotavator,grading with the motor grader and compacting with the road roller at OMC to
achieve the desired unconfined compressive strength and to form a layer of sub-base/base as per Technical Specification Clause 404.
74958 4-6 700.60
Water Bound Macadam Sub-base/base4-7WBM Grading 1Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, handpacking, rolling with three wheel 80-100 kN static roller in stages to proper grade
and camber, applying and brooming, stone screening/binding materials to fill-up theinterstices of coarse aggregate, watering and compacting to the required density
Grading 1 as per Technical Specification Clause 404.
4-7-1
cu.mBy Manual Means74959 4-7-1-A 1,861.70
cu.mBy Mechanical Means74960 4-7-1-B 1,743.30
WBM Grading 2Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, handpacking, rolling with smooth wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening/binding materials to fill-up the
4-7-2
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 14 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
15/99
Rate In (Rs.)
UnitItem Description Rate
interstices of coarse aggregate, watering and compacting to the required densitygrading 2 as per Technical Specification Clause 405.
cu.mBy Manual Means74961 4-7-2-A 1,939.50
cu.mBy Mechanical Means74962 4-7-2-B 1,821.00
WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, hand
packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and
camber, applying and brooming, stone screening to fill-up the interstices of coarseaggregate, watering and compacting to the required density Grading 3 as perTechnical Specification Clause 405.
4-7-3
cu.mBy Manual Means74963 4-7-3-A 1,967.00
cu.mBy Mechanical Means74964 4-7-3-B 1,848.50
Water Bound Macadam with Crushable Screenings4-8
WBM Grading 1Providing, laying, spreading and compacting stone aggregates of specific sizes to
water bound macadam specification including spreading in uniform thickness, handpacking, rolling with three wheel 80-100 kN static roller in stages to proper grade
and camber, applying and brooming, crushable screening to fill-up the interstices ofcoarse aggregate, watering and compacting to the required density Grading 1 as per
Technical Specification Clause 405.
4-8-1
cu.mBy Manual Means74965 4-8-1-A 1,894.40
cu.mBy Mechanical Means74966 4-8-1-B 1,775.90
WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN static roller in stages to proper gradeand camber, applying and brooming, crushable screening to fill-up the interstices of
coarse aggregate, watering and compacting to the required density Grading 2 as perTechnical Specification Clause 405.
4-8-2
cu.mBy Manual Means74967 4-8-2-A 1,967.70
cu.mBy Mechanical Means74968 4-8-2-B 1,849.20
WBM Grading 3
Providing, laying, spreading and compacting stone aggregates of specific sizes towater bound macadam specification including spreading in uniform thickness, hand
packing, rolling with three wheel 80-100 kN static roller in stages to proper gradeand camber, applying and brooming, crushable screening to fill-up the interstices of
coarse aggregate, watering and compacting to the required density Grading 3 as perTechnical Specification Clause 405.
4-8-3
cu.mBy Manual Means74969 4-8-3-A 2,036.40
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 15 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
16/99
Rate In (Rs.)
UnitItem Description Rate
cu.mBy Mechanical Means74970 4-8-3-B 1,917.90
cu.mWet Mix MacadamProviding, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the material with water at OMC in
mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying inuniform layers in sub-base/base course on a well prepared sub-base and compacting
with smooth wheel roller of 80 to 100kN weight to achieve the desired densityincluding lighting, barricading and maintenance of diversion, etc as per Tables
400.11 & 400.12 and Technical Specification Clause 406.
74971 4-9 1,998.00
Construction of Shoulders as per Technical Specification Clause 407.4-10
Granular sub-base/base/surface course with local materials (Table 400.13) by mix inplace method normal Construction of granular sub-base by providing local material
spreading in uniform layers with motor grader on prepared surface, mixing by mixin place method with rotavator at once and compacting with smooth wheel roller to
achieve the desired density complete as per Clause 401.4 as per TechnicalSpecification Clause 408.
4-11
cu.mUsing naturally occuring gravel74972 4-11-1 453.10
cu.mUsing Gravel mix soil using74973 4-11-2 451.30
cu.mConstruction of Water Bound Macadam using locally available material (Table
400.13)
Providing, laying spreading and compacting local material in block or large discreteparticles, such as kankar, Laterite, Dhandla etc. as per Table 400.13 to water bound
macadam specification including spreading in uniform thickness, hand packing,rolling with three wheel 80-100 kN static roller in stages to proper grade and
camber, applying and brooming requisite type of screening /binding materials tofill-up the interstices of laid material watering and compacting to the required
density as per Clause 405.3 and Technical Specification Cluase 408.
74974 4-12 496.30
cu.mLime-Flyash Stablised Soil Sub-baseConstruction of sub-base using lime-flyash admixture with granular soil, free from
organic matter/deleterious material or clayey silts and low plasticity clays having PIbetween 5 and 20 and liquid limit less than 25 and commercial dry lime, slaked at
site or pre-slaked with CaO content not less than 50 per cent, flyash to conform togradation as per Clause 4.3 of IRC:SP:20, lime+flyash content ranging between 10
to 30 per cent, the minimum un-confined compressive strength and CBR value after28-days curing and 4-days soaking to be 0.75 MPa and 25 per cent respectively, all
as specified in IRC:88 including a lead upto 1000 m as per Technical Specification
Cluase 409.
74975 4-13 703.60
cu.mConstruction of Sub-base/Course Using Crushed Slag as per Table
400.19Construction of Sub-base by providing crushed slag spreading in uniformlayer with motor grader on prepared surface mixing by mix-in-place method with
Rotavator @ OMC, and compacting with three wheel 80-100 kN static roller toachieve the desired density complete as per Technical Specifications Cluase 402.4
74976 4-14 1,071.90
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 16 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
17/99
Rate In (Rs.)
UnitItem Description Rate
and 410.3.2
cu.mWater Bound Macadam using crushed slagProviding, laying, spreading and compacting crushed slag to water Bound Macadam
specification including spreading in uniform thickness, hand packing rolling withsmooth wheel roller 80-100 kN in stages to proper grade and camber, applying and
brooming requisite type of screening/binding materials to fill up the interstees ofcrushed slag watering and compacting to the required density as per Clause 405.3
and Technical Specification Cluase 410.3.2.
74977 4-15 1,576.60
cu.mCement Bound Granular Material sub-base/base
Providing laying and spreading granulated blast furnace slag on a preparedsub-grade pulverising adding the designed quantitity of cement to the spread
granulated blast furnace slag mixing in place with rotavator grading with the mortargrader and compacting with smooth wheel roller 80-100 kN at OMC to achieve the
desired unconfined compressive strength and to form a layer of sub-base/base as per
Technical Specification Clauses 404.3 and 410.4.2.
74978 4-16 692.60
Crusher Run Macadam Base
Providing crushed run stone aggregate greading conforming to table 400.20depositing on a prepared surface by hauling vehicles, spreading and mixing with a
motor grader, watering and compacting with a three wheel 80-100 kN static rolleras per Technical Specification Clause 411 to form a layer of sub-base/base
4-17
By mix-in-place method4-17-A
cu.mWith 53 mm maximum size of aggregates74979 4-17-A-1 1,572.60
cu.mWith 37.5 mm maximum size of aggregates74980 4-17-A-2 1,866.70
By mixing plant method4-17-B
cu.mWith 53 mm maximum size of aggregates74981 4-17-B-1 1,886.00
cu.mWith 37.5 mm maximum size of aggregates74982 4-17-B-2 1,997.00
sq.mBrick Soling
Laying brick soling layer on prepared sub-grade with brick on end edging accordingto lines, graded and cross-section shown on the drawing filling joints with sand and
earth, spreading 25 mm thick layer of earth over brick soling, watering and rolliingthe same with three wheel road roller 80-100 kN as per Technical Specification
Clause 412
74983 4-18 507.70
sq.mStone Set Pavement
Providing and laying stone set pavement on prepared surface with sub-base 100 mm
thick compacted Granular Sub-base as per Clause 401.4 and base 75 mm thickcompacted water bound macadam grading 2 as per Clause 405.3. The 150 mm thick
hammer desired stones are laid in the herring one or stretched bond pattern. Thestones are compacted into the bedding sand of 40 mm over the WBM base bounded
by edge stone using suitable compacting device. The gaps are filled with fine sandstone dust as per Technical Specification Clause 413.4
74984 4-19 1,809.20
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 17 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
18/99
Rate In (Rs.)
UnitItem Description Rate
Water Bound Macadam Sub-base/base without screening material (As per PWD
Uttarakhand Specification)
4-20
cu.mProviding, laying, spreading & compaction of stone aggregates of specific sizes to
WBM specifications including spreading in uniform thickness, hand packing, rollingwith power roller 8-10 tonn in stages to proper grade & camber, applying &
brooming requisite type of binding material to fill up the intristices of coarseaggregates,watering & rolling, making necessary earthen bund to protect edges
lighting, guarding & barricadings, & maintenance of diversions etc.[Grading ofno-1] (45-90 mm size).
74985 4-20-1 1,512.20
cu.mProviding, laying, spreading & compaction of stone aggregates of specific sizes to
WBM specifications including spreading in uniform thickness, hand packing, rollingwith power roller 8-10 tonn in stages to proper grade & camber, applying &
brooming requisite type of binding material to fill up the intristices of coarseaggregates,watering & rolling making necessary earthen bund to protect edges
lighting, guarding & barricatings, &maintenance of diversions etc.[Grading of no-2](45-63 mm size).
74986 4-20-2 1,594.30
cu.mProviding, laying, spreading & compaction of stone aggregates of specific sizes toWBM specifications including spreading in uniform thickness, hand packing, rolling
with power roller 8-10 tonn in stages to proper grade & camber, applying &brooming requisite type of binding material to fill up the intristices of coarse
aggregates,watering & rolling making necessary earthen bund to protect edgeslighting, guarding & barricatings, &maintenance of diversions etc.[Grading of no-3]
(22.4 - 53 mm size).
74987 4-20-3 1,656.70
Specification:
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 18 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
19/99
Chapter Name BASES AND SURFACE COURSES (BITUMINOUS) (Based on MORD)
Rate In (Rs.)UnitItem Description Rate
Prime Coat5-1
sq.mLow porosity
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared
surface of granular base including cleaning of road surface and spraying primer atthe rate of 0.70 kg/sqm using mechanical means as per Technical Specification
Clause 502
74988 5-1-1 31.60
sq.mLow porosityProviding and applying primer coat with bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at
the rate of 1.00 kg/sqm using mechanical means as per Technical SpecificationClause 502
74989 5-1-2 44.40
sq.mMedium porosityProviding and applying primer coat with Bitumen emulsion (SS-1) on prepared
surface of granular base including cleaning of road surface and spraying primer atthe rate of 0.90 kg/sqm using mechanical means as per Technical Specification
Clause 502.
74990 5-1-3 40.30
sq.mMedium porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at
the rate of 1.20 kg/sqm using mechanical means as per Technical Specification
Clause 502.
74991 5-1-4 53.20
sq.mHigh porosity
Providing and applying primer coat with Bitumen emulsion (SS-1) on preparedsurface of granular base including cleaning of road surface and spraying primer at
the rate of 1.2kg/sqm using mechanical means as per Technical Specification Clause502.
74992 5-1-5 53.30
sq.mHigh porosityProviding and applying primer coat with Bitumen emulsion (SS-1) on prepared
surface of granular base including cleaning of road surface and spraying primer atthe rate of 1.5 kg/sqm using mechanical means as per Technical Specification
Clause 502.
74993 5-1-6 66.20
Tack Coat5-2
sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned
with hydraulic broom as per Technical Specification Clause 503.
74994 5-2-1 10.30
sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned
with hydraulic broom as per Technical Specification Clause 503.
74995 5-2-2 12.50
sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsion
distributor at the rate of 0.25 kg per sqm on the prepared dry and hungry bituminous74996 5-2-3 12.50
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 19 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
20/99
Rate In (Rs.)
UnitItem Description Rate
surface cleaned with hydraulic broom as per Technical Specification Clause 503.
sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous
surface cleaned with hydraulic broom as per Technical Specification Clause 503.
74997 5-2-4 14.80
sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.25 kg per sqm on the prepared granular surfaces treated
with primer & cleaned with hydraulic broom as per Technical Specification Clause503.
74998 5-2-5 12.50
sq.mProviding and applying tack coat with bitumen emulsion (RS-1) using emulsiondistributor at the rate of 0.30 kg per sqm on the prepared granular surfaces treated
with primer & cleaned with hydraulic broom as per Technical Specification Clause503.
74999 5-2-6 14.80
sq.mProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion
pressure distributor at the rate of 0.30 kg per sqm on the prepared non-bituminoussurfaces (cement concrete pavement) cleaned with Hydraulic broom as per
Technical Specification Clause 503.
75000 5-2-7 14.80
sq.mProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsionpressure distributor at the rate of 0.35 kg per sqm on the prepared non-bituminoussurfaces (cement concrete pavement)cleaned with Hydraulic broom as per Technical
Specification Clause 503.
75001 5-2-8 17.00
Providing and laying bituminous macadam with 60-90 TPH hot mix plant producing
an average output of 75 tonnes per hour using crushed aggregates of specifiedgrading premixed with bituminous binder, transported to site, laid over a previously
prepared surface with paver finisher to the required grade, level and alignment androlled as per clauses 501.6 and 501.7 to achieve the desired compaction
5-3
Bituminous Macadam using VG 10 (80/100 Pen. Grade) Bitumen5-3-1
Bituminous Macadam Grading I (40 mm) using VG - 10 Grade Bitumen5-3-1-1
cu.mBituminous Macadam (Grading I) using 3.1% VG-10 Bitumen(By weight of total
mix)75002 5-3-1-1-1 6,737.50
cu.mBituminous Macadam (Grading I) using 3.3% VG-10 Bitumen(By weight of total
mix)75003 5-3-1-1-2 6,985.50
cu.mBituminous Macadam (Grading I) using 3.4% VG-10 Bitumen(By weight of total
mix)75004 5-3-1-1-3 7,109.40
Bituminous Macadam Grading II (19 mm) using VG - 10 grade bitumen5-3-1-2
cu.mBituminous Macadam (Grading II) using 3.3% VG-10 Bitumen(By weight of totalmix)
75005 5-3-1-2-1 6,985.50
cu.mBituminous Macadam (Grading II) using 3.4% VG-10 Bitumen(By weight of totalmix)
75006 5-3-1-2-2 7,109.40
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 20 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
21/99
Rate In (Rs.)
UnitItem Description Rate
cu.mBituminous Macadam (Grading II) using 3.5% VG-10 Bitumen(By weight of total
mix)75007 5-3-1-2-3 7,233.40
Bituminous Macadam using VG 30 (60/70 Pen. Grade) Bitumen5-3-2
Bituminous Macadam Grading I (40 mm) using VG - 30 Grade Bitumen5-3-2-1
cu.mBituminous Macadam (Grading I) using 3.1% VG-30 Bitumen(By weight of total
mix)75008 5-3-2-1-1 6,809.70
cu.mBituminous Macadam (Grading I) using 3.3% VG-30 Bitumen(By weight of total
mix)
75009 5-3-2-1-2 7,062.20
cu.mBituminous Macadam (Grading I) using 3.4% VG-30 Bitumen(By weight of total
mix)75010 5-3-2-1-3 7,188.50
Bituminous Macadam Grading II (19 mm) using VG - 30 Grade Bitumen5-3-2-2
cu.mBituminous Macadam (Grading II) using 3.3% VG-30 Bitumen75011 5-3-2-2-1 7,062.20
cu.mBituminous Macadam (Grading II) using 3.4% VG-30 Bitumen75012 5-3-2-2-2 7,188.50
cu.mBituminous Macadam (Grading II) using 3.5% VG-30 Bitumen75013 5-3-2-2-3 7,314.80
Built-Up Spray GroutProviding, laying and rolling of built-up spray grout layer over prepared baseconsisting of a two layer composite construction of crushed coarse aggregates using
motor grader for aggregates. Key stone chips spreader may be used with applicationof bituminous binder after each layer, and with key aggregates placed on top of the
second layer to serve as a base, conforming to the line, grades and cross-section
specified, the compacted layer thickness being 75 mm as per Technical SpecificationClause 505.
5-4
By Manual Means5-4-A
sq.mBitumen (S-90)75014 5-4-A-1 371.90
sq.mBitumen (S-65)75015 5-4-A-2 375.10
sq.mBy Mechanical Means75016 5-4-B 331.30
Modified Penetration Macadam
Construction of penetration macadam over prepared base by providing a layer ofcompacted crushed coarse aggregate using chips spreader with alternate applications
of bituminous binder and key aggregates and rolling with a three wheel 80-100 kNstatic roller to achieve the desired degree of compaction as per Technical
Specification Clause 506.
5-5
50 mm thick5-5-A
sq.mBitumen (S-90)75017 5-5-A-1 190.80
75 mm thick5-5-B
sq.mBitumen (S-90)75018 5-5-B-1 236.30
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 21 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
22/99
Rate In (Rs.)
UnitItem Description Rate
sq.mBitumen (S-65)75019 5-5-B-2 177.80
Surface Dressing using Bituminous (Penetrations grade / modified bitumen) BinderProviding and laying surface dressing as wearing course consisting of a layer of
bituminous binder laid on the prepared surface, followed by a cover of crushed stone
aggregates of specified size and rolling with three wheel 80-100 kN static rollerincluding cleaning the road surface as per Technical Specification Clause 507.
5-6
By Manual Means Case I: Nominal chipping size 13.2 mm5-6-A
Case I: Nominal chipping size 13.2 mm5-6-A-1
sq.mBitumen (S-90)75020 5-6-A-1-1 91.70
sq.mBitumen (S-65)75021 5-6-A-1-2 92.80
sq.mPolymer Modified Bitumen75022 5-6-A-1-3 74.20
sq.mCrumb Rubber Modified Bitumen75023 5-6-A-1-4 94.80
sq.mNatural Rubber Modified Bitumen75024 5-6-A-1-5 77.80
Case II: Nominal chipping size 9.5 mm5-6-A-2
sq.mBitumen (S-90)75025 5-6-A-2-1 81.00
sq.mBitumen (S-65)75026 5-6-A-2-2 81.90
sq.mPolymer Modified Bitumen75027 5-6-A-2-3 65.30
sq.mCrumb Rubber Modified Bitumen75028 5-6-A-2-4 83.70
sq.mNatural Rubber Modified Bitumen75029 5-6-A-2-5 68.50
By Mechanical Means5-6-B
Case I: Nominal chipping size 13.2 mm5-6-B-1
sq.mBitumen (S-90)75030 5-6-B-1-1 75.80
sq.mBitumen (S-65)75031 5-6-B-1-2 76.80
sq.mPolymer Modified Bitumen75032 5-6-B-1-3 58.30
sq.mCrumb Rubber Modified Bitumen75033 5-6-B-1-4 78.80
sq.mNatural Rubber Modified Bitumen75034 5-6-B-1-5 61.90
Case II: Nominal chipping size 9.5 mm5-6-B-2
sq.mBitumen (S-90)75035 5-6-B-2-1 67.10
sq.mBitumen (S-65)75036 5-6-B-2-2 68.10
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 22 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
23/99
Rate In (Rs.)
UnitItem Description Rate
sq.mPolymer Modified Bitumen75037 5-6-B-2-3 51.40
sq.mCrumb Rubber Modified Bitumen75038 5-6-B-2-4 69.90
sq.mNatural Rubber Modified Bitumen75039 5-6-B-2-5 54.70
Surface Dressing using Bitumen Emulsion
Providing and laying surface dressing as wearing course consisting of a layer of
bitumen emulsion laid on the prepared surface, followed by a cover of crushed stonechippings of specified size and rolling with 80-100 kN roller including cleaning the
road surface as per Technical Specification Clause 507.
5-7
By Manual Means5-7-A
sq.mCase I: Nominal aggregate size 13.2 mm75040 5-7-A-1 102.20
sq.mCase II: Nominal chipping size 9.5 mm75041 5-7-A-2 92.50
By Mechanical Means5-7-B
sq.mCase I: Nominal chipping size 13.2 mm75042 5-7-B-1 85.50
sq.mCase II: Nominal chipping size 9.5 mm75043 5-7-B-2 78.20
Pre-coating ChipsPre-coating of chips with 1 per cent of paving bitumen by weight of chips in asuitable mixer duly heated to 160 degree C as per Technical Specification Clause
507.2.5
5-8
cu.mBitumen (S-90)75044 5-8-1 1,413.90
cu.mBitumen (S-65)75045 5-8-2 1,430.90
20mm thick Open-Graded Premix Carpet using Bituminous (penetrationgrade/modified bitumen) BinderProviding, laying and rolling of open-graded premix
carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either usingpenetration grade bitumen or emulsion to required line, grade and level to serve as
wearing course on a previously prepared base, including mixing in a suitable plant,laying and rolling with a three wheel 80-100 kN static roller capacity, finished to
required level and grades to be followed by seal coat of either Type A or Type B orType C as per Technical Specification Clause 508.
5-9
Case - I By Manual Means5-9-1
sq.m20 mm thick open graded premix carpet using Bitumen (S-90)75046 5-9-1-1 150.40
sq.m20 mm thick open graded premix carpet using Bitumen (S-65)75047 5-9-1-2 151.90
sq.m20 mm thick open graded premix carpet using Polymer Modified Bitumen75048 5-9-1-3 124.90
sq.m20 mm thick open graded premix carpet using Crumb Rubber Modified Bitumen75049 5-9-1-4 154.90
sq.m20 mm thick open graded premix carpet using Natural Rubber Modified Bitumen75050 5-9-1-5 130.10
Case - II By Mechanical Means5-9-2
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 23 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
24/99
Rate In (Rs.)
UnitItem Description Rate
sq.mBitumen (S-90)75051 5-9-2-1 146.70
sq.mBitumen (S-65)75052 5-9-2-2 148.20
sq.mPolymer Modified Bitumen75053 5-9-2-3 121.20
sq.mCrumb Rubber Modified Bitumen75054 5-9-2-4 151.20
sq.mNatural Rubber Modified Bitumen75055 5-9-2-5 126.40
sq.m20 mm thick Open Graded Premix Carpet using Bitumen Emulsion as per Technical
Specification Clause 508.2
75056 5-10 141.20
Mix Seal Surfacing
Providing, laying and rolling of close-graded premix surfacing material of 20 mmthickness composed of 11.2 mm to 0.9 mm (Type-A) or 13.2 mm to 0.9 mm
(Type-B) aggregates using penetration grade bitumen to required line, grade andlevel to serve as wearing course on a previously prepared base, including mixing in
a suitable plant, laying and rolling with a three wheel 8-10 kN static roller andfinishing to required level and grades as per Technical Specification Clause 509
5-11
By Manual Means5-11-1
Type A5-11-1-A
sq.mBitumen (S-90)75057 5-11-1-A-1 205.20
sq.mBitumen (S-65)75058 5-11-1-A-2 207.50
sq.mPolymer Modified Bitumen75059 5-11-1-A-3 166.80
sq.mCrumb Rubber Modified Bitumen75060 5-11-1-A-4 211.90
sq.mNatural Rubber Modified Bitumen75061 5-11-1-A-5 174.60
Type B5-11-1-B
sq.mBitumen (S-90)75062 5-11-1-B-1 187.90
sq.mBitumen (S-65)75063 5-11-1-B-2 190.00
sq.mPolymer Modified Bitumen75064 5-11-1-B-3 154.80
sq.mCrumb Rubber Modified Bitumen75065 5-11-1-B-4 193.80
sq.mNatural Rubber Modified Bitumen75066 5-11-1-B-5 161.60
By Mechanical Means5-11-2
Type A5-11-2-A
sq.mBitumen (S-90)75067 5-11-2-A-1 189.30
sq.mBitumen (S-65)75068 5-11-2-A-2 191.60
sq.mPolymer Modified Bitumen75069 5-11-2-A-3 150.90
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 24 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
25/99
Rate In (Rs.)
UnitItem Description Rate
sq.mCrumb Rubber Modified Bitumen75070 5-11-2-A-4 196.10
sq.mNatural Rubber Modified Bitumen75071 5-11-2-A-5 158.80
Type B5-11-2-B
sq.mBitumen (S-90)75072 5-11-2-B-1 172.10
sq.mBitumen (S-65)75073 5-11-2-B-2 174.20
sq.mPolymer Modified Bitumen75074 5-11-2-B-3 139.00
sq.mCrumb Rubber Modified Bitumen75075 5-11-2-B-4 178.00
sq.mNatural Rubber Modified Bitumen75076 5-11-2-B-5 145.80
Seal CoatProviding and laying seal coat sealing the voids in a bituminous surface laid to the
specified levels, grade and cross fall using Type A, Type B and Type C as per
Technical Specification Clause 510
5-12
By Manual Means5-12-A
Case - I : Type A5-12-A-A
sq.mSeal coat using Bitumen (S-90)75077 5-12-A-A-1 76.50
sq.mSeal coat using Bitumen (S-65)75078 5-12-A-A-2 77.60
sq.mSeal coat using Polymer Modified Bitumen75079 5-12-A-A-3 59.40
sq.mSeal coat using Crumb Rubber Modified Bitumen75080 5-12-A-A-4 79.50
sq.mSeal coat using Natural Rubber Modified Bitumen75081 5-12-A-A-5 62.90
Case - II : Type B5-12-A-B
sq.mSeal Coat Using Bitumen (S-90)75082 5-12-A-B-1 55.30
sq.mSeal Coat Using Bitumen (S-65)75083 5-12-A-B-2 56.00
sq.mSeal Coat Using Polymer Modified Bitumen75084 5-12-A-B-3 43.40
sq.mSeal Coat Using Crumb Rubber Modified Bitumen75085 5-12-A-B-4 57.40
sq.mSeal Coat Using Natural Rubber Modified Bitumen75086 5-12-A-B-5 45.80
Case - III : Type C5-12-A-C
sq.mSeal Coat Using Bitumen (S-90)75087 5-12-A-C-1 57.30
sq.mSeal Coat Using Bitumen (S-65)75088 5-12-A-C-2 58.00
sq.mSeal Coat Using Polymer Modified Bitumen75089 5-12-A-C-3 46.00
sq.mSeal Coat Using Crumb Rubber Modified Bitumen75090 5-12-A-C-4 59.30
sq.mSeal Coat Using Natural Rubber Modified Bitumen75091 5-12-A-C-5 48.30
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 25 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
26/99
Rate In (Rs.)
UnitItem Description Rate
By Mechanical Means5-12-B
Case - I : Type A5-12-B-A
sq.mSeal Coat Using Bitumen (S-90)75092 5-12-B-A-1 72.20
sq.mSeal Coat Using Bitumen (S-65)75093 5-12-B-A-2 73.30
sq.mSeal Coat Using Polymer Modified Bitumen75094 5-12-B-A-3 55.10
sq.mSeal Coat Using Crumb Rubber Modified Bitumen75095 5-12-B-A-4 75.20
sq.mSeal Coat Using Natural Rubber Modified Bitumen75096 5-12-B-A-5 58.60
Case - II : Type B5-12-B-B
sq.mSeal Coat Using Bitumen (S-90)75097 5-12-B-B-1 54.70
sq.mSeal Coat Using Bitumen (S-65)75098 5-12-B-B-2 55.40
sq.mSeal Coat Using Polymer Modified Bitumen75099 5-12-B-B-3 42.80
sq.mSeal Coat Using Crumb Rubber Modified Bitumen75100 5-12-B-B-4 56.80
sq.mSeal Coat Using Natural Rubber Modified Bitumen75101 5-12-B-B-5 45.30
Case - III : Type C5-12-B-C
sq.mSeal Coat Using Bitumen (S-90)75102 5-12-B-C-1 53.50
sq.mSeal Coat Using Bitumen (S-65)75103 5-12-B-C-2 54.20
sq.mSeal Coat Using Polymer Modified Bitumen75104 5-12-B-C-3 42.10
sq.mSeal Coat Using Crumb Rubber Modified Bitumen75105 5-12-B-C-4 55.50
sq.mSeal Coat Using Natural Rubber Modified Bitumen75106 5-12-B-C-5 44.40
cu.mSupply of Stone Aggregates for Pavement Courses
Supply of stone aggregates from approved sources conforming to the physicalrequirement, specified in the respective clauses, including royalties, fees rents,collection, transportation, stacking and testing and measured in cum as per Clause
511.5.
75107 5-13 0.00
Surface Dressing using Bitumen Emulsion
Providing and laying surface dressing as wearing course consisting of a layer ofbitumen laid on the prepared WBM surface, followed by a cover of crushed stone
chippings of specified size(excluding Precoating ) and rolling with 80-100 kN rollerincluding cleaning the road surface as per PWD Specification.
5-14
By Mannual Means5-14-A
sq.m19 mm size Grit for P1 Surface75108 5-14-A-1 149.30
sq.m13 mm size grit for P2 surface75109 5-14-A-2 92.50
Semi-Dense Bituminous Concrete
5-15
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 26 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
27/99
Rate In (Rs.)
UnitItem Description Rate
Providing and laying semi dense bituminous concrete with 60-90 TPH batch typHMP producing an average output of 75 tonnes per hour using crushed aggregate
of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mixand filler, transporting the hot mix to work site, laying with a hydrostatic pave
finisher with sensor control to the required grade, level and alignment, rolling witsmooth wheeled, vibratory and tandem rollers to achieve the desired compaction a
per MoRTH specification clause No. 508 complete in all respects
SDBC using VG - 10 (80/100 pen. grade) Bitumen5-15-1
SDBC Grading I(13mm) using VG - 105-15-1-1
cu.mSDBC Grading I using 4.5% VG-10 bitumen(By weight of total mix)75110 5-15-1-1-1 9,185.90
cu.mSDBC Grading I using 4.75% VG-10 bitumen(By weight of total mix)75111 5-15-1-1-2 9,512.40
cu.mSDBC Grading I using 5% VG-10 bitumen(By weight of total mix)75112 5-15-1-1-3 9,836.00
SDBC Grading II(10mm) using VG - 105-15-1-2
cu.mSDBC Grading II using 4.5% VG-10 bitumen(By weight of total mix)75113 5-15-1-2-1 9,185.90
cu.mSDBC Grading II using 4.75% VG-10 bitumen(By weight of total mix)75114 5-15-1-2-2 9,512.40
cu.mSDBC Grading II using 5% VG-10 bitumen(By weight of total mix)75115
5-15-1-2-3 9,836.00
SDBC using VG - 30 (60/70 pen. grade) Bitumen5-15-2
SDBC Grading I(13mm) using VG - 305-15-2-1
cu.mSDBC Grading I using 4.5% VG-30 bitumen75116 5-15-2-1-1 9,296.00
cu.mSDBC Grading I using 4.75% VG-30 bitumen75117 5-15-2-1-2 9,628.60
cu.mSDBC Grading I using 5% VG-30 bitumen75118 5-15-2-1-3 9,958.30
SDBC Grading II(10mm) using VG - 305-15-2-2
cu.mSDBC Grading II using 4.5% VG-30 bitumen75119 5-15-2-2-1 9,296.00cu.mSDBC Grading II using 4.75% VG-30 bitumen75120 5-15-2-2-2 9,628.60
cu.mSDBC Grading II using 5% VG-30 bitumen75121 5-15-2-2-3 9,958.30
Specification:
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 27 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
28/99
Chapter Name CEMENT CONCRETE PAVEMENT (Based on MORD)
Rate In (Rs.)
UnitItem Description Rate
cu.mLime Treated Soil75122 6-2 661.60
Water Bound Macadam (WBM) - Sub-base6-3
cu.mBy Manual Means75123 6-3-A 1,863.80
cu.mBy Mechnical Means75124 6-3-B 1,745.20
cu.mCement Concrete PavementConstruction of un-reinforced, dowel jointed at expansion and construction joint
only, plain cement concrete pavement, thickness as per design, over a prepared subbase, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade),
coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregatenot exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity
and appropriate weigh batcher using approved mix design, laid in approved fixedside formwork (steel channel, laying and fixing of 125 micron thick polythene film,
wedges, steel plates including levelling the formwork as per drawing), spreading theconcrete with shovels, rakes, compacted using needle, screed and plate vibrators and
finished in continuous operation including provision of contraction and expansion,construction joints, applying debonding strips, primer, sealant, dowel bars, near
approaches to bridge/culvert and construction joints, admixtures as approved, curingof concrete slabs for 14-days,using curing compound (where specified) and water
finishing to lines and grade as per drawing and Technical Specification Clause 1501
75125 6-4 6,379.90
cu.mRoller Compacted Concrete PavementConstruction of Roller Compacted Concrete Pavement (RCCP) with coarse and fine
aggregates conforming to IS:383, the size of coarse aggregate not exceeding 25 mmwith minimum aggregate cement ratio of 5:1 mm and with minimum cemnt content
of 310 kg per cum, aggregate gradation to be as per Table 602.2 after blending,mixing in concrete mixer at optimum moisture content, transporting to site, laying
with wheel barrows or steel pans or with mechanical paver, compacting with 80-100kN smooth wheel, tandem vibratory roller, to achieve, the designed flexural
strength, finishing and curing as per drawings and Technical Specification Clause1502
75126 6-5 5,611.50
sq.mRectangular Concrete Block PavementManufacturing, laying of cement concrete blocks of size 0.450 m x 0.300 m x 0.15
m of Cement Concrete (C.C.) M30 garde and spreading 25 mm thick sand underneath and filling joints with sand on existing W.B.M. base as per Technical
Specification Clause 1503.
75127 6-6 593.80
Interlocking Concrete Block PavementProviding and Laying of Interlocking Concrete Block Pavements having thickness
80 mm as per drawings and Technical Specification Clause 1504.
6-7
sq.mProviding and Laying of Interlocking Concrete Block Pavements having thickness
80 mm as per drawings and Technical Specification Clause 1504.75128 6-7-1 707.30
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 28 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
29/99
-
8/10/2019 Sor Laksar r&b 16.5.2014
30/99
Chapter Name CAUSEWAY AND SUBMERSIBLE BRIDGES (Based on MORD)
Rate In (Rs.)
UnitItem Description Rate
Construction of Cut-off Walls/Head Walls7-1
cu.mEarthwork in excavation for structures as per drawing and technical specification
Clause 305.75131 7-1-1 213.60
cu.mPlain cement concrete M15 grade75132 7-1-2 4,585.10
cu.mBrick masonry in cement mortar 1:475133 7-1-3 5,391.20
cu.mStone masonry in cement mortar 1:475134 7-1-4 3,863.40
cu.mProviding P.C.C M20 architectural coping on top of wall75135 7-1-5 346.40
cu.mPreparation of Subgrade75136 7-2 48.30
cu.mGranular Sub-base75137 7-3 1,377.00
cu.mW.B.M. Base Course75138 7-4 1,861.70
cu.mCement Concrete Slab75139 7-5 6,379.90
Providing and Laying Apron7-6
cu.mProviding and Laying Apron with Stone Boulders as per Drawings & TechnicalSpecification Clause 1301
75140 7-6-1 981.30
cu.mProviding and Laying of Boulder Apron Laid in Wire Crates as per Drawing and
Technnical Specification Clause 130175141 7-6-2 1,789.30
cu.mProviding and Laying of Apron with Cement Concrete Blocks as per Drawing and
Technical Specification Clause 130175142 7-6-3 4,630.50
cu.mConstruction of R.C.C. guide posts of 250 mm dia, M25 grade as per drawing and
technical specification Clause 1401.675143 7-7 67,752.40
Bedding for Causeway7-8cu.mType A (concrete cradle) Bedding Clause 1402.575144 7-8-1 4,631.00
cu.mType B (first class) Bedding Clause 1402.575145 7-8-2 1,636.10
metreLaying Reinforced Cement Concrete Pipe NP3 as per drawing and technical
specification Clause 1402.675146 7-9 7,382.30
metreLaying Reinforced Cement Concrete Pipe NP4 as per technical specification Clause
1402.675147 7-10 8,935.10
Specification:
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 30 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
31/99
-
8/10/2019 Sor Laksar r&b 16.5.2014
32/99
Rate In (Rs.)
UnitItem Description Rate
cu.mFilter material behind retaining wall / breast wall as per Specification 1204.3.8 in a
width of 600 m75162 8-4-6 1,794.00
cu.mBack filling behind retaining wall/breast wall75163 8-4-7 560.20
Construction of Hill Side Drain
Construction of hill side drain in accordance with the requirement of specifications
true to lines and grades. Dimesions and other particulars as per drawing andTechnical Specification Clause 1606.1
8-5
cu.mEarthwork in excavation for structures as per drawing and technical specification75164 8-5-1 213.60
cu.mPlain cement concrete M10 grade75165 8-5-2 4,565.10
cu.mStone masonry in cement mortar 1:575166 8-5-3 3,094.30
cu.mPlain cement concrete M15 grade75167 8-5-4 4,570.10
sq.mCement plaster 15 mm thick 1:4 on stone masonry75168 8-5-5 117.20
metreProviding P.C.C. M20 architectural coping on top of wall75169 8-5-6 346.40
Construction of Catch Water / Intercepting Drain
Construction of catch water/intercepting drain in random rubble masonry in 1:5cement mortar true to the specified lines grades levels and dimensions as per the
requirement of the specifications Clause 1606.2
8-6
cu.mEarthwork in excavation for structures as per drawing and technical specification75170 8-6-1 213.60
cu.mPlain cement concrete M10 grade75171 8-6-2 4,565.10
cu.mStone masonry in cement mortor 1:575172 8-6-3 3,094.30
cu.mPlain cement concrete M15 grade75173 8-6-4 4,570.10
sq.mCement plaster 15 mm thick 1:4 on stone masonry75174 8-6-5 117.20
metreProviding P.C.C. M 20 architectural coping on top of wall75175 8-6-6 346.40
Construction of Scupper
Construction of scupper with dry stone masonry as per drawing and technical
specifications as per Clause 1606.5.
8-7
metreEarthwork in excavation for structures as per drawing and technical specifications75176 8-7-1 4,094.00
metreRandom rubble dry stone masonry75177 8-7-2 10,581.20
metreRandom course rubble dry stone masonry in corbelling75178 8-7-3 2,160.60
metreStone filling in foundation trenches as per drawing and technical specification75179 8-7-4 1,218.30
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 32 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
33/99
Rate In (Rs.)
UnitItem Description Rate
metreConstruction of Scupper Totally75180 8-7-5 18,054.10
Construction of RCC guide posts of 250 mm dia M15 grade cast-in-situ with 20 mmnominal size aggregate, true to line and grade, tolerance of vertical RCC posts not to
exceed 1 in 500 as per drawing and Technical Specification Clause 1608.2
8-8
cu.mEarth work in excavation for structures75181 8-8-(i) 215.70
cu.mRCC M15 grade75182 8-8-(ii) 4,585.10
tonneHYSD steel bars75183 8-8-(iii) 62,857.70
sq.mPainting two coats including prime coat on new concrete surface75184 8-8-(iv) 93.90
metreProviding edge stones on valley side of formation as per drawing and Technical
Specification Clause 1608.2.675185 8-9 108.70
sq.mTurfing with Sods
Furnishing and laying of the live sods of perennial turf forming grass on
embankment slope, verges or other locations shown on the drawing or as directed bythe Engineer including preparation of ground, stacking the sods and watering as per
Clause 309
75186 8-10 56.70
sq.mSeeding and Mulching
Preparation of seed bed on previously laid top soil, furnishing and placing of seeds,
fertilizer, multching material, applying bituminous emulsion at the rate of 0.23 l persqm and laying and fixing jute netting, including watering for 3 months all as per
Clause 310.
75187 8-11 124.80
Specification:
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 33 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
34/99
Chapter Name PIPE CULVERTS (Based on MORD)
Rate In (Rs.)
UnitItem Description Rate
cu.mExcavation for StructuresEarthwork in excavation for foundation of structures upto 3 m depth as per drawing
and technical specification Clause 1104 includding setting out, construction ofshoring and bracing, removal of stumps and other deleterious matter, dressing of
sides and bottom and backfilling with approved material.
75188 9-1 215.70
Bedding for Pipe9-2
cu.mType A (Concrete Cradle) Bedding
Laying concrete cradle bedding with M15 Grade Cement Concrete as per Clause1105 (i)
75189 9-2-(i) 4,585.10
cu.mType B (First Class) BeddingLaying (First Class) bedding on well compacted sand, moorum or approved granular
material as per Clause 1105 (ii)
75190 9-2-(ii) 1,619.90
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single
Row
Providing and laying reinforced cement concrete pipe NP3 for culverts on first classbedding of granular material in single row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete andmasonry works in head walls and parapets Clause 1106.
9-3
metre1200 mm dia75191 9-3-A 7,309.20
metre1000 mm dia75192 9-3-B 7,213.50
metre750 mm dia75193 9-3-C 3,462.40
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per design in SingleRow
Providing and laying reinforced cement concrete pipe NP4 for culverts on first class
bedding of granular material in single row including fixing collar with cementmortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets Clause 1106.
9-4
metre1200 mm dia75194 9-4-A 8,846.60
metre1000 mm dia75195 9-4-B 6,572.00
metre750 mm dia75196 9-4-C 4,181.60
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per Design inDouble RowProviding and laying reinforced cement concrete pipe NP3 for culverts on first class
bedding of granular material in double row including fixing collar with cementmortar 1:2 but excluding excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets as per Clause 1106.
9-5
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 34 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
35/99
Rate In (Rs.)
UnitItem Description Rate
metre1200 mm dia75197 9-5-A 14,675.80
metre1000 mm dia75198 9-5-B 10,826.10
metre750 mm dia75199 9-5-C 6,923.80
Providing and Laying Reinforced Cement Concrete Pipe NP4 as per Design in
Double RowProviding and laying reinforced cement concrete pipe NP4 for culverts on first class
bedding of granular material in double row including fixing collar with cement
mortar 1:2 but excluding excavation, protection works, backfilling, concrete andmasonry works in head walls and parapets as per Clause 1106.
9-6
metre1200 mm dia75200 9-6-A 17,750.50
metre1000 mm dia75201 9-6-B 13,612.20
metre750 mm dia75202 9-6-C 6,923.80
metreLaying Cement Concrete Pipe NP3 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and masonary work in head walland parapets
75203 9-7 2,468.60
metreLaying Cement Concrete Pipe NP4 (burried conduits) on first class bedding of
granular material including fixing collar with cement sand mortar 1:2 but excludingexcavation, protection works, backfilling, concrete and masonary work in head wall
and parapets
75204 9-8 2,468.60
cu.mPlain Cement Concrete M10 (1:3:6 nominal mix) in levelling course below openfoundation of Head walls as per drawings & Technical Specification Clause 1109
75205 9-9 4,580.00
Brick Masonry Work in cement mortar in foundation of Head walls complete
exculding pointing and plastering as per drawing and technical specification Clause1109
9-10
cu.mBrick Masonry in 1:4 cement mortar75206 9-10-A 5,391.20
cu.mBrick Masonry in cement-lime mortar (1:0.5:4.5)75207 9-10-B 5,816.20
Stone Masonry Work in cement mortar in foundation of Head walls complete as per
drawing and technical specification Clasue 1109
9-11
cu.mIn 1:4 cement mortar75208 9-11-A 3,728.70
cu.mIn cement-lime mortar (1:0.5:4.5)75209
9-11-B 2,174.00
sq.mPointing with Cement Mortar (1:3) on brickwork as per technical specificationClause 613.3
75210 9-12 60.30
sq.mPlastering with Cement Mortar (1:4), 15 mm thick on brickwork in substructure asper technical specification
75211 9-13 118.40
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 35 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
36/99
Rate In (Rs.)
UnitItem Description Rate
cu.mBackfilling in Foundation Trenches as per drawing and technical specification
Clause 110875212 9-14 138.70
metreProviding PCC M20 Architectural Coping on the top of wing wall, return wall etc.
complete as per drawing and technical specification Clause 61575213 9-15 349.90
Specification:
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 36 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
37/99
-
8/10/2019 Sor Laksar r&b 16.5.2014
38/99
Rate In (Rs.)
UnitItem Description Rate
each800 mm x 600 mm rectangular75226 10-2-A-(2)-(iv) 2,919.40
each600 mm x 450 mm rectangular75227 10-2-A-(2)-(v) 2,427.90
each600 mm x 600 mm square75228 10-2-A-(2)-(vi) 2,638.50
each900 mm sides octagon75229 10-2-A-(2)-(vii) 3,368.80
Providing and fixing of retro-reflectorised cautionary, mandatory and informatory
sign as per IRC:67 made of encapsulated lens type reflective sheeting vide Clause1701.2.3, fixed over aluminium sheeting, 1.5 mm thick supported on RCC Post 100
mm x 100 mm firmly fixed to the ground by means of properly designed foundationwith M15 grade cement concrete 450 mm x 450 mm x 600 mm, 600 mm below
ground level as per approved drawing Clause 1701
10-2-A-(3)
each900 mm equilateral triangle75230 10-2-A-(3)-(i) 2,259.50
each600 mm equilateral triangle75231 10-2-A-(3)-(ii) 1,818.60
each600 mm circular75232 10-2-A-(3)-(iii) 2,107.20
each800 mm x 600 mm rectangular75233 10-2-A-(3)-(iv) 2,554.90
each600 mm x 450 mm rectangular75234 10-2-A-(3)-(v) 2,204.90
each600 mm x 600 mm square75235 10-2-A-(3)-(vi) 2,409.40
each900 mm sides octagon75236 10-2-A-(3)-(vii) 3,118.50
Semi Reflective Traffic Signs
Providing and fixing of semi reflective cautionary, mandatory and informatory sign
board as per IRC:67 made of 1.5 mm thick MS Sheet duly stove white colour infront and gray colour on back with red reflective border of 65 mm width and
required letters and figures with reflective tape engineering grade as per Clause
1701.3.9 of MORD for Rural Roads of required shade and colour supported andwelded on 47mm x 47 mm x 12 SWG sheet tube firmly fixed to the ground by meanof properly designed foundations with M-15 grade cement concrete 450x450x600
mm, 600 mm below ground level as per approved drawing Clause 1701.2.2
10-2-B
each900 mm equilateral & triangle75237 10-2-B-(i) 2,607.40
each600 mm equilateral & triangle75238 10-2-B-(ii) 2,153.40
each600 mm circular75239 10-2-B-(iii) 2,489.90
each800 mm x 600 mm rectangular75240 10-2-B-(iv) 2,911.70
each600 mm x 450 mm rectangular75241 10-2-B-(v) 2,420.20each600 mm x 600 mm75242 10-2-B-(vi) 2,630.90
each900 mm side octagon75243 10-2-B-(vii) 3,361.10
Direction and Place Identification signs upto 0.9 sqm size board10-3
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 38 of 99
-
8/10/2019 Sor Laksar r&b 16.5.2014
39/99
Rate In (Rs.)
UnitItem Description Rate
Retro-reflectorised Traffic Signs10-3-A
sq.mProviding and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,
fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqmsupported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the
ground by means of properly designed foundation with M-15 grade cement concrete450 x 450 x 600 mm, 600 mm below ground level as per approved drawing and
Technical Specification Clause 1701
75244 10-3-A-(i) 4,541.90
sq.mProviding and erecting direction and place identification retro-reflectorised sign as
per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,
fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqmsupported on 2 inch dia GI Pipe firmly fixed to the ground by means of properly
designed foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600mm below ground level as per approved drawing and Tehnical Specification Clause
1701.
75245 10-3-A-(ii) 4,265.10
sq.mProviding and erecting direction and place identification retro-reflectorised sign as
per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on RCC Post 100 mm x 100 mm firmly fixed to the ground by means of
properly designed foundation with M-15 grade cement concrete 450 x 450 x 600mm, 600 mm below ground level as per approved drawing and TechnicalSpecification Clause 1701
75246 10-3-A-(iii) 3,970.30
metreSemi-Reflective Traffic signsDirection and place indentification signs up to 0.9 sqm size board
Providing and erecting direction and place identifications of semi reflective sign
boards as per IRC:67 made of 2 mm thick M.S. Sheet duly stove enameled paint inwhite colour in front and grey colour on back with red reflective border of 70 mm
width and required message, letters, figures with reflective engineering grade tape asper MORD specifications of required shade and colour. Supported and welded on
47 mm x 47mm of 12 SWG Square tube of 3050 mm height duly strengthened by25 mm x 5 mm M/s flat iron on edges on back firmly fixed to the ground by means
of properly designed foundations with M-15 grade cement concrete 450 mm x 450mm x 600 mm, 600 mm below ground level as per approved drawing and Technical
Specification Clause 1701
75247 10-3-B 2,846.50
Direction and Place Identification signs with size more than 0.9 sqm size board10-4
Retro-reflectorised Traffic Signs10-4-A
sq.mProviding and erecting direction and place identification retro-reflectorised sign asper IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,
fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to theground by means of properly designed foundation with M-15 grade cement concrete
450 x 450 x 600 mm, 600 mm below ground level as per approved drawing andTechnical Specification Clause 1701
75248 10-4-A-1 4,806.40
Block 94 Laksar (HARIDWAR)Rate Card Effective Date 16/05/2014
Roads & Bridges Uttarakhand - 2014-2015 - 16/05/2014
23/05/14 10:50Page 39 of 99
Bl k 94 L k (HARIDWAR) 16/05/2014
-
8/10/2019 Sor Laksar r&b 16.5.2014
40/99
Rate In (Rs.)
UnitItem Description Rate
sq.mProviding and erecting direction and place identification retro-reflectorised sign as
per IRC:67 made of encapsulated lens type reflective sheeting vide Clause 1701.2.3,fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm
supported on 2 inch dia GI Pipe firmly fixed to the ground by means of properlydesigned foundation with M-15 grade cement concrete 450 x 450 x 600 mm, 600
mm below ground level