south maple street sanitary & storm sewer system improvements project
DESCRIPTION
South Maple Street Sanitary & Storm Sewer System Improvements Project. October 14, 2014. Project Area. 400 block South Maple Street 12 & 24 College Street 200 block Boone Avenue (east side of Boone) 101 & 117 Belmont Avenue. Project Area…. Project Area…. Area Impact. - PowerPoint PPT PresentationTRANSCRIPT
South Maple Street South Maple Street
Sanitary & Storm Sewer System Sanitary & Storm Sewer System
Improvements ProjectImprovements Project
October 14, 2014
Project Area. . .Project Area. . .
400 block South Maple Street400 block South Maple Street
12 & 24 College Street12 & 24 College Street
200 block Boone Avenue (east side of Boone)200 block Boone Avenue (east side of Boone)
101 & 117 Belmont Avenue101 & 117 Belmont Avenue
Area Impact . . .Area Impact . . .
• 27 +/- Residences and Properties27 +/- Residences and Properties
Project Disruptions….
• Road Closures / DetoursRoad Closures / Detours
• Noise Noise
• DustDust
• No expected customer sewer service No expected customer sewer service impactsimpacts
• Construction in back yardsConstruction in back yards
• Closure of alley way during construction Closure of alley way during construction periodperiod
Project Purpose…Project Purpose…
• US EPA Consent Decree (Not a defined project)US EPA Consent Decree (Not a defined project)
• Inflow / Infiltration ReductionInflow / Infiltration Reduction
• Eliminates any combined sewer connections Eliminates any combined sewer connections
• Eliminates “Private” Sanitary Sewer Service Eliminates “Private” Sanitary Sewer Service connections; Publicly owned and maintainedconnections; Publicly owned and maintained
• Reduces Public Health RisksReduces Public Health Risks
• Reduces amount and time period of Storm Reduces amount and time period of Storm Water in back yards and alley*Water in back yards and alley*
Scope of Work for Maple Street Scope of Work for Maple Street Project…Project…
741 ft. of 8-inch sanitary sewer741 ft. of 8-inch sanitary sewer 750750 ft. of 6-inch sanitary sewerft. of 6-inch sanitary sewer Six (6) sanitary sewer manholesSix (6) sanitary sewer manholes 1,7401,740 ft. of storm sewer pipe 24” - 12”ft. of storm sewer pipe 24” - 12” 13 storm sewer boxes and other structures13 storm sewer boxes and other structures Other necessary construction activitiesOther necessary construction activities
Maple Street Project Maple Street Project Costs . . . Costs . . . • DesignDesign $100,000$100,000
• Construction Construction (Preliminary Cost (Preliminary Cost Estimate) Estimate) $562,000$562,000
• Construction Admin./Inspection Construction Admin./Inspection $50,000$50,000
• Additional Site Restoration Additional Site Restoration (Estimated) (Estimated) $50,000$50,000
Total Project Cost (Total Project Cost (EstimatedEstimated)) $762,000$762,000
Maple Street Project Maple Street Project Funding…Funding…
• Winchester Municipal Utilities Winchester Municipal Utilities Private Sewer and Main Private Sewer and Main Replacement Funds Replacement Funds - Sanitary Sewer Portion of Work- Sanitary Sewer Portion of Work
• City of Winchester General FundCity of Winchester General Fund - Storm Sewer Portion of Work- Storm Sewer Portion of Work
Maple Street Project Schedule Maple Street Project Schedule (Anticipated)(Anticipated)
• Advertisement DateAdvertisement Date November 2, November 2,
20142014
• Bid OpeningBid Opening November 22, November 22,
20142014
• Bid Award Bid Award (Estimated; bid (Estimated; bid
amounts)amounts)
December 2, December 2,
20142014
• Construction StartConstruction Start
• Construction TimeConstruction Time
• Estimated Completion Estimated Completion
January 2, 2015January 2, 2015
6 months 6 months
July 31, 2015July 31, 2015
Easements…Easements…
• Temporary and Permanent Easements Temporary and Permanent Easements
RequiredRequired
New easement – Not in flood plain – $4.00/ft.New easement – Not in flood plain – $4.00/ft.
New easement – In the flood plain – $3.00/ft.New easement – In the flood plain – $3.00/ft.
Existing easement (Increase width) – $2.00/ft.Existing easement (Increase width) – $2.00/ft.
Temporary (all) – $1.00/ft. Temporary (all) – $1.00/ft.
Summary…Summary…
• Eliminate combined sanitary sewer and Eliminate combined sanitary sewer and storm connections (if any) storm connections (if any)
• Eliminate “Private” sanitary sewer Eliminate “Private” sanitary sewer connectionsconnections
• Reduce amount and time period of storm Reduce amount and time period of storm water on private propertywater on private property
• Reduce public health risks Reduce public health risks
Key Contacts….
Mike Flynn/Duke Mike Flynn/Duke DrydenDryden
Matt Belcher/Joe Matt Belcher/Joe TincherTincher
WMUWMU
City of WinchesterCity of Winchester
Winchester Municipal Utilities City of Winchester150 North Main Street 32 Wall StreetPO Box 4177 PO Box 40Winchester, KY 40392-4177 Winchester, KY 40392-0040
Phone: (859) 744-5434 (859) 744-2821Fax: (859) 745-4146 (859) 745-4590