Page 1: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

1

Southwest LRT UpdateFreight Rail – Technical Issue #21

City of St. Louis Park Council Study Sessiony y

Mark FuhrmannJim AlexanderMay 28, 2013

2

Today’s Topics• Project Overview and

Timeline

• Freight Rail Update• Freight Rail Update

• A Look Ahead

Page 2: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

2

3

Southwest LRT

• 18 new stations

• 9 8 miles of new double track

UPDATE Map with SWLTR GREEN Line• 17 new stations

• 15 miles of new double track9.8 miles of new double track

• 47 new Light Rail Vehicles

• 40,940 average weekday ridership in 2030

• 35 new Light Rail Vehicles

• 30,000 average weekday ridership in 2030

4

• Project Development2013

Southwest LRT Development Timeline

j p2013

• Environmental Documentation Complete2014

• Engineering2014-15

• Full Funding Grant Agreement2015

• Heavy Construction2015-17

• Passenger Operations2018

Page 3: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

3

5

6

SWLRT PE Technical Issues

Page 4: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

4

7

SWLRT PE Technical Issues

8

Technical Issue #21:Freight Rail Co-location / Relocation

Page 5: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

5

9

• Background:

Freight Rail Technical Issue #21

Background:

Co-location and relocation analysis required by FTA as a condition to enter PE

Part of the Metropolitan Council’s due diligence and responsibility as project sponsorand responsibility as project sponsor

10

Freight Rail Technical Issue #21

• Review existing information

Freight Rail lines

Train volumes

• Technical Issue overview

• Freight Rail co-location design options

• Freight Rail relocation design options

Page 6: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

6

11

Freight Rail Technical Issue #21

12

Freight Rail Technical Issue #21 Existing Train Volumes

Railroad andRoute

Avg. Weekly Trains

Avg. Numberof Cars

Per TrainTypical Commodities

TC&W/ Bass Lake and Kenilworth

14 65 – 75 Agri-goods

5 – 6 80 – 125 Ethanol, Grain, Coal

CP/ MN&S 10 10 – 25 Local Services

BNSF/ Wayzata Subdivision

91 80 – 125 Wide Variety

Page 7: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

7

13

Freight Rail Technical Issue #21 - Overview

14

Freight Rail Co-Location – Kenilworth Corridor

Page 8: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

8

15

Kenilworth – Existing Right-of-Way Widths

16

Freight Rail Technical Issue #21

• Freight Rail Co-location Design Options

All modes at-grade

Trail relocated

Trail elevated

LRT elevated

LRT i t l LRT in tunnel

o Shallow tunnel

o Deep bored tunnels

Page 9: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

9

17

All Modes At-Grade - 94 ft Section

18

All Modes At-Grade – 94 ft Typical Sections

Page 10: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

10

19

All Modes At-Grade - Typical Section A-A’

20

All Modes At-Grade - Typical Section A1-A1’

Page 11: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

11

21

All Modes At-Grade - Typical Section B-B’

22

All Modes At-Grade - Typical Section C-C’

Page 12: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

12

23

All Modes At-Grade - Typical Section D-D’

24

Freight Rail Technical Issue #21• Freight Rail Co-location Design Options All modes at-grade All modes at-grade

Trail relocated – Midtown Greenway to Cedar Lake Pkwy.

Trail elevated – West Lake Station to North side of Burnham Bridge

LRT elevated – Lake Street Bridge to North side of Burnham Bridge

LRT in tunnelo Shallow tunnel: Lake Street Bridge to North of Cedar Lake

Pkwy.

o Deep twin bored tunnels: West of West Lake Station to South of 21st Street Station

Page 13: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

13

25

Additional Design Options – Typical Section B-B’

26

Trail Relocated - Typical Section B-B’

Page 14: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

14

27

Trail Elevated - Typical Section B-B’

28

LRT Elevated - Typical Section B-B’

Page 15: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

15

29

LRT in Shallow Tunnel - Typical Section B-B’

30

LRT in Deep Twin Tunnels-Typical Section B-B’

Page 16: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

16

31

Freight Rail Co-Location – Kenilworth Corridor

West Lake Street Proposed Midto n

Begin Bored Tunnels

Proposed SWLRT Tracks

Freight Tracks Propose to be Re-aligned

Midtown Corridor(by others)

Begin Excavation Bored Tunnels

Limits of Excavation of Bored Tunnel Pit

Cedar Lake Trail Proposed to be Re-aligned

Begin Elevated Trail

32

Freight Rail Co-Location – Kenilworth Corridor

Freight Tracks

Begin Bored TunnelsCedar Lake

Proposed SWLRT Tracks

Freight Tracks Proposed to be Re-aligned

Kenilworth Trail Proposed to be Re-aligned

Proposed Midtown

Begin Elevated LRT

Begin Shallow Tunnel

End Shallow Tunnel

Corridor (by others)

Midtown Greenway Trail

Page 17: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

17

33

Freight Rail Co-Location – Kenilworth CorridorCedar Lake

Proposed SWLRT Tracks

Freight Tracks Proposed to be Re-aligned

End Bored Tunnels

Limits of Excavation for Bored Tunnels

End Elevated LRT End Elevated Trail

End Excavation Bored Tunnels

Kenilworth Trail

34

Freight Rail Co-Location – Kenilworth Corridor

Freight Tracks Proposed to be Re-aligned

Proposed Trail Bridge Over Freight and LRT Tracks Proposed

Access to Penn

BNSF Wayzata Subdivision Freight Tracks

Proposed SWLRT Tracks

Re aligned

Kenilworth Trail Proposed to be Re aligned

Access to Penn Station

Re-aligned

Page 18: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

18

35

Freight Rail Technical Issue #21

• Freight Rail Relocation Design Options

Modified MN&S connection

Brunswick West

Brunswick Central

36

Modified MN&S Connection

Page 19: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

19

37

Brunswick West Alignment

38

Brunswick Central Alignment

Page 20: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

20

39

Brunswick West Alignment

Proposed Freight Relocation Connection

Oxford Street

Proposed Southerly Freight Connection

Proposed Southwest LRT

40

Brunswick West Alignment

Proposed Walker St. C i

Proposed Freight Relocation Connection

Proposed Southwest LRT

Proposed Cul-de-Sac

Connection

Proposed West Lake St. Re-alignment

Proposed Southerly Freight Connection

Cedar Lake Trail

Existing Bass Lake Spur –Proposed to be Removed

Proposed Dakota Ave Re-alignment

Page 21: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

21

41

Brunswick West AlignmentProposed West Lake St. Re-alignment Existing MN&S Spur: Proposed to be Relocated

Between the Cedar Lake Trail and W. 33rd Street

Proposed Dakota Ave Re-alignment

MN&S Spur: Proposed to be Re-aligned

Proposed MN&S

Proposed Dakota Ave Re-alignment

Proposed Wooddale Ave Re-alignment

Proposed MN&SFreight Connection

42

Brunswick West Alignment – Typical Section A-A’

Page 22: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

22

43

Brunswick West Alignment – Typical Section B-B’

44

Brunswick West Alignment – Typical Section C-C’

Page 23: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

23

45

Brunswick Central Alignment

Ave

.

Proposed

Lo

uis

ian

a

Oxford St.

Southerly Freight Connection

46

Brunswick Central Alignment

Proposed Walker St. Connection

Proposed Southwest LRT

Frontage Road

Proposed RoadwayRe-alignment

Proposed Roadway

TH 7Existing Bass Lake Spur Proposed to be Removed

Cedar Lake Trail Proposed to be Re-aligned

Proposed Dakota Ave Re-alignment

RoadwayRe-grading

Page 24: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

24

47

Brunswick Central Alignment

Existing MN&S Spur Proposed to be Removed

TH 7

Proposed Dakota Ave Re-alignment Proposed Wooddale

Ave. S. Re-grading

Existing MN&S Spur Proposed to be Re-aligned

48

Brunswick Central Alignment – Typical Section A-A’

Page 25: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

25

49

Brunswick Central Alignment – Typical Section B-B’

50

Brunswick Central Alignment – Typical Section C-C’

Page 26: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

26

51

Brunswick Central Alignment – Typical Section D-D’

52

Brunswick Central Alignment – Typical Section E-E’

Page 27: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

27

53

Brunswick West/Central Alignments: Property Impacts Common to Both Options

54

Brunswick Alignment: Segment Common to Both West and Central Options

hS

t.

Blv

d.

thS

t.

MN&S Spur:

W. 2

9th

Min

net

on

ka B

W. 2

8

pProposed to be Re-aligned

Roadways Proposed to be Re-graded to Accommodate At-grade Crossing at Freight Tracks

Page 28: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

28

55

Brunswick AlignmentSegment Common to Both West and Central Options

MN&S Spur

Proposed Freight Tracks

Proposed Trail Bridge Over Freight Tracks

Proposed Freight TrackSiding

56

Brunswick Alignment – Typical Section F-F’

Page 29: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

29

57

Brunswick Alignment – Typical Section G-G’

58

Brunswick Alignment – Typical Section H-H’

Page 30: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

30

59

Brunswick Alignment – Typical Section I-I’

60

Freight Rail Technical Issue #21Next Steps• Review co-location and relocation designs / seek input

St Louis Park School Board May 28 St. Louis Park School Board – May 28

Minneapolis Transportation & Public Works Committee – June 4

Special Joint SWLRT Business/Community Advisory Cmt. – June 6

SWLRT Corridor Management Committee – June 12

Public Open Houses – June 13

• Develop cost estimates / Continue design refinement – environmental evaluation – June/July

• Present recommended design option Business Advisory Committee – July 24

Community Advisory Committee – July 25

SWLRT Corridor Management Committee – August 7

Metropolitan Council – August

Continue design refinement – environmental evaluation

Page 31: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

31

61

A Look Ahead: Design & Engineering

• June 2013: Hold Station Public Open Houses

• Q3 2013: Submit Municipal Consent SWLRT Plans for City Review

• Q4 2013: Complete Municipal Consent Approval Process

• Q1 2014: Finalize 30% Design Plans and Specs

62

Page 32: Southwest LRT Update Freight Rail – Technical Issue #21 · 5/28/2013 1 Southwest LRT Update Freight Rail – Technical Issue #21 Cityyy of St. Louis Park Council Study Session Mark

5/28/2013

32

63