TEMPLATE EXPLANATION This template must be used by SP AusNet to report service performance information for the last three quarters of the 2008 calendar year. Yellow worksheets ( 'Inputs - Performance' and 'Inputs - Exclusions' ) are for inputs, including performance and exclusion information. SP AusNet only needs to enter data on these worksheets. Purple worksheets 'S1' to 'S9' are the s-factor results based on the performance inputs from the 'Inputs - Performance' worksheet. (NB: The caps, collars and targets for s-factor worksheets 'S6' and 'S7' have been scaled as this template only applies to the last three quarters of the 2008 calendar year) Blue worksheet ' Revenue Calculation' quantifies the appropriate revenue to be applied to the s-factor results adjusted for CPI. Red worksheet ' Outcomes' shows the total performance, s-factor and financial incentive results based on SP AusNet's performance in 'Inputs-Performance' and 'Revenue Calculation' worksheets. Orange worksheet ' Exclusion Definitions' are the defined exclusions for SP AusNet which should form the basis of exclusion requests under 'Inputs-Exclusions' worksheet. SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls Explanatory notes

Upload: nguyentram

Post on 07-Mar-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

TEMPLATE EXPLANATION

This template must be used by SP AusNet to report service performance information for the last three quarters of the 2008 calendar year.

Yellow worksheets ('Inputs - Performance' and 'Inputs - Exclusions') are for inputs, including performance and exclusion information. SP AusNet only needs to enter data on these worksheets. Purple worksheets 'S1' to 'S9' are the s-factor results based on the performance inputs from the 'Inputs - Performance' worksheet.(NB: The caps, collars and targets for s-factor worksheets 'S6' and 'S7' have been scaled as this template only applies to the last three quarters of the 2008 calendar year)

Blue worksheet 'Revenue Calculation' quantifies the appropriate revenue to be applied to the s-factor results adjusted for CPI.

Red worksheet 'Outcomes' shows the total performance, s-factor and financial incentive results based on SP AusNet's performance in 'Inputs-Performance' and 'Revenue Calculation' worksheets.

Orange worksheet 'Exclusion Definitions' are the defined exclusions for SP AusNet which should form the basis of exclusion requests under 'Inputs-Exclusions' worksheet.

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xlsExplanatory notes

SP AUSNET - SERVICE STANDARDS PERFORMANCE

Performance parameter S Performance (Without exclusions)

Performance (With exclusions)

Total circuit availability S1 99.078398% 99.117382%

Peak critical availability S2 99.745438% 99.802938%

Peak non-critical availability S3 99.810606% 99.932660%

Intermediate critical availability S4 99.366936% 99.424704%

Intermediate non-critical availability S5 99.518644% 99.530316%

Loss of supply event frequency (no. of events > 0.05 system minutes per annum) S6 1 1

Loss of supply event frequency (no. of events > 0.3 system minutes per annum) S7 1 1

Average outage duration– transformers (minutes) S8 226 226

Average outage duration– transformers (minutes) S9 263 263

Date prepared: 10 February 2009Revision date:

NOTES:

Pink cells- Input performance without exclusions from performance data

Orange cells- Input performance with exclusions from performance data

Green cells- Input date that template data was entered and date of any revisions from original version.

Performance should be measured on a calendar year basis

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xlsInputs - Performance

AER Report Dec-08 SP AusNet Performance Page 3 of 30

SP AUSNET - Proposed exclusions

Event proposed for exclusion

Description of the event and its impact on the network and

performanceCause of the event Start

dateStart time

End date

End time Circuits affected Reactive plant or

transformerQuantitative

impact Reasons for exclusion request Further references

Name of the eventDetail of the event. Such as: the action of any third parties, the actions of the TNSP,assets damaged or interrupted.

A description of the cause of the event

Name of circuits affected

Name of any reactive plant or transformer affected

Number of hours, mins etc interrupted

Full details of the reason/s for excluding this event. Should include a reference to the defined exclusions and explain how it meets this exclusion definition (se

Exclusion definition tab). Eg. Exclusion 1.2 Third party event.

A TNSP may provide further details of an exclusion event. TNSP to provide reference.

Out W/O No3 Trans warranty works

X432 - (RCTS) STATION REDEVELOPMENT

SPICAPX 1/04/08 00:00:00 11/04/08 17:37:00 R3 220/66/22KV TRANS AT RCTS

257.617 EXCLUDE 1.1 Unregulated transmission asset WO # X43258AM

Complete more hand rail on Trans Rack

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 1/04/08 05:38:00 1/04/08 18:55:00 B3 220/66KV TRANS AT MTS

13.283 EXCLUDE 1.2 Connection asset WO # X32058S2

Complete more hand rail on Trans Rack

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 2/04/08 05:41:00 2/04/08 17:26:00 B3 220/66KV TRANS AT MTS

11.750 EXCLUDE 1.2 Connection asset WO # X32058S2

Complete more hand rail on Trans Rack

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 3/04/08 06:12:00 3/04/08 16:28:00 B3 220/66KV TRANS AT MTS

10.267 EXCLUDE 1.2 Connection asset WO # X32058S2

Complete more hand rail on Trans Rack

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 4/04/08 06:06:00 4/04/08 14:22:00 B3 220/66KV TRANS AT MTS

8.267 EXCLUDE 1.2 Connection asset WO # X32058S2

replace Damage Cable SPIMAINT 6/04/08 07:16:00 6/04/08 18:20:00 L1 220/22KV TRANS AT RTS

11.067 EXCLUDE 1.2 Connection asset WO # 10280299

O/HAUL Transformer and Div Sw (EM)

SPIMAINT 8/04/08 07:08:00 8/04/08 15:54:00 B2 220/66KV TRANS AT TSTS

8.767 EXCLUDE 1.2 Connection asset WO # 10269251

Out W/O No1 Trans to cutover new OLTC control

X461 - (BATS) TERMINAL STATION REBUILD

SPICAPX 8/04/08 11:18:00 22/04/08 13:41:00 B1 220/66KV TRANS AT BATS

338.383 EXCLUDE 1.2 Connection asset WO # X46158Q4

Installhebal wall columns

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 9/04/08 05:33:00 9/04/08 17:08:00 B1 220/66KV TRANS AT MTS

11.583 EXCLUDE 1.2 Connection asset WO # X32058R9

Condition Monitoring Country Trans 2day North Area

SPIMAINT 9/04/08 07:05:00 11/04/08 15:50:00 B2 220/66KV TRANS AT GNTS

56.750 EXCLUDE 1.2 Connection asset WO # 10273067

O/H No.3 Trans Div. Switch @ TSTS

SPIMAINT 9/04/08 07:06:00 9/04/08 15:49:00 B3 220/66KV TRANS AT TSTS

8.717 EXCLUDE 1.2 Connection asset WO # 10269216

No1 66 Cap bank during setting change

V775 - ROUTINE PROTECTION & CONTROL DEVICE SETTING AND CONF

SPIMAINT 9/04/08 10:23:00 9/04/08 17:57:00 NO.1 66KV CAPACITOR BANK AT TBTS

7.567 EXCLUDE 1.1 Unregulated transmission asset WO # V77558A7

O/HAUL Transformer and Trafo Union Div Sw (EM)

SPIMAINT 10/04/08 07:00:00 10/04/08 15:37:00 B1 220/66KV TRANS AT TSTS

8.617 EXCLUDE 1.2 Connection asset WO # 10269248

Install ground wire Proximty only

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 11/04/08 05:38:00 11/04/08 12:19:00 B3 220/66KV TRANS AT MTS

6.683 EXCLUDE 1.2 Connection asset WO # X32058S0

No1 66 Cap bank during setting change

V775 - ROUTINE PROTECTION & CONTROL DEVICE SETTING AND CONF

SPIMAINT 11/04/08 13:21:00 11/04/08 18:03:00 NO.1 66KV CAPACITOR BANK AT TBTS

4.700 EXCLUDE 1.1 Unregulated transmission asset WO # V77558A8

replace Transformer Surge Arrestors

X708 - REPLACEMENT OF AGEING 22KV TO 500KV SURGE ARRESTERS

SPICAPX 12/04/08 05:59:00 13/04/08 17:40:00 L4 220/22KV TRANS AT RTS

35.683 EXCLUDE 1.2 Connection asset WO # X70858A9

SCAN - 2a Trans 220kv B ph LA High RF

SPIMAINT 18/04/08 07:12:00 18/04/08 18:08:00 R2 220/66/22KV TRANS GROUP AT RCTS

10.933 EXCLUDE 1.2 Connection asset WO # 10280123

Perf Calc No4 Trans, during No2 220kv Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 19/04/08 05:36:00 19/04/08 15:23:00 B4 220/66KV TRANS AT GTS

9.783 EXCLUDE 1.2 Connection asset WO # X50858A8

Trans Rebate for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 20/04/08 06:05:00 20/04/08 11:57:00 B3 220/66KV TRANS AT RWTS

5.867 EXCLUDE 1.2 Connection asset WO # X55658D6

rebate for bus outage SPIMAINT 20/04/08 06:55:00 20/04/08 14:24:00 NO.1 66KV CAPACITOR BANK AT TSTS

7.483 EXCLUDE 1.1 Unregulated transmission asset WO # 10282658

rebate trans for bus outage

SPIMAINT 20/04/08 06:55:00 20/04/08 14:24:00 B1 220/66KV TRANS AT TSTS

7.483 EXCLUDE 1.2 Connection asset WO # 10280227

U 2 Trans X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 23/04/08 07:04:00 23/04/08 15:30:00 U2 66/22KV TRANS AT MTS

8.433 EXCLUDE 1.2 Connection asset WO # X32058Z1

End date and time of event

CIRCUIT AVAILABILITY

Name of any circuit availabilityparameters applying to SP AusNet

Start date and time of event

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 4 of 30

Perf calc W/O B1 Trans during bus de-energ

SPIMAINT 23/04/08 10:39:00 23/04/08 11:38:00 B1 220/66KV TRANS AT TGTS

0.983 EXCLUDE 1.2 Connection asset WO # 10281990

No1 66 Cap bank during setting change

V775 - ROUTINE PROTECTION & CONTROL DEVICE SETTING AND CONF

SPIMAINT 24/04/08 13:16:00 24/04/08 18:24:00 NO.1 66KV CAPACITOR BANK AT TBTS

5.133 EXCLUDE 1.1 Unregulated transmission asset WO # V77558A9

rebate tran outage SPIMAINT 30/04/08 07:12:00 30/04/08 14:19:00 U1 66/22KV TRANS AT RWTS

7.117 EXCLUDE 1.2 Connection asset WO # 10282110

Rebate for No1 220kv Bus outage

SPIMAINT 1/05/08 07:10:00 1/05/08 14:55:00 B2 220/66KV TRANS AT TSTS

7.750 EXCLUDE 1.2 Connection asset WO # 10282181

No 2 Trans Trip FAULT 1/05/08 08:55:00 1/05/08 10:20:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

1.417 EXCLUDE 1.2 Connection asset WO # 10282478

Perf Calc No3 Trans during No1 220kv Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 4/05/08 06:09:00 4/05/08 17:12:00 B3 220/66KV TRANS AT GTS

11.050 EXCLUDE 1.2 Connection asset WO # X50858A3

Tran rebate for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 4/05/08 07:01:00 4/05/08 14:13:00 B4 220/66KV TRANS AT RWTS

7.200 EXCLUDE 1.2 Connection asset WO # X55658F8

O/HAUL Transformer and Div Sw (W)

SPIMAINT 4/05/08 07:09:00 4/05/08 15:04:00 L3 220/22KV TRANS AT WMTS

7.917 EXCLUDE 1.2 Connection asset WO # 10269980

VSCAP to Powercor Outage requested by DISTCO DBPROX 4/05/08 08:03:00 4/05/08 20:13:00 12.167 EXCLUDE 1.3 Third party outage WO # 10282279Condition Monitoring Metro Trans 2day West Area(W)

SPIMAINT 5/05/08 07:31:00 6/05/08 16:00:00 B4 220/66KV TRANS AT BLTS

32.483 EXCLUDE 1.2 Connection asset WO # 10273063

Install hebel wall on B3 trans

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 6/05/08 06:04:00 6/05/08 16:59:00 B3 220/66KV TRANS AT MTS

10.917 EXCLUDE 1.2 Connection asset WO # X32058S3

Install hebel wall on B3 trans

X320 - (MTS) STATION REDEVELOPMENT

SPICAPX 7/05/08 06:07:00 7/05/08 16:41:00 B3 220/66KV TRANS AT MTS

10.567 EXCLUDE 1.2 Connection asset WO # X32058S3

Conditional Monitoring Trans 1Day RTS B4

SPIMAINT 8/05/08 06:57:00 8/05/08 15:36:00 B4 220/66KV TRANS AT RTS

8.650 EXCLUDE 1.2 Connection asset WO # 10281988

No1 Trans Group oil leaks

SPIMAINT 8/05/08 07:08:00 8/05/08 18:29:00 R1 220/66/22KV TRANS GROUP AT RCTS

11.350 EXCLUDE 1.2 Connection asset WO # 10282221

Trans Rebate for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 10/05/08 08:15:00 10/05/08 09:45:00 B3 220/66KV TRANS AT RWTS

1.500 EXCLUDE 1.2 Connection asset WO # X55658L2

Out W/O B1 Trans to connect to fut No2 S-S trans

X498 - (MBTS) REDEVELOPMENT 220KV SWITCHYARD

SPICAPX 12/05/08 07:43:00 21/05/08 12:01:00 B1 220/66KV TRANS (HOT SPARE) AT MBTS

220.300 EXCLUDE 1.2 Connection asset WO # X49858M3

SF6 Top Up at APD Outage requested by APDALCOA APDALCOA 13/05/08 14:27:00 13/05/08 15:46:00 APD NO.1 500KV LINE AT HYTS

1.317 EXCLUDE 1.3 Third party outage WO # 10282842

Out W/O A2 TRANS isolated pending test energ

Z543 - (MLTS) INTERFACE WORK FOR NEXT 500/220KV TRANSFORMER

VEN_AUG 15/05/08 19:57:00 20/05/08 11:47:00 A2 500/220KV TRANS BANK AT MLTS

111.833 EXCLUDE 1.1 Unregulated transmission asset WO # Z54358C0

APD work Outage requested by APDALCOA APDALCOA 17/05/08 09:03:00 17/05/08 12:58:00 HYTS-APD 2 500KV W

3.917 EXCLUDE 1.3 Third party outage WO # 10282960

Rebate for Bus outage SPIMAINT 18/05/08 06:45:00 18/05/08 16:02:00 B4 220/66KV TRANS AT ERTS

9.283 EXCLUDE 1.2 Connection asset WO # 10282616

VSCAP to Powercor Outage requested by DISTCO DBPROX 18/05/08 07:50:00 18/05/08 17:38:00 9.800 EXCLUDE 1.3 Third party outage WO # 10282795Perf calc W/O No3 Trans during No2 220 Bus outage

SPIMAINT 19/05/08 07:23:00 19/05/08 17:26:00 R3 220/66/22KV TRANS AT KGTS

10.050 EXCLUDE 1.2 Connection asset WO # 10282683

Perf calc W/O No3 Trans during No2 220 Bus outage

SPIMAINT 20/05/08 06:58:00 20/05/08 16:12:00 R3 220/66/22KV TRANS AT KGTS

9.233 EXCLUDE 1.2 Connection asset WO # 10282683

SCAP to PTH Outage requested by APDALCOA APDALCOA 20/05/08 07:37:00 20/05/08 15:32:00 GTS -PTH 2 220KV WY

7.917 EXCLUDE 1.3 Third party outage WO # 10281818

Out W/O A2 Trans test energ & commiss

Z543 - (MLTS) INTERFACE WORK FOR NEXT 500/220KV TRANSFORMER

VEN_AUG 20/05/08 12:55:00 20/05/08 16:49:00 A2 500/220KV TRANS BANK AT MLTS

3.900 EXCLUDE 1.1 Unregulated transmission asset WO # Z54358C1

Perf calc W/O No1 Trans during No1 220 bus outage

SPIMAINT 21/05/08 07:16:00 21/05/08 17:12:00 R1 220/66/22KV TRANS AT KGTS

9.933 EXCLUDE 1.2 Connection asset WO # 10282687

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 5 of 30

Out W/O De-energ B2 Tr- Commiss B1 Tr hot spare

X498 - (MBTS) REDEVELOPMENT 220KV SWITCHYARD

SPICAPX 21/05/08 12:24:00 21/05/08 13:26:00 B2 220/66KV TRANS AT MBTS

1.033 EXCLUDE 1.2 Connection asset WO # X49858M5

No 3 Trans at GTS FORCED 22/05/08 06:42:00 22/05/08 11:44:00 B3 220/66KV TRANS AT GTS

5.033 EXCLUDE 1.2 Connection asset WO # 10283851

Perf calc W/O No1 Trans during No1 220 bus outage

SPIMAINT 22/05/08 07:14:00 22/05/08 17:21:00 R1 220/66/22KV TRANS AT KGTS

10.117 EXCLUDE 1.2 Connection asset WO # 10282687

CT - No1 220kv Cap Bank CB CT oil samples

SPIMAINT 22/05/08 08:02:00 22/05/08 11:13:00 NO.1 220KV CAPACITOR BANK AT DDTS

3.183 EXCLUDE 1.1 Unregulated transmission asset WO # 10282226

No 3 Trans at GTS FORCED 22/05/08 11:50:00 22/05/08 14:44:00 B3 220/66KV TRANS AT GTS

2.900 EXCLUDE 1.2 Connection asset WO # 10283852

Perf calc W/O No1 Trans during No1 220 bus outage

SPIMAINT 23/05/08 06:59:00 23/05/08 13:57:00 R1 220/66/22KV TRANS AT KGTS

6.967 EXCLUDE 1.2 Connection asset WO # 10282687

Out W/O A2 Trans for 22kV isol int'lock mods

Z543 - (MLTS) INTERFACE WORK FOR NEXT 500/220KV TRANSFORMER

VEN_AUG 23/05/08 07:06:00 23/05/08 14:14:00 A2 500/220KV TRANS BANK AT MLTS

7.133 EXCLUDE 1.1 Unregulated transmission asset WO # Z54358C3

Rebate Tran for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 25/05/08 08:20:00 25/05/08 08:45:00 B4 220/66KV TRANS AT RWTS

0.417 EXCLUDE 1.2 Connection asset WO # X55658M2

Trans Rebate for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 25/05/08 09:01:00 25/05/08 11:48:00 B3 220/66KV TRANS AT RWTS

2.783 EXCLUDE 1.2 Connection asset WO # X55658M5

APD No2 Line de-energised for Alcoa.

Outage requested by APDALCOA APDALCOA 26/05/08 14:36:00 26/05/08 15:29:00 APD NO.2 500KV LINE AT HYTS

0.883 EXCLUDE 1.3 Third party outage WO # 10283375

Tran rebate for Bus outage

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 27/05/08 06:10:00 27/05/08 16:43:00 U1 66/22KV TRANS AT MTS

10.550 EXCLUDE 1.2 Connection asset WO # X32058Z4

Tran rebate for Bus outage

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 27/05/08 06:10:00 27/05/08 16:43:00 B3 220/66KV TRANS AT MTS

10.550 EXCLUDE 1.2 Connection asset WO # X32058Z3

OVERHAUL TRANSFORMER

SPIMAINT 27/05/08 07:10:00 27/05/08 15:38:00 B3 220/66KV TRANS AT RTS

8.467 EXCLUDE 1.2 Connection asset WO # 10282344

Tran rebate for Bus outage

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 28/05/08 06:10:00 28/05/08 15:28:00 U1 66/22KV TRANS AT MTS

9.300 EXCLUDE 1.2 Connection asset WO # X32058Z4

Tran rebate for Bus outage

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 28/05/08 06:10:00 28/05/08 15:28:00 B3 220/66KV TRANS AT MTS

9.300 EXCLUDE 1.2 Connection asset WO # X32058Z3

O/HAUL Transformer and Div Sw (EM)

SPIMAINT 28/05/08 07:20:00 28/05/08 15:21:00 B4 220/66KV TRANS AT RTS

8.017 EXCLUDE 1.2 Connection asset WO # 10269289

REPAIR TRANS COOLING

SPIMAINT 29/05/08 07:16:00 29/05/08 16:04:00 B1 220/66KV TRANS AT RTS

8.800 EXCLUDE 1.2 Connection asset WO # 10282764

Out W/O No2 66kV Cap bank prot setting change

V775 - ROUTINE PROTECTION & CONTROL DEVICE SETTING AND CONF

SPIMAINT 29/05/08 07:47:00 29/05/08 17:36:00 NO.2 220KV CAPACITOR BANK AT ATS

9.817 EXCLUDE 1.1 Unregulated transmission asset WO # V77558B3

Install Column wall B1 Trans & No2 66kv Bus

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 30/05/08 06:01:00 30/05/08 15:36:00 B1 220/66KV TRANS AT MTS

9.583 EXCLUDE 1.2 Connection asset WO # X32058Z5

Perf Calc B4 Trans during No2 220kv Bus Outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 31/05/08 06:00:00 31/05/08 17:50:00 B4 220/66KV TRANS AT GTS

11.833 EXCLUDE 1.2 Connection asset WO # X50858B7

LYA 1 Gen Trans isolation

Outage requested by GENCO GENCO 31/05/08 07:31:00 31/05/08 23:59:59 NO.1 GEN 500/21KV TRANS AT LYPA

16.483 EXCLUDE 1.3 Third party outage WO # 10283549

LYA 1 Gen Trans isolation

Outage requested by GENCO GENCO 1/06/08 00:00:00 1/06/08 13:47:00 NO.1 GEN 500/21KV TRANS AT LYPA

13.783 EXCLUDE 1.3 Third party outage WO # 10283549

rebate Tran for bus outage

SPIMAINT 1/06/08 06:42:00 1/06/08 14:36:00 B1 220/66KV TRANS AT RTS

7.900 EXCLUDE 1.2 Connection asset WO # 10282646

Replace CT on B2 Trans 220kv CB

X670 - CT REPLACEMENT PROGRAM - STAGE 2

SPICAPX 2/06/08 07:07:00 6/06/08 12:53:00 B2 220/66KV TRANS AT TBTS

101.767 EXCLUDE 1.2 Connection asset WO # X67058A7

Out W/O Perf Calc No2 Transformer

SPIMAINT 3/06/08 07:46:00 3/06/08 17:18:00 R2 220/66/22KV TRANS AT KGTS

9.533 EXCLUDE 1.2 Connection asset WO # 10283458

REMOVE BIRD NEST SPIMAINT 3/06/08 10:37:00 3/06/08 12:18:00 L2 220/22KV TRANS BANK AT RWTS

1.683 EXCLUDE 1.2 Connection asset WO # 10282965

Out W/O Perf Calc No2 Transformer

SPIMAINT 4/06/08 07:03:00 4/06/08 17:13:00 R2 220/66/22KV TRANS AT KGTS

10.167 EXCLUDE 1.2 Connection asset WO # 10283458

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 6 of 30

Basslink Remote Trip for CB fault at BLLY

Outage requested by GENCO GENCO 8/06/08 00:31:00 8/06/08 02:36:00 BLLY 500KV LINE AT LYPS

2.083 EXCLUDE 1.3 Third party outage WO # 10284017

SCAP to JLGS Outage requested by GENCO GENCO 10/06/08 15:31:00 30/06/08 23:59:59 NO.2 UNIT 220/10.5KV TRANS AT JLGA

488.483 EXCLUDE 1.3 Third party outage WO # 10283935

Condition Monitoring Metro Trans 2day Valley Area

SPIMAINT 12/06/08 07:17:00 13/06/08 14:22:00 B1 220/66KV TRANS AT MWTS

31.083 EXCLUDE 1.2 Connection asset WO # 10273039

Install Rack Structure Handrails and Lighting

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 14/06/08 05:51:00 14/06/08 15:50:00 B4 220/66KV TRANS AT GTS

9.983 EXCLUDE 1.2 Connection asset WO # X50858C9

Out W/O No1 220kV Cap bank prot setting changes

V775 - ROUTINE PROTECTION & CONTROL DEVICE SETTING AND CONF

SPIMAINT 14/06/08 08:09:00 14/06/08 14:30:00 NO.1 220KV CAPACITOR BANK AT DDTS

6.350 EXCLUDE 1.1 Unregulated transmission asset WO # V77558B4

Replace CT on B1 Trans 220kv CB

X670 - CT REPLACEMENT PROGRAM - STAGE 2

SPICAPX 16/06/08 07:05:00 19/06/08 11:46:00 B1 220/66KV TRANS AT TBTS

76.683 EXCLUDE 1.2 Connection asset WO # X67058A8

OVERHAUL OF A TRANSFORMER BANK/GROUP

SPIMAINT 16/06/08 10:15:00 17/06/08 15:48:00 B5 220/66KV TRANS GROUP AT BLTS

29.550 EXCLUDE 1.2 Connection asset WO # 10267836

Repaire Oil leaks SPIMAINT 21/06/08 06:16:00 22/06/08 15:27:00 A1 500/220KV TRANS BANK AT CBTS

33.183 EXCLUDE 1.1 Unregulated transmission asset WO # 10283555

Rebate Trans for Bus outage

V786 - (CBTS) URGENT REPLACEMENT OF ROTS 4L 500KV CVT

SPIMAINT 21/06/08 07:05:00 21/06/08 16:31:00 B1 220/66KV TRANS AT CBTS

9.433 EXCLUDE 1.2 Connection asset WO # V78658A2

Request by City Power Outage requested by DISTCO DBPROX 21/06/08 11:08:00 22/06/08 07:04:00 ROTS NO.1 220KV LINE AT RTS

19.933 EXCLUDE 1.3 Third party outage WO # 10284035

Rebate Tran for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 22/06/08 07:38:00 22/06/08 12:12:00 B2 220/66KV TRANS AT RWTS

4.567 EXCLUDE 1.2 Connection asset WO # X55658O8

tran rebate for bus outage

SPIMAINT 24/06/08 07:09:00 24/06/08 15:46:00 B2 220/66KV TRANS AT SVTS

8.617 EXCLUDE 1.2 Connection asset WO # 10282644

SMTS - DDTS No 1 Line Series Cap Bank Bypassed

FAULT 24/06/08 10:51:00 24/06/08 11:08:00 0.283 EXCLUDE 1.1 Unregulated transmission asset WO # 10284608

Work at APD No2 Reactor Gas Relay

Outage requested by APDALCOA APDALCOA 25/06/08 07:37:00 25/06/08 17:17:00 APD NO.2 500KV LINE AT HYTS

9.667 EXCLUDE 1.3 Third party outage WO # 10284594

De-energisation of No 1 220 kV Bus for AGL Hydro

Outage requested by STHHYDRO GENCO 27/06/08 07:17:00 27/06/08 07:20:00 0.050 EXCLUDE 1.3 Third party outage WO # 10284697

B1 Trans OUT W/O - Replace Insulators at the Rack

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 28/06/08 05:34:00 28/06/08 17:57:00 B1 220/66KV TRANS AT GTS

12.383 EXCLUDE 1.2 Connection asset WO # X50858D7

O/HAUL Transformer without Div Sw (W)

SPIMAINT 28/06/08 07:05:00 28/06/08 17:40:00 B5 220/66KV TRANS AT TTS

10.583 EXCLUDE 1.2 Connection asset WO # 10249897

Trans Rebate for Bus Outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 28/06/08 09:37:00 28/06/08 11:07:00 B2 220/66KV TRANS AT RWTS

1.500 EXCLUDE 1.2 Connection asset WO # X55658O2

O/HAUL Transformer without Div Sw (W)

SPIMAINT 29/06/08 06:58:00 29/06/08 15:25:00 B5 220/66KV TRANS AT TTS

8.450 EXCLUDE 1.2 Connection asset WO # 10249897

Rebate Trans for Bus outage

V786 - (CBTS) URGENT REPLACEMENT OF ROTS 4L 500KV CVT

SPIMAINT 29/06/08 07:09:00 29/06/08 14:41:00 B2 220/66KV TRANS AT CBTS

7.533 EXCLUDE 1.2 Connection asset WO # V78658A4

Overhaul Transformer at YPS

SPIMAINT 30/06/08 08:04:00 30/06/08 23:59:59 AUX 'D' 220/22KV TRANS AT YPS

15.933 EXCLUDE 1.2 Connection asset WO # 10272883

B2 Trans wiring modifications

FAULT 30/06/08 12:10:00 30/06/08 16:29:00 B2 220/66KV TRANS AT RWTS

4.317 EXCLUDE 1.2 Connection asset WO # 10284818

APD work Outage requested by APDALCOA APDALCOA 30/06/08 13:07:00 30/06/08 17:01:00 HYTS-APD 2 500KV W

3.900 EXCLUDE 1.3 Third party outage WO # 10284672

O/HAUL Transformer Div Mechanism (N)

SPIMAINT 30/06/08 13:48:00 30/06/08 16:35:00 B2 220/66KV TRANS AT HOTS

2.783 EXCLUDE 1.2 Connection asset WO # 10273485

SCAP to JLGS Outage requested by GENCO GENCO 1/07/08 00:00:00 16/07/08 14:52:00 NO.2 UNIT 220/10.5KV TRANS AT JLGA

374.867 EXCLUDE 1.3 Third party outage WO # 10283935

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 7 of 30

Overhaul Transformer at YPS

SPIMAINT 1/07/08 00:00:00 1/07/08 13:50:00 AUX 'D' 220/22KV TRANS AT YPS

13.833 EXCLUDE 1.2 Connection asset WO # 10272883

Rebate for Cap Bank SPIMAINT 2/07/08 07:04:00 2/07/08 17:24:00 NO.1 220KV CAPACITOR BANK AT ROTS

10.333 EXCLUDE 1.1 Unregulated transmission asset WO # 10285015

Overhaul Transformer at YPS

SPIMAINT 2/07/08 07:55:00 3/07/08 13:48:00 AUX 'E' 220/22KV TRANS AT YPS

29.883 EXCLUDE 1.2 Connection asset WO # 10272885

O/HAUL Transformer Div Mechanism (N)

SPIMAINT 4/07/08 07:51:00 4/07/08 13:20:00 B3 220/66KV TRANS AT HOTS

5.483 EXCLUDE 1.2 Connection asset WO # 10273483

O/HAUL Transformer Div Mechanism - bucs

SPIMAINT 4/07/08 08:45:00 4/07/08 15:10:00 B1 220/66KV TRANS AT WMTS

6.417 EXCLUDE 1.2 Connection asset WO # 10269978

Tran Rebate for Bus Outage

V769 - (CBTS) PRIMARY EQUIPMENT DEFECTS REPAIR

SPICAPX 6/07/08 07:51:00 6/07/08 15:01:00 B1 220/66KV TRANS AT CBTS

7.167 EXCLUDE 1.2 Connection asset WO # V76958B5

PTH Work Outage requested by APDALCOA APDALCOA 7/07/08 08:00:00 7/07/08 15:13:00 GTS -PTH 2 220KV WY

7.217 EXCLUDE 1.3 Third party outage WO # 10284989

SCAN Repaire hot joint

SPIMAINT 8/07/08 07:10:00 8/07/08 14:38:00 B3 220/66KV TRANS AT HTS

7.467 EXCLUDE 1.2 Connection asset WO # 10283623

O/HAUL Transformer and Div Sw (W)

SPIMAINT 8/07/08 07:15:00 9/07/08 15:25:00 B4 220/66KV TRANS AT BLTS

32.167 EXCLUDE 1.2 Connection asset WO # 10270222

Condition Monitoring Country Trans 2day North

SPIMAINT 9/07/08 06:54:00 11/07/08 12:56:00 R4 220/66/22KV TRANS AT BETS

54.033 EXCLUDE 1.2 Connection asset WO # 10273029

Investigate incorrect B2 Tran Gas Relay operation

SPIMAINT 10/07/08 09:02:00 10/07/08 14:56:00 B2 220/66KV TRANS AT HOTS

5.900 EXCLUDE 1.2 Connection asset WO # 10285021

Trans Rebate for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 12/07/08 06:35:00 12/07/08 12:46:00 B3 220/66KV TRANS AT RWTS

6.183 EXCLUDE 1.2 Connection asset WO # X55658P5

Perf calc W/O No2 Trans GRP 22kV only

X497 - (BETS) STATION REDEVELOPMENT

SPICAPX 12/07/08 09:30:00 12/07/08 18:20:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

8.833 EXCLUDE 1.2 Connection asset WO # X49758M1

Tran rebate for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 12/07/08 13:12:00 12/07/08 18:33:00 B4 220/66KV TRANS AT RWTS

5.350 EXCLUDE 1.2 Connection asset WO # X55658P9

Rebate Tran for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 13/07/08 06:41:00 13/07/08 12:42:00 B1 220/66KV TRANS AT RWTS

6.017 EXCLUDE 1.1 Unregulated transmission asset WO # X55658S2

Rebate Tran for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 13/07/08 06:41:00 13/07/08 12:42:00 U1 66/22KV TRANS AT RWTS

6.017 EXCLUDE 1.2 Connection asset WO # X55658S1

Perf calc W/O No4 Trans 22kV only

X497 - (BETS) STATION REDEVELOPMENT

SPICAPX 13/07/08 07:04:00 13/07/08 12:00:00 R4 220/66/22KV TRANS AT BETS

4.933 EXCLUDE 1.2 Connection asset WO # X49758M2

Tran Rebate for Bus outage

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 13/07/08 12:59:00 13/07/08 18:32:00 B2 220/66KV TRANS AT RWTS

5.550 EXCLUDE 1.2 Connection asset WO # X55658S4

O/H Trans SPIMAINT 14/07/08 07:04:00 14/07/08 15:34:00 B3 220/66KV TRANS AT WMTS

8.500 EXCLUDE 1.2 Connection asset WO # 10249107

LNGS 2 SCAP Outage requested by GENCO GENCO 14/07/08 07:50:00 17/07/08 14:39:00 LNGS NO.2 GEN TRANS 220KV LINE AT ATS

78.817 EXCLUDE 1.1 Unregulated transmission asset WO # 10285069

SF6 Alarm to moved from RTU to SCIMS

X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 17/07/08 07:07:00 17/07/08 15:25:00 U1 66/22KV TRANS AT RWTS

8.300 EXCLUDE 1.2 Connection asset WO # X55658T4

Repair No 1 Trans oil leaks

SPIMAINT 18/07/08 08:03:00 18/07/08 14:08:00 NO.1 330/66/22KV TRANS AT WOTS

6.083 EXCLUDE 1.2 Connection asset WO # 10275340

Sealing of A2 Trans Enclosure Wall seams

Z546 - (MLTS) 500/220KV TRANSFORMER CONTESTABLE

VEN_AUG 19/07/08 08:02:00 19/07/08 17:07:00 A2 500/220KV TRANS BANK AT MLTS

9.083 EXCLUDE 1.1 Unregulated transmission asset WO # Z54658A7

Tran Rebate for Bus Outage

V769 - (CBTS) PRIMARY EQUIPMENT DEFECTS REPAIR

SPICAPX 20/07/08 07:10:00 20/07/08 14:44:00 B2 220/66KV TRANS AT CBTS

7.567 EXCLUDE 1.2 Connection asset WO # V76958B0

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 8 of 30

Adjust ROTS No3 Line / B1 Trans CB Trans Side ROI

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 21/07/08 06:26:00 21/07/08 15:16:00 B1 220/66KV TRANS AT MTS

8.833 EXCLUDE 1.2 Connection asset WO # X32058AE

REPAIR/REPLACE FAULTY FAN

SPIMAINT 22/07/08 07:34:00 22/07/08 12:13:00 B2 220/66KV TRANS AT TBTS

4.650 EXCLUDE 1.2 Connection asset WO # 10285085

Fault No3 220/66KV Transformer.

FAULT 23/07/08 05:46:00 23/07/08 20:39:00 B3 220/66KV TRANS AT GTS

14.883 EXCLUDE 1.2 Connection asset WO # 10285380

Earth the metallic ducting in enclosure

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 24/07/08 06:59:00 24/07/08 13:41:00 U1 66/22KV TRANS AT MTS

6.700 EXCLUDE 1.2 Connection asset WO # X32058AF

Repair B1 trans fans SPIMAINT 25/07/08 06:58:00 25/07/08 15:05:00 B1 220/66KV TRANS AT HTS

8.117 EXCLUDE 1.2 Connection asset WO # 10285209

B4 Trans - Install cable tray and conduits

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 26/07/08 06:02:00 26/07/08 14:58:00 B4 220/66KV TRANS AT GTS

8.933 EXCLUDE 1.2 Connection asset WO # X50858E5

Tran Rebate for Bus Outage

V769 - (CBTS) PRIMARY EQUIPMENT DEFECTS REPAIR

SPICAPX 27/07/08 07:08:00 27/07/08 14:55:00 B2 220/66KV TRANS AT CBTS

7.783 EXCLUDE 1.2 Connection asset WO # V76958B3

REPAIR FANS,PUMPS & BUSHING OIL LEVELS

SPIMAINT 28/07/08 07:15:00 28/07/08 15:12:00 B3 220/66KV TRANS AT RWTS

7.950 EXCLUDE 1.2 Connection asset WO # 10285265

Scap to PTH Outage requested by APDALCOA APDALCOA 29/07/08 07:22:00 29/07/08 14:33:00 GTS -PTH 1 220KV WY

7.183 EXCLUDE 1.3 Third party outage WO # 10285168

REPAIR FANS, PUMPS AND BUSHING OIL LEVELS

SPIMAINT 29/07/08 07:35:00 29/07/08 15:10:00 B4 220/66KV TRANS AT RWTS

7.583 EXCLUDE 1.2 Connection asset WO # 10285267

Scap to PTH Outage requested by APDALCOA APDALCOA 30/07/08 07:18:00 30/07/08 15:10:00 GTS -PTH 2 220KV WY

7.867 EXCLUDE 1.3 Third party outage WO # 10285171

Scap to PTH Outage requested by APDALCOA APDALCOA 31/07/08 07:28:00 31/07/08 14:55:00 GTS -PTH 1 220KV WY

7.450 EXCLUDE 1.3 Third party outage WO # 10285170

REPAIR OIL PUMP & FAN MOTORS

SPIMAINT 1/08/08 07:06:00 1/08/08 14:25:00 B3 220/66KV TRANS AT SVTS

7.317 EXCLUDE 1.2 Connection asset WO # 10285375

Scap to PTH Outage requested by APDALCOA APDALCOA 1/08/08 07:15:00 1/08/08 13:34:00 GTS -PTH 2 220KV WY

6.317 EXCLUDE 1.3 Third party outage WO # 10285172

Avail plant due to bus outage fix 1-4 BT CB isol

FORCED 1/08/08 13:29:00 1/08/08 15:34:00 B1 220/66KV TRANS AT MWTS

2.083 EXCLUDE 1.2 Connection asset WO # 10286928

APD Work Outage requested by APDALCOA APDALCOA 6/08/08 07:05:00 6/08/08 17:40:00 HYTS-APD 2 500KV W

10.583 EXCLUDE 1.3 Third party outage WO # 10285412

Check Bucholtz X556 - (RWTS) REPLACE REYROLLE 66KV CBS AND ASSOCIATED CTS

SPICAPX 6/08/08 07:10:00 6/08/08 17:23:00 B1 220/66KV TRANS AT RWTS

10.217 EXCLUDE 1.1 Unregulated transmission asset WO # X55658U8

APD Work Outage requested by APDALCOA APDALCOA 7/08/08 07:18:00 7/08/08 18:45:00 HYTS-APD 2 500KV W

11.450 EXCLUDE 1.3 Third party outage WO # 10285412

B2 Transformer tripped on low oil.

FAULT 10/08/08 05:06:00 10/08/08 12:56:00 B2 220/66KV TRANS AT SVTS

7.833 EXCLUDE 1.2 Connection asset WO # 10285904

decommiss No1 S/S Trans

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 10/08/08 06:19:00 10/08/08 11:58:00 B1 220/66KV TRANS AT GTS

5.650 EXCLUDE 1.2 Connection asset WO # X50858F1

Rebate Trans outage SPIMAINT 10/08/08 07:33:00 10/08/08 11:16:00 B3 220/66KV TRANS AT ERTS

3.717 EXCLUDE 1.2 Connection asset WO # 10285625

Inspect Buchholz Relay & adjust as Required

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 11/08/08 06:40:00 11/08/08 15:56:00 B1 220/66KV TRANS AT MTS

9.267 EXCLUDE 1.2 Connection asset WO # X32058AH

Perf calc W/O No2 Tr grp

SPIMAINT 11/08/08 07:54:00 11/08/08 15:59:00 R2 220/66/22KV TRANS GROUP AT RCTS

8.083 EXCLUDE 1.2 Connection asset WO # 10285538

Inspect Buchholz Relay & adjust as Required

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 12/08/08 06:50:00 12/08/08 16:52:00 B3 220/66KV TRANS AT MTS

10.033 EXCLUDE 1.2 Connection asset WO # X32058AJ

Inspect Buchholz Relay & adjust as Required

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 13/08/08 06:23:00 13/08/08 15:00:00 U1 66/22KV TRANS AT MTS

8.617 EXCLUDE 1.2 Connection asset WO # X32058AK

Inspect Buchholz Relay

X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 14/08/08 06:18:00 14/08/08 15:24:00 U2 66/22KV TRANS AT MTS

9.100 EXCLUDE 1.2 Connection asset WO # X32058AG

Total circuit availabilityS1

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 9 of 30

Trans rebate for bus outage

FAULT 14/08/08 07:13:00 14/08/08 09:05:00 B1 220/66KV TRANS AT TBTS

1.867 EXCLUDE 1.2 Connection asset WO # 10286205

Rebate outage for Cap FAULT 14/08/08 07:13:00 17/08/08 14:38:00 NO.1 66KV CAPACITOR BANK AT TBTS

79.417 EXCLUDE 1.1 Unregulated transmission asset WO # 10286231

remove 1 upper and replace 1 upper fan

SPIMAINT 14/08/08 07:32:00 14/08/08 18:15:00 B1 220/66KV TRANS AT FBTS

10.717 EXCLUDE 1.2 Connection asset WO # 10285733

replace upper faulty fan

SPIMAINT 15/08/08 07:37:00 15/08/08 16:57:00 B4 220/66KV TRANS AT FBTS

9.333 EXCLUDE 1.2 Connection asset WO # 10285735

Rebate Tran for Bus outage

SPIMAINT 17/08/08 07:08:00 17/08/08 13:24:00 B3 220/66KV TRANS AT SVTS

6.267 EXCLUDE 1.2 Connection asset WO # 10283619

SCAP to LNGS Outage requested by GENCO GENCO 18/08/08 07:49:00 21/08/08 12:00:00 LNGS NO.2 GEN TRANS 220KV LINE AT ATS

76.183 EXCLUDE 1.1 Unregulated transmission asset WO # 10286073

O/HAUL Transformer Div Mechanism (N)

SPIMAINT 19/08/08 07:12:00 19/08/08 16:52:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

9.667 EXCLUDE 1.2 Connection asset WO # 10268287

O/HAUL Transformer Div Mechanism (N)

SPIMAINT 20/08/08 07:05:00 20/08/08 18:03:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

10.967 EXCLUDE 1.2 Connection asset WO # 10268287

Repair oil leak SPIMAINT 20/08/08 07:13:00 20/08/08 14:48:00 B2 220/66KV TRANS AT SVTS

7.583 EXCLUDE 1.2 Connection asset WO # 10285919

Repair/replace two faulty fans from Trans

SPIMAINT 20/08/08 08:27:00 20/08/08 14:40:00 NO.1 330/66/22KV TRANS AT WOTS

6.217 EXCLUDE 1.2 Connection asset WO # 10285032

O/HAUL Transformer Div Mechanism (N)

SPIMAINT 21/08/08 07:03:00 21/08/08 16:17:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

9.233 EXCLUDE 1.2 Connection asset WO # 10268287

O/HAUL Transformer Div Mechanism (N)

SPIMAINT 22/08/08 07:05:00 22/08/08 16:01:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

8.933 EXCLUDE 1.2 Connection asset WO # 10268287

remove faulty upper fans & invest faulty wti

SPIMAINT 22/08/08 08:07:00 22/08/08 15:42:00 B2 220/66KV TRANS AT ATS

7.583 EXCLUDE 1.2 Connection asset WO # 10285915

Repair oil leak SPIMAINT 26/08/08 07:24:00 26/08/08 15:01:00 B2 220/66KV TRANS AT SVTS

7.617 EXCLUDE 1.2 Connection asset WO # 10285919

APD Work Outage requested by APDALCOA APDALCOA 26/08/08 07:46:00 26/08/08 16:29:00 HYTS-APD 1 500KV W

8.717 EXCLUDE 1.3 Third party outage WO # 10286343

APD Work Outage requested by APDALCOA APDALCOA 27/08/08 07:30:00 27/08/08 09:23:00 HYTS-APD 2 500KV W

1.883 EXCLUDE 1.3 Third party outage WO # 10286344

Perf calc W/O No1 Trans during its 220kV CB O-H

SPIMAINT 28/08/08 07:41:00 28/08/08 14:37:00 R1 220/66/22KV TRANS AT KGTS

6.933 EXCLUDE 1.2 Connection asset WO # 10285822

O/HAUL Transformer and Trafo Union Div Sw (EM)

SPIMAINT 29/08/08 07:05:00 29/08/08 14:55:00 B3 220/66KV TRANS AT RWTS

7.833 EXCLUDE 1.2 Connection asset WO # 10269264

Perf calc W/O No3 Trans during its 220kV CB O-H

SPIMAINT 29/08/08 07:51:00 29/08/08 16:16:00 R3 220/66/22KV TRANS AT KGTS

8.417 EXCLUDE 1.2 Connection asset WO # 10285824

Rebate for Bus outage SPIMAINT 31/08/08 06:45:00 31/08/08 14:46:00 B4 220/66KV TRANS AT RWTS

8.017 EXCLUDE 1.2 Connection asset WO # 10282645

SCAP to LNGS Outage requested by GENCO GENCO 1/09/08 07:23:00 4/09/08 15:00:00 LNGS NO.1 GEN TRANS 220KV LINE AT ATS

79.617 EXCLUDE 1.1 Unregulated transmission asset WO # 10286479

O/Haul 22KV CAPACITOR BANK

SPIMAINT 3/09/08 07:01:00 3/09/08 14:46:00 NO.1 22KV CAPACITOR BANK AT RWTS

7.750 EXCLUDE 1.2 Connection asset WO # 10272575

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 10 of 30

Work for SWN SM165a

SPIMAINT 3/09/08 09:25:00 3/09/08 16:22:00 B1 220/66KV TRANS AT RWTS

6.950 EXCLUDE 1.1 Unregulated transmission asset WO # 10286681

Rebate W/O for RWTS Bus Trip

FAULT 3/09/08 16:58:00 3/09/08 17:18:00 L3 220/22KV TRANS BANK AT RWTS

0.333 EXCLUDE 1.2 Connection asset WO # 10286811

O/Haul 22KV CAPACITOR BANK

SPIMAINT 4/09/08 07:17:00 4/09/08 15:30:00 NO.2 22KV CAPACITOR BANK AT RWTS

8.217 EXCLUDE 1.2 Connection asset WO # 10272577

REBATE TRANS for CB outage

SPIMAINT 5/09/08 06:57:00 5/09/08 15:20:00 L3 220/22KV TRANS BANK AT RWTS

8.383 EXCLUDE 1.2 Connection asset WO # 10282655

Rebate Tran for Bus outage

SPIMAINT 6/09/08 07:22:00 6/09/08 13:13:00 B1 220/66KV TRANS AT SVTS

5.850 EXCLUDE 1.2 Connection asset WO # 10283621

Perf calc W/O B2 Trans during No2 66kV Bus outage

FORCED 6/09/08 14:05:00 6/09/08 16:19:00 B2 220/66KV TRANS AT TGTS

2.233 EXCLUDE 1.2 Connection asset WO # 10286906

Rebate for Tran outage

X670 - CT REPLACEMENT PROGRAM - STAGE 2

SPICAPX 10/09/08 07:06:00 12/09/08 18:29:00 B1 220/66KV TRANS AT TBTS

59.383 EXCLUDE 1.2 Connection asset WO # X67058B7

Replace oil pump X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 11/09/08 06:25:00 11/09/08 14:42:00 B4 220/66KV TRANS AT SVTS

8.283 EXCLUDE 1.2 Connection asset WO # X32058TT

out w/o for cap bank HPL - B1GS CB TESTING BY ABB

SPIMAINT 11/09/08 07:18:00 11/09/08 15:32:00 NO.2 220KV CAPACITOR BANK AT ATS

8.233 EXCLUDE 1.1 Unregulated transmission asset WO # 10296277

Condition Monitoring Metro Trans 3day Valley Area

SPIMAINT 14/09/08 07:08:00 18/09/08 16:38:00 NO.1 11/220KV TRANS BANK AT MPS (10106) SJ=001152

105.500 EXCLUDE 1.2 Connection asset WO # 10273043

Trans Rebate for Bus Outage

SPIMAINT 14/09/08 10:00:00 14/09/08 13:37:00 B1 220/66KV TRANS AT RTS

3.617 EXCLUDE 1.2 Connection asset WO # 10286960

O/HAUL Transformer and Div Sw (N)

SPIMAINT 16/09/08 08:58:00 16/09/08 15:55:00 R3 220/66/22KV TRANS AT KGTS

6.950 EXCLUDE 1.2 Connection asset WO # 10272413

O/HAUL Transformer and Div Sw (N)

SPIMAINT 17/09/08 07:30:00 17/09/08 17:12:00 R3 220/66/22KV TRANS AT KGTS

9.700 EXCLUDE 1.2 Connection asset WO # 10272413

O/HAUL Transformer and Div Sw (N)

SPIMAINT 18/09/08 07:40:00 18/09/08 15:54:00 R3 220/66/22KV TRANS AT KGTS

8.233 EXCLUDE 1.2 Connection asset WO # 10272413

Isolations for SCAP on LYA Unit 2

Outage requested by GENCO GENCO 22/09/08 12:35:00 23/09/08 09:09:00 LYPS-HWTS 1 500KV G

20.567 EXCLUDE 1.3 Third party outage WO # 10296421

No2 Trans Grp Div Sw Service ops O/Haul

SPIMAINT 23/09/08 07:02:00 23/09/08 15:05:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

8.050 EXCLUDE 1.2 Connection asset WO # 10286001

No2 Trans Grp Div Sw Service ops O/Haul

SPIMAINT 24/09/08 07:02:00 24/09/08 16:37:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

9.583 EXCLUDE 1.2 Connection asset WO # 10286001

Electranet Outage Outage requested by ELECTRAN ELECTRAN 25/09/08 08:40:00 25/09/08 17:18:00 HYTS-SESS 1 275KV WH

8.633 EXCLUDE 1.3 Third party outage WO # 10286025

Rebate for Bus Outage SPIMAINT 28/09/08 06:27:00 28/09/08 15:15:00 B2 220/66KV TRANS AT RWTS

8.800 EXCLUDE 1.2 Connection asset WO # 10286549

Transgrid Outage Outage requested by TRANSGRD TRANSGRD 29/09/08 10:04:00 29/09/08 16:06:00 MSS -DDTS 1 330KV NW

6.033 EXCLUDE 1.3 Third party outage WO # 10296473

Out W/O No2A Cap Bank to replace CB Sf6 aux rly

SPIMAINT 30/09/08 10:33:00 30/09/08 17:07:00 NO.2A 66KV CAPACITOR BANK AT BETS

6.567 EXCLUDE 1.1 Unregulated transmission asset WO # 10296637

Switching for APD Outage requested by APDALCOA APDALCOA 1/10/08 11:09:00 1/10/08 12:36:00 APD NO.2 500KV LINE AT HYTS

1.450 EXCLUDE 1.3 Third party outage WO # 10296698

Out W/O No3 Trans to install 220kV CVD's

X432 - (RCTS) STATION REDEVELOPMENT

SPICAPX 2/10/08 06:02:00 2/10/08 16:53:00 R3 220/66/22KV TRANS AT RCTS

10.850 EXCLUDE 1.1 Unregulated transmission asset WO # X43258BA

Transgrid Outage Outage requested by TRANSGRD TRANSGRD 3/10/08 07:06:00 3/10/08 13:14:00 MSS -DDTS 2 330KV NW

6.133 EXCLUDE 1.3 Third party outage WO # 10296630

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 11 of 30

Perf calc W/O No4 trans during No4 66 Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 4/10/08 06:01:00 4/10/08 14:47:00 B4 220/66KV TRANS AT GTS

8.767 EXCLUDE 1.2 Connection asset WO # X50858G2

EPS-MBTS No 2 220kv Line Gun shot repair

FORCMAJ 6/10/08 04:11:00 6/10/08 16:54:00 MBTS-EPS 2 220KV N

12.717 EXCLUDE 1.4 Force majeure WO # 10296796

Replace Surge Divertors

X7F8 - REPLACE AGEING 66KV - 330KV SURGE RESISTRS

SPICAPX 6/10/08 07:00:00 7/10/08 15:28:00 B1 220/66KV TRANS AT HTS

32.467 EXCLUDE 1.2 Connection asset WO # X7F858A0

Replace Surge Divertors

X7F8 - REPLACE AGEING 66KV - 330KV SURGE RESISTRS

SPICAPX 8/10/08 07:04:00 9/10/08 14:29:00 B2 220/66KV TRANS AT HTS

31.417 EXCLUDE 1.2 Connection asset WO # X7F858A1

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 9/10/08 05:40:00 9/10/08 18:13:00 JDSS-WOTS 330KV NW

12.550 EXCLUDE 1.3 Third party outage WO # 10296605

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 10/10/08 05:55:00 10/10/08 18:56:00 JDSS-WOTS 330KV NW

13.017 EXCLUDE 1.3 Third party outage WO # 10296605

Out W/O No4 Transformer for rebuild works

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 10/10/08 06:03:00 11/10/08 06:09:00 B4 220/66KV TRANS AT GTS

24.100 EXCLUDE 1.2 Connection asset WO # X50858F2

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 11/10/08 05:45:00 11/10/08 18:19:00 JDSS-WOTS 330KV NW

12.567 EXCLUDE 1.3 Third party outage WO # 10296605

Perf calc W/O No4 Trans during No2 220 Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 11/10/08 06:09:00 11/10/08 19:01:00 B4 220/66KV TRANS AT GTS

12.867 EXCLUDE 1.2 Connection asset WO # X50858F7

Out W/O No4 Transformer unavailable O'night

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 11/10/08 19:01:00 12/10/08 06:00:00 B4 220/66KV TRANS AT GTS

10.983 EXCLUDE 1.2 Connection asset WO # X50858F8

Out W/O No4 Transformer for rebuild works

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 12/10/08 06:00:00 13/10/08 20:58:00 B4 220/66KV TRANS AT GTS

38.967 EXCLUDE 1.2 Connection asset WO # X50858F9

Trans Rebate for Bus outage

SPIMAINT 12/10/08 07:19:00 12/10/08 10:00:00 B2 220/66KV TRANS AT RTS

2.683 EXCLUDE 1.2 Connection asset WO # 10286623

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 13/10/08 05:44:00 13/10/08 15:56:00 JDSS-WOTS 330KV NW

10.200 EXCLUDE 1.3 Third party outage WO # 10296605

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 14/10/08 05:50:00 14/10/08 19:06:00 JDSS-WOTS 330KV NW

13.267 EXCLUDE 1.3 Third party outage WO # 10296605

Clean Bird Droppings X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 14/10/08 06:43:00 14/10/08 09:24:00 B3 220/66KV TRANS AT MTS

2.683 EXCLUDE 1.2 Connection asset WO # X32058AO

O/HAUL Transformer and Div Sw (W)

SPIMAINT 14/10/08 07:03:00 14/10/08 18:48:00 B1 220/66KV TRANS AT KTS

11.750 EXCLUDE 1.2 Connection asset WO # 10291826

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 15/10/08 05:35:00 15/10/08 18:18:00 JDSS-WOTS 330KV NW

12.717 EXCLUDE 1.3 Third party outage WO # 10296605

INSTALL NEW COOLING FAN

SPIMAINT 15/10/08 07:04:00 15/10/08 15:18:00 B4 220/66KV TRANS AT RTS

8.233 EXCLUDE 1.2 Connection asset WO # 10296485

O/HAUL Transformer and Div Sw (W)

SPIMAINT 15/10/08 07:08:00 15/10/08 15:30:00 B2 220/66KV TRANS AT KTS

8.367 EXCLUDE 1.2 Connection asset WO # 10291829

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 16/10/08 05:30:00 16/10/08 19:12:00 JDSS-WOTS 330KV NW

13.700 EXCLUDE 1.3 Third party outage WO # 10296605

Rebate W/O DDTS-SMTS No2 Line during ROI & Esw OH

SPIMAINT 16/10/08 07:04:00 16/10/08 16:10:00 9.100 EXCLUDE 1.1 Unregulated transmission asset WO # 10297735

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 17/10/08 05:32:00 17/10/08 18:13:00 JDSS-WOTS 330KV NW

12.683 EXCLUDE 1.3 Third party outage WO # 10296605

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 18/10/08 05:34:00 18/10/08 16:26:00 JDSS-WOTS 330KV NW

10.867 EXCLUDE 1.3 Third party outage WO # 10296605

Rebate W/O No3 TR during No1 220kV Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 19/10/08 05:30:00 19/10/08 18:55:00 B3 220/66KV TRANS AT GTS

13.417 EXCLUDE 1.2 Connection asset WO # X50858H9

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 19/10/08 05:32:00 19/10/08 20:40:00 JDSS-WOTS 330KV NW

15.133 EXCLUDE 1.3 Third party outage WO # 10296605

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 20/10/08 05:34:00 20/10/08 18:59:00 JDSS-WOTS 330KV NW

13.417 EXCLUDE 1.3 Third party outage WO # 10296605

Outage request from Pt Henry

Outage requested by APDALCOA APDALCOA 20/10/08 08:38:00 21/10/08 16:31:00 GTS -PTH 2 220KV WY

31.883 EXCLUDE 1.3 Third party outage WO # 10297280

Repair OLTC FORCED 20/10/08 13:03:00 20/10/08 14:34:00 B1 220/66KV TRANS AT KTS

1.517 EXCLUDE 1.2 Connection asset WO # 10297294

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 21/10/08 05:39:00 21/10/08 18:32:00 JDSS-WOTS 330KV NW

12.883 EXCLUDE 1.3 Third party outage WO # 10296605

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 22/10/08 05:32:00 22/10/08 16:39:00 JDSS-WOTS 330KV NW

11.117 EXCLUDE 1.3 Third party outage WO # 10296605

Replace Surge Divertors

X7F8 - REPLACE AGEING 66KV - 330KV SURGE RESISTRS

SPICAPX 22/10/08 07:03:00 23/10/08 14:16:00 B3 220/66KV TRANS AT SVTS

31.217 EXCLUDE 1.2 Connection asset WO # X7F858A3

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 12 of 30

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 23/10/08 05:40:00 23/10/08 18:04:00 JDSS-WOTS 330KV NW

12.400 EXCLUDE 1.3 Third party outage WO # 10296605

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 24/10/08 05:38:00 24/10/08 17:21:00 JDSS-WOTS 330KV NW

11.717 EXCLUDE 1.3 Third party outage WO # 10296605

Install weather shields X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 24/10/08 06:47:00 24/10/08 07:30:00 U1 66/22KV TRANS AT MTS

0.717 EXCLUDE 1.2 Connection asset WO # X32058AS

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 25/10/08 05:40:00 25/10/08 15:15:00 JDSS-WOTS 330KV NW

9.583 EXCLUDE 1.3 Third party outage WO # 10296605

Rebate for Bus outage X741 - (TYREE,GEC FMJL,ASEA IMBA) CT REPLACEMENT

SPICAPX 25/10/08 07:13:00 25/10/08 18:41:00 B3 220/66KV TRANS AT SVTS

11.467 EXCLUDE 1.2 Connection asset WO # 10297278

O/HAUL Transformer and Div Sw (N)

SPIMAINT 25/10/08 07:48:00 25/10/08 17:19:00 B1 220/66KV TRANS AT GTS

9.517 EXCLUDE 1.2 Connection asset WO # 10270150

O/HAUL Transformer and Div Sw (N)

SPIMAINT 26/10/08 07:01:00 26/10/08 15:26:00 B1 220/66KV TRANS AT GTS

8.417 EXCLUDE 1.2 Connection asset WO # 10270150

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 28/10/08 05:30:00 28/10/08 17:30:00 JDSS-WOTS 330KV NW

12.000 EXCLUDE 1.3 Third party outage WO # 10296605

MODIFY TRANS SD EARTHING

SPIMAINT 28/10/08 07:12:00 28/10/08 15:49:00 B1 220/66KV TRANS AT SVTS

8.617 EXCLUDE 1.2 Connection asset WO # 10297331

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 29/10/08 05:34:00 29/10/08 16:04:00 JDSS-WOTS 330KV NW

10.500 EXCLUDE 1.3 Third party outage WO # 10296605

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 30/10/08 05:34:00 30/10/08 15:25:00 JDSS-WOTS 330KV NW

9.850 EXCLUDE 1.3 Third party outage WO # 10296605

O/HAUL Transformer Div Mechanism (N)

SPIMAINT 30/10/08 08:02:00 30/10/08 18:03:00 B1 220/66KV TRANS AT TGTS

10.017 EXCLUDE 1.2 Connection asset WO # 10274177

Switching for APD to top up SF6 CB at APD

Outage requested by APDALCOA APDALCOA 30/10/08 09:34:00 30/10/08 11:51:00 APD NO.2 500KV LINE AT HYTS

2.283 EXCLUDE 1.3 Third party outage WO # 10297612

HOTS-RCTS 220kV Line Hattah Busfire Outage

BUSHFIRE 30/10/08 18:21:00 31/10/08 10:06:00 HOTS-RCTS 220KV

15.750 EXCLUDE 1.4 Force majeure WO # 10297647

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 1/11/08 05:31:00 1/11/08 19:59:00 JDSS-WOTS 330KV NW

14.467 EXCLUDE 1.3 Third party outage WO # 10296605

Replace No1 Tr 66kv neutral isolator

SPIMAINT 1/11/08 06:57:00 1/11/08 11:32:00 B1 220/66KV TRANS AT GTS

4.583 EXCLUDE 1.2 Connection asset WO # 10297515

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 3/11/08 05:35:00 3/11/08 18:02:00 JDSS-WOTS 330KV NW

12.450 EXCLUDE 1.3 Third party outage WO # 10296605

Delta E/F Alarm FORCED 3/11/08 06:46:00 3/11/08 08:09:00 L3 220/22KV TRANS BANK AT RWTS

1.383 EXCLUDE 1.2 Connection asset WO # 10297697

Transgrid OPGW work Outage requested by TRANSGRD TRANSGRD 4/11/08 05:35:00 4/11/08 13:17:00 JDSS-WOTS 330KV NW

7.700 EXCLUDE 1.3 Third party outage WO # 10296605

Perf calc W/O No1A Trans during 22kV CB outage

SPIMAINT 4/11/08 07:26:00 4/11/08 17:29:00 NO.1A TRANS AT RCTS

10.050 EXCLUDE 1.2 Connection asset WO # 10297312

Perf calc W/O No2 Tr grp

SPIMAINT 6/11/08 09:33:00 6/11/08 19:34:00 R2 220/66/22KV TRANS GROUP AT RCTS

10.017 EXCLUDE 1.2 Connection asset WO # 10297316

Install weather shields X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 7/11/08 06:51:00 7/11/08 10:04:00 U1 66/22KV TRANS AT MTS

3.217 EXCLUDE 1.2 Connection asset WO # X32058AW

Install weather shields X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 7/11/08 10:05:00 7/11/08 12:13:00 U2 66/22KV TRANS AT MTS

2.133 EXCLUDE 1.2 Connection asset WO # X32058AT

Future B1 Trans at SMTS

VEN_AUG 7/11/08 14:55:00 30/11/08 23:59:59 FUTURE B1 220/66KV TRANS AT SMTS

561.083 EXCLUDE 1.2 Connection asset WO # 10300287

Rebate W/O No3 TR during No1 220kV Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 8/11/08 06:00:00 8/11/08 17:52:00 B3 220/66KV TRANS AT GTS

11.867 EXCLUDE 1.2 Connection asset WO # X50858I5

Installation of access hatch

V8C4 - (CBTS) RECTIFY CONSTRUCTION DEFECTS

SPIMAINT 8/11/08 06:57:00 8/11/08 16:04:00 B1 220/66KV TRANS AT CBTS

9.117 EXCLUDE 1.2 Connection asset WO # V8C458A0

Perf calc W/O No1 trans during No2 66 Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 9/11/08 06:00:00 9/11/08 14:41:00 B1 220/66KV TRANS AT GTS

8.683 EXCLUDE 1.2 Connection asset WO # X50858J5

O/HAUL Transformer and Trafo Union Div Sw (W)

SPIMAINT 11/11/08 06:38:00 11/11/08 15:44:00 B3 220/66KV TRANS AT FBTS

9.100 EXCLUDE 1.2 Connection asset WO # 10291416

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 13 of 30

O/HAUL Transformer and Trafo Union Div Sw (W)

SPIMAINT 12/11/08 06:54:00 12/11/08 17:00:00 B3 220/66KV TRANS AT FBTS

10.100 EXCLUDE 1.2 Connection asset WO # 10291416

Clean Bird Droppings X320 - (MTS) STATION REDEVELOPMENT

SPIMAINT 12/11/08 08:16:00 12/11/08 16:15:00 B3 220/66KV TRANS AT MTS

7.983 EXCLUDE 1.2 Connection asset WO # X32058AU

O/Haul B1 TRANS AT FBTS

SPIMAINT 13/11/08 06:22:00 13/11/08 16:15:00 B1 220/66KV TRANS AT FBTS

9.883 EXCLUDE 1.2 Connection asset WO # 10291414

NO2 Trans OLTC Mech tight during operation

SPIMAINT 13/11/08 14:19:00 13/11/08 18:01:00 R2 220/66/22KV TRANS AT KGTS

3.700 EXCLUDE 1.2 Connection asset WO # 10297912

Perf calc W/O B4 trans during No4 66 Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 15/11/08 06:40:00 15/11/08 15:00:00 B4 220/66KV TRANS AT GTS

8.333 EXCLUDE 1.2 Connection asset WO # X50858K1

Out W/O B4 trans VT ratio change

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 15/11/08 15:00:00 15/11/08 17:18:00 B4 220/66KV TRANS AT GTS

2.300 EXCLUDE 1.2 Connection asset WO # X50858K6

Perf calc W/O B4 trans during No4 66 Bus outage

X508 - (GTS) STATION REDEVELOPMENT

SPICAPX 22/11/08 06:00:00 22/11/08 18:15:00 B4 220/66KV TRANS AT GTS

12.250 EXCLUDE 1.2 Connection asset WO # X50858K5

Treatment and Regeneration of Appro 60,000

V881 - COST EST - (RTS) B1 TRANSFORMER OIL REGENERATION

SPIMAINT 22/11/08 07:11:00 23/11/08 12:00:00 B1 220/66KV TRANS AT RTS

28.817 EXCLUDE 1.2 Connection asset WO # V88158A0

B4 Trans tripped on thru fault

FAULT 23/11/08 03:05:00 23/11/08 05:14:00 B4 220/66KV TRANS AT GTS

2.150 EXCLUDE 1.2 Connection asset WO # 10298577

Investigate No2 Transformer Out of Step

SPIMAINT 27/11/08 07:54:00 27/11/08 15:15:00 R2 220/66/22KV TRANS AT KGTS

7.350 EXCLUDE 1.2 Connection asset WO # 10298413

B1 Trans SPIMAINT 27/11/08 10:31:00 27/11/08 10:50:00 B1 220/66KV TRANS AT KTS

0.317 EXCLUDE 1.2 Connection asset WO # 10298425

Installation of access hatch

V8C4 - (CBTS) RECTIFY CONSTRUCTION DEFECTS

SPIMAINT 29/11/08 07:10:00 29/11/08 16:12:00 B2 220/66KV TRANS AT CBTS

9.033 EXCLUDE 1.2 Connection asset WO # V8C458A1

Perf calc W/O B2 Trans during #1 66 bus outage

SPIMAINT 30/11/08 18:22:00 30/11/08 18:41:00 B2 220/66KV TRANS AT HOTS

0.317 EXCLUDE 1.2 Connection asset WO # 10298148

Future B1 Trans at SMTS

VEN_AUG 1/12/08 00:00:00 31/12/08 23:59:59 FUTURE B1 220/66KV TRANS AT SMTS

744.000 EXCLUDE 1.2 Connection asset WO # 10300287

replace faulty transformer mechanism

SPIMAINT 1/12/08 07:03:00 2/12/08 14:38:00 B3 220/66KV TRANS AT WMTS

31.583 EXCLUDE 1.2 Connection asset WO # 10298353

Works for Power Station

Outage requested by GENCO GENCO 1/12/08 20:46:00 1/12/08 21:41:00 BLTS 220KV LINE AT NPSD

0.917 EXCLUDE 1.3 Third party outage WO # 10298562

Works for Power Station

Outage requested by GENCO GENCO 1/12/08 21:55:00 1/12/08 22:13:00 FBTS 220KV LINE AT NPSD

0.300 EXCLUDE 1.3 Third party outage WO # 10298563

KGTS No2 Trans OLTC Fault

FORCED 3/12/08 00:12:00 3/12/08 01:04:00 R2 220/66/22KV TRANS AT KGTS

0.867 EXCLUDE 1.2 Connection asset WO # 10298609

Out W/O A2 Trans to connect new 1B CB Cts

X565 - REPLACE 220KV TYREE CTS

SPICAPX 3/12/08 06:37:00 3/12/08 10:53:00 A2 500/220KV TRANS BANK AT MLTS

4.267 EXCLUDE 1.1 Unregulated transmission asset WO # X56558G4

APD Work Outage requested by APDALCOA APDALCOA 3/12/08 08:02:00 3/12/08 08:30:00 HYTS-APD 2 500KV W

0.467 EXCLUDE 1.3 Third party outage WO # 10298431

Repair oil leaks SPIMAINT 4/12/08 06:55:00 4/12/08 14:56:00 L3 220/22KV TRANS BANK AT RWTS

8.017 EXCLUDE 1.2 Connection asset WO # 10298311

top up 2 off 220kv trans bushings

SPIMAINT 4/12/08 07:12:00 4/12/08 14:53:00 B1 220/66KV TRANS AT WMTS

7.683 EXCLUDE 1.2 Connection asset WO # 10298631

APD Work Outage requested by APDALCOA APDALCOA 4/12/08 08:01:00 4/12/08 11:44:00 HYTS-APD 1 500KV W

3.717 EXCLUDE 1.3 Third party outage WO # 10298434

Investigate No2 Transformer Out of Step

SPIMAINT 4/12/08 08:28:00 4/12/08 13:45:00 R2 220/66/22KV TRANS AT KGTS

5.283 EXCLUDE 1.2 Connection asset WO # 10298542

Power Station requirements

Outage requested by GENCO GENCO 5/12/08 23:36:00 8/12/08 00:32:00 NO.6 GEN TRANS 220/16.5KV(CHECK PCB REGISTER) AT HWPS

48.933 EXCLUDE 1.3 Third party outage WO # 10298672

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 14 of 30

P/Station requirements - W1 Gen to 220 kV System

Outage requested by GENCO GENCO 6/12/08 04:08:00 6/12/08 04:17:00 W1A 230/20KV GEN TRANS (CHECK PCB REGISTER) AT YWPS

0.150 EXCLUDE 1.3 Third party outage WO # 10298676

Perf calc W/O No2 Trans during its 66kv CB outage

SPIMAINT 9/12/08 12:43:00 9/12/08 15:27:00 B2 220/66KV TRANS AT SHTS

2.733 EXCLUDE 1.2 Connection asset WO # 10298339

Perf calc W/O B2 Trans during #1 66 bus outage

SPIMAINT 10/12/08 21:14:00 10/12/08 21:24:00 B2 220/66KV TRANS AT HOTS

0.167 EXCLUDE 1.2 Connection asset WO # 10298320

Transformer Div. Switch Overhaul

SPIMAINT 11/12/08 07:01:00 11/12/08 14:27:00 B2 220/66KV TRANS AT HTS

7.433 EXCLUDE 1.2 Connection asset WO # 10290912

Rebate W/O 3A Cap bk during CB outage

SPIMAINT 14/12/08 06:36:00 14/12/08 18:00:00 NO.3A 66KV CAPACITOR BANK AT BETS

11.400 EXCLUDE 1.1 Unregulated transmission asset WO # 10298596

No2 Transf fault on 22kV Cable

FAULT 14/12/08 12:34:00 14/12/08 20:40:00 NO.2 330/66/22KV TRANS AT WOTS

8.100 EXCLUDE 1.2 Connection asset WO # 10298841

Perf calc W/O No2 Trans during #3 66 bus outage

SPIMAINT 14/12/08 18:36:00 14/12/08 18:57:00 R2A/2B 220/66/22KV TRANS GROUP AT BETS

0.350 EXCLUDE 1.2 Connection asset WO # 10298591

invest / repair faulty trans mechanism

SPIMAINT 15/12/08 07:31:00 16/12/08 15:04:00 B3 220/66KV TRANS AT WMTS

31.550 EXCLUDE 1.2 Connection asset WO # 10298760

APD Work Outage requested by APDALCOA APDALCOA 16/12/08 14:50:00 16/12/08 18:08:00 HYTS-APD 2 500KV W

3.300 EXCLUDE 1.3 Third party outage WO # 10298847

APD Work Outage requested by APDALCOA APDALCOA 17/12/08 07:46:00 17/12/08 16:23:00 HYTS-APD 2 500KV W

8.617 EXCLUDE 1.3 Third party outage WO # 10298847

Electranet Outage Outage requested by ELECTRAN ELECTRAN 17/12/08 08:45:00 17/12/08 16:20:00 HYTS-SESS 2 275KV WH

7.583 EXCLUDE 1.3 Third party outage WO # 10297872

HYTS-APD No2 Line De-Energised for APD

Outage requested by APDALCOA APDALCOA 18/12/08 11:01:00 18/12/08 15:53:00 HYTS-APD 2 500KV W

4.867 EXCLUDE 1.3 Third party outage WO # 10299057

Out W/O for reconnection of No2 Trans 22kV Cable

SPIMAINT 21/12/08 10:43:00 21/12/08 17:27:00 NO.2 330/66/22KV TRANS AT WOTS

6.733 EXCLUDE 1.2 Connection asset WO # 10299041

Replace Pump SPIMAINT 22/12/08 06:59:00 22/12/08 17:12:00 B4 220/66KV TRANS AT SVTS

10.217 EXCLUDE 1.2 Connection asset WO # 10298992

Repair oil leaks SPIMAINT 22/12/08 07:07:00 22/12/08 14:31:00 L3 220/22KV TRANS BANK AT RWTS

7.400 EXCLUDE 1.2 Connection asset WO # 10298311

APD work Outage requested by APDALCOA APDALCOA 22/12/08 07:45:00 22/12/08 15:17:00 HYTS-APD 2 500KV W

7.533 EXCLUDE 1.3 Third party outage WO # 10299134

APD work Outage requested by APDALCOA APDALCOA 23/12/08 08:00:00 23/12/08 11:02:00 HYTS-APD 1 500KV W

3.033 EXCLUDE 1.3 Third party outage WO # 10299222

Works for Power Station

Outage requested by GENCO GENCO 1/12/08 20:46:00 1/12/08 21:41:00 BLTS 220KV LINE AT NPSD

0.917 EXCLUDE 2.3 Third party outage WO # 10298562

Works for Power Station

Outage requested by GENCO GENCO 1/12/08 21:55:00 1/12/08 22:13:00 FBTS 220KV LINE AT NPSD

0.083 EXCLUDE 2.3 Third party outage WO # 10298563

APD Work Outage requested by APDALCOA APDALCOA 4/12/08 08:01:00 4/12/08 11:44:00 HYTS-APD 1 500KV W

0.733 EXCLUDE 2.3 Third party outage WO # 10298434

APD Work Outage requested by APDALCOA APDALCOA 16/12/08 14:50:00 16/12/08 18:08:00 HYTS-APD 2 500KV W

3.300 EXCLUDE 2.3 Third party outage WO # 10298847

APD Work Outage requested by APDALCOA APDALCOA 17/12/08 07:46:00 17/12/08 16:23:00 HYTS-APD 2 500KV W

5.383 EXCLUDE 2.3 Third party outage WO # 10298847

Electranet Outage Outage requested by ELECTRAN ELECTRAN 17/12/08 08:45:00 17/12/08 16:20:00 HYTS-SESS 2 275KV WH

5.333 EXCLUDE 2.3 Third party outage WO # 10297872

HYTS-APD No2 Line De-Energised for APD

Outage requested by APDALCOA APDALCOA 18/12/08 11:01:00 18/12/08 15:53:00 HYTS-APD 2 500KV W

4.867 EXCLUDE 2.3 Third party outage WO # 10299057

APD work Outage requested by APDALCOA APDALCOA 22/12/08 07:45:00 22/12/08 15:17:00 HYTS-APD 2 500KV W

4.283 EXCLUDE 2.3 Third party outage WO # 10299134

APD work Outage requested by APDALCOA APDALCOA 23/12/08 08:00:00 23/12/08 11:02:00 HYTS-APD 1 500KV W

0.033 EXCLUDE 2.3 Third party outage WO # 10299222

S2 Peak critical availability

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 15 of 30

Excavate adjacent to No1 66kv Reactor

X724 - (HOTS) NO.1 SHUNT REACTOR REPLACEMENT

SPICAPX 19/11/08 15:08:00 19/11/08 16:12:00 NO.1 66KV REACTOR AT HOTS

1.067 EXCLUDE 3.7 Shunt reactor WO # X72458A2

Out W/O 220kV Shunt Reactor to replace its CTs

X565 - REPLACE 220KV TYREE CTS

SPICAPX 4/12/08 07:02:00 5/12/08 12:50:00 220KV SHUNT REACTOR AT MLTS

12.833 EXCLUDE 3.7 Shunt reactor WO # X56558G5

O/Haul - 66kV reactor SPIMAINT 10/12/08 07:27:00 10/12/08 15:14:00 NO.3 66KV REACTOR AT RCTS

4.233 EXCLUDE 3.7 Shunt reactor WO # 10272601

Repair No2 66kv Reactor oil leaks

SPIMAINT 11/12/08 07:23:00 11/12/08 16:04:00 NO.2 66KV REACTOR AT RCTS

5.067 EXCLUDE 3.7 Shunt reactor WO # 10284435

Work at APD No2 Reactor Gas Relay

Outage requested by APDALCOA APDALCOA 25/06/08 07:37:00 25/06/08 17:17:00 APD NO.2 500KV LINE AT HYTS

9.667 EXCLUDE 4.3 Third party outage WO # 10284594

APD work Outage requested by APDALCOA APDALCOA 30/06/08 13:07:00 30/06/08 17:01:00 HYTS-APD 2 500KV W

3.900 EXCLUDE 4.3 Third party outage WO # 10284672

PTH Work Outage requested by APDALCOA APDALCOA 7/07/08 08:00:00 7/07/08 15:13:00 GTS -PTH 2 220KV WY

7.217 EXCLUDE 4.3 Third party outage WO # 10284989

Scap to PTH Outage requested by APDALCOA APDALCOA 29/07/08 07:22:00 29/07/08 14:33:00 GTS -PTH 1 220KV WY

7.183 EXCLUDE 4.3 Third party outage WO # 10285168

Scap to PTH Outage requested by APDALCOA APDALCOA 30/07/08 07:18:00 30/07/08 15:10:00 GTS -PTH 2 220KV WY

7.867 EXCLUDE 4.3 Third party outage WO # 10285171

Scap to PTH Outage requested by APDALCOA APDALCOA 31/07/08 07:28:00 31/07/08 14:55:00 GTS -PTH 1 220KV WY

7.450 EXCLUDE 4.3 Third party outage WO # 10285170

Scap to PTH Outage requested by APDALCOA APDALCOA 1/08/08 07:15:00 1/08/08 13:34:00 GTS -PTH 2 220KV WY

6.317 EXCLUDE 4.3 Third party outage WO # 10285172

APD Work Outage requested by APDALCOA APDALCOA 6/08/08 07:05:00 6/08/08 17:40:00 HYTS-APD 2 500KV W

10.583 EXCLUDE 4.3 Third party outage WO # 10285412

APD Work Outage requested by APDALCOA APDALCOA 7/08/08 07:18:00 7/08/08 18:45:00 HYTS-APD 2 500KV W

11.450 EXCLUDE 4.3 Third party outage WO # 10285412

APD Work Outage requested by APDALCOA APDALCOA 26/08/08 07:46:00 26/08/08 16:29:00 HYTS-APD 1 500KV W

8.717 EXCLUDE 4.3 Third party outage WO # 10286343

APD Work Outage requested by APDALCOA APDALCOA 27/08/08 07:30:00 27/08/08 09:23:00 HYTS-APD 2 500KV W

1.883 EXCLUDE 4.3 Third party outage WO # 10286344

O/Haul - 66kV reactor SPIMAINT 1/07/08 08:01:00 1/07/08 15:18:00 NO.2 66KV REACTOR AT HOTS

7.283 EXCLUDE 5.7 Shunt reactor WO # 10272603

Event proposed for exclusion

Description of the event and its impact on the network and

performanceCause of the event Start

dateStart time

End date

End time Circuits affected Maximum system

demandQuantitative

impactDemand shed

and time Reasons for exclusion request Further references

Name of the eventDetail of the event. Such as: the action of any third parties, the actions of the TNSP,assets damaged or interrupted.

A description of the cause of the event

Name of circuits or plant affected

The max system demand that occurred up until the time of the event

Number of hours, mins etc interrupted

The (MW) demand shed and the duration it was shed for.

Full details of the reason/s for excluding this event. Should include a reference to the defined exclusions and explain how it meets this exclusion definition (seExclusion definition tab). Eg. Exclusion 1.2 Third party event

A TNSP may provide further details of an exclusion event. TNSP to provide reference.

Event proposed for exclusion

Description of the event and its impact on the network and

performanceCause of the event Start

dateStart time

End date

End time

Quantitative impact

Capped impact (if applicable) Reasons for exclusion request Further references

Name of the eventDetail of the event. Such as: the action of any third parties, the actions of the TNSP,assets damaged or interrupted.

A description of the cause of the event

Number of hours, mins etc interrupted

Impact following any applicable cap

Full details of the reason for excluding this event. Should include a reference to the defined exclusions and explain how it meets this exclusion definition (seExclusion definition tab). Eg. Exclusion 1.2 Third party event

A TNSP may provide further details of an exclusion event. TNSP to provide reference.

HOTS-RCTS 220kV Line Hattah Busfire Outage

BUSHFIRE 30/10/08 18:21:00 31/10/08 10:06:00 HOTS-RCTS 220KV

15.750 EXCLUDE 6.4 Force majeure WO # 10297647, SIR # 10297642

Start date and time of event

End date and time of event

S5 Intermediate non-critical availability

LOSS OF SUPPLY EVENT FREQUENCY

Name of any loss of supply parameters applying to Powerlink

S3

S7Loss of supply event

frequency (No. of events > 0.3 system

AVERAGE OUTAGE DURATION

S6Loss of supply event

frequency (No. of events > 0.05 system

Peak non-critical availability

S4 Intermediate critical availability

Circuits affected

Name of any average outage duration parameters applying to SP AusNet

Name of circuits or plant affected

S8 Average outage duration (lines)

Start date and time of event

End date and time of event

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

AER Report Dec-08 SP AusNet Performance Page 16 of 30

NOTES:

This worksheet should include a list all events that are proposed for exclusion.

Each proposed exclusion should include a description of the event, a description of the impact and quantification of the impact on the network and performance. The descriptive elements should also include reasons for the exclusion request making reference to the "Exclusion Definitions" worksheet.

Each exclusion should be entered onto one row for each parameter. Where one exclusion event applies to more than one parameter, the relevant details of the event should be entered under each of the measure headings.

The TNSP must provide details for all events requested for exclusion in this template. In the event that the TNSP wishes to provide further details of an exclusion, this should be provided with the TNSP's performance report. The source of information should be referenced in this template.

Green cells - input description impact

Orange cells - input reasons for the exclusion request

S9Average outage

duration (transformers)

Created: 02/02/2009 16:05 Printed: 8/05/2009 3:33 PM Inputs - Exclusions File: SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls

SP AUSNET- S1 - Total circuit availability

Performance Targets Graph start Collar Target Cap Graph endTotal circuit availability 98.10% 98.41% 98.73% 99.05% 99.30%

Weighting -0.20% -0.20% 0.00% 0.20% 0.20%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.002000 Availability < 98.41% -0.002000 -0.002000

= 0.625000 x Availability + -0.617063 98.41% ≤ Availability ≤ 98.73% 0.002177 0.002421

= 0.625000 x Availability + -0.617062 98.73% ≤ Availability ≤ 99.05% 0.002177 0.002421

= 0.002000 99.05% < Availability 0.002000 0.002000

Performance OutcomesPerformance

(Without Exclusions)

Performance (Exclusions)

Total circuit availability = 99.078398% 99.117382%

S-Factor = 0.200000% 0.200000%

Formulae

SP AUSNET SERVICE STANDARDSS1 - Total circuit availability

-0.25%

-0.20%

-0.15%

-0.10%

-0.05%

0.00%

0.05%

0.10%

0.15%

0.20%

0.25%

98.10% 98.40% 98.70% 99.00% 99.30%

Total circuit availabilityFi

nanc

ial I

ncen

tive

(Per

cent

age

of A

nnua

l Rev

enue

)

Service standardsincentive curve

Performance (Without Exclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S1

SP AUSNET - S2 - Peak critical availability

Performance Targets Graph start Collar Target Cap Graph endPeak critical availability 98.50% 98.62% 99.39% 99.78% 100.00%

Weighting -0.20% -0.20% 0.00% 0.20% 0.20%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.002000 When: Availability < 98.62% -0.002000 -0.002000

= 0.259740 x Availability + -0.258156 98.62% ≤ Availability ≤ 99.39% 0.000923 0.001073

= 0.512821 x Availability + -0.509692 99.39% ≤ Availability ≤ 99.78% 0.001823 0.002118

= 0.002000 99.78% < Availability 0.002000 0.002000

Performance OutcomesPerformance

(Without Exclusions)

Performance (Exclusions)

Peak critical availability = 99.745438% 99.802938%

S-Factor = 0.182276% 0.200000%

Formulae

SP AUSNET SERVICE STANDARDSS2 - Peak critical availability

-0.25%

-0.20%

-0.15%

-0.10%

-0.05%

0.00%

0.05%

0.10%

0.15%

0.20%

0.25%

98.5% 98.7% 98.9% 99.1% 99.3% 99.5% 99.7% 99.9%

Peak critical availabilityFi

nanc

ial I

ncen

tive

(Per

cent

age

of A

nnua

l Rev

enue

)

Service standardsincentive curve

Performance (Without Exclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S2

SP AUSNET S3 - Peak non-critical availability

Performance Targets Graph start Collar Target Cap Graph endPeak non-critical availability 98.70% 98.83% 99.40% 99.69% 100.00%

Weighting -0.05% -0.05% 0.00% 0.05% 0.05%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.000500 When: Availability < 98.83% -0.000500 -0.000500

= 0.087719 x Availability + -0.087193 98.83% ≤ Availability ≤ 99.40% 0.000360 0.000467

= 0.172414 x Availability + -0.171379 99.40% ≤ Availability ≤ 99.69% 0.000708 0.000918

= 0.000500 99.69% < Availability 0.000500 0.000500

Performance OutcomesPerformance

(Without Exclusions)

Performance (Exclusions)

Peak non-critical availability = 99.810606% 99.932660%

S-Factor = 0.050000% 0.050000%

Formulae

SP AUSNET SERVICE STANDARDSS3 - Peak non-critical availability

-0.075%

-0.050%

-0.025%

0.000%

0.025%

0.050%

0.075%

98.70% 98.90% 99.10% 99.30% 99.50% 99.70% 99.90%

Peak non-critical availabilityFi

nanc

ial I

ncen

tive

(Per

cent

age

of A

nnua

l Rev

enue

)

Service standardsincentive curve

Performance (Without Exclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S3

SP AUSNET S4 - Intermediate critical availability

Performance Targets Graph start Collar Target Cap Graph endIntermediate critical availability 96.50% 97.29% 98.67% 99.36% 100.00%

Weighting -0.03% -0.0250% 0.00% 0.0250% 0.03%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.000250 When: Availability < 97.29% -0.000250 -0.000250

= 0.018116 x Availability + -0.017875 97.29% ≤ Availability ≤ 98.67% 0.000126 0.000137

= 0.036232 x Availability + -0.035750 98.67% ≤ Availability ≤ 99.36% 0.000253 0.000273

= 0.000250 99.36% < Availability 0.000250 0.000250

Performance OutcomesPerformance

(Without Exclusions)

Performance (Exclusions)

Intermediate critical availability = 99.366936% 99.424704%

S-Factor = 0.025000% 0.025000%

Formulae

SP AUSNET SERVICE STANDARDSS4 - Intermediate critical availability

-0.030%

-0.020%

-0.010%

0.000%

0.010%

0.020%

0.030%

96.50% 97.00% 97.50% 98.00% 98.50% 99.00% 99.50% 100.00%

Intermediate critical availabilityFi

nanc

ial I

ncen

tive

(Per

cent

age

of A

nnua

l Rev

enue

)

Servicestandardsincentive curve

Performance (WithoutExclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S4

SP AUSNET S5 - Intermediate non-critical availability

Performance Targets Graph start Collar Target Cap Graph endIntermediate non-critical availability 97.00% 97.57% 98.73% 99.31% 100.00%

Weighting -0.03% -0.0250% 0.00% 0.0250% 0.03%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.000250 When: Availability < 97.57% -0.000250 -0.000250

= 0.021552 x Availability + -0.021278 97.57% ≤ Availability ≤ 98.73% 0.000170 0.000172

= 0.043103 x Availability + -0.042556 98.73% ≤ Availability ≤ 99.31% 0.000340 0.000345

= 0.000250 99.31% < Availability 0.000250 0.000250

Performance OutcomesPerformance

(Without Exclusions)

Performance (Exclusions)

Intermediate non-critical availability = 99.518644% 99.530316%

S-Factor = 0.025000% 0.025000%

Formulae

SP AUSNET SERVICE STANDARDSS5 - Intermediate non-critical availability

-0.030%

-0.020%

-0.010%

0.000%

0.010%

0.020%

0.030%

97.00% 97.50% 98.00% 98.50% 99.00% 99.50% 100.00%

Intermediate non-critical availabilityFi

nanc

ial I

ncen

tive

(per

cent

age

of A

nnua

l Rev

enue

) Servicestandardsincentive curve

Performance (WithoutExclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S5

SP AUSNET S6 - Loss of supply event frequency (no. of events > 0.05 system minutes per annum)

Performance Targets Graph start Collar Target Cap Graph endLoss of supply (events > 0.05 system minutes) 8.00 7.00 5.00 2.00 1.00

Weighting -0.125% -0.125% 0.00% 0.125% 0.125%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.001250 7.00 < No. of events -0.001250 -0.001250

= -0.000625 x No. of events + 0.003125 5.00 ≤ No. of events ≤ 7.00 0.002500 0.002500

= -0.000417 x No. of events + 0.002083 2.00 ≤ No. of events ≤ 5.00 0.001667 0.001667

= 0.001250 No. of events < 2.00 0.001250 0.001250

Loss of supply (events > 0.05 system minutes) =

Performance (Without

Exclusions)

Performance (Exclusions)

Loss of supply (events > 0.05 system minutes) = 1 1

S-Factor 0.125000% 0.125000%

Formulae

SP AUSNET SERVICE STANDARDS S6 - Loss of supply event frequency (events > 0.05 system minutes)

-0.15%

-0.10%

-0.05%

0.00%

0.05%

0.10%

0.15%

1 2 3 4 5 6 7 8

Loss of supply event frequency (events > 0.05 system minutes)

Fina

ncia

l Inc

entiv

e(P

erce

ntag

e of

Ann

ual R

even

ue)

Service standardsincentive curve

Performance (Without Exclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S6

SP AUSNET S7 - Loss of supply event frequency (no. of events > 0.3 system minutes per annum)

Performance Targets Graph start Collar Target Cap Graph endLoss of supply (events > 0.3 system minutes) 4.00 3.00 1.00 0.00 0.00

Weighting -0.13% -0.125% 0.00% 0.125% 0.13%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.001250 3.00 < No. of events -0.001250 -0.001250

= -0.000625 x No. of events + 0.000625 1.00 ≤ No. of events ≤ 3.00 0.000000 0.000000

= -0.001250 x No. of events + 0.001250 0.00 ≤ No. of events ≤ 1.00 0.000000 0.000000

= 0.001250 No. of events = 0.00 0.001250 0.001250

Loss of supply (events > 0.3 system minutes) =

Performance (Without

Exclusions)

Performance (Exclusions)

Loss of supply (events > 0.3 system minutes) = 1 1

S-Factor 0.000000% 0.000000%

Formulae

SP AUSNET SERVICE STANDARDS S7 - Loss of supply event frequency (events > 0.3 system minutes)

-0.15%

-0.10%

-0.05%

0.00%

0.05%

0.10%

0.15%

0.00 1.00 2.00 3.00 4.00

Loss of supply event frequency (events > 0.3 system minutes)

Fina

ncia

l Inc

entiv

e(P

erce

ntag

e of

Ann

ual R

even

ue)

Service standardsincentive curve

Performance (Without Exclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S7

SP AUSNET S8 - Average outage duration (lines)

Performance Targets Graph start Collar Target Cap Graph endAverage outage duration – lines (mins) 700 667 382 98 0

Weighting -0.13% -0.125% 0.00% 0.125% 0.13%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.001250 667 < Duration -0.001250 -0.001250

= -0.000004 x Duration + 0.001675 382 ≤ Duration ≤ 667 0.000686 0.000686

= -0.000004 x Duration + 0.001681 98 ≤ Duration ≤ 382 0.000688 0.000688

= 0.001250 Duration < 98 0.001250 0.001250

Average outage duration – lines (mins) =Performance

(Without Exclusions)

Performance (Exclusions)

Average outage duration – lines (mins) = 225.685714 225.685714

S-Factor 0.068800% 0.068800%

Formulae

SP AUSNET SERVICE STANDARDS S8 - Average outage duration– lines

-0.15%

-0.10%

-0.05%

0.00%

0.05%

0.10%

0.15%

0 100 200 300 400 500 600 700

Average outage duration– lines (minutes)Fi

nanc

ial I

ncen

tive

(Per

cent

age

of A

nnua

l Rev

enue

)

Service standardsincentive curve

Performance (Without Exclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S8

SP AUSNET S9 - Average outage duration (transformers)

Performance Targets Graph start Collar Target Cap Graph endAverage outage duration– transformers (mins) 700 556 412 268 100

Weighting -0.13% -0.125% 0.00% 0.125% 0.13%

Performance Formulae Conditions S- Calc 1 S- Calc 2Performance = -0.001250 556.00 < Duration -0.001250 -0.001250

= -0.000009 x Duration + 0.003576 412.00 ≤ Duration ≤ 556.00 0.001292 0.001292

= -0.000009 x Duration + 0.003576 268.00 ≤ Duration ≤ 412.00 0.001292 0.001292

= 0.001250 Duration < 268.00 0.001250 0.001250

Average outage duration– transformers (mins) =

Performance (Without

Exclusions)

Performance (Exclusions)

Average outage duration– transformers (mins) = 263.181818 263.181818

S-Factor = 0.125000% 0.125000%

Formulae

SP AUSNET SERVICE STANDARDS S9 - Average outage duration– transformers

-0.20%

-0.15%

-0.10%

-0.05%

0.00%

0.05%

0.10%

0.15%

0.20%

100 200 300 400 500 600 700

Average outage duration– transformers (minutes)Fi

nanc

ial I

ncen

tive

(per

cent

age

of A

nnua

l Rev

enue

) Service standardsincentive curve

Performance (Without Exclusions)

Performance (Exclusions)

NOTE: This sheet will automatically update based on data in input sheets

Blue cells show SP AusNet's performance targets and weightings

Yellow/Green cells show SP AusNet's performance formulae and related formula conditions based on performance targets and weightings

Pink cells show SP AusNet's performance outcomes without any events excluded from performance data

Orange cells show SP AusNet's performance outcomes with events excluded from performancedata

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls S9

SP AUSNET - Revenue Calculation

Revenue cap information

Base year allowed revenue

Base year 2008-09

X-factor

Commencement of regulatory period

Annual revenue adjusted for CPI Dec-07

CPI

Allowed Revenue

Calendar year revenue

Revenue

$454,974,504

2008

$341,230,878

$454,974,504

-1.01%

2008-09

1-Jan-03

160.1

NOTES:

This sheet will automatically update based on data on input sheets.

Grey cells show calendar year revenue

Green cells are for formula

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xlsRevenue Calculation

SP AUSNET- Performance outcomes

Revenue calendar year $341,230,878

Performance S-Factor Final Incentive Performance S-Factor Final Incentive

Total circuit availability S1 98.73% 99.078398% 0.200000% $682,462 99.117382% 0.200000% $682,462 0.000000%

Peak critical availability S2 99.39% 99.745438% 0.182276% $621,981 99.802938% 0.200000% $682,462 0.017724%

Peak non-critical availability S3 99.40% 99.810606% 0.050000% $170,615 99.932660% 0.050000% $170,615 0.000000%

Intermediate critical availability S4 98.67% 99.366936% 0.025000% $85,308 99.424704% 0.025000% $85,308 0.000000%

Intermediate non-critical availability S5 98.73% 99.518644% 0.025000% $85,308 99.530316% 0.025000% $85,308 0.000000%

Loss of supply event frequency ( > 0.05 min ) S6 5 1 0.125000% $426,539 1 0.125000% $426,539 0.000000%

Loss of supply event frequency ( > 0.3 min ) S7 1 1 0.000000% $0 1 0.000000% $0 0.000000%

Average outage duration– lines (mins) S8 382 226 0.068800% $234,768 226 0.068800% $234,768 0.000000%

Average outage duration– transformers (mins) S9 412 263 0.125000% $426,539 263 0.125000% $426,539 0.000000%

TOTALS 0.801076% $2,733,519 0.818800% $2,793,999 0.017724%

Aggregate outcome

S-factor 0.818800%

Financial Incentive $2,793,999

Financial year affected by financial incentive 2009-10

Impact of exclusions

Performance without exclusions Performance with exclusionsPerformance parameter S Target

NOTE:This sheet will automatically update based on data in input sheets.

Grey cell shows relevant calendar year revenue

Green cells show performance measure targets

Pink cells show performance, s-factor results and financial incentive without exclusions

Orange cells show performance, s-factor results and financial incentive with exclusions

Blue cells show the impact of exclusions on revenue

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls Outcomes

SP AUSNET - Defined exclusions

No. Measure 1- Total circuit availabilityDefined exclusions Further description of exclusion

1.1 Unregulated transmission assets1.2 Connection assets1.3 Third party outages Exclude from ‘circuit unavailability’ any outages caused by a fault or other event on a connected third party system e.g. intertrip signal, customer installation (TNSP to

provide lists); outages requested by NEMMCO except if SP AusNet 'causes' the outage through an act or omission; or outages caused by direction of fire services (eg. MFB, CFA or DSE Bushfire Incident Co-ordinator). Exclude co-incident outages for a generator or HV direct connect customer defined as: • Planned outages requested by the Generator or HV Customer on their dedicated line (eg. APD at Portland or JLA Bluescope Steel at Tyabb or Alcoa point Henry Geelong).• Outages co-ordinated with the shutdown of the Generator or HV customers equipment such that the customer does not require system normal network reliability or transfer capability through the high voltage grid and the outage does not affect the supply of any other person who is connected to the high voltage grid;

• Faults on the dedicated line caused by faults in the Generator or HV customers installation.1.4 Force majeure1.5 Switching to control voltages Outages to control voltages within required limits, both as directed by NEMMCO and where NEMMCO does not have direct oversight of the network (in both cases only

where the element is available for immediate energisation if required)1.6 Fault-level mitigation works Fault-level mitigation works, except for that associated with JLTS 220 kV Fault Limiting Reactors and Fault Level Mitigation Works at JLTS and MWTS; and WMTS 66 kV

Bus Tie Series Fault Limiting Reactor

Measure 2- Peak critical availabilityDefined exclusions Further description of exclusion

2.1 Unregulated transmission assets2.2 Connection assets2.3 Third party outages Exclude from ‘circuit unavailability’ any outages caused by a fault or other event on a connected third party system e.g. intertrip signal, customer installation (TNSP to

provide lists); outages requested by NEMMCO except if SP AusNet 'causes' the outage through an act or omission; or outages caused by direction of fire services (eg. MFB, CFA or DSE Bushfire Incident Co-ordinator). Exclude co-incident outages for a generator or HV direct connect customer defined as: • Planned outages requested by the Generator or HV Customer on their dedicated line (eg. APD at Portland or JLA Bluescope Steel at Tyabb or Alcoa point Henry Geelong).• Outages co-ordinated with the shutdown of the Generator or HV customers equipment such that the customer does not require system normal network reliability or transfer capability through the high voltage grid and the outage does not affect the supply of any other person who is connected to the high voltage grid;

• Faults on the dedicated line caused by faults in the Generator or HV customers installation.2.4 Force majeure2.5 Switching to control voltages Outages to control voltages within required limits, both as directed by NEMMCO and where NEMMCO does not have direct oversight of the network (in both cases only

where the element is available for immediate energisation if required)2.6 Fault-level mitigation works Fault-level mitigation works, except for that associated with JLTS 220 kV Fault Limiting Reactors and Fault Level Mitigation Works at JLTS and MWTS; and WMTS 66 kV

Bus Tie Series Fault Limiting Reactor2.7 Shunt reactors Exclude from ‘circuit availability (peak critical)’ and ‘circuit availability (peak non-critical)’ any outages of shunt reactors

Measure 3- Peak non-critical availabilityDefined exclusions Further description of exclusion

3.1 Unregulated transmission assets3.2 Connection assets3.3 Third party outages Exclude from ‘circuit unavailability’ any outages caused by a fault or other event on a connected third party system e.g. intertrip signal, customer installation (TNSP to

provide lists); outages requested by NEMMCO except if SP AusNet 'causes' the outage through an act or omission; or outages caused by direction of fire services (eg. MFB, CFA or DSE Bushfire Incident Co-ordinator). Exclude co-incident outages for a generator or HV direct connect customer defined as: • Planned outages requested by the Generator or HV Customer on their dedicated line (eg. APD at Portland or JLA Bluescope Steel at Tyabb or Alcoa point Henry Geelong).• Outages co-ordinated with the shutdown of the Generator or HV customers equipment such that the customer does not require system normal network reliability or transfer capability through the high voltage grid and the outage does not affect the supply of any other person who is connected to the high voltage grid;

• Faults on the dedicated line caused by faults in the Generator or HV customers installation.3.4 Force majeure3.5 Switching to control voltages Outages to control voltages within required limits, both as directed by NEMMCO and where NEMMCO does not have direct oversight of the network (in both cases only

where the element is available for immediate energisation if required)3.6 Fault-level mitigation works Fault-level mitigation works, except for that associated with JLTS 220 kV Fault Limiting Reactors and Fault Level Mitigation Works at JLTS and MWTS; and WMTS 66 kV

Bus Tie Series Fault Limiting Reactor3.7 Shunt reactors Exclude from ‘circuit availability (peak critical)’ and ‘circuit availability (peak non-critical)’ any outages of shunt reactors

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls Exclusion definitions

Measure 4- Intermediate critical availabilityDefined exclusions Further description of exclusion

4.1 Unregulated transmission assets4.2 Connection assets4.3 Third party outages Exclude from ‘circuit unavailability’ any outages caused by a fault or other event on a connected third party system e.g. intertrip signal, customer installation (TNSP to

provide lists); outages requested by NEMMCO except if SP AusNet 'causes' the outage through an act or omission; or outages caused by direction of fire services (eg. MFB, CFA or DSE Bushfire Incident Co-ordinator). Exclude co-incident outages for a generator or HV direct connect customer defined as: • Planned outages requested by the Generator or HV Customer on their dedicated line (eg. APD at Portland or JLA Bluescope Steel at Tyabb or Alcoa point Henry Geelong).• Outages co-ordinated with the shutdown of the Generator or HV customers equipment such that the customer does not require system normal network reliability or transfer capability through the high voltage grid and the outage does not affect the supply of any other person who is connected to the high voltage grid;

• Faults on the dedicated line caused by faults in the Generator or HV customers installation.4.4 Force majeure4.5 Switching to control voltages Outages to control voltages within required limits, both as directed by NEMMCO and where NEMMCO does not have direct oversight of the network (in both cases only

where the element is available for immediate energisation if required)4.6 Fault-level mitigation works Fault-level mitigation works, except for that associated with JLTS 220 kV Fault Limiting Reactors and Fault Level Mitigation Works at JLTS and MWTS; and WMTS 66 kV

Bus Tie Series Fault Limiting Reactor4.7 Shunt reactors Exclude from ‘circuit availability (peak critical)’ and ‘circuit availability (peak non-critical)’ any outages of shunt reactors.

Measure 5- Intermediate non-critical availabilityDefined exclusions Further description of exclusion

5.1 Unregulated transmission assets5.2 Connection assets5.3 Third party outages Exclude from ‘circuit unavailability’ any outages caused by a fault or other event on a connected third party system e.g. intertrip signal, customer installation (TNSP to

provide lists); outages requested by NEMMCO except if SP AusNet 'causes' the outage through an act or omission; or outages caused by direction of fire services (eg. MFB, CFA or DSE Bushfire Incident Co-ordinator). Exclude co-incident outages for a generator or HV direct connect customer defined as: • Planned outages requested by the Generator or HV Customer on their dedicated line (eg. APD at Portland or JLA Bluescope Steel at Tyabb or Alcoa point Henry Geelong).• Outages co-ordinated with the shutdown of the Generator or HV customers equipment such that the customer does not require system normal network reliability or transfer capability through the high voltage grid and the outage does not affect the supply of any other person who is connected to the high voltage grid;

• Faults on the dedicated line caused by faults in the Generator or HV customers installation.5.4 Force majeure5.5 Switching to control voltages Outages to control voltages within required limits, both as directed by NEMMCO and where NEMMCO does not have direct oversight of the network (in both cases only

where the element is available for immediate energisation if required)5.6 Fault-level mitigation works Fault-level mitigation works, except for that associated with JLTS 220 kV Fault Limiting Reactors and Fault Level Mitigation Works at JLTS and MWTS; and WMTS 66 kV

Bus Tie Series Fault Limiting Reactor5.7 Shunt reactors Exclude from ‘circuit availability (peak critical)’ and ‘circuit availability (peak non-critical)’ any outages of shunt reactors.

Measure 6- Loss of supply event frequency (>0.05min)

Defined exclusions Further description of exclusion6.1 Unregulated transmission assets6.3 Third party outages Any outages shown to be caused by a fault or other event on a connected ‘3rd party system’ e.g. intertrip signal, generator outage, or customer installation6.4 Force majeure6.5 Successful reclose events ( <1 min duration)

Measure 7- Loss of supply event frequency (>0.3min)Defined exclusions Further description of exclusion

7.1 Unregulated transmission assets7.3 Third party outages Any outages shown to be caused by a fault or other event on a connected ‘3rd party system’ e.g. intertrip signal, generator outage, or customer installation7.4 Force majeure7.5 Successful reclose events ( <1 min duration)

Measure 8- Average outage durations (lines)Defined exclusions Further description of exclusion

8.1 Unregulated transmission assets8.3 Third party outages Any outages shown to be caused by a fault or other event on a connected ‘3rd party system’ e.g. intertrip signal, generator outage, or customer installation8.4 Force majeure

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls Exclusion definitions

8.5 Momentary Interuptions ( <1 min duration)8.6 Planned outages Planned outages do not apply to this measure. Whilst they are excluded, they do not have to be listed in the AER Template.

Measure 9 - Average outage duration (transformers)Defined exclusions Further description of exclusion

9.1 Unregulated transmission assets9.3 Third party outages Any outages shown to be caused by a fault or other event on a connected ‘3rd party system’ e.g. intertrip signal, generator outage, or customer installation9.4 Force majeure9.5 Momentary Interuptions ( <1 min duration)9.6 Planned outages Planned outages do not apply to this measure. Whilst they are excluded, they do not have to be listed in the AER Template.

SP AusNet - Service standards report - last three quarters 2008 - template (10 February 2008).xls Exclusion definitions