Page 1: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON DISTRICT

2019 ANNUAL OPERATIONS PLAN

View looking west from Kennedy Ridge across to Jack London Peak. A hiking trail follows from State Lands north to London Peak overlooking the town of Wolf Creek.

Page 2: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON DISTRICT FINAL 2019 ANNUAL OPERATIONS PLAN

OVERVIEW

This plan describes the activities and outcomes that Oregonians can expect to see on the Southwest Oregon District for 2019. A public comment period will be provided in which your comments will be considered for improvement of this plan within the scope of the Department’s authority, in alignment with the longer term plans, budget and staff resources.

This plan supports a balance between, social, economic, and environmental benefits valued by Oregonians and described in the Greatest Permanent Value rule for Board of Forestry Lands (BOF) that are detailed in the Southwest Oregon Forest Management Plan and OAR 629-035-0020. These benefits are sustainable over the long run.

The Annual Operations Plan incorporates Structure Based Management which over the landscape provides a mix of forest structures such as young and old stands. We accomplish these structures on the district through active management and natural processes that develop these stands. Layering of stands is often through mixes of conifer and hardwood stands. It is a challenge to manage the layered structure without creating ladders for fire to grow to the canopy. We try to achieve a balance between habitat and fuels management.

Habitat for spotted owls is a major consideration in harvest planning. The Department uses a policy regarding this species which is addressed in our biological assessments of each unit that evaluates available habitat.

Hunting, dispersed camping, education, hiking and off road vehicles make up the majority of our social and recreational opportunities on the forest. We are a part of the greater Bureau of Land Management (BLM) and private ownership mix, but not the principle player or destination for recreation on our lands.

Finally, we achieve a harvest on this landbase consistent with sound harvest planning and environmental and social needs that are appropriate for a small landbase of scattered parcels throughout the BLM and Private landowners of the area.

The public comment period for the FY2019 Annual Operations Plan is scheduled to run from March 19, 2018 – May 4, 2018. This AOP contains an appendix G describing a major revision to the harvest acreage ranges. This public comment period is your opportunity to comment on this revision.

We welcome your comments on our plan.

Page 3: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

A short summary of activities planned for the coming year:

Harvesting: Two Timber Sales and one alternate sale are presented in this AOP: Net revenue is expected to be $704,100 from sales harvested in Josephine and Douglas County on BOF land. Kennedy Ridge is in Josephine County and will raise $503,000 from 1.2 MMBF. The sale is 78 acres of partial cut and 52 acres of modified clearcut. Bear Patch in Douglas County is 43 acres of retention cut. Bear Patch is expected to raise $201,100. The alternate sale is London Bridge, 89 acres of thinning and 0.4 MMBF. These are preliminary estimates of future sales that will depend on stumpage prices, cruise volumes and final sale boundaries.

Projects: Road-building and improvements associated with timber sales will cost $54,000. Kennedy Ridge ($43,000) will have 2.5 miles of new road construction, reconstruction and maintenance running about 8% of the gross revenue. Bear Patch will have a half mile of road construction and 2 miles of improvements expected to be $11,000.

Planting and Reforestation: The total planting costs will be $31,110 of the total reforestation budget. ($58,730) which includes nursery seedling costs, initial planting of 92 acres and interplanting of 40 acres. Initial planting costs $110 an acre and seedlings cost $197 an acre. One of the planting units is a 42 acre Common School Lands (CSL) piece. Planting costs to the Common School Fund will be $4,620.

Pre-commercial Thinning: A large amount of fuels treatment work was accomplished back in 2008-2010. The district does not have acres in the 10-20 year range that are in need of Pre-commercial Thinning (PCT), so we will not put out contracts on PCT work for a couple more years.

Vegetation Control: Foliar spray or hack ‘n squirt will be done on 42 acres of CSL and 50 acres of BOF at $100-$160 per acre.

Recreation: Dispersed recreation such as hunting, camping, hiking is the norm on the forest with some designated trails at Onion Mountain, Kerby Peak, and London Peak. One recreation site in Windy Creek is maintained as a parking and day-use area.

Events: Oregon Department of Forestry (ODF) will work with students and volunteers in Glendale on a tree plant and on education field days. Other opportunities to work with the public to promote forest stewardship will be explored such as a forest clean-up days.

Page 4: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 4

FINAL – JUNE 2018

Table of Contents OVERVIEW ................................................................................ 2

INTRODUCTION ........................................................................ 6

INTEGRATED FOREST MANAGEMENT ................................ 8

Timber Harvest Operations ....................................................................... 8

Overview of Timber Harvest Operations ....................................................... 8

Structural Habitat Components ..................................................................... 9

Summary of Timber Harvest Operations by Basin ...................................... 10

Forest Roads Management ....................................................................... 10

Overview ..................................................................................................... 10

Road Construction ....................................................................................... 11

Road Improvement ..................................................................................... 12

Road Access Management ........................................................................... 12

Road Maintenance ....................................................................................... 12

Management of Rock Source/Supply .......................................................... 13

Land Surveying ............................................................................................ 13

Young Stand Management ........................................................................ 13

Site Preparation ........................................................................................... 13

Seedlings / Nurseries .................................................................................. 14

Planting ....................................................................................................... 14

Vegetation Management .............................................................................. 14

Tree Protection ............................................................................................ 15

Pre-commercial Thinning ............................................................................ 15

Pruning ........................................................................................................ 15

Invasive Species ........................................................................................... 15

Roadside Spraying ....................................................................................... 16

Stocking Surveys ......................................................................................... 16

Page 5: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 5

FINAL – JUNE 2018

Recreation Management .......................................................................... 16

Overview of Recreation Management ......................................................... 16

Facilities and Trails (Campgrounds, View Points, Trail Heads, etc.) ........... 16

Volunteer Program ...................................................................................... 16

Grants .......................................................................................................... 17

Other Integrated Forest Management Projects ..................................... 17

Aquatic Habitat Improvement ..................................................................... 17

Land Exchange ............................................................................................ 17

Law Enforcement and Public Safety ............................................................ 17

Firewood Cutting Program .......................................................................... 17

Non-Timber Forest Products ....................................................................... 18

Planning ................................................................................... 18

Stand Level Inventory and Other Vegetation Inventories ........................... 18

Fish and Wildlife Surveys ............................................................................ 18

Research and Monitoring ............................................................................ 19

Other Planning Operations .......................................................................... 19

Public Information and Education ....................................... 19

Administration ........................................................................ 20

State Forests Unit Organization ................................................................... 20

APPENDIXES........................................................................... 21

Page 6: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 6

FINAL – JUNE 2018

SOUTHWEST OREGON DISTRICT

DRAFT 2019 ANNUAL OPERATIONS PLAN

INTRODUCTION

This Annual Operations Plan (AOP) describes activities and projects designed to achieve the goals and objectives of the Southwest Oregon State Forest Management Plan (FMP) – April 2010, and the Southwest Oregon (SWO) District Implementation Plan (IP) – March 2003. In addition, this plan is designed to comply with State Forest Policies governing Threatened and Endangered (T&E) Plants and Animals. The Southwest Oregon District manages approximately 16,793 acres of State Forest land in Douglas, Josephine, Jackson, and Curry counties. For more information regarding the strategies used to manage State Forests in Southwest Oregon, refer to the Southwest Oregon State Forest Management Plan – April 2010. For more information on the resources and characteristics specific to the Southwest Oregon District, refer to the Southwest Oregon District Implementation Plan – March 2003. This year a modification or revision modification to the harvest acreage ranges was done to better accomplish our objectives. (See Appendix G)

The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following:

1. Annual Operations Plan Summary document which includes sections on timber harvest operations, forest roads, young stand management operations, and recreation.

2. Annual Operations Plan Summary tables 3. Pre-Operation Reports with unit maps (available upon request) 4. Preliminary Biological Assessments of the planned harvest operations (available upon

request) 5. Public Involvement Summary (this section will be added prior to the approval of the

AOP) 6. Consultation with Other Agencies (posted after comments are received).

Table 1 below documents the Southwest Oregon District Implementation Plan – March 2003 activities and the range of acreages that could be reasonably anticipated in a given year, as well as the acres proposed through this AOP. Further refinement of the acreage will occur during the field preparation of the planned commercial forest operation. The management activities planned for FY 2019 are based on the range of objectives established in the Southwest Oregon District Implementation Plan (Table 1), as well as the assumption that budget allotments will be similar to fiscal 2018.

Page 7: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 7

FINAL – JUNE 2018

The accomplishments of forest management objectives that occurred under previous AOP’s can be found in several reports, including the “State Forester’s Annual Report for the Association of Oregon Counties, the “Common School Forest Lands Annual Report”, and the individual district annual reports (these reports also cover the accomplishments of the Fire Protection and Private Forests Programs). These reports are available through the local district office or through the internet. According to the SWO Forest Management Plan, 2010, “The forest produces sustainable and predictable forest products that generate jobs and revenues for the benefit of the state, counties, and local taxing districts.” The revenues generated from this plan are distributed to the counties less 36.4% for the Forest Development Fund. The 2019 plan has sales in both Josephine County and Douglas County, so each county would receive a share of the revenue. A report done on the Elliott State Forest (Gary Lettman 2001, 2010) determined that for every 1MMBF of timber harvested, 11 jobs would be created or supported in the industry, from mill workers to truck drivers, loggers and lumber stores. It follows that this plan would support 20 jobs with an average salary in Southwest Oregon of $48,029. The public comment period for the Draft 2019 annual operations plan will be from March 19th, 2018 through May 4th, 2018. When the comment period concludes, ideas from the public will be reviewed and incorporated appropriately into the plan. Interested parties may participate in this process by going to the ODF website State Forests Planning area and providing comments or by writing to the State Forests Department in Salem.

Page 8: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 8

FINAL – JUNE 2018

INTEGRATED FOREST MANAGEMENT

Timber Harvest Operations

Overview of Timber Harvest Operations

Harvest Levels: In accordance with the guidance on the 2019 harvest levels, the district has included 172 acres of timber harvest (77 net acres partial cut and 95 acres clear-cut) in this AOP (Table A-1). This harvest level is consistent with the district’s intensive review of the outputs from the department’s Harvest and Habitat Model Project. The district is implementing the mix of clearcut and thinning acres identified in its review of the model outputs. The objective is to achieve the average of the Annual Harvest Objective (AHO) over the expected duration for the IP. Under normal circumstances, the volume proposed in an AOP will be near the AHO target; however, some events may result in an AOP volume that is farther from the AHO target. These events may consist of, but are not limited to, storm damage, insect and/or disease outbreaks, timber market conditions or other significant events. Alternate timber sales included in this AOP may be sold as primary operations in repose to any of these circumstances.

Table 1. Annual Operations Plan objectives compared to Annual Harvest Objectives identified in the

Southwest Oregon District Implementation Plan. All values are acres, except for Volume.

Silvicultural Activity IP Annual Objective 1 2019 AOP Objective Low High

Partial Cut Harvest 0 220 77

Regeneration Harvest 0 80 95

Reforestation ( All Planting) 0 270 132

Pre-commercial Thinning 0 500 0

Fertilization 0 250 0

Pruning 0 50 0 1 The IP Annual Objective is based on a 10 year average.

For 2019 we are submitting two main sales and two alternates. Two timber sales will produce 1.8 MMBF of timber from 172 acres (1% of the land-base). Kennedy Ridge, a BOF sale in Josephine County, will raise $503,000 on 78 acres of thinning and 52 acres of modified clearcut. Bear Patch, a BOF sale in Douglas County will raise $201,100 based on a retention cut of 43 acres. For these BOF sales, the Josephine County share (63.6%) would be $318,175 and the Douglas County share would be $127,900. An alternate sale, London Bridge, a BOF sale in Josephine County, could potentially raise approximately $174,000 net revenue on 89 acres of selective thinning. These numbers are estimates based on a rough inventory of the timber. Once the sale has been cruised and appraised with the future stumpage prices and final sale boundaries, the estimated revenue above will change. All units were selected on the basis of stand management needs in light of the current stand structures and the desired future condition objectives. In all of the harvest units, stand complexity will progress toward the desired future condition through the retention of all “legacy” forest structure components (such as snags, down wood, old-growth trees etc.), the retention of

Page 9: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 9

FINAL – JUNE 2018

the majority of the overstory, the utilization of a variety of residual densities and small open patches, site preparation, and underplanting of a variety of forest tree species. In addition, the structural components of snags and downed wood will be created where deficiencies exist. The revenue projections on these sales use a stumpage value $400-500 based on past stumpage prices and professional judgment. This value fluctuates based on market conditions. The sale volume is also an estimate based on the available inventory data and the final sale layout design. All of the harvest operations and many of the other forest management activities have been reviewed by ODF’s wildlife biologists, aquatic specialist, geotechnical engineer, road engineer, and operations coordinator. Information on operations that occur within the provincial circle of a Northern Spotted Owl (NSO) will be provided to the US Fish and Wildlife Service. Occasionally, operations may contain a resource or activity where review with another state agency, such as the Oregon Department of Fish and Wildlife or the Department of State Lands, is warranted. Written comments from the external resource specialists and the resolution of those comments will be included in the approved AOP. Some additional small operations such as salvage logging and commercial firewood will produce timber volume during the 2019 fiscal year. These small operations are not included as part of the AOP because they affect a very small area, produce little volume or revenue, and do not require significant effort to develop and execute. These sales will be less than $100,000 in value and comply with all policies and plans. Structural Habitat Components

Structural habitat components such as green trees, snags and down woody debris (DWD) are described in Chapter 4 of the SWO FMP and may be considered for all harvest prescriptions; however, the emphasis will be placed on regeneration harvest. Green Tree Retention- The green tree retention target for regeneration harvest units is five trees per acre. Green tree arrangements in SWO take the form of scattered individual trees, clumps of trees, and trees concentrated in and adjacent to riparian management areas. Scattered trees provide an immediate seed source and added structure within the unit. Trees that naturally blow over provide down wood in uplands or into streams. On south slopes in SWO scattered leave trees provide some shelter for seedlings over long hot summers. Snags- The FMP strategy for hard snags is to manage for at least two per acre on average across the landscape. The need for snag creation for regeneration sales is evaluated on a sale by sale basis. Across the landscape, snags may be overabundant in some areas and deficient in others. In SWO, the presence of bark beetles causes additional snags in the Windy Creek area, grand fir tend to die in dry years when drought stress and beetle infestations combine. These snags are softer than Incense Cedar and Douglas-fir, and do not stand as long after they are dead. In the south in Josephine and Jackson County, Ponderosa Pine are susceptible to drought and beetles as well, though we do not see the wide scale die off as in eastern Oregon. In Curry County, there are an abundance of snags across the landscape as a result of the Biscuit Fire. Down Wood- The FMP strategy for Down Woody Debris is to retain and supplement the supply of down wood during regeneration harvest and to manage for old growth forests in the future

Page 10: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 10

FINAL – JUNE 2018

that contain an average of 250 to 300 cubic feet of hard conifer logs (class 1 & 2) across the landscape or 1,200 – 1,800 cubic feet total in all decay classes. Stand Level Inventory data indicates that there is approximately 100 cubic feet of Class 1 & 2 DWD per acre over the district and 1,689 cubic feet in all size classes. These numbers do not include additions from recent fires, wind events or all of the snags & DWD created with recent timber sale contracts.

Summary of Timber Harvest Operations by Basin

The Rogue and Umpqua basins are the two main watersheds that encompass the SWO district land base. These basins are rather large compared to the small footprint of the State Forest lands. The Umpqua Watershed encompasses most of Douglas County and is approximately 2.7 million acres. ODF managed lands in the Umpqua Watershed cover 8,134 acres of the basin. The Rogue Basin covers 3.25 million acres- 8,626 of which is managed by ODF. Table 2. Summary of Timber Harvest Operations in each Management Basin. All values are in net acres.

Management Basin Partial Cut Clearcut

Rogue 78 52 Umpqua 43

Rogue Basin

Kennedy Ridge in Josephine County will harvest about 52 acres in the basin that will become regeneration and 78 acres that will become understory. The London Bridge Alternate sale is in Josephine County and the Rogue Basin. The upper reaches of tributaries to Wolf Creek in the north and Flume Gulch to the south flow into the Rogue River from Grave Creek. The stands in this sale are closed single canopy and are 85-97 years old according to inventory data. After the sale, 89 acres would be partial cut and become understory development that are now closed single canopy. These sales are a small percentage of the Rogue Basin.

Umpqua Basin

The Bear Patch sale would change approximately 43 acres within the Umpqua basin to a regen structure. The Bear Patch sale is in the upper reaches of Bear Creek watershed which flows into Windy Creek, which flows into Cow Creek and eventually the Umpqua.

Forest Roads Management

Overview

Southwest Oregon District will continue the development and maintenance of a low impact transportation system for the management of SWO State Forests. The typical transportation pattern for access to State Forest land is one primary haul route crossing a variety of landowners to one or more access spurs once within State Forest property. The primary roads needed to access State Forest property will be maintained at a level consistent with the access agreement developed by the District and the appropriate landowner.

Page 11: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 11

FINAL – JUNE 2018

Access spurs within State Forest properties are developed to maintain the appropriate management presence that is anticipated for a given tract. For tracts requiring an extended management presence, surface rock and drainage structures will be incorporated into the road design. For tracts requiring limited management presence, naturally surfaced, seasonal roads with temporary drainage structures will be utilized. Upon completion of the operation, all access spurs will be assessed for closure. The level of new road construction and improvement is kept to a minimum in harvest planning to reduce costs where possible. Road building costs will be kept to a minimum, but not at the expense of best management practices aimed at controlling erosion. Roads will be improved or constructed to meet the minimum design standards necessary to prevent impact to streams. Various prescriptions for road renovation will be required including but not limited to: resurfacing with rock, replacing undersized culverts, adding new culverts as needed for proper drainage, grading and ditching, and roadside brushing. Also, any potential hazards such as slides, side-cast material, and other drainage issues will be identified and corrected. The primary objective is to minimize the effect forest roads have on water quality and slope stability and at the same time provide a safe and efficient transportation system. Some of the naturally surfaced roads will have the drainage reestablished, be grass seeded, and blocked upon completion of the operation to minimize erosion and sedimentation. In addition, Level III planning, in accordance with the State Forests Forest Roads Manual, is conducted for each operation. See the attached Pre-Operations Reports for more detailed information concerning road activities within each operation area. During active timber harvest, the purchaser of the sale will maintain these roads. Upon completion of the sale, road maintenance responsibility on private and federal land will be returned to the landowner. Prior to any major forest activity such as logging, an assessment of noxious weeds will be conducted along the travel route. ODF will work with the BLM and other neighboring landowners to remove and control noxious weeds before they are spread by forest use activities. See Table A-3 Forest Roads Summary for information on road activities.

Road Construction

Road construction will primarily focus on the development of low use spurs necessary for operation access. Most of these spurs will remain naturally surfaced during the operation and generally have natural drainage reestablished, be grass seeded, and blocked upon completion of the operation to minimize erosion and sedimentation. There will be one major road building project in the Kennedy Ridge sale that will be 2.5 miles costing $43,000. Approximately 2/3 of this road work will be maintenance and reconstruction. The new road construction will cover the remaining 1/3. The road will only require a small section to be end-hauled. There’s no drill and shoot. Bear Patch will have better access and logging opportunities if the road from the south to area 1 is built, otherwise the sale could be logged eastward to the Bear Creek Road.

Page 12: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 12

FINAL – JUNE 2018

Road Improvement

Road improvement will focus on low use spurs on Department of Forestry managed lands. These roads may be open or closed to vehicular travel but will need to be improved for commercial activity. Upon completion of the operation, drainage will be reestablished, and natural surfaced roads will be grass seeded, and blocked to minimize erosion and sedimentation. Approximately 2.6 miles of established roads will need maintenance in this sale plan for about $4,000.

Road Access Management

The typical transportation pattern for access to State Forest land is to use one primary road crossing a variety of landowners and several access spurs once within State Forest ownership. This makes road access management difficult. When feasible, road systems currently in place will be utilized for State Forest access. This will require coordination and permission with adjacent landowners. At times, road maintenance on other forest landowner road systems will be required as a condition of use. Once on State ownership, the road system will be maintained in a condition which best reflects use intensity, duration, and season. Roads receiving medium to high use, frequent use, or all season use, will be surfaced with rock to prevent damage to the road and the aquatic system. These roads will be ditched including cross drainage, and will have sufficient drainage to pass a 50 year flood event. Roads receiving medium to low use, infrequent use, or seasonal use will remain unsurfaced during the operation, outsloped with waterbars, and will generally have natural drainage reestablished, be grass seeded, and blocked upon completion of the operation to minimize erosion and sedimentation. Therefore, medium to high use roads will generally be maintained in an active use condition while medium to low use roads will be maintained in a closed to vacated condition. Road Maintenance

Road maintenance is typically conducted with harvest operations as a means to conduct the operation as well as to maintain or improve the condition of the transportation system. Road maintenance conducted apart from harvest operations is accomplished as needed by the district. As a means of reducing road induced sedimentation, the district actively grass seeds areas susceptible to erosion. Grass seed is obtained through the Oregon Department of Fish and Wildlife. The district typically grades high use rocked roads on a regular rotation, once per year if necessary. Maintenance rock is added as needed. Water Quality- In order to protect water quality during active operations, a variety of methods will be used to prevent sediment from entering live streams. These methods include (but are not limited to) maintaining culverts and other road drainage structures, using sediment control devices in road ditches when necessary, and seasonal restrictions on logging and hauling operations. Culvert installment and replacement in live streams will be conducted during in-water work periods when possible. Riparian management areas result in leave trees adjacent to the stream which protect stream temperature, provide nutrients, protect stream banks, and eventually provide wood to improve fish habitat.

Page 13: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 13

FINAL – JUNE 2018

Management of Rock Source/Supply

There are several rock sources on State Forests in SWO. Periodically, rock is crushed as part of a timber sale. The rock may be used to repair and maintain roads or to build new winterized roads where it is feasible. Rock may also be purchased locally by the Purchaser when it is closer to a scattered property with no gravel available. The Windy Creek block has a quality gravel pit which could be used to supplement sales in that area. A newer rock pit is being developed just up from the Bear Patch sale which may be used to supplement that sale. There are no rock sources yet developed within the Kennedy Ridge sale. There is a pit on the London property in the south and a stockpile in the northeast as well. For this sale plan, rock will not be crushed, but may supplement road repairs and maintenance.

Land Surveying

The Southwest Oregon District relies on expertise from the Salem Roads Engineer for surveying assistance when necessary. It is typical to assess the survey needs during sale preparation to determine whether to conduct a full cadastral survey or reestablish blazing. Many of the property boundaries have already been identified from this AOP. Bear Patch shares a boundary on the west with BLM which has been blazed. On the south, the property line with BLM will need to be reviewed. Kennedy Ridge shares a boundary with private land on the west which has been blazed. The BLM property line to the south will need review. London Bridge lines are in. Further investigation will be needed during the sale planning process, to determine if cadastral surveys will be needed.

Young Stand Management

Young Stand Management is related to activities that develop young stands into healthy vigorous growing trees; site preparation, reforestation, tree protection, and pre-commercial thinning. Under the Southwest Oregon State Forest Management Plan (FMP) and the Southwest Oregon District Implementation Plan, the objectives for the SWO District are to maintain the high level of biodiversity exhibited throughout the landscape as well as provide for economic and social sustainability in the future. This will be accomplished while functioning at the appropriate budget matrix level using the management activities below. See table A-4 in the appendix for the detailed reforestation plan.

Site Preparation

Site preparation is used to create planting space and reduce competing vegetation. In addition, site preparation is an excellent means to reduce the fuel loading following a commercial operation. Without slash management methods, one can expect to see higher rates of mortality, a higher risk of catastrophic loss from fire, and losses in growth, vigor, and overall health due to competition from surrounding vegetation. The goal of site preparation is to create excellent micro-sites that are free of competing vegetation which minimizes seedling mortality and creates an area relatively safe from loss due to wildland fire. Mechanical site preparation combined with slash piling, slash burning and/or slash removal creates planting spaces. Slash removal may come in the form of yarding unmerchantable tree tops to landing areas combined with public or commercial wood cutting permits. One of the most cost effective methods of site preparation involves hack and squirt of hardwoods prior to clearcutting. This prevents the stumps from sprouting after the harvest. In 2019 the district will treat approximately 50-92 acres (see Reforestation Summary Tables A-4 “Release”.

Page 14: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 14

FINAL – JUNE 2018

In recent years it is getting difficult to find a weather window to do the burning. There are candidates for burning in the sale plan and we will look for opportunities to burn. Seventy acres are planned in this AOP for burning. The district does not typically do a pre-emergent spray, rather tries to plant as soon as possible to get ahead of the brush.

Seedlings / Nurseries

In the south where the climate is hot and dry, we grow drought tolerant seedlings. This is done at the J. Herbert Stone Nursery in Jacksonville, a US Forest Service nursery. The district has an intergovernmental agreement to grow the seedlings there. We believe this nursery is the best option for SWO since we generally plant relatively few seedlings. This nursery grows seedlings in a Styrofoam container for three months, and then out-plants the seedlings in a nursery bed for another year of growth. This produces a thicker root and caliper and gives the seedlings a better chance of survival than the fast growing 2 year seedlings that are grown in other nurseries. The district plants on a 10 x 10 foot spacing (435 tpa), and may order between 20,000 and 50,000 seedlings per year in a normal year. Wildfires may change these numbers significantly which happened in 2013.

Planting

Planting helps to reestablish forest stands, or to create layering and diversity of canopies. Initial planting serves to reforest an area following a clearcut, patch cut, or severe wildfire. Interplanting helps to improve reforestation success when significant mortality results due to wildland fire, animal browse, drought, freeze, or other event usually targeting only a portion of the stand. Underplanting creates multiple forest canopy layers while maintaining or improving overall stand health and diversity. In addition, each of these planting strategies has a target stocking level for the planted species. Initial planting and interplanting attempt to achieve 250 to 300 viable trees per acre by age 15, while underplanting may only need 50 to 100 viable trees per acre. Most stands are initially planted to 435 trees per acre and may need interplanting in following years. The 2019 planting will depend on the results of our stocking surveys and timber harvest. There are 92 acres planned for initial planting in the 2019 fiscal: from sales past. We are planning on 40 acres of interplanting in 2019 on units after stocking surveys reveal the locations. The cost of all seedlings and cost to plant them for initial plant and interplanting combined is estimated to be $31,110 or $236 per acre planted including seedlings. The Common School Lands will account for 42 acres (Trapper’s Cabin) at a cost of $4,620 of the total. BOF lands planting will cost $26,490. (See Table A-4)

Vegetation Management

Vegetation management may be accomplished through foliar spray or manual release (chainsaws). Hack and squirt prior to harvesting a unit is a cost effective means of reducing future vegetation and minimizing vegetation management at a later date. Stump treatments may give greater flexibility and safety during harvest where the tree is cut and the cambium layer is treated on the stump immediately. Still another method is to treat suckers when they are about 1 inch thick by basal spray or hack and squirt. All of these methods are aimed at reducing competition from madrone, chinkapin, tanoak and other aggressive hardwoods allowing reestablishment of conifer stands.

Page 15: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 15

FINAL – JUNE 2018

Vegetation management occurs on the district in a number of ways. Some of the techniques used in site preparation would be considered vegetation management for example. This year the vegetation management will come through the site prep mentioned above. We have successfully treated grasses and young shrubs (early foliar) by spraying by hand around seedlings in the past. The district will treat 30 acres this year with a hack and squirt treatment.

Tree Protection

Deer and elk have proven to browse aggressively on newly planted seedlings in this District. They often damage the terminal bud of young trees stunting tree growth and/or causing seedling mortality by browsing on the new growth. The damage done by deer and elk can have a significant effect on the stocking level. To avoid re-entry and future interplanting, an application of Big Game Repellant (BGR) has shown to be extremely successful in deterring animal browse. In fiscal year 2019, the district may apply BGR on small areas as needed.

Pre-commercial Thinning

This treatment is used on stands that have over 250 trees or woody stems per acre. If these stands are not thinned it can significantly increase the number of growing years before the stand is merchantable as well as reducing the stand’s health, vigor, and resistance to insects and disease. If the stand is not thinned, density-dependent mortality can take place along with inter-specific competition for limited resources such as water and light. Stands will be thinned to a 14 foot spacing of approximately 222 trees per acre so that the next entry can be a commercial thin at 40-50 years of age. Pine stands may be thinned to a lower density of approximately 170 trees per acre to meet wildlife, structure, and silvicultural objectives. The district has been able to accomplish pre-commercial thinning through fuels management over the previous several years through grants that have funded 1,500 acres of fuels reduction. The majority of this was understory thinning and a smaller portion was in the younger age classes (PCT). There are no PCT acres planned for the 2019 fiscal year. Pruning

Pruning was done on the district in the 1980’s and 1990’s. Whether pruning provides an economic benefit is up for debate. The district is not currently doing any pruning. Often pruning is done together with fuels treatment to reduce ladder fuels and help prevent fires from reaching the canopy. Pruning for fire resistance may be a better strategy then product values. Pruning for fuels treatments was done on approximately 2000 acres from 2009-2011 as part of the American Recover and Reinvestment Act (ARRA) grant projects. As a result of this work, pruning is not a high level need for the district this year and will not be done. Invasive Species

The district conducts a noxious weed program to control invasive weed species. The program involves identification, eradication and prevention of noxious weeds and their spread. The

Page 16: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 16

FINAL – JUNE 2018

district inventories and maps noxious weeds, coordinates with the Douglas County Soil and Conservation District and Bureau of Land Management to identify and treat weed species. The majority of species are scotch broom and blackberries. Scotch broom is scattered and primarily near roads and powerline right-of-ways. Scotch broom is not at the level seen to the north of Roseburg. It is at a manageable level that needs constant treatment to control.

Roadside Spraying

Roadside spraying can keep right-of-ways clear, increasing visibility and clearing ditches which improve drainage. The district usually accomplishes road brushing with saws. There is no roadside spraying planned for fiscal year 2019.

Stocking Surveys

Stocking surveys are a fixed plot method of measuring seedlings on a unit. The results measure planting success, natural and planted seedlings densities, and seedling mortality. On SWO our reforestation forester measures seedlings in stocking surveys during the winter prior to planting season. Units that are understocked, below 250 tpa, are interplanted back to 435 tpa. Again this year, stocking surveys will be conducted by ODF employees.

Recreation Management

Overview of Recreation Management

There are currently four forest recreation sites located on State Forest land in the Southwest Oregon District. These include Windy Park, London Peak Trailhead, Onion Mountain Trail, and the Kerby Peak Trail. Recreational use of the forest is currently low and primarily consists of horseback riding, all-terrain vehicle (ATV) use, hunting, and sightseeing. The district is open to working with volunteers and user groups on recreation needs.

Facilities and Trails (Campgrounds, View Points, Trail Heads, etc.)

Our trails are joint ventures with the BLM. London Peak starts on ODF at our rock quarry and runs to a point about a quarter mile out a ridge on BLM property. All signage was provided by the BLM. Kerby Peak starts on BLM, crosses ODF and ends on BLM. It’s about a mile long. The Onion Mountain trail begins on BLM and crosses through a full section (1 mile) of ODF property. This trail became a dozer line during a fire that nearly burned ODF lands, but was actually a contingency line. The trail is maintained by volunteers. Windy Park is an undeveloped day-use area with parking. It is used more on Friday nights by the Glendale High School then the general public.

Volunteer Program

The district occasionally hosts volunteers on a one-on-one professional basis. We had a volunteer in State Lands in 2016 and 2017 who was hired as a wildland firefighter. We have had high school kids volunteer for school senior projects. We hosted the Glendale High School in 2014-2016 to plant a small portion of the Douglas Complex fire. SWO will look for opportunities to host volunteers when possible.

Page 17: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 17

FINAL – JUNE 2018

Grants

The district is participating in Federal Forest Restoration working through the Good Neighbor Authority on federal lands. State Forests is able to offset some administrative and payroll costs using grant and other budget dollars. One such project is a $30,000 contract for marking timber with the BLM likely to be renewed in 2019. State Forests is also working with USFS to administer fuels reduction, pre-commercial thinning, salvage and timber harvesting. The McCullough Creek fish log placement will be done at the start of fiscal 2019 stemming from a grant and cooperative project with Umpqua Watershed and BLM. The grant is worth $50,000.

Other Integrated Forest Management Projects

Aquatic Habitat Improvement

The district will review each unit in the sale planning process to determine where fish habitat may be improved. Our Salem staff riparian specialist and biologists suggest streams that will benefit from fish log and rock placement in streams or culvert replacements that allow fish passage. Priority projects are those that improve fish habitat particularly Coho Salmon streams. Culverts are replaced that can be tied to other projects and benefit fish. SWO works with local watershed groups, Oregon Fish and Wildlife Department and Bureau Land Management whenever we can cooperate on a mutually beneficial project. In the summer of 2017 (fiscal 2018 and 2019) we will be placing logs in McCullough Creek to improve Coho habitat. For fiscal 2019, we will be reviewing Bear Creek and the Bear Patch sale for possible log placement to improve Coho habitat. Land Exchange

The district will not be doing any land exchange planning in fiscal year 2019.

Law Enforcement and Public Safety

Oregon Department of Forestry works with local law enforcement agencies when issues arise. We work with State Police, County Sheriff’s office, and BLM officers, leveraging help where possible. Recreational use is low level, but there is illegal activity, dumping, cedar bough theft, illegal firewood cutting, and unpermitted camping. These issues are dealt with on an individual incident basis. ODF staff clean up quickly to discourage dumping and use signage to communicate the rules.

Firewood Cutting Program

The Southwest Oregon District will continue to issue personal firewood cutting permits in the coming year for areas where it is available. The public will be notified of firewood cutting permits through the district’s telephone recording and posting at the district office. Permits will be issued for 3 week periods, during the months outside the fire season.

Page 18: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 18

FINAL – JUNE 2018

A limited number of personal firewood cutting permits will be issued, on a first come-first served basis, with a limit of 5 permits per individual or household within a 12 month period. A permit fee of $20 for 2 cords of firewood is collected for each personal firewood permit. Oregon Department of Forestry (ODF) does not guarantee the quality or availability of wood when issuing firewood cutting permits. Designated firewood cutting areas will be marked on the permit map, which excludes active and sold timber sales, recreation sites, and planned operations. Active timber sales will be posted with no firewood cutting signs.

Non-Timber Forest Products

There are price schedules for forest products besides firewood and timber. When snow is heavy in Washington State, we may get bear grass pickers on occasion, but no other forest product is in much demand.

Planning

Stand Level Inventory and Other Vegetation Inventories

The Stand Level Inventory (SLI) project will be on hold this year. In the FY 2019, there are no surveys planned for inventory. Year-end updates are conducted by Salem staff and the SWO unit forester to improve and update the inventory. As a result of changes to the forest from timber harvests, fires, and other activities such as fuels management.

Fish and Wildlife Surveys

Northern Spotted Owl: The district surveys to an established scientific protocol for Northern Spotted Owl Surveys and cooperates with the BLM to monitor nest sites on a number of other nests. NSO surveys are conducted and a biological assessment is written in order to assess the impacts to owls from harvest operations. The table below shows protocol surveys by timber sale for current operations and future sales. Sold sales receive spot checks. Table 3. Summary of Surveys for Northern Spotted Owls

Operation* Survey Years1

BA2 Required

Special Considerations

Buck Ridge 2013-16 No Spot Checks in 2018 Lawson 2014-18 Yes Needs 5 years protocol survey Little Mac 2015-16 Yes Spot Checks in 2018 Southwest Kerby 2015-16 Yes Spot Checks in 2018 Buck Ridge 2016-17 Yes Spot Checks in 2018 Third Rock 2015-18 Yes London Broil 2016-18 Yes Kennedy Ridge 2018- Yes London Bridge 2018- Yes Bear Patch 2018- No Windy Southrail 2018- Yes

Page 19: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 19

FINAL – JUNE 2018

* Indicates operations surveyed using the Density Survey Protocols. 1Calendar years that surveys have been completed or are planned. Surveys begin in March and end around August. 2A Biologic Assessment is required for this operation due to the presence of NSO or MM in the vicinity of the operation.

Research and Monitoring

Research and monitoring takes many forms on the district. The largest statewide effort is to inventory our stands of timber. SLI data is used to monitor the results of timber sales after harvesting and in conjunction with the more detailed timber cruise prior to harvest. The SLI surveys provide data on snags, down wood, vegetation, and structural attributes that the traditional timber cruise does not measure. The district will continue to monitor the forest through the existing stand level inventory; however, new inventory plots are on hold due to current budget constraints. A number of other monitoring processes take place in Southwest Oregon:

Streams are monitored for fish presence and seasonal flows. Northern Spotted Owl monitoring surveys are conducted in and around ODF lands. A crown closure study is looking at different levels of crown closure at different thinning

densities. There is an ongoing pilot project to develop new NSO guidelines for SWO.

Data for these studies is kept in Salem and the Grants Pass office. Other Planning Operations

The Southwest Oregon Forest Management Plan was revised in 2010. For this AOP, the Implementation plan harvest levels are being used from the March 2003 plan, with a minor modification to the harvest acres in 2017. This plan will be redone in the future; the analysis of the outputs from the State Forests (SF) harvest model will be conducted to set the harvest objectives for the new IP. In addition, the landscape design and Forest Land Classification maps will be revised and updated. The district and State Forests Program are working on Good Neighbor Authority projects. These projects involve watershed restoration and may include projects such as fuels reduction, tree planting, pre-commercial thinning, timber marking, commercial thinning, and salvage. By participating in these projects ODF and the Forest Development Fund may raise some revenue and achieve cost reductions. These projects take cooperation between multiple programs within ODF and require creative planning to balance the workload.

Public Information and Education

Public information and involvement activities will include review and input regarding the FY19 Annual Operations Plan. No comments were received on the Annual Operations Plan after a 45 day public comment period. It is the intent of the Southwest Oregon District to continue to serve the public by addressing their questions and concerns regarding the management of the state’s natural resources.

Page 20: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 20

FINAL – JUNE 2018

The district has its outdoor education program with Glendale School District and Oregon State University. This program features a curriculum designed by the local teachers about forestry and biological sciences. BOF lands are within 5 miles of the school, which is a convenient place for outdoor labs. ODF has also started an annual tree plant with kids from the Glendale School District to replant trees in the burned areas from the Douglas Complex fires of 2013.

Administration

State Forests Unit Organization

The Southwest Oregon District State Forests Unit is staffed by two employees year-round and three employees that share time and funding with the Protection program (Figure 1). The Forest Manager 1 (FM1) and Natural Resource Specialist (NRS1) Forester are fully funded by the State Forests Division. The Information Systems Specialist (ISS3) has district-wide responsibilities and is split-funded by the State Forests and the Protection Divisions. A Forest Officer is split funded through Protection and State Forests Programs; his winter duties for SF include reforestation and timber sale preparation. We have an Equipment Operator that works in State Lands for a portion of the winter months. His duties include road maintenance, road development and quarry development. A Forest Technician (not shown below) is utilized “on the shoulders” of fire season when funds allow. Under this organizational structure the district is able to accomplish the goals and objectives of the Southwest Oregon District Implementation. Figure 1. Southwest Oregon State Forests Organizational Chart.

District Forest ManagerMMS X8261 SR33X

Dave Larson2071 1 Mo.

Office CoordinatorOA C0801 SR15

Jacob Denton2204 1 Mo.

Forest Manager 1MMS X8259 SR27F

Chris Rudd0450 12 Mo.

Nat Res. Spec. 1OA C8501 SR21

Vacant2165 12 Mo.

Info. Sys. Specialist 3OA C1483 SR24I

Erik Larsen2166 6 Mo.

Equip. Op.OXN C4422 SR21Don McGloughlin

2223 3 Mo.

Forest OfficerOXN C8257 SR23

Curtis Clark2256 6 Mo.

Office Specialist 1OA C0103 SR12

Val Hacket2201 3 Mo.

Page 21: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN 21

FINAL – JUNE 2018

APPENDIXES

A. Summary Tables

1. Harvest Operations – Financial Summary

2. Harvest Operations – Forest Resource Summary

3. Forest Road Management Summary

4. Reforestation and Young Stand Management Summary

B. Map Section

a. Harvest Operations Vicinity Map

C. Consultations with Other State Agencies

This appendix summarizes the results of consultations with the Oregon Department of Fish and Wildlife and other agencies, as appropriate. This appendix contains any written comments that we received from state agencies.

D. Public Involvement

This appendix describes the results of the public involvement process of this AOP.

E. Pre-Operations Reports

Pre-Operations Reports are available from the district upon request. F. Major Revision to the harvest Range. An explanation of the proposed Revision to the harvest acre range.

Page 22: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

Table A-1District: Fiscal Year: 2019 Date: 06/28/2018

BOF CSLPartial

Cut

Clear-

cut

Con-

ifer

Hard-

woodsTotal Gross Projects Net

Kennedy Ridge 100% 0% Josephine 4 78 52 1.2 1.2 $546,000 $43,000 $503,000

Bear Patch 100% 0% Douglas 4 43 0.4 0.2 0.6 $212,100 $11,000 $201,100

Total: 78 95 1.6 0.2 1.8 758,100$ 54,000$ 704,100$

Alternate Operations

London Bridge 100% 0% Josephine 4 89 0.4 0 0.4 $178,000 $4,000 $174,000

Net Acres Volume (MMBF) Value

TIMBER HARVEST OPERATIONS - FINANCIAL SUMMARY

CountySale

QuarterPrimary Operation

Fund %

Southwest

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN

FINAL - JUNE 2018 22

Page 23: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

Table A-2District: Date:

This table lists Forest Resources and other issues addressed within Pre-Operations Report due to their presence within or near harvest operations

Primary Harvest Operations

Un

it (

Op

tio

nal

)

Fore

st H

ealt

h Is

sues

1

Inva

sive

Sp

ecie

s

LYR

/OFS

Str

uct

ure

s 2

Lan

dca

pe

Des

ign

LYR

/OFS

3

Inst

all/

Rep

lace

Cu

lver

ts o

n

Fish

Bea

rin

g /

Per

enn

ial

Stre

ams

Har

vest

ing

wit

hin

10

0' o

f

Fish

Bea

rin

g St

ream

Do

mes

tic

Wat

er S

ou

rce

Po

ten

tial

Str

eam

Hab

itat

Imp

rove

men

t 4

Wit

hin

Aq

uat

ic A

nch

or

Wit

hin

Ter

rest

rial

An

cho

r

Op

erat

ing

wit

hin

a N

SO

Pro

vin

cial

Cir

cle

(BA

Req

uir

ed)

Op

erat

ing

wit

hin

a M

MM

A

(BA

Req

uir

ed)

Mu

rrel

et T

imb

er S

ale

Scre

enin

g P

roce

ss R

equ

ired

(MM

Po

licy

2.2

7)

T&E

Fish

Ad

jace

nt

to

Har

vest

Un

it /

Hau

l Ro

ute

5

T&E

Pla

nts

Geo

tech

nic

al Is

sues

Nee

din

g Fi

eld

Rev

iew

Rec

reat

ion

Sit

es

Cu

ltu

ral R

eso

urc

es

Scen

ic R

eso

urc

es

Other Resources or Issues

Kennedy Ridge 1 to 3 x x

Bear Patch 1, 2 x x x

This table lists Forest Resources and other issues addressed within Pre-Operations Report due to their presence within or near harvest operations

Alternate Harvest Operations

Un

it (

Op

tio

nal

)

Fore

st H

ealt

h Is

sues

1

Inva

sive

Sp

ecie

s

LYR

/OFS

Str

uct

ure

s 2

Lan

dca

pe

Des

ign

LYR

/OFS

3

Inst

all/

Rep

lace

Cu

lver

ts o

n

Fish

Bea

rin

g /

Per

enn

ial

Stre

ams

Har

vest

ing

wit

hin

10

0' o

f

Fish

Bea

rin

g St

ream

Do

mes

tic

Wat

er S

ou

rce

Po

ten

tial

Str

eam

Hab

itat

Imp

rove

men

t 4

Wit

hin

Aq

uat

ic A

nch

or

Wit

hin

Ter

rest

rial

An

cho

r

Op

erat

ing

wit

hin

a N

SO

Pro

vin

cial

Cir

cle

Op

erat

ing

wit

hin

a M

MM

A

(BA

Req

uir

ed)

Mu

rrel

et T

imb

er S

ale

Scre

enin

g P

roce

ss R

equ

ired

(MM

Po

licy

2.2

7)

T&E

Fish

Ad

jace

nt

to

Har

vest

Un

it /

Hau

l Ro

ute

5

T&E

Pla

nts

Geo

tech

nic

al Is

sues

Nee

din

g

Fiel

d R

evie

w

Rec

reat

ion

Sit

es

Cu

ltu

ral R

eso

urc

es

Scen

ic R

eso

urc

es

Other Resources or Issues

London Bridge 1 x x x

2 A 'x' indicates the harvest operation contains stands that are currently in a Layered or Older Forest Stand Structure

3 A 'x' indicate that the operation contains areas that have been designated for the development of complex forest stands (LYR/OFS)

4 The final decision on these projects will occur during sale preparation and inconsultation with ODFW.

5 This table lists harvest operations (units or log haul routes) that are adjacent to streams that are known to contain T&E fish. The Pre-Operation Report identifies whether T&E fish are present in the basin.

2 A 'x' indicates the harvest operation contains stands that are currently in a Layered or Older Forest Stand Structure

3 A 'x' indicate that the operation contains areas that have been designated for the development of complex forest stands (LYR/OFS)

4 The final decision on these projects will occur during sale preparation and inconsultation with ODFW.

5 This table lists harvest operations (units or log haul routes) that are adjacent to streams that are known to contain T&E fish. The Pre-Operation Report identifies whether T&E fish are present in the basin.

ALTERNATE HARVEST OPERATIONS - FOREST RESOURCE SUMMARY

1 A 'x' (in any column) indicates yes the resource or other issue occurs within or near the harvest operation and is addressed by the Pre-Operations Report

1 A 'x' (in any column) indicates yes the resource or other issue occurs within or near the harvest operation and is addressed by the Pre-Operations Report

PRIMARY HARVEST OPERATIONS - FOREST RESOURCE SUMMARY

Southwest Fiscal Year 2019 06/28/2018

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN

FINAL - JUNE 2018 23

Page 24: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

Table A-3District: Fiscal Year: 2019 Date: 06/28/2018

Miles Cost Miles Cost

Kennedy Ridge 2.5 40,000$ 0.6 $3,000 -$ $43,000 $546,000 8% 1.5 Mi New Rd, 1 mi. Reconstruct.

Bear Patch 0.5 7,000$ 2 $4,000 $11,000 $212,100 5%

Total 3.0 $47,000 2.6 $7,000 $0 $54,000 $758,100 7.1%

Alternate Operations

London Bridge 2.0 $4,000 $4,000 $178,000 2%

Road Projects Not Associated with Harvest Operations in this AOP

Miles Cost Miles Cost

-$ -$ -$

-$ -$ -$

-$ -$ -$

Total 0.0 -$ 0.0 -$ 0.0 -$

FOREST ROADS SUMMARY

Construction Improvement Other

Projects

Total

Project

Costs

Primary Operations CommentsGross Value

of Operation

Total Cost as a

percent of Gross

Value

Southwest

OperationConstruction Improvement Other

Projects

Total

Project

Funding

SourceComments

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN

FINAL - JUNE 2018 24

Page 25: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

Table A-4District: Fiscal Year: 2019 Date: 06/28/2018

Acres

Planned

Average

Cost*/Acre BOF Cost

Acres

Planned

Average

Cost*/Acre CSL Cost Total Acres Total Cost

Seedling / Nursery Costs (London) 70 $197.00 $13,790.00 $0.00 70 $13,790.00

Initial Planting (Buck-Mac-TC7) 50 $110.00 $5,500.00 42 $110.00 $4,620.00 92 $10,120.00

Interplanting 40 $180.00 $7,200.00 $0.00 40 $7,200.00

Underplanting $0.00 $0.00 0 $0.00

Tree Protection - Barriers $0.00 $0.00 0 $0.00

Tree Protection - Direct Control $0.00 $0.00 0 $0.00

Site Prep - Chemical - Aerial $0.00 $0.00 0 $0.00

Site Prep - Chemical - Hand $0.00 $0.00 0 $0.00

Site Prep - Broadcast Burning (London) 70 $170.00 $11,900.00 $0.00 70 $11,900.00

Site Prep - Piling Burning $0.00 $0.00 0 $0.00

Site Prep - Mechanical $0.00 $0.00 0 $0.00

Release - Chemical - Aerial $0.00 $0.00 0 $0.00

Release - Chemical - Hand 50 $160.00 $8,000.00 42 $160.00 $6,720.00 92 $14,720.00

Release - Mechanical - Hand $0.00 $0.00 0 $0.00

Precommercial Thinning $0.00 $0.00 0 $0.00

Pruning $0.00 $0.00 0 $0.00

Invasive Species 10 $100.00 $1,000.00 $0.00 10 $1,000.00

Road Side Spraying $0.00 $0.00 0 $0.00

Stocking Surveys $0.00 $0.00 0 $0.00

Other $0.00 $0.00 0 $0.00

Totals 290 -- $47,390.00 84 -- $11,340.00 374 $58,730.00

* Work to be completed by ODF staff; cost are for materials only

Board of Forestry Common School Forest Lands

Southwest

REFORESTATION AND YOUNG STAND MANAGEMENT SUMMARY

DistrictProjects Conducted by ODF Staff or

Contractors

SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN

FINAL - JUNE 2018 25

Page 26: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

7 7

1

9

46 24

7

535

8

9

1

9

9

88

6

8 7

2

31

19

18

30

11

18

19

18

11

17

30

31

23

33

16

24

28

14

30

36

29

16

21

20

15

25

12

20

13

10

32

28

19

10

21

22 24

26

32

29

34

15

27

33

29

17

22 2320

35

28

12

12

25

13

25

17 16

24

31

16

26

24

21

25

36

20

14 17

343332

21

2928

27

13

36 35 36

13

32

12

19

18

33

30

31

11

23

26

14

11

14

35

23

35

26

41 6 53 26 145

3

2

27

22

15

34

10

3

27

34

15

10

22

Southwest District 2019 AOPVicinity Map

London Bridge

Kennedy Ridge

§̈¦5

DOUGLAS

JOSEPHINE

Glendale

Interstate

County Lines

Mainline Road

2019 AOP

Alternate

Primary

Ownership

City Limits

BLM

BOF

µDOUGLAS

KLAMATH

JACKSON

COOS

LANE

CURRYJOSEPHINE

Map Location and ODF District Boundaries

0 1.5 30.75Miles

Bear Patch

1:4,342,015 1:4,342,015

chrisrudd
Typewritten Text
26
chrisrudd
Typewritten Text
SOUTHWEST OREGON 2019 ANNUAL OPERATIONS PLAN FINAL - JUNE 2018
Page 27: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON ANNUAL OPERATIONS PLAN

FINAL – JUNE 2018 27

Appendix C

Consultations with Other State Agencies This appendix summarizes the results of consultations with the Oregon Department Of Fish and Wildlife, the Oregon Department of Transportation and other cooperators.

Proposed harvests within the Provincial Circle of northern spotted owls have been

sent to US Fish and Wildlife Service for review.

Archaeologists from the Oregon Department of Transportation (ODOT) have reviewed the proposed timber harvests, road construction and recreation projects to review potential impacts to cultural resources. No known historical or archaeological sites were found during this review.

No written comments from ODFW have been received to date.

Page 28: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON ANNUAL OPERATIONS PLAN

FINAL – JUNE 2018 28

Appendix D Public Comment Process for the 2019 AOP

The Oregon Department of Forestry held a formal 45 day public comment period for the 2019 Annual Operations Plans from March 19 through May 4, 2018.

The purpose of the Public Comment Period was to provide an opportunity for the public to review the AOPs, ask questions, make recommendations and offer comments. As a public agency, ODF strives to operate in the best interest of Oregonians. We provide opportunities for public participation to assist us in securing the greatest permanent value from state forests for all Oregonians.

No comments were received.

Page 29: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan

SOUTHWEST OREGON ANNUAL OPERATIONS PLAN

FINAL – JUNE 2018 29

Appendix E

Pre-Operations reports available upon request

Page 30: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan
chrisrudd
Typewritten Text
SOUTHWEST OREGON ANNUAL OPERATIONS PLAN FINAL - JUNE 2018
chrisrudd
Typewritten Text
chrisrudd
Typewritten Text
chrisrudd
Typewritten Text
chrisrudd
Typewritten Text
chrisrudd
Typewritten Text
chrisrudd
Typewritten Text
30
chrisrudd
Typewritten Text
Page 31: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan
Page 32: SOUTHWEST OREGON DISTRICT 2019 ANNUAL OPERATIONS … · The Southwest Oregon District 2019 Annual Operations Plan is organized to include the following: 1. Annual Operations Plan