sotware para copiar
DESCRIPTION
sadasdfTRANSCRIPT
![Page 1: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/1.jpg)
PARTIDA DESCRIPCION
01.00.00 ESTRUCTURAS
01.03.01 EXCAVACION ZANJA
z-1,2,3,4,5
01.03.04 ELIMINACION DE MATERIAL EXCEDENTE
01.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL
eje largo
eje ancho
01.05.01.01 CONCRETO(F'C=140 KG/CM2)
VOL (Total)VOL (Adentro)
01.05.02.01 TARRAJEO CON IMPERMEABILIZANTES
Area de bordeArea lateral
Area de baseArea Libre
![Page 2: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/2.jpg)
NRO DE POZOS = 5
DESCRIPCION
UND.
ESTRUCTURAS
EXCAVACION ZANJA m3z-1,2,3,4,5
ELIMINACION DE MATERIAL EXCEDENTE m3
ENCOFRADO Y DESENCOFRADO NORMAL m2eje largo
eje ancho
CONCRETO(F'C=140 KG/CM2) m3VOL (Total)
VOL (Adentro)
TARRAJEO CON IMPERMEABILIZANTES m2
Area de bordeArea lateral
Area de baseArea Libre
![Page 3: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/3.jpg)
DIMENSIONES (m)
PARCIAL AREA(M2) ANCHO LARGO ALTURA
3.000 20.00 2.00 1.00 120.00
Esponjaminto 15% 690 1.00 690.00
19.60 1.85 2.00 72.52 2.60 1.85 2.00 9.62
3.000 20.00 2.00 1.00 120.00 2.600 19.60 1.85 1.00 94.28
19.60 1.85 2.00 362.60
2.60 1.85 2.00 48.10
19.60 2.60 1.00 254.80
9.04 area total= 60.00 area interior = 50.96
N° DE ELEM.
![Page 4: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/4.jpg)
TOTAL OBSERV.
600.00
690.00
410.70
128.62
674.54
![Page 5: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/5.jpg)
h = 2.00 m
L = 20.00 m
![Page 6: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/6.jpg)
0.20 m
A = 3.00 m
0.15 m
![Page 7: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/7.jpg)
0.20 m
![Page 8: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/8.jpg)
NRO DE ARCOS =
PARTIDA DESCRIPCION
UND.
01.00.00 ESTRUCTURAS
01.03.01 EXCAVACION DE ZANJA m3z-1,2,3,4,5
01.03.04 CONCRETO F'c=140 Kg/cm^2 m3
01.04.04.02 INSTALACION DE ARCO m2
01.05.01.01 PINTURA EN ARCO CON ESMALTE m3Perimetro 0.32
Longitud total 8.00
01.05.02.01 INSTALACION DE MALLA m2
![Page 9: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/9.jpg)
2
N° DE ELEM. PARCIAL TOTAL OBSERV.
0.565 1.131 2.00
0.565 1.131 1.00
2
2.553 5.107
![Page 10: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/10.jpg)
3.00 m
0.50 m
Radio = 0.30 mH = 1.00 m
![Page 11: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/11.jpg)
2.00 m
pulgadas metrosDIAMETRO DEL ARCO 4 0.1016 m
![Page 12: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/12.jpg)
2.- Elaborar los gastos generales de un presupuesto en el s10 con un plazo de ejecucion de seis meses, para ello considerar las partidas que se muestran a contnuacion
a ) Personal profesional y auxiliar: 33900
1 Administrador de obra Sueldo mensual = s/.2 Planillero Sueldo mensual = s/.1 Residente de obra Sueldo mensual = s/.
b) Alquiler de equipo menor:
1 camioneta 4x4 Costos 1 GPS Satelital2 Laptop
![Page 13: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/13.jpg)
Elaborar los gastos generales de un presupuesto en el s10 con un plazo de ejecucion de seis meses, para ello considerar las partidas que se muestran 6 meses
solucion:Sueldo mensual = s/. 2500 Porntaje de Participacion = 50 1250Sueldo mensual = s/. 1800 Porntaje de Participacion = 25 900Sueldo mensual = s/. 3500 Porntaje de Participacion = 100 3500
5650
![Page 14: Sotware Para Copiar](https://reader036.vdocuments.net/reader036/viewer/2022081908/56d6bdcf1a28ab30168f6cd4/html5/thumbnails/14.jpg)
33900