Robin Lafayette E N G I N E E R , T R A N S M I S S I O N P L A N N I N G
Planning Advisory Committee
Southeastern Massachusetts and Rhode Island (SEMA-RI) Minimum Load Needs Assessment Scope of Work
![Page 2: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/2.jpg)
ISO-NE PUBLIC
Purpose
• Present the Southeastern Massachusetts and Rhode Island (SEMA-RI) Minimum Load Needs Assessment Scope of Work
2 ISO-NE PUBIC
![Page 3: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/3.jpg)
ISO-NE PUBLIC
Overview
• Background on the study effort
• Objectives
• Study area description
• Scope of needs assessment
• Schedule/next steps
• Appendix
3 ISO-NE PUBIC
![Page 4: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/4.jpg)
ISO-NE PUBLIC
Background • The most recent updates for the SEMA-RI study are:
– In October 2013, EquiPower submitted an NPR request for Brayton Point Power Station for June 2017
– In February 2015, the preferred solution was selected for the Greater Boston area study and the solution components were added to the SEMA-RI study due to the influence on the area
– In February 2016, Canal 3 and Burrillville Energy Center (“BEC”) received Capacity Supply Obligations in FCA #10
– 2026 SEMA-RI Needs Assessment results presented to PAC on March 22, 2016
– Final 2026 SEMA-RI Needs Assessment report posted on May 26, 2016
• Covered summer peak load (90/10) thermal / voltage and short-circuit needs
• Links to previous SEMA-RI presentations and reports have been placed in the Appendix
4 ISO-NE PUBIC
![Page 5: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/5.jpg)
ISO-NE PUBLIC
Objectives
• Evaluate the reliability performance and identify reliability‐ based transmission needs in the SEMA‐RI study area under minimum load conditions, while considering the following: – SEMA‐RI area performance under minimum New England load level
conditions – Reliability over a range of generation patterns – Retirement of Brayton Point and Pilgrim generators
• Additions of Canal 3 and Burrillville Energy Center
– Coordination with plans in Greater Boston – All applicable transmission planning reliability standards
5 ISO-NE PUBIC
![Page 6: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/6.jpg)
ISO-NE PUBLIC
Study Area – SEMA-RI Geographical
6
Boston Import
CT Import
West Medway - Walpole
Farnum
Somerset - Newport
Industrial Park
South Shore
Cape
CT to RI 115 kV Tie
![Page 7: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/7.jpg)
ISO-NE PUBLIC
7
The diagram is shown for reference only and does not include all of the latest topology changes ISO-NE PUBIC
SEMA-RI – One Line Diagram
![Page 8: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/8.jpg)
ISO-NE PUBLIC
Modeling Assumptions
• Base Case Topology: consistent with recently completed 2026 SEMA-RI Needs Assessment peak load study cases – All proposed and planned transmission projects as of the May 2015
RSP project listing have been included – All cleared generation as of FCA #9 were modeled, plus major FCA #10
cleared generation in SEMA-RI
• 8500 MW load plus losses in New England
• Load power factor assumptions – based on system design objectives – NE loads = 0.998 leading power factor on the low side of distribution
transformers – Boston load = 0.978 lagging power factor for downtown, 1.000 power
factor for suburban Boston on the low side of distribution transformers
8
![Page 9: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/9.jpg)
ISO-NE PUBLIC
9
Modeling Assumptions, Cont’d.
• Seabrook OOS – One nuclear unit OOS along with Pilgrim retirement
• All major Boston gen OOS
• All Boston area reactors online
• All pumped hydro units either OOS or in pumping mode
• Low transfers across interfaces
• All capacitors OOS
• All fast-start generation OOS
ISO-NE PUBIC
![Page 10: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/10.jpg)
ISO-NE PUBLIC
Generation Dispatches
• Testing combinations of study area units online
• 69 MW of other SEMA-RI generation online in all cases: – SEMASS (69 MW)
10 ISO-NE PUBIC
Dispatch Major SEMA-RI Unit In-Service
1 No Major SEMA-RI Units In Service
2 Edgar (700 MW)
3 Tiverton (244 MW)
4 RISE (543 MW)
5 ANP Bellingham (481 MW)
![Page 11: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/11.jpg)
ISO-NE PUBLIC
11
Study Methodology
• Steady state thermal and voltage analysis (including Delta-V) will be performed, for N-0 (all-facilities-in), N-1 (all-facilities-in, first contingency), and N-1-1 (facility-out, first contingency) for the described set of generation dispatches – First element out scenarios for N-1-1 testing will focus on key 345 kV
line, 345/115 kV autotransformers, and lagging reactive support devices in the SEMA-RI area
ISO-NE PUBIC
![Page 12: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/12.jpg)
ISO-NE PUBLIC
Next Steps / Schedule
• Post the SEMA‐RI Minimum Load Needs Assessment Scope of Work and Study Files for PAC review – Q2 2016
• Complete the SEMA‐RI Minimum Load Needs Assessment, present to PAC and post draft report – Q3 2016
12 ISO-NE PUBIC
![Page 13: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/13.jpg)
ISO-NE PUBLIC
13 ISO-NE PUBIC
![Page 14: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/14.jpg)
ISO-NE PUBLIC
APPENDIX Links to Previous SEMA-RI Presentations and Reports
![Page 15: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/15.jpg)
ISO-NE PUBLIC
Links to Previous SEMA-RI Presentations and Reports
• Final SEMA/RI 2026 Needs Assessment Report, Appendices, Revised Results Presentation and Responses to Stakeholder Comments, posted to PAC website on May 26, 2016
– https://smd.iso-ne.com/operations-services/ceii/pac/2016/05/final_sema_ri_needs_assessment_report.pdf
• Final SEMA/RI 2026 Needs Assessment Final Study Files, posted to PAC website on April 6, 2016
– https://smd.iso-ne.com/operations-services/ceii/pac/2016/04/sema_ri_2026_needs_assessment_final_study_files.zip
• Final SEMA/RI 2026 Needs Assessment Scope of Work and Appendices, posted to PAC website on January 22, 2016
– https://smd.iso-ne.com/operations-services/ceii/pac/2016/01/sema_ri_2026_needs_assessment_scope_of_work_appendicies.zip
15 ISO-NE PUBIC
![Page 16: Southeastern Massachusetts and Rhode Island (SEMA-RI ... · 5/26/2016 · Boston area study and the solution components were added to the SEMA-RI study due to the influence on the](https://reader035.vdocuments.net/reader035/viewer/2022070923/5fbb494847cd1d50e62c7294/html5/thumbnails/16.jpg)
ISO-NE PUBLIC
Links to Previous SEMA-RI Presentations and Reports, Cont.
• Newport Aquidneck Island Transmission Area Improvements – Needs and Preferred Solutions, presented to PAC on April 28, 2015
– https://smd.iso-ne.com/planning/ceii/reports/2010s/archive/a7_newport_aquidneck_island_transmission_area_improvements_presentation.pdf
• Brayton Point Non-Price Retirement: Short Term Solutions presented to PAC on July 15, 2014
– https://smd.iso-ne.com/committees/comm_wkgrps/prtcpnts_comm/pac/ceii/mtrls/2014/jul152014/a4_brayton_pt_npr_short_term_upgrades_rev1.pdf
• Additional Southeastern Massachusetts and Rhode Island presentations and reports can be found at the following link
– http://www.iso-ne.com/committees/planning/planning-advisory