NATIONAL IRANIAN OIL COMPANY SOUTH PARS GAS FIELD DEVELOPMENT PHASE 12 SP12-2Y3-PC-RM-993-000 6 5 4 ONSHORE FACILITIES Page 1 of 50 MONTHLY REPORT No. [Project Month] 6 5 4 Ju ly Month / August ne 2010 Year D0 0 9 July 20 10 FOR INFORMATION FEC SUA Rev Date Purpose of Issue Prep’d Check’d TNDG PPL Approved This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited. Filename: document.doc

Upload: alex-ciupitu

Post on 01-Dec-2015

104 views

Category:

Documents


3 download

DESCRIPTION

SP12-0002Y3-PC-RM-993-

TRANSCRIPT

NATIONAL IRANIAN OIL COMPANYSOUTH PARS GAS FIELD DEVELOPMENT

PHASE 12

SP12-2Y3-PC-RM-993-000654

ONSHORE FACILITIES Page 1 of 39

MONTHLY REPORT

No. [Project Month]654

JulyMonth /Augustne 2010Year

D0 09 July 2010 FOR INFORMATION FEC SUA

Rev Date Purpose of Issue Prep’d Check’dTNDG PPL

Approved

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 2 of 39

TABLE OF CONTENTS

1 INTRODUCTION 34

1.1 SOUTH PARS 34

1.2 FINAL PRODUCTION 34

1.3 EXECUTION PERIOD 34

1.4 FACILITIES 35

2 EXECUTIVE SUMMARY 35

2.1 MANAGEMENT TOPICS AND HIGHLIGHTS 35

2.2 SCHEDULE ANALYSIS AND CRITICAL ISSUE SUMMARY 37

2.3 PROGRESS SUMMARY 37

2.4 MANPOWWER STATUS 38

2.5 HSE 39

2.6 QA/QC 39

2.7 FINANCIAL 39

2.8 VARIATION ORDER STATUS 310

2.9 AREA OF CONCERNS 310

3 MANAGEMENT 310

3.1 OVERALL MANAGEMENT PROGRESS STATUSS-CURVE 310

3.2 ACHIEVED GOALS DURING THE PERIOD 311

3.3 AREA OF CONCERN 311

4 ENGINEERING 311

4.1 OVERALL ENGINEERING PROGRESS STATUSS-CURVE 311

4.2 ACHIEVED GOALS DURING THE PERIOD 311

4.3 PLANNED FOR THE NEXT PERIOD 323

4.4 AREA OF CONCERN 325

5 PROCUREMENT 327

5.1 OVERALL PROCUREMENT S-CURVEPROGRESS STATUS 327

5.2 ACHIEVED GOALS DURING THE PERIOD 327

5.3 PLANNED FOR NEXT PERIOD Error! Bookmark not defined.29

5.4 AREA OF CONCERNS Error! Bookmark not defined.32

6 CONSTRUCTION AND PRECOMMISSIONING 332

6.1 OVERALL CONSTRUCTION AND PRECOMMISSIONING S-CURVEPROGRESS STATUS 332

6.2 ACHIEVED GOALS DURING THE PERIOD 332

6.3 PLANNED FOR THE NEXT PERIOD 333

6.4 AREA OF CONCERNS 335

7 GENERAL SERVICES 336

7.1 OVERALL GENERAL SEVICES S-CURVEPROGRESS STATUS 336

7.2 ACHIEVED GOALS DURING THE PERIOD 336

7.3 PLANNED FOR THE NEXT PERIOD 339

7.4 AREA OF CONCERNS 340

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 3 of 39

8 COMMISSIONING AND START UP 341

8.1 OVERALL COMMISSIONING AND START S-CURVE 341

8.2 ACHIEVED GOALS DURING THE PERIOD 341

8.3 PLANNED FOR THE NEXT PERIOD 341

8.4 AREA OF CONCERNS 342

9 ATTACHMENTS 342

43434343535353737383939393931031131131131131131131231832032232232232732732732732732833133133133133433533633633633633733831 INTRODUCTION 31.1 SOUTH PARS 31.2 FINAL PRODUCTION 31.3 EXECUTION PERIOD 31.4 FACILITIES 32 EXECUTIVE SUMMARY 32.1 MANAGEMENT TOPICS AND HIGHLIGHTS 32.2 SCHEDULE ANALYSIS AND CRITICAL ISSUE SUMMARY 32.3 PROGRESS SUMMARY 32.4 MANPOWWER STATUS 32.5 HSE 32.6 QA/QC 32.7 FINANCIAL 32.8 VARIATION ORDER STATUS 32.9 AREA OF CONCERNS 33 MANAGEMENT33.1 OVERALL MANAGEMENT S-CURVE 33.2 ACHIEVED GOALS DURING THE PERIOD 33.3 AREA OF CONCERN 34 ENGINEERING 34.1 OVERALL ENGINEERING S-CURVE 34.2 ACHIEVED GOALS DURING THE PERIOD 34.3 PLANNED FOR THE NEXT PERIOD 34.4 AREA OF CONCERN 35 PROCUREMENT 35.1 OVERALL PROCUREMENT S-CURVE 35.2 ACHIEVED GOALS DURING THE PERIOD 35.3 PLANNED FOR NEXT PERIOD 35.4 AREA OF CONCERNS 36 CONSTRUCTION AND PRECOMMISSIONING 36.1 OVERALL CONSTRUCTION AND PRECOMMISSIONING S-CURVE 36.2 ACHIEVED GOALS DURING THE PERIOD 36.3 PLANNED FOR THE NEXT PERIOD 36.4 AREA OF CONCERNS 37 general services 37.1 OVERALL GENERAL SEVICES S-CURVE 37.2 ACHIEVED GOALS DURING THE PERIOD 37.3 PLANNED FOR THE NEXT PERIOD 37.4 AREA OF CONCERNS 38 commissioning and start up 38.1 OVERALL COMMISSIONING AND START S-CURVE 38.2 ACHIEVED GOALS DURING THE PERIOD 38.3 PLANNED FOR THE NEXT PERIOD 38.4 AREA OF CONCERNS 39 attacHments 39.1 QA/AC REPORT

9.2 CRITICAL PATH9.3 ONE MONTH LOOK AHEAD SCHEDULE9.4 WPA9.5 MANPOWER HISTOGRAMS

9.5.1 MANAGEMENT MANPOWER HISTOGRAMS

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 4 of 39

9.5.2 ENGINEERING MANPOWER HISTOGRAMS9.5.3 PROCUREMENT MANPOWER HISTOGRAMS9.5.4 CONSTRUCTION MANPOWER HISTOGRAMS9.5.5 GENERAL SERVICES MANPOWER HISTOGRAMS

9.6 DETAILED S-CURVES9.6.1 ENGINEERING S-CURVES9.6.2 PROCUREMENT S-CURVES9.6.3 CONSTRUCTION S-CURVES9.6.4 GENERAL SERVICES S-CURVES

9.7 INVOICE STATUS REGISTER9.8 VARIATION ORDER STATUS9.9 DOCUMENT STATUS REPORT9.10 PROCUREMENT REPORT (PSR/MSR)9.11 SUBCONTRACTING STATUS9.12 PHOTOS

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 5 of 39

INTRODUCTIONSOUTH PARSPetropars has been awarded by Pars Oil and Gas Company (POGC) (owned by NIOC) the Contract to develop the South Pars Gas Field Phase 12.This field shall be developed to produce 3000 MMSCFD reservoir fluids from three wellhead platforms, 1000 MMSCFD each, and to transport the fluids, after separation of free water to the Onshore Gas Plant which is located in Tombak area some 65 km west of Assaluyeh, where the onshore treatment facilities are installed at a distance of approximately 145 Km from offshore dedicated block.On-Shore facilities are furthermore divided into 3 main Packages:

Gas Plant EPC1 – Non technical Buildings/ TanksGas Plant EPC2 - Liquid Processing/ UtilitiesGas Plant EPC3 - Gas ProcessingThe TNDG Consortium has been awarded by Petropars the Contract for the development of Gas Plant EPC3 – Gas processing units.FINAL PRODUCTIONContractual final Production Date is set at 40 Months from the Commencement Date of the Contract. Evaluation about the new forecasted final production date, considering the new conditions of the Project, is on going EXECUTION PERIODContractual execution milestones are the following:Condensate Loading Pumps ready for commissioning: 22 Months form C.D.;First train of Gas Treatment (first production): 28 Months form C.D.;Second train of Gas Treatment: 31 Months form C.D.;Third and fourth train of Gas Treatment: 34 Months from C.D.;Fifth and Sixth train of Gas Treatment: 39 Months from C.D.;Final Production and competition of all works including PT and handover. Evaluation about the new forecasted execution milestones considering the new conditions of the Project is on going. FACILITIESEPC 3 Package includes the following facilities:PROCESSSix Gas Processing Trains including Gas Sweetening, Gas Dehydration, Gas Dew-Pointing and Gas Mercaptans Removal (Mol. Sieve)Export Gas Compression Sulphur Recovery and Tail Gas TreatmentSulphur Granulation and Transit Storage Propane Refrigerant Storage Relevant Technical and non-technical Buildings Relevant Roads and Paving

NON PROCESSAccomodation CampsEXECUTIVE SUMMARYMANAGEMENT TOPICS AND HIGHLIGHTSOn June 6th , 2009, COMPANY has issued a Letter of Intent to the CONSORTIUM composed by Tecnimont S.p.A., Nargan Engineering Company, Dorriz Construction Company and Gamma Construction Company, (hereinafter CONTRACTOR) for the execution of the Gas Processing Unit (EPC3) within the South Pars Phase 12 Offshore facilities, requesting the immediate start of the Project activities. On August 11th , 2009, the main body of the CONTRACT and Side Letter One have been signed by PARTIES, depicting a list of actions required for the finalization of the remaining parties of the CONTRACT and for the effectiveness of the same, to be completed by October 15th , 2009. On December 13th , 2009 an Interim Agreement has been signed by PARTIES to allow the start the Project activities in full force to the maximum extent applicable, considering the impediments created by the non finalization of main contractual issues, such as: Tripartite Agreement, Trilateral Agreements, Assignment to Iskra, Assignment of COMPANY ITEMS.On January 11th , 2010 the Complimentary Soil Investigation Report commissioned by CONTRACTOR to Zamiran, and executed between November 2009 and January 2010, has been submitted to COMPANY for information and action.Such survey has identified some non-conformity of exiting soil in relation to the the conditions committed by COMPANY in the ITB.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 6 of 39

On January 13th , 2010, the first Instalment of the Advance Payment has been paid by COMPANY to CONTRACTOR, upon receipt of the relevant bank guarantees.On January 15th , 2010 a Pre-Kick Off Meeting has been held in Tehran for the definition of the agenda of the Kick-Off Meeting.In this period main management procedures such as: Coordination Procedure, Project Execution Procedure and Project Quality Procedure, have been finalized and submitted to COMPANY. During February and March 2010, just before and after the KOM, joint technical meetings for all technical disciplines have been held in Tehran.On March 3rd and 4th , 2010, the Project Kick Off Meeting has been held in Milan. During such Meeting, certain agreements (to be included in an Amendment to the Interim Agreement still under negotiation,) have been reached by PARTIES:Exposure curve to be submitted and agreed (Exposure Curve has been submitted to COMPANY by CONTRACTOR on March 16th , has been accepted by COMPANY and is in process to be sent to NICO).February 10th , 2010 has been fixed as COMMENCEMENT DATE under certain conditions:1) ISKRA to be included as CONSORTIUM member by April 15th , 2010;2) Project Exposure Coverage with NICO to be defined by April 30th , 2010. At the end of April both the above conditions were not met. Actual status is the following:Partial Assignment to ISKRA has been signed in July 2010.On 23-24 June a meeting has been held in Lausanne with NICO to discuss the Project Exposure Coverage. During the meeting, NICO has submitted to Consortium a Guarantee of 160 Million US Dollars to Cover the procurement exposure. Discussions are still on going for the necessary financial guarantees to be provided by PPL to allow Consortium to proceed with the procurement activities; the matter is not yet finalized.Upon request from COMPANY, Contractor has submitted on April 14 th , 2010 a plan of site activities that could be anticipated, subject to extraordinary effort to be paid by Contractor. List of achieved goals during the period is indicated in 3.2.In April the site mobilization of manpower and facilities has been started. Temporary offices has been established at site; excavation and foundations activities are on going; activities for main pipe-rack are started. On August 20th , the first forundation for Refrigeration Compressors has been successfully casted.The text and content of the Trilateral Agreement has been finalized on August 24th , and the document is now under signature by parties. Acceptance by Licensors shall be expedited by Company.Documents issuance for COMPANY Review/Approval is ongoing. The list of documents issued up to end of August 2010 is herewith attached.On June 6th, 2009, COMPANY has issued a Letter of Intent to the CONSORTIUM composed by Tecnimont S.p.A., Nargan Engineering Company, Dorriz Construction Company and Gamma Construction Company, (hereinafter CONTRACTOR) for the execution of the Gas Processing Unit (EPC3) within the South Pars Phase 12 Offshore facilities, requesting the immediate start of the Project activities. On August 11th, 2009, the main body of the CONTRACT and Side Letter One have been signed by PARTIES, depicting a list of actions required for the finalization of the remaining parties of the CONTRACT and for the effectiveness of the same, to be completed by October 15th, 2009. On December 13th, 2009 an Interim Agreement has been signed by PARTIES to allow the start the Project activities in full force to the maximum extent applicable, considering the impediments created by the non finalization of main contractual issues, such as: Tripartite Agreement, Trilateral Agreements, Assignment to Iskra, Assignment of COMPANY ITEMS.On January 11th, 2010 the Complimentary Soil Investigation Report commissioned by CONTRACTOR to Zamiran, and executed between November 2009 and January 2010, has been submitted to COMPANY for information and action.Such survey has identified some non-conformity of exiting soil in relation to the the conditions committed by COMPANY in the ITB. On January 13th, 2010, the first Instalment of the Advance Payment has been paid by COMPANY to CONTRACTOR, upon receipt of the relevant bank guarantees.On January 15th, 2010 a Pre-Kick Off Meeting has been held in Tehran for the definition of the agenda of the Kick-Off Meeting.In this period main management procedures such as: Coordination Procedure, Project Execution Procedure and Project Quality Procedure, have been finalized and submitted to COMPANY. During February and March 2010, just before and after the KOM, joint technical meetings for all technical disciplines have been held in Tehran.On March 3rd and 4th, 2010, the Project Kick Off Meeting has been held in Milan. During such Meeting, certain agreements (to be included in an Amendment to the Interim Agreement still under negotiation,) have been reached by PARTIES:

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 7 of 39

Exposure curve to be submitted and agreed (Exposure Curve has been submitted to COMPANY by CONTRACTOR on March 16th, has been accepted by COMPANY and is in process to be sent to NICO).February 10th, 2010 has been fixed as COMMENCEMENT DATE under certain conditions:

1) ISKRA to be included as CONSORTIUM member by April 15th, 2010;2) Project Exposure Coverage with NICO to be defined by April 30th, 2010.

At the end of April both the above conditions were not met. Actual status is the following:Partial Assignment to ISKRA has beenis expected to be signed inby July 2010.On 23-24 June a meeting has been held in Lausanne with NICO to discuss the Project Exposure Coverage. During the meeting, NICO has submitted to Consortium a Guarantee of 160 Million US Dollars to Cover the procurement exposure. Discussions are still on going for the necessary additional financial guarantees to be provided by PPL to allow Consortium to proceed with the procurement activities; the matter is not yet finalized. Upon request from COMPANY, Contractor has submitted on April 14th, 2010 a plan of site activities that could be anticipated in the period up to June 15th, subject to extraordinary effort to be paid by Contractor. List of achieved goals during the period is indicated in 3.2.In April the site mobilization of manpower and facilities has been started. Temporary offices has been established at site; eExcavation and foundations activities are on going; .activities for main pipe-rack are started. Documents issuance for COMPANY Review/Approval is ongoing. The list of documents issued up to end of Junely 2010 is herewith attached.SCHEDULE ANALYSIS AND CRITICAL ISSUE SUMMARYThe Project Planning, Scheduling and Control System Procedure has been submitted to COMPANY for APPROVAL during the month of February 2010.A preliminary level 2 schedule has been submitted to COMPANY on April 7th, 2010, showing the shifting of some overdue milestones due to the delay of the finalization of main contractual provisions.The Project Level 3 Schedule has been issued for comments and approval to PPL on June 17th, 2010. The schedule has been approved by PPL on July.

PROGRESS SUMMARYThe progress measurement system from May 2010 onwards and the format of the WPA have been agreed during the current month. Progress control S-Curve for Engineering has been estimated according to the L3 schedule and WPA breakdown. (Attachment 9.6):.

LEV1 LEV2 PLAN ACT PLAN ACT

1 PROCESS 92.24% 1.03% 1.03%

1.1 MANAGEMENT 4.96% 5.38% 1.36% 1.36%

1.2 ENGINEERING 7.77% 8.42% 11.41% 11.31%

1.3 PROCUREMENT 59.52% 64.53%

1.4 CONSTRUCTION&PRE-COMMISSIONING 17.11% 18.55%

1.5 COMMISSIONING AND START-UP 2.88% 3.12%

2 GENERAL SERVICES 7.76% 6.74% 6.74%

2.1 PLANT AREA AND CAMP AREA PREPARATION AND SITE ACCESS 0.01% 0.16%

2.2 SITE ESTABLISHMENT / MOBILIZATION 1.59% 20.45% 14.80% 14.80%

2.3 ACCOMMODATION CAMPS 3.51% 45.26% 0.69% 0.69%

2.4 GENERAL SERVICES 2.63% 33.83% 10.05% 10.05%

2.5 DEMOBILIZATION 0.02% 0.30%

OVERALL PROJECT 100% 1.48% 1.47%

WPA Code

DESCRIPTION

WEIGHT FACTOR CUMULATIVE MONTHLY

MANPOWWER STATUS

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 8 of 39

As instructed by COMPANY with the Letter Of Intent dated June 2009, CONTRACTOR has started the mobilization of the Management Personnel and the execution of preliminary general management activities related to Project and Procedures set up. With the signature of the Interim Agreement on December 2009, CONTRACTOR has opened the consortium offices in Tehran and he has mobilized the Project teams in Tehran Operating Center (TOC) and Milan Operating Center (MOC), starting the execution of the project activities to the maximum extent allowed by the contractual situation.At the end of April, the Project teams were fully mobilized in the operating centres.The full time mobilization of Consortium Team in Tehran is partly jeopardized by the current administrative constraints (e.g. Visa obtainment etc.) on mobilizing foreign personnel in Iran.The mobilization of manpower and facilities in SOC, started in March, is on going. Man power status is attached as attachment 9.5.HSEHSE Superintendent at Site has been introduced to CompanyThe required facilities and equipment for “HSE Training Center” are prepared and submitted.HAZID has been executed and the relevant report submitted to Company.QA/QCThe following Quality Procedures:

SP12-2Y3-QA-PP-993-002-D0 Milan Operating Centre Quality Plan has been commented by PPL and the comments are under review.

P12-2Y3-QA-PP-993-007-D0 Site Operating Centre Quality Plan has been rejected by PPL and the reason why is under review.

The following Quality Procedure is under signing ready to be issued:SP12-2Y3-QA-PP-993-003-D0 Tehran Operating Centre Quality PlanCONSORTIUM PMT QUALITY PLAN has been enforced including, in the Quality

Management Team at Directorate level, the focal point towards PPL for the QC activities.The first Quality Audit has been performed to the Directorate Organization on 21st, 22nd, 23rd

of June at the Directorate Office in Tehran. The result of the audit was the finding of 8 observations and 2 recommendations.

Bi-weekly meetings for QA/QC with PPL have been decided starting from 18th of July in Directorate Office at Tehran.

Re-Issue of SOC Quality Plan based on Company Comments. FINANCIALThe Invoicing Procedure and Payment Procedure have been submitted to COMPANY on

March for APPROVAL. The procedure is presently under revision to reflect the latest agreements regarding the retention policy

The WPA up to the month of May 2010 has been approved and the relevant invoice is expected to be issued on July 2010.The first instalment` of the Advance Payment (2.5% of CONTRACT price), has been paid to Contractor on January 13th, 2010; the payment . The payment of the second instalment of the Advance Payment (2.5% of CONTRACT price) has been executed inis expected by July 2010.The WPA up to the month of May 2010 has been approved and the relevant invoice has been issued on 22nd July 2010. Various invoices for procurement progress have been submitted to PPL. Payment of the progress invoices is urgently awaited to allow Contractor to proceed with project. VARIATION ORDER STATUS

TextThe Variation Order Procedure has been submitted on March to COMPANY for APPROVAL. Comments from Company have been received and are under evaluation.Preparation of variation proposal due to deletion of Managerial Camp from Contractor scope of work is ongoing.Variation request for remedial works of Labor Camps submitted to PPL.AREA OF CONCERNSCONTRACT issues still open: Appendix A03 “Tripartite Agreement”; Appendix A04 “Trilateral Agreements”; Appendixes C09, C12, C19, C20; Appendixes E01, E04; Assignment Agreement with ISKRA; Amendment of Interim Agreement; Confidentiality Agreement.Impact on Procurement activities due to the delay on finalizing the following: Assignment to ISKRA, Confidentiality Agreement, NICO financial coverage of the Project.Late receipt/non submission of common documents by COMPANY through EPC2 contractor;

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 9 of 39

Lack of Vendor information regarding the COMPANY ITEMS (C.I.) and non finalization of the C.I. Assignment Agreement.Difficulties on obtaining export licenses to IRAN for materials of foreign origin.Non conformities of site soil conditions.Unavailability and suitability of adequate land at SITE and finalization of handing over of land for mobilization.Finalization of handing over of the Site & Labor Camp lands with respect to their “Geotechnical” and “Site preparation” issues; the issue is going to be worst respecting the recent excavations made on Unit 106 area.Finalization of changes in scope of work for Managerial camp / POGC camp.Finalization of exemption of CONTRACT from any Iranian VAT.Finalization of AGREEMENT text for “Escalation” issue.Finalization of AGREEMENT text for “Change in Law” issuePayment of second instalment of Advance Payment. Agreement on payment procedure with respect to new scheme of Tripartite Payment Agreement.MANAGEMENTOVERALL MANAGEMENT S-CURVEHoldACHIEVED GOALS DURING THE PERIODBi-weekly management meetings on goinghave been started. TAmong the anticipated site activities the following goals have been achieved during the month of May: Excavation of compressor foundations in Unit 106.Excavation of Substation foundations Issue of PO for site temporary offices.TBE Issue of PO for Storage Tanks and Column Internals…of Drums and ColumnTBE of ASME reactorsTechnical Specification of Main Packages, Rotating and Static EquipmentPLANNED FOR THE NEXT PERIODTAmong the anticipated site activities the following events are planned during the month of AugustJune: Excavation of compressor foundations in Unit 106.Excavation of Substation foundations.Excavation of Interconnecting Piperack foundations;Issue of various TBE (see 5.3);Issue of PO for .various equipment (see 5.3)During the month of June is also envisaged tThe closure of pending contractual issues is awaited at the soonest to minimize the impacts on the project.. AREA OF CONCERNSee point 2.9ENGINEERINGOVERALL ENGINEERING S-CURVEOverall Engineering S-Curve is reported in Attachment 9.6Overall Engineering S-Curve is reported in Attachment 9.6ACHIEVED GOALS DURING THE PERIODGeneral EngineeringModel review with PPL commencedIssued PID’s for Fire Water Network & Deluge valves in D0 RevisionUpdated and issued all IPR study piping plansReview/comments of vendor documents for (COMPANY ITEM) - Refrigerant compressor package & Export gas compressor package. Issue of first IFC Drawings for Company Items foundations, piperack foundations and SubstationsPROCESS EngineeringInstrument datasheet IDS preparationPreparation of Hierarchic diagram and Cause and Effect tables of units from 101 to 111P&ID master copy preparation for P&ID review (with Process comments)Revision of medium pressure flare load for optimization of main headersCommenting vendor documents for TBE of pumpsAssistance to Nargan engineering disciplines.Material Selection Diagram completion and issuePSFS drawings preparationUpdating and issue of equipment PDS based on client comments (in revision D1).

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 10 of 39

Filling process data in Instrument PDS from NEC.On-off valve typical list preparation.P&ID mark-up for valve typical and other general comments.Review of Finder pump offer.Review and comments on vendor drawings.Draft check of Hierarchy Diagrams.Update of process Datasheets based on client comments Review and comments on vendor drawingsIssue of P&IDs Rev. D0 issued (All Units)Instrument datasheet IDS preparationPreparation of Hierarchic diagram and Cause and Effect tablesUpdating and issue of equipment PDS based on client comments (in revision D1)Chemical and catalyst list preparationP&ID master copy preparation (with Process comments)Revision of flare load summary for optimization of flare main headersCommenting vendor documents Meeting with vendor for TEG package, air blowers, solidification package, high power pumpsTie-in point list issueAssistance to engineering disciplinesPreparation of Material Selection DiagramStudies of flare lines Comments on Company items documents (refrigeration and export gas package compressors)Legends for ESDV/SDV valves clarified through interface meeting (with PPL/EPC2)Preparation of Depressurization report.Receiving PPL comments for process data sheets.Finalization of process data sheets.Review of Mechanical drawings.Coordination with other disciplines.Thermal design of shell & Tube heat exchangers.Review of vendor proposals received for plate heat exchangers.Review of vendor proposals received for Air Coolers.Review of vendor proposals for Column Internals.Review of vendor proposals for Chemical dosing packages.Review of vendor proposals for Dehydration package.Review of vendor proposals for Sulphur solidification  package.Providing Process data for instrument data sheets. MECHANICAL EngineeringOffer evaluation for Filter (SP12-2Y3-ME-MR-993-F-001)-(under progress).Review/comments of vendor documents for Refrigerant compressor package (COMPANY ITEM).Review/comments of vendor documents for Export gas compressor package (COMPANY ITEM).Prepared technical query for KSB Pumps (SP12-2Y3-ME-MR-993-P-001).TQ sent to FINDER offer ((SP12-2Y3-ME-MR-993-P-002).TQ sent to KSB offer (SP12-2Y3-ME-MR-993-P-002).TQ sent to FINDER offer (SP12-2Y3-ME-MR-993-P-004).MR ready for issue of Bid enquiry for SP12-2Y3-ME-MR-108-U-142.Completed Meeting with CBI for SP12-2Y3-ME-MR-108-K-001. Completed TBE for Client Review for the SP12-2Y3-ME-MR-108-K-001 & SP12-2Y3-ME-MR-144-U-001.Meeting with Vendors for SULZER (SP12-2Y3-ME-MR-993-P-001), HOWDEN (SP12-2Y3-ME-MR-108-K-001) & SBS (SP12-2Y3-ME-MR-144-U-001).Completed TBE for API 610 Pumps >150 KW (SP12-2Y3-ME-MR-993-P-001) for Client review.Follow-up with vendors for TQ/Meeting dateMeeting with Vendors for MR-P-001 (API Pumps >150 KW), MR-K-001 (Blowers) & MR-U-001 (Sulphur solidification package).Updating of engineering drawings for drumsReissue of engineering drawings for reactorsBid evaluation of offers for plate type heat exchangersBid evaluation of offers for shell and tube made of titaniumBid evaluation of offers for chemical injection package,Bid evaluation of offers for air coolersPreparation of engineering drawings for shell and tube made of CS/SS

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 11 of 39

Reissue of MR for column internalsBid evaluation of offers for drum internalsReview of JMC vendor documents for columns according to PD-5500Review of HYOSUNG vendor documents for drums according to PD-5500Review of JMC vendor documents for columns according to ASMEReissue of TBE for reactors according to PD-5500Preparation of spec. for cranesPreparation of data sheets for cranes of compressors of 106-K-101 and 111-K-101Issued supply specifications for MR005-Solvent filtration.Issued supply specifications for MR006 - Sulphur Degassing Package for inter dept for comments.Review/comments of vendor documents for Refrigerant compressor package (COMPANY ITEM).Review/comments of vendor documents for Export gas compressor package (COMPANY ITEM).Follow-up with vendors for TQ/Meeting dateMeeting with Vendors for SULZER (MR-P-001, API Pumps >150 KW), HOWDEN (MR-K-001, Blowers) & SBS (MR-U-001, Sulphur Solidification package)Completed TBE for API 610 Pumps >150 KW (MR-P-001) for Client reviewBids closing for Regeneration Gas Heaters, n.4 Vendors to be evaluatedBids closing for Reducing Gas Generators, n.4 Vendors to be evaluateVendor Document ReviewCompletion of MR for HETechnical meeting for AC TBEIssuance of S&T HEX Engineering DrawingsStorage Tank KOMIssued MR for Solvent filtration Package (SP12-2Y3-ME-MR-101-F-005).Issued supply specifications for Sulphur Degassing Package (SP12-2Y3-ME-MR-108-U-006).Offer evaluation for Filter (SP12-2Y3-ME-MR-993-F-001)Review/comments of vendor documents for Refrigerant compressor package (COMPANY ITEM).Review/comments of vendor documents for Export gas compressor package (COMPANY ITEM).Completed Meeting with CBI for Blower (SP12-2Y3-ME-MR-108-K-001). Completed TBE for Client Review for the SP12-2Y3-ME-MR-108-K-001 & SP12-2Y3-ME-MR-144-U-001.Preparation of technical query for KSB Pumps (SP12-2Y3-ME-MR-993-P-001).Preparation of technical query for FINDER Pumps (SP12-2Y3-ME-MR-993-P-002).MR issued for Bid enquiry for Antifoam Injection Package (SP12-2Y3-ME-MR-101-U-001).Prepared technical query for KSB Pumps (3546-GG-MR-004).TQ sent to FINDER offer (SP12-2Y3-ME-MR-993-P-002).MR ready for issue Bid enquiry Lubricants & Consumables (SP12-2Y3-ME-MR-993-X-001)Internal Communication.Job co-ordinationTBE for Reaction Furnace – 001TBE for Thermal Oxidizer - 002 IncineratorTBE for Reducing Gas Generator – 003TBE for Regeneration Furnace - 004Updating of Engineering Drawings for all Drums, ColumnsBid Evaluation of offers for Plate Type Heat Exchangers,Issue of TBE for Shell and Tube made of Titanium,Bid evaluation of offers for Chemical Injection Package,Reissue of MR for Air CoolersReissue of TBE for Air CoolersFinal Technical meeting with TASHA for Drums according to ASMEFinal Technical meeting with PIDEMCO for Drums according to ASMEBid evaluation of offers for Refractory lined Heat ExchangersBid evaluation of offers for multi-tube hairpin Heat ExchangersReview of JMC vendor documents for columns according to PD-5500,Review of HYOSUNG vendor documents for drums according to PD-5500,Review of JMC vendor documents for Columns according to ASME,Review of FSK vendor documents for Reactors according to ASMEReview of MACHINE SAZI ESFAHAN vendor documents for Storage TanksPreparation of data sheets for Cranes of Compressors of 106-K-101 and 111-K-101MR and supply specifications for filters, ejector and desuperheater issued

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 12 of 39

Meeting with Gas dehydration package vendors – In Tehran - M/s Gastech; In Milan - M/s IMS, M/s COMART Follow-up with vendors for TQReview/comments of vendor documents for (COMPANY ITEM) - Refrigerant compressor package & Export gas compressor package Follow-up with vendors for TQ/Meeting date.Vendor offers for Gas Dehydration Package (GASTEC/COMART/IMS), reviewed/ commented. Vendor offers for Blowers (HOWDEN, CONTINENTAL), reviewed/commented.Issued of Dimension and weight for Machinery equipments.Issued MR for Bid Enquiry for API 610 Vertical centrifugal pumps (SP12-2Y3-ME-MR-993-P-004) & Metering Pumps (SP12-2Y3-ME-MR-993-P-005).Technical clarification meeting with EBARA (SP12-2Y3-ME-MR-993-P-001) & HOWDEN, CONTINENTAL (SP12-2Y3-ME-MR-108-K-001) completed.Vendor documents issued for Export Gas Compressor & Refrigeration compressor for squad checkParticipated in the Export Gas Compressor Vendor documents Handover Meeting with OTC/PPL at Teheran (held on 10~16 Jun 2010)Preparation of Supply specifications for Filters, Ejectors, DesuperheatersUpdating of engineering drawings for drums.Updating of engineering drawings for columns. Reissue of engineering drawings for reactors. Updating of engineering drawings for storage tanks. Issue of mechanical data sheets for refractory lined heat exchangers. Issue of mechanical data sheets for multi-tube hairpin heat exchangers. Issue of engineering drawings for shell and tube made of titanium.Reissue of MR for reactors according to PD-5500.Issue of MR for multi-tube hairpin heat exchangers.Issue of MR for shell and tube made of titanium.Reissue of TBE for drums according to PD-5500. Reissue of TBE for columns according to PD-5500.Reissue of TBE for reactors according to ASME.Reissue of TBE for columns according to ASME.Bid evaluation of offers for reactors according to PD-5500.Issue of TBE of offers for storage tanks.Bid evaluation of offers for air coolers.Bid evaluation of offers for plate type heat exchangers.Issue of TBE of offers for column internals.issue of MR for drum internals.Bid evaluation of offers for drum internals.Bid evaluation of offers for shell and tube made of titanium.KOM with Vendor for columns according to PD-5500.Bid evaluation of offers for chemical injection package.CIVIL / STRUCTURE / BUILDING EngineeringIssued Support reaction of IPR NS-GTU/EW-COMP module no PR-3-160-601/607/308.Base Plate drawings issued.Issued Structural steel drawings for E-W IPR, module no. PR-3-160-309, 310, 201 to 206. Issued Tekla Model of module no. PR-3-160-310, 201 to 206.Issued Support reaction of E-W-IPR module no PR-3-160-310/201 to 206.Issued Structural steel drawings for N-S IPR, module no. PR-3-160-503, 506 and 507. Issued TEKLA Model of module no. PR-3-160-503/504/505/506/507/508. Issued Support reaction of E-W-IPR module no PR-3-160-309.TEKLA Model & structural steel drawings for N-S IPR, module no. PR-3-160-601, 605, 606 & 607 (GTU) & PR-3-160-501, 502 & 509 issued during the week as per schedule.Analysis/Design for E-W racks started.Load data for one module in case of E-W racks issued.Start of 30% ModellingSewer System Networks and Ditches from EPC2 Tie-inBuilding Clash CheckingChecking of HPPCivil Drawings and Key Plan PreparationReview of 56” Pipeline Profile

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 13 of 39

SRU Interconnecting Pipe Rack Foundation PlanSRU Interconnecting Pipe Rack Foundation FormworkSRU Interconnecting Pipe Rack Foundation Bar BendingIssuing of SS-05/06/07 Bar Bending Sch.Issuing of Rev.2 SS-05/06/07 Foundation Form WorkIssuing of Rev.2 SS-05/06/07 Foundation ReinforcementSS-05/06/07 LER/LCR Architectural LayoutCompletion of SS-09/10 Architectural LayoutIssuing of the 1st Equipment Foundation 106-D-101Operator Building HVAC Load CalculationsHVAC Ducting for Gate HouseRecalculation of SS-05/06/07 HVAC LoadsIssued Structural steel drawings for N-S SRU IPRIssued TEKLA Model of module no. PR-3-160-503/504/505/506/507/508. Issued Support reaction of E-W-IPR module no PR-3-160-309.Analysis/Design for E-W racks module no. PR-3-160-201/202/203/204 startedCalculation of sewer UG pipe network.Calculation of surface drainage ditch network.Working on Key plan dwgs for civil items.Working on coordinate for buildings and related clash checking.Participation on clash removing meeting for site cable trenches.Communication with Dor-Riz surveyor for 56” pipe line route surveying.Giving comment on mechanical equipment dwgs. (EDMS)3D modeling of civil items for model review 30%.Calculating MTO of gravity UG pipe for piping department. Participation on Bi-weekly meeting with PPL and EPC2Recalculation of SS-05/06/07/09/10 HVAC Loads Issuing of  the “HVAC SYSTEM FLOW DIAGRAM” FOR SS5/SS6/SS7Issuance of SS-05/06/07 Column BBSIssuance of SS-05/06/07 Wall/Column FormworkIssuance of SS-05/06/07 Wall/Column ReinforcementIssuance of BBS of SRU IPR FoundationStructural steel drawings for E-W IPR, module no. PR-3-160-309, 310, 201 to 206 issued during the week. Tekla Model of module no. PR-3-160-310, 201 to 206 issued during this week.Support reaction of E-W-IPR module no PR-3-160-310/201 to 206 issued during the weekSupport reaction of IPR NS-GTU/EW-COMP module no PR-3-160-601/607/308 issued during the week.Base Plate drawings issued during the week.Design of Unit106-compressor shelter (SH-3-106-101)Design of Unit111-compressor shelter (SH-3-111-101)Design of foundation for interconnecting pipe rack Parts-201,203&205-EW/SRUEquipment foundation design ( 101-D-102~602, 107-D-101~601,107-D-102~602,107-R-101~601 A to D, 108-C-102~402, 108-C-103~403, 108-D-141, 108-D-142)Design of Equipment structure Unit-105 (ST-3-105-201)Design of Unit-108 Main pipe rackContinue of Unit-101 Main pipe rack designDesign of SS-10Continue of SS5,SS6,SS7,SS9 designCalculation of AC UNITS for SS-09. Preparation the “AC UNITS & PLUMBING PLAN” for Operating Building. Check of  the HVAC system ducting plan (supply & return& exhaust) for SS5PIPING EngineeringModels & drawings for N-S IPR under progress.Analysis/Design for E-W racks started.Structural steel drawings for N-S IPR, module no. PR-3-160-608, 607, 606, 605,601, 509, 508, 505, 502 & 501 issued.STAAD file for N-S IPR, module no. PR-3-160-608 issued for PPL review.TEKLA model issued for PR-3-160-601, 605, 606, 607, 608, 501, 502 & 509.Preparation of STAAD model for interconnecting piperacks (IPR)Preparation of models for Inteconnecting Piperack (under progress).Support reactions for foundation design for N-S racks issued. Issued HVAC design basis data sheet for Operator Shelter

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 14 of 39

Issued HVAC flow diagram for Operator ShelterIssue of HVAC Calculation for Substation 5, 6, 7, 9 &10.Preparation of flow diagram for Substation 5, 6, 7, 9 &10.Preliminary routing study and site visit for 56” gas pipe line.Preparing preliminary key plan for interconnecting UG composite plan.Preparing coordinate and clash checking for SS-05, 06, 07, 09, 10 and gate house and operator building 01, 05, 06, 07.Preparing preliminary location for heavy duty concrete paving and access for units (with piping department).Preparing, sending and receiving Tie in point information for UG pipe and ditches.Working on level of buildings at site and on output level of end point of ditch networkClash checking for foundation of interconnecting pipe rackArchitectural /Foundation drawings for Substation # 5, 6, 7 issued with AFC status, as well as calculation notes for foundation designFoundation design for interconnecting pipe rack [North- South parts issued for excavation]Start of design for gas treatment units’ pipe racks.Equipment foundation design for 101-T- 101, 108-T-101, 144-T-101 A/BReview & comments for air coolers technical offersIssue of MR for Steel Structure based on BOQ at Bidding Stage.

Issue of MR for Steel Structure First Lot

Completed revised stress analysis for Interconnecting Pipe Rack (IPR), for change in the flare line size rework (from 28 “ to 30”)and load data given as input to Civil. Comments on Vendor offer for filters, Desuperheater. Study of IPR, for rework due to pipe bridge span change.Reissued E-W revised IPR piping study plans according 10mtr width to NEC for further engineering.IPR key plan issued.Comments on vendor offer for Sulphur solidification package-SANDVIK.Meeting with PPL for changes in flare line sizes NS IPRReselecting of piping componentPreparation of single line for some shelterPiping modelling in all units U/G pipe routeChecking of Mechanical Vendor drawingStudy of N-S & E-W IPR in GT area as per revised flare lines.Review/Comments on Vendor documents for Export gas Compressor (Company Items).Preparation of single line for some shelterPiping modelling in all units U/G pipe modellingChecking of Mechanical Vendor drawingPiping study of N-S IPR in SRU area for revised flare lines.Stress analysis of GT N-S and E W IPR is in progress.Piping load data for N-S SRU, N-S GT and E-W GT IPR Issued to civil.Updated and issued section drawings for IPR for UDL marking.Vendor drawing review and comments on Desuperheater (101-X-101).Starting of %30 Model Review for All UnitsPiping modelling in all units U/G pipe modellingChecking of Mechanical Vendor drawingLoop study in SRU and GT unitsLoop modelling in SRU Internal model review in SRU and 108ELECTRICAL EngineeringReview of package vendor offers.Review of vendor clarifications for package comments.Checking of company items vendor documents. Issuing of Telecom layout SS/LER/LCR/05Issuing of Telecom layout SS/LER/LCR/06Issuing of Telecom layout SS/LER/LCR/07Issuing of Earthing layout-UNIT 144Issuing of SS 05/06/07/09/10 Electrical cable ladder layout

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 15 of 39

Issuing of TBE for H.V SWG.(D1)Issuing of Bill of material for local control stationIssuing of Earthing layout Unit-106)Issuing of power factor calculationStudy on LER/LCR of Substations 5, 9 Architectural DrawingsVendor offer Review Electrical and mechanical Issuing of overall cable routing Issuing of earthing Unit 144Issuing of earthing Unit 143Issuing of earthing Unit 145Review of vendor clarifications for package comments. Checking of company items vendor documents. Issuance of Telecom layoutTechnical meeting for Power Transformer TBETechnical clarifications with vendors for finalization of Transformers & Panels (no. and size)Technical meeting for SS-09/10 electrical equipment layoutPreparation of 30% modellingInterface Technical meeting for Telecom issuesFinalization of electrical main cable layoutIssuance of AC UPS calculationIssuance of Revised TBE for HV SWGRReview of vendor clarifications for package comments. Checking of company items vendor documents. Vendor offer Review Electrical and mechanical Overall cable routing Review and clash check with instrument ,civil and pipingClash check Underground cable routing modelling 30%Clash check Above ground modelling 30%Meeting with HV SWG VendorIssue of TBE NGRIssue of MR LCSStudy on Opening SS05,06,07Issuing of lighting ss,9,10Issue of TBE NGRIssue of DC UPSReview with other DIs. for earthing Unit 101,104,105,107,111Review with other DIs. for earthing Unit 108PIPING EngineeringIPR study piping plans issued for further engineering activity.Updated IPR piping loading data issued to civil for further design.Internal issue of IPR piping stress documentationIssued E-W revised IPR piping study plans according 10mtr width for further engineering.IPR key plan issued.Comments on vendor offer for sulphur solidification package.Completed stress analysis for Interconnecting Pipe Rack (IPR) and loading data issued to Civil Group. Comments on Vendor offer for Gas Dehydration packageLine numbering for fire water deluge systemsCompletion of equipment modelling in Units 101,108 and 111.Completion of equipment modelling in Unit 104.Completion of equipment modelling in Unit 105.Completion of equipment modelling in Unit 107.Completion of equipment modelling in Unit 143.Completion of equipment modelling in Unit 144.Completion of equipment modelling in Unit 145.Temporary pipe rack modelling in all units.Piping modelling in interconnecting unit.Mechanical drawing checking.Checking of piping route study.Issuing of plot plan for Gas train (1).Issuing of plot plan for Unit 108.Issuing of plot plan for Unit 106.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 16 of 39

Equipment structures modelling in Gas trainELECTRICAL EngineeringReview of package vendor offers for Company Items (Refrigerant compressor package & Export gas compressor package)Issue of Main and feeder 6KV Single Line Diagram for substation 5.Issue of Main and feeder 0.4KV Single Line Diagram for substation 5.Issue of Main and feeder 0.4KV emergency Single Line Diagram for substation 5.Issue of AC and DC Single Line Diagram for substation 5.Issue of Main and feeder 6KV Single Line Diagram for substation 6.Issue of Main and feeder 0.4KV Single Line Diagram for substation 6.Issue of Main and feeder 0.4KV emergency Single Line Diagram for substation 6.Issue of AC and DC Single Line Diagram for substation 6.Issue of Main and feeder 6KV Single Line Diagram for substation 7.Issue of Main and feeder 0.4KV Single Line Diagram for substation 7.Issue of Main and feeder 0.4KV emergency Single Line Diagram for substation 7.Issue of AC and DC Single Line Diagram for substation 7.Issue of Main and feeder 6KV Single Line Diagram for substation 10.Issue of Main and feeder 0.4KV Single Line Diagram for substation 10.Issue of Main and feeder 0.4KV emergency Single Line Diagram for substation 10.Issue of AC and DC Single Line Diagram for substation 10.Issue of AC and DC Single Line Diagram for substation 9.Issue of Battery and Battery Charger Sizing Calculation for UPS System. Issue of Data Sheet for AC UPS Panels and Batteries.Issue of MR for LV Switchgear.Issue of MR for Neutral Earthing Resistor.Issue of Earthing Layout-Overall.Issue of Panel Board Schedule-Street Lighting.Issue of TBE HV Switchgear.Issue of TBE Power switchgear.Issue of Lightning Layout- SS 5, 6, 7,9,10. Issue of Earthing Layout- SS 5, 6, 7,9,10. TELECOMMUNICATION EngineeringN.A.N.A.INSTRUMENT AND CONTROL EngineeringReview/comments  of vendor documents for Refrigerant compressor package & Export gas compressor package (Company item).Issued LER/LCR-9, LER/LCR-10 equipment layout based on changes received from IPCS vendor, PPL comments and other changes.Comments on Temperature transmitter MR and Thermal relief valve datasheet general comments as requested by NEC, before issue of MR.Level sketch comments issued.Comments provided on On-off valve P&ID legend typical, motor legend typical and issued to EPC-2/PPL.Comments on package documents and assistance to machinery.Meeting with centrifugal blower package vendor (M/s CBI).Instrument Index issued in EPC-2 format.Instrument specification prepared for Sulphur Degassing package.Interface meeting with EPC-2/PPL.Support to Machinery package requirements e.g. revised offer evaluation, reply to vendor queries.Comments on piping/Instrument interface document received from EPC-2/PPL.Issue of Instrument specification for Sulphur Degassing package.On-off valve (32” and above) datasheet comment issued.Meeting with Centrifugal blower package vendors (M/s Continental, M/s Howden).Meeting with Gas dehydration package vendor (M/s Comart).Meeting with Sulphur solidification package vendor (M/s SBS).Review/comments of vendor documents for Refrigerant compressor package (Company item).Review/comments of vendor documents for Export gas compressor package (Company item).Revised LER/LCR equipment layout for LER/LCR-05/09.Meeting with PPL regarding layout for LER/LCR 05/06/07LCR/LER heat load calculation under preparation.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 17 of 39

Verification of IPCS system I/O count.Preparation of Instrument Data SheetReview/comments of vendor documents for Refrigerant compressor package (Company item)Review/comments of vendor documents for Export gas compressor package (Company item)Issued LER/LCR-09 equipment layout based on changes due input received from package vendor/IPCS vendor and also due to changes from civil/architectLER/LCR-09 heat load calculationMeeting with Sulphur solidification package vendor (M/s SBS)Meeting with API High pressure pump package vendor (M/s Sulzer)Updation of Inst index based on Rev-DO P&IDIO COUNT revised based on the Rev DB P&IDSInterface meeting with EPC2/PPLVendor document reviewProvision of Instrument data sheetProvision of 30% ModellingFinalization of C&I main cable layoutInterface meeting with EPC2/ PPL.Review/comments of vendor documents for Refrigerant compressor package (Company item).Review/comments of vendor documents for Export gas compressor package (Company item).Issued LER/LCR-10 equipment layout based on changes due input received from IPCS vendor, PPL comments and other changes.Meeting with centrifugal blower package vendor (M/s CBI).Instrument Index issued in EPC-2 format.Instrument specification prepared for Sulphur Degassing package.Comments on Electrical/Instrument interface typical legend and issued to EPC-2/PPLComments on package documents and assistance to machineryInstrument data sheet (pressure relief valves)-Unit 104 (issued)Instrument data sheet (temperature transmitter)-Unit 101 (issued)Instrument data sheet (temperature transmitter)-Unit 106 (issued)Instrument data sheet (pressure relief valves)-Unit 105 –in progressInstrument data sheet (pressure relief valves)-Unit 107 –in progressInstrument data sheet (pressure relief valves)-Unit 111–in progressInstrument data sheet (temperature transmitter)-Unit 111–in progressInstrument data sheet (temperature transmitter)-Unit 104–in progressInstrument data sheet (temperature transmitter)-Unit 143–in progressInstrument data sheet (temperature transmitter)-Unit 144–in progressInstrument data sheet (temperature transmitter)-Unit 145–in progressInstrument data sheet (control valve)-Unit 106 -in progressInstrument data sheet (control valve)-Unit 105 -in progressInstrument data sheet (control valve)-Unit 101 -in progressNozzle arrangements for level instrument of all units-in progress (implementation of owner comments) Instrument data sheet (analyzer-CO2)-Unit 101-in progress Instrument data sheet (analyzer- H2S)-Unit 101- in progress Instrument data sheet (analyzer- H2S/SO2)-Unit 108- in progress Instrument data sheet (analyzer- GC)-Unit 104- in progress Instrument data sheet (analyzer- RSH)-Unit 107- in progress Instrument data sheet (analyzer- H2O)-Unit 104- in progress Instrument data sheet (analyzer-PH)-Unit 108- in progressInstrument data sheet (analyzer-H2 )-Unit 101 in progressInstrument data sheet (pressure differential transmitter)-all units in progressInstrument data sheet (pressure transmitter)- all units in progressInstrument data sheet (pressure relief valves)-Unit 101 (input to process)Instrument index –all units –in progressStarting of instrument data sheet (level gauges)-Unit 101&104,105,106,107,108 (input to process)Review of mechanical engineering drawings (vessels, drums, exchangers,) in different unitsReview of mechanical received vendor Bids (air coolers, chemical injection packages…)Review and comments on P&ID (S)-Rev.DTBE of vendor offer for IPCS issued.Interface meeting with EPC-2/PPLExport gas compressor handover meeting with PPL and OTC at Tehran.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 18 of 39

Meeting with Export gas compressor vendor OTC in TehranInstrument index update in excel based on Rev-D0 P&ID.Bulk MTO and QPL Refrigerant compressor package vendor dwgs/documents review/comments Export gas compressor contract document review, Communication /MOM / Clarification between client and vendor are reviewed and comments provided, Listed all open points where client’s / vendor’s confirmation required. Support to Machinery and AUSI package requirements.Study review of Project common documents issued by EPC-2 for Instrument and Telecom systemMachinery package vendor offer review and comments provided for following package

Sulphur solidification (M/s SBS)Gas dehydration package (M/s Gastech, M/s IMS, M/s Comart)Centrifugal Blower package (M/s Howden, M/s Continental, M/s CBI)API- pump (M/s Ebara, M/s Sulzur, M/s Weir)

Start of Bid evaluation for IPCS

Assistance in Review of offers for Gas dehydration package receivedAssistance in Review of offers received for Centrifugal blower packageAssistance in Review of offers received for “API 610 heavy duty process centrifugal pumps”.Assistance in Review/comments of vendor documents for Refrigerant compressor package (Company item) Assistance in Review/comments of vendor documents for Export gas compressor package (Company item)Starting of instrument data sheet (control valve)-Unit 101 (input to process).Starting of instrument data sheet (pressure differential transmitter)-Unit 101 (input to process).Starting of instrument data sheet (pressure differential transmitter-level)-Unit 101 (input to process).Starting of instrument data sheet (pressure relief valves)-Unit 101 (input to process).Starting of instrument data sheet (orifice assembly)-Unit 101 (input to process).Preparation of nozzle arrangement for level instrument (unit-101).Preparation of nozzle arrangement for level instrument (all units).Implementation of F&G devices tag Nos. in the EPC3 Buildings (SS/LER/LCR) F&G layouts (drawings by HSE).Review of mechanical engineering drawings (vessels, drums, exchangers) in different units.Review of mechanical received vendor Bids (air coolers…).Review of SS/LCR/LER (S) architectural drawings.Preparation of instrument index in unit-101, unit-104, unit-105, unit -106.HVAC EngineeringIssued HVAC design basis data sheet for Substation 5, 6, 7 , 9, 10 and North fence gate houseNilIssued HVAC flow diagram for Substation 5, 6, 7 , 9, 10 and North fence gate houseIssued HVAC Conceptual design basisIssued HVAC Legend and Symbol drawingFinalization of document list & Numbering the DocumentsPreparation of HVAC Calculation for Substation 5&6&7Preparation of PFD for Substation 5&6&7Receiving the HVAC Philosophy, Basis of Design, Specs, Symbol& Abbreviation from PPL.HSE/SAFETY EngineeringPlanning of HAZOP activitiesPlanning of 3D Model Safety ReviewReview and comments on Electrical Hazardous Areas Issue D1Issued 4 Nos. PID’s for Fire Water Network in D0 Revision.Issued 22 Nos. PID’s for Deluge valves in D0 Revision.Issued Fire Proofing Layouts (General Layout) in D0 Revision.Issued Fire Proofing Layouts (Gas Train/Unit 143/Unit106/Unit 144/Unit 145/Unit 108) in D0 Revision.Meeting with PPL on Substation Layout and Clean Agent SystemsMeeting with PPL on F&G Cause & Effect DiagramsIssue of F&G Cause & Effect DiagramPreparing hazardous area classification of process units.Comments on hazardous source list.Checking MR for fire fighting equipments.Checking and comments on substation DWG.Preparation of F&G detection layout.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 19 of 39

Preparation of Manual Alarm Call Point general layout.Preparation of MTO for fire fighting equipments.Preparation of MR for fire fighting equipments.Preparation of MTO for fire extinguishers.Preparation of MR for fire extinguishers.Preparation of Safety equipment data sheets.Preparing of simulation files of HP, MP & LP flare networks.Reviewing the Plot Plans of EPC3 scope of work units.Filling the instrument data sheets containing process devices.Preparing the F.F. & safety equipment layout.Review and comments on Consequence Analysis from EPC2.Preparation of Consequence Analysis for EPC3.Mechanical Data sheets and drawings review.Reviewing comments on vendor packages.AUXILIARY EQUIPMENT EngineeringBE for Reaction Furnace – 001TBE for Thermal Oxidizer - 002 IncineratorTBE for Reducing Gas Generator – 003TBE for Regeneration Furnace - 004Engineering assistance to other disciplinesTechnical evaluation on going for offers for Reaction furnace, Thermal Oxidizer, Reducing Gas generator and Regeneration Furnace.NilPLANNED FOR THE NEXT PERIODGeneral EngineeringP&IDs review and HAZOP meetings30% Model Review planned in AugustFirst Issue of P&ID’sPreparation of HAZOP PROCESS EngineeringChemical and catalyst list preparationCompletion of Cause and Effect tables Unit 143, 144, 145P&ID review meetingHAZOP meetingInstrument datasheet IDS completion for local instruments (PI, TI, LG)Issue of Material Selection DiagramPSFS drawings issueDepressurization report issue revision D0Electrical tracing list preparation for equipment, lines, instrumentsAssistance to Nargan engineering disciplinesCatalyst and chemical list preparationP&ID master copy updating with P&ID review commentP&ID master copy updating with HAZOP review commentCommenting vendor documents for TBECommenting vendor documents of company itemsCompletion of Hierarchic diagram and Cause and Effect tablesInstrument datasheet IDS completionUpdating and issue of equipment PDS based on client comments (in revision D1)Material Selection Diagram completion and issuePSFS drawings preparationDepressurization report finalization for issue D0Electrical user list preparationAssistance to engineering disciplinesCatalyst and chemical list preparationP&ID master copy updating for P&ID reviewFinalization of studies for flare linesIssue of P&IDs Rev. D0 issued (All Units)Cause and Effect Matrix and hierarchy diagram preparationCommenting vendor documents Updating equipment PDS based on client commentsReview of process and interconnecting P&IDs revision D0.Finalization of Depressurization report.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 20 of 39

Revised process data sheets having final depressurizing report.Review of Mechanical drawings.Process data for instrument data sheets.Checking and commenting of vendor proposalsMECHANICAL EngineeringOffer evaluation for Filter (SP12-2Y3-ME-MR-993-F-001/ SP12-2Y3-ME-MR-993-J-002).Offer evaluation of Ejector (SP12-2Y3-ME-MR-993-J-002).Offer evaluation of Desuperheater (SP12-2Y3-ME-MR-993-X-003).Review/comments of vendor documents for Refrigerant compressor package (Company item).Preparation of Technical query on FINDER Pump (SP12-2Y3-ME-MR-993-P-004).Review/comments of vendor documents for Refrigerant compressor package (COMPANY ITEM).Review/comments of vendor documents for Export gas compressor package (COMPANY ITEM).Preparation of Technical query on FINDER Pump & KSB Pumps (SP12-2Y3-ME-MR-993-P-004).Attendance of meeting for Export gas compressor in Teheran.Follow-up, communication, review of vendor reply on TQ for SP12-2Y3-ME-MR-993-P-002, SP12-2Y3-ME-MR-993-P-004.MR and supply specifications for Filtration package and Sulphur Degassing Unit completion.Offer evaluation in case of receipt of the same.MR to be issued for Bid enquiry for SP12-2Y3-ME-MR-101-U-001 (Antifoam package)Preparation of comments for vendor offers for API 610 Vertical centrifugal pumps. Meeting with Vendors & Preparation of comments for vendor offers for MR nos. SP12-2Y3-ME-MR-993-P-001 (SULZER) & SP12-2Y3-ME-MR-108-K-001 (CBI). Review of vendor documentation for Export Gas compressor and Refrigeration package.Preparation of Technical query & Meeting with Vendors for MR no. SP12-2Y3-ME-MR-993-P-002 & SP12-2Y3-ME-MR-993-P-003.Preparation of MR for issue of Bid Enquiry (API 610 Vertical centrifugal pumps & Metering Pumps)  Preparation of Comments for vendor offers for Gas Dehydration Package Preparation of comments for vendor offers for BlowersPreparation of comments for vendor offers for API 610 Vertical centrifugal pumpsVendor meeting with vendors for API 610 Vertical centrifugal pumps /Blowers/ Gas Dehydration PackageReview of vendor documentation for Export Gas compressor and Refrigeration package Export Gas Compressor Vendor documents 2nd. Handover Meeting with OTC/PPL at TeheranPreparation of Material Requisition for Filtration package and degassing package Update of engineering drawings for drums.Reissue of engineering drawings for columns.Updating of engineering drawings for reactors. Updating of engineering drawings for storage tanks. Updating of engineering drawings for shell and tube made of titanium.Bid evaluation of offers for reactors according to PD-5500.Reissue of TBE of offers for storage tanks.Bid evaluation of offers for air coolers.Issue of TBE of offers for drums according to ASME.Bid evaluation of offers for plate type heat exchangers.Reissue of TBE of offers for column internals.Issue of TBE for drum internals.Bid evaluation of offers for shell and tube made of titanium.KOM with HYOSUNG for columns according to PD-5500.KOM with FSK for reactor According to ASME.Bid evaluation of offers for chemical injection package.CIVIL / STRUCTURE / BUILDING EngineeringFurther revised Support Reaction of IPR-NS-GTU/EW-COMP module no PR3-160-601 to 608/ 301 to 308 to be issued.Further revised Structural steel drawings of IPR-NS-GTU/EW-COMP module no PR3-160-601 to 608/ 301 to 308.Support Reaction & Structural steel drawings of IPR-NS-SRU modified module no PR3-160-501, 505 & 508 to updated as per the new 20m pipe bridge span & to be issued. TEKLA model & structural steel drawings for E-W IPR to be issued as per schedule.Revised TEKLA model & structural steel drawings for N-S to be issued.Load data for foundation design of remaining E-W racks to be issued progressively.Load data for foundation design of N-S racks (GTU/SRU) to be issued.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 21 of 39

N-S racks – Support reactions to be modified due to comments received from PPL and Piping GroupN-S racks – Structural drawings to be issued for comments.E-W racks - Support reactions to be prepared for foundation designIssue of flow diagram for Substation 5, 6, 7, 9 &10.Issue of HVAC Calculation for Operating Buildings. Preparation of Equipment schedule for Substation 5, 6, 7, 9 &10.Preparing preliminary key plan for units for UG composite and road & paving.Receiving tie in point information and starting of preliminary calculation for Ditches network.Receiving tie in point information and starting of preliminary calculation for UG pipe network.Clash checking for foundation of interconnecting pipe rack.Start of modelling for U/G work.Receiving of as built drawings for site preparation works and comparison with plot plans and FEED documents.Architectural drawings for Substation # 9 & 10 will be issued AFC. Foundation drawings for Substation # 9 & 10 will be issued AFC.Architectural drawings of Operator building & Gatehouse will be revised and reissued.Re-Issue of MR for Steel Structure based on 1st BOQIssue of TBE for Steel StructureIssue of MR for Anchor BoltsIssue of MR for Steel RebarsPIPING EngineeringTemporary structure modeling for all Units.Completion of temporary pipe rack modeling in all unitsPiping modeling in interconnecting unitPiping modeling in Gas TrainPiping modeling in SRUPiping modeling in Export Gas CompressionEquipment structures modeling in SRUIssuing of plot plan for Gas trains(2~5)Issuing of plot plan for SRU(2~4)Revised load data to civil for IPR, for rework due to pipe bridge span change.Issue of revised piping study plans of IPR to NEC for further engineering.ELECTRICAL EngineeringReview of vendors offers as receivedIssue of Above Ground Cable Ladder Layout-(Unit 101/104/105/107/111) TRAIN 1, 2, 3,4,5,6Issue of Earthing Layout-(Unit 101/104/105/107/111) TRAIN 1, 2, 3,4,5,6Issue of Above Ground Cable Ladder Layout-(Unit 106)Issue of Earthing Layout-(Unit 106) Issue of Above Ground Cable Ladder Layout-(Unit 108) Train 1,2,3,4Issue of Earthing Layout-(Unit 108) Train 1,2,3,4Issue of Earthing Layout-(Unit 143)Issue of Earthing Layout-(Unit 144)Issue of Earthing Layout-(Unit 145)Issue of Power Factor Calculation and ScheduleIssue of Data Sheet for Power FactorIssue of MR Power factorIssue of Overall Electrical Cable Routing - AbovegroundIssue of Earthing Layout-Outside Area SS5, 6, 7,9,10 Issue of Electrical cable ladder/Tray Layout- SS5, 6, 7,9,10 Issue of Lighting and small power Layout- SS5, 6, 7,9,10Issue of Lighting Layout- Gate houseIssue of Lighting Layout- Operation buildingIssue of Earthing Layout- Gate houseIssue of Earthing Layout- Operation buildingSubstation-SS5 Electrical Cable Ladder/Tray LayoutSubstation-SS6 Electrical Cable Ladder/Tray LayoutSubstation-SS7 Electrical Cable Ladder/Tray LayoutSubstation-SS9 Electrical Cable Ladder/Tray LayoutSubstation-SS10 Electrical Cable Ladder/Tray LayoutElec. Cable List & Schedule -SS5

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 22 of 39

Elec. Cable List & Schedule –SS6Elec. Cable List & Schedule –SS7I/O ListData Sheet for Power FactorTBE for DC UPS Panels And BatteriesTBE for AC UPS Panels And BatteriesTBE for Neutral Earthing ResistorBill of Material for Local Control StationsTBE for LV Bus DuctReview of package vendor offers.TELECOMMUNICATION EngineeringIssue of Telecom Layout- SS5, 6, 7,9,10NilINSTRUMENT AND CONTROL EngineeringMeeting with Export gas compressor package vendor in TehranIssue of LCR/LER-05, LCR/LER-06, LCR/LER-07, LCR/LER-09 based on final architecture layout prepared by NEC.P&ID review meeting in Tehran.Interface meeting with EPC-2/PPL.Refrigerant Gas compressor package vendor dwgs/document review/comments.Export gas compressor package vendor dwgs/documents review/comments.UPS power consumption data (Preliminary) for each LCR/LER-05, -06, -07, -09, -10.Heat load calculation for each LCR/LER-10.Support to Machinery package requirements e.g. revised offer evaluation, TBE preparation.Issue of Instrument Electrical Interface Document.Review of NEC-Instrument deliverables uploaded in PCIM.Preliminary MCC interface list Interface meeting with EPC-2/PPLInstrument index update in Intools based on Rev-D0 P&ID.Refrigerant Gas compressor package vendor dwgs/document review/comments.Export gas compressor package vendor dwgs/documents review/commentsUPS power consumption data (Preliminary) for each LCR/LER-05, -06, -07, -09, -10.Heat load calculation for each LCR/LER-05, -06, -07, -09, -10Support to Machinery and Auxiliary Equipment package requirements.Study review of Project common documents issued by EPC-2Revision of LCR/LER layouts based on revised input received from IPCS vendor and package vendorsBulk MTO and QPL Machinery package vendor technical clarification meeting for following packages

- Centrifugal Blower (Offer from M/s HOWDEN, M/S CBI, M/s CONTINENTAL)- Gas Dehydration (Offer from M/s Gastech, M/s Comart, M/s IMS)- Sulphur solidification package (offer from M/s Sandvik, M/s SBS)- API-610 Heavy duty pump package (M/s Sulzur, M/s Ebara, M/s Weir)• Assistance to machinery for preparation of TBE for following packages

Gas Dehydration (Offer from M/s Gastech, M/s Comart, M/s IMS)Completion of Bid evaluation for IPCS

Assistance in Bid evaluation for “API 610 heavy duty process centrifugal pumps” for offers receivedAssistance in Bid evaluation for Sulphur solidification package offer receivedStarting of instrument data sheet (On-off valve)-Unit 101&104,105,107 (input to process)Start of remain instrument data sheets-for remain unitsStart of F&G field devices data sheets provided receiving template from EPC2Start of F&G field cable routingIssue of nozzle arrangement for level instrument (all units)Review of mechanical engineering drawings (vessels, drums, exchangers,) in different unitsReview of mechanical received vendor Bids HVAC EngineeringPreparation of HVAC Calculation for Substation 9&10& Operating Buildings & Gate House.Preparation of PFD for Substation 9&10Investigation & Responding to the HVAC Philosophy, Basis of Design, Specs, Symbol & Abbreviation Received from PPL.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 23 of 39

NilHSE/SAFETY EngineeringPlanning of HAZOP activitiesPlanning of 3D Model Safety ReviewInterface meetings on F&G C&E Diagrams, Consequence Analysis & Fire Zone Layout, Muster Point LocationsPlanning of HAZOP activitiesPlanning of 3D Model Safety ReviewReview and comments on FF&SE Layout Issue D1.PIDs for Fire Water Network and for Deluge valvesHazardous area Layouts for Fire Proofing Issuing the hazardous area classification of process unitsPreparing hazardous source listPreparation of F.F. & F.G. substation based on new architecture drawingPreparation of Consequence Analysis for EPC3Issuing F&G detection layoutIssue of Manual Alarm Call Point general layoutIssue of MTO for fire fighting equipmentsIssuing MTO for fire extinguishersIssue of Safety equipment data sheetsIssuing MR for fire fighting equipmentsIssuing MR for fire extinguishersPreparing escape routes for process unitsReviewing and comments on F&G cause & effect matricesReview and comments on vendor documents & mechanical drawings & datasheetsReviewing and commenting of Rev. D0 of Process P&ID’sFilling the instrument data sheets containing process devicesReviewing the Plot Plans of EPC3 scope of work unitsFlare networks design and simulationPreparing F.F. & F&G drawings of buildingsPreparing Fireproofing list and drawingsIssuing F.F. & safety equipment layoutReviewing and preparing fire protection layout for EPC3AUXILIARY EQUIPMENT EngineeringNil

NilAREA OF CONCERNGeneral EngineeringUnavailability of Common Documents.Design changes in the Flare headers & sub header N-S IPR GTU/SRU & E-W Comp Modules are getting affected. The support reaction, structural drawings & TEKLA model for modules issued till date may be revised. Non finalization of Trilateral Agreement and consequent lack of direct communication with Licensors; communication channel through PPL not effective..Unavailability of Common Documents.PROCESS EngineeringRefer to 4.4.1 in particular clarifications on Unit 108 are neededApproval from Licensors (Prosernat, Whorley Parson) of documentation according to trilateral Agreement (signed but not yet available)Presence of Licensors at Hazop Meeting.MECHANICAL EngineeringApproval from client awaited on the following:

Nameplate specification (SP12-2Y3-ME-SP-993-004_ D0 ) Handover of Manufacturing data report (SP12-2Y3-ME-SP-993-002_ D0).For MR001 and MR006, all vendors has regretted to supply Vibration probes and

monitoring system due to Embargo issue. Approval from client awaited on various specifications (Nameplate, Handover of Manufacturing data report, General specification for the supply of pressure and non-pressure equipments)

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 24 of 39

Client reply to technical queries awaited.Licensor/PPL approval of TBE for Column Internals in order to provide relevant column vendors with internal’s informationFinalization of EPC3 comments on Material SpecificationsCIVIL / STRUCTURE / BUILDING EngineeringDue to recent study of flare lines, there are changes in line size & load data. This will affect N-S IPR GTU/SRU & E-W Comp.N.A.N/APIPING EngineeringFinalization of EPC3 comments on PMSFinalization of EPC3 comments on Material SpecificationsNilELECTRICAL EngineeringEPC2 to provide interface information about refrigeration compressors and typical scheme for MV and LV feeder.N.A.The following information to be provided by EPC-2 Total cable length (NEC already forwarded EPC-3 battery limit length to EPC-2) for refrigeration gas compressor motors to be informed to Siemens to check terminal box size.Details of differential protection CTs for refrigeration gas compressor motors.TELECOMMUNICATION EngineeringN.A.N.A.INSTRUMENT AND CONTROL EngineeringFinalisation of P&ID legend for Motors typical by EPC-2/PPL EPC-2 to provide input required for standardization Receiving F&G data sheets templates from EPC2HVAC EngineeringN.A.N.A.HSE/SAFETY EngineeringN.A.N.A.AUXILIARY EQUIPMENT EngineeringN.A.

N.A.

PROCUREMENT

OVERALL PROCUREMENT S-CURVE

N.A.

ACHIEVED GOALS DURING THE PERIOD

Filtration Package

Heat Exchangers, Shell & Tube, Made of CS/SS

Local Control Station

Other Bid Inquiries Issued

Anchor Bolts for Plant Pre-Fabricated Structural Steel

API 610 Centrifugal Pumps (>150 kw)

Centrifugal Blowers

Sulphur Solidification Package

Reaction Furnace

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 25 of 39

Thermal Oxidizer (Incinerator)

Reducing Gas Generator

Regeneration Furnace

Drum Internals

Heat Exchangers, Shell & Tube, Made of Titanium

Neutral Earthing Resistor (NER)Filters API 610 Centrifugal Pumps (<= 150 kw)API 610 Vertical CF PumpsHeat Exchangers, Shell & Tube, Made of CS/SSHeat Exchangers, Shell & Tube, Refractory LinedHeat Exchangers, Multi Tube, Hairpin TypePower Factor Impr.Bid inquires compiled and issuedN.A.Reactors according to PD5500Drums according to ASMEAir coolersSteel pipesHV SwitchgearPre-Fabricated Structural Steel (DR Scope of Supply - Early Production)Pre-Fabricated Structural Steel (GM Scope of Supply - Early Production)Reactors according to PD5500Drums according to ASMEAir coolersSteel pipesPre-Fabricated Structural Steel (DR Scope of Supply - Early ProductionPre-Fabricated Structural Steel (GM Scope of Supply - Early Production)

Reactors according to PD5500

Drums according to ASME

Air coolersAll the Procurement Procedures have been revised including Company comments and issued for Company approval.Balance Procurement Procedures to be issued: “Transport, Custom clearance and Shipping Management Procedure”Refrigerant Compressors: follow-up activities in progressExport Gas Compressors: follow-up activities in progressDue to the present market situation many bids are in a critical status.Degassing PackagePlant Pre-Fabricated Structural Steel (DR Scope of Supply- Except Early Production)Plant Pre-Fabricated Structural Steel (GM Scope of Supply- Except Early Production)FiltersAPI 610 Centrifugal Pumps (<= 150 kw)API 610 Vertical CF PumpsHeat Exchangers, Shell & Tube, Refractory LinedHeat Exchangers, Multi Tube, Hairpin TypeHeat Exchangers, Plate TypeChemical Injection PackageA certain number of MR for Steel PipesDC UPS Panels and BatteriesLV Bus DuctAC UPS Panels and Batteries

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 26 of 39

LV SwitchgearPower Factor Impr.Anchor Bolts for Plant Pre-Fabricated Structural SteelHV CableCable Ladder/TrayTermination KitEarthing & Lightning Protection SystemStreet Lighting PolesDiff. Pressure TransmittersLevel Diff. Pressure TransmittersPressure TransmittersTemperature TransmittersHydrants/Monitors/Hose ReelsPersonnel Protection EquipmentSafety Showers and Eye WashPortable/Wheeled ExtinguishersDegassing Ejectors / Start Up Gas Stream EjectorsDesuperheatersFeed Gas Filter Coalescer / Regeneration Gas FiltersFiltration PackageDegassing Package Local Control StationHydrants/Monitors/Hose ReelsPortable/Wheeled Extinguishers

API 610 Centrifugal Pumps (>150 kw)

Centrifugal Blowers

Sulphur Solidification Package

Reaction Furnace

Thermal Oxidizer (Incinerator)

Reducing Gas Generator

Regeneration Furnace

Catalyst for Mercaptane Removal Beds

Drum Internals

Heat Exchangers, Shell & Tube, Made of Titanium

Chemical Injection Package

Power Transformers

Neutral Earthing Resistor (NER)

Anchor Bolts for Plant Pre-Fabricated Structural SteelAPI 610 Centrifugal Pumps (>150 kw)Centrifugal BlowersSulphur Solidification PackageReaction FurnaceThermal Oxidizer (Incinerator)Reducing Gas GeneratorRegeneration Furnace

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 27 of 39

Catalyst for Mercaptane Removal BedsDrum InternalsHeat Exchangers, Shell & Tube, Made of TitaniumPower TransformersNeutral Earthing Resistor (NER)Anchor Bolts for Plant Pre-Fabricated Structural SteelIPCSAPI 610 Centrifugal Pumps (>150 kw)Centrifugal BlowersSulphur Solidification PackageReaction FurnaceThermal Oxidizer (Incinerator)Reducing Gas GeneratorCatalyst for Mercaptane Removal BedsDrum InternalsHeat Exchangers, Shell & Tube, Made of TitaniumSteel PipesHV SwitchgearPower TransformersPre-Fabricated Structural Steel (DR Scope of Supply - Early Production)Pre-Fabricated Structural Steel (GM Scope of Supply - Early Production)Anchor Bolts for Plant Pre-Fabricated Structural Steel

TBE to be approved by PPL in order to proceed with procurement activities

Issuance of reviewed Vendor list.

Site Survey activities in progress

Refrigerant Compressors: follow-up activities in progress

Export Gas Compressors: follow-up activities in progress

Issue of Vendors’ Prequalification documents To COMPANY, for approval of additional Vendors proposed/to be proposed by Consortium for Plant Pre-Fabricated Structural Steel (Except Early Production Portion)

Delay on procurement activities due the unresolved contractual issues.

Company Items: finalization of the open contractual and technical issues highlighted by EPC3 are awaited from PPL/Vendor to allow the finalization of the Partial Assignment Agreement.

Further EU sanctions & restrictions causing more and more Vendor declines..Bid Inquiries Issued (PRELIMINARY, waiting for resolution of the open issues indicated in the area of concerns):Issue of Inquiry Package for Steel Structure fabricators.API 610 Centrifugal Pumps (<=150kw)High Head PumpsRegeneration FurnaceCatalyst for Sulphur Recovery UnitSteel StructuresOther Bid Inquiries Issued:Drum InternalsHeat Exchangers TitaniumDC Battery ChargerBid Inquiries complete and offer evaluated for:HV SwitchgearsStorage TanksColumn InternalsOffer received for:

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 28 of 39

Heat Exchangers TitaniumDC Battery ChargerChemical Injection Packages Award Recommendation submission to COMPANYDrums acc. to PD-5500Columns acc. to PD-5500Reactors acc. to ASMEColumns acc. to ASMEAward Recommendation Approved by COMPANYDrums acc. to PD-5500Columns acc. to PD-5500Reactors acc. to ASMEColumns acc. to ASMELOI/PO’s IssueDrums acc. to PD-5500Columns acc. to PD-5500Reactors acc. to ASMEColumns acc. to ASMEOther pointsAll the Procurement Procedures commented by Company are under revision.Support Documentation for Yokogawa Italy submitted to COMPANY through letter SP12-EPC3-L-PPL-161, dtd. June 12th, 2010.Prequalification Documents of Esfahan Machinery for Storage Tank submitted to COMPANY for Approval through letter SP12-EPC3-L-PPL-175, dtd. June 27th, 2010.The collection of Vendors' Prequalification documents is being finalized for submission to COMPANYCompany Items – Export Gas Compressor:meeting has been held in Tehran at Company office with OTC/MIGT for review of the open technical issues highlighted by Consortium (Report Doc. No. SP12-2Y3-ME-RP-106-K-001-D0, transmitted to PPL with letter SP12-EPC3-L-PPL-133 dtd. May 15th, 2010); since Vendor (OTC/MIGT) could not provide the required clarification a new meeting, with participations of COMPANY, Siemens and OTC/MIGT and EPC3, will be held in Tehran in the early July 2010.PLANNED FOR NEXT PERIODBid Inquiries IssuedIssue of Inquiry Package for Steel Structure Anchor BoltsIssuing of Bid Inquiries for Steel Structure first lot. FiltersDegassing Ejectors / Start Up Gas Stream EjectorsDesuperheatersFeed Gas Filter Coalescer / Regeneration Gas FilterDegassing PackageAPI 610 Vertical CF PumpsMetering PumpsLubricants & ConsumablesAntifoam packageSteel Structure Anchor Bolts Steel RebarsComplete offer evaluations to be issued for following MRsIPCS - Integrated Plant Control SystemAPI 610 Centrifugal Pumps (>150kw)Centrifugal BlowersSulphur Solidification PackageGas Dehydration PackageDrums acc. to ASMETransformersAir CoolersReactors acc. to PD-5500Heat Exchanger Plate typeSteel Structure for first lotBid inquiry to be issued for following MRsHeat Exchanger Refractory Lined

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 29 of 39

Heat Exchanger Multi Tube Hairpin TypeLV SwitchgearLV Bus DuctPower Factor Impv.AC UPS Panels and BatteriesNeutral Grounding Resistor (NGR)Steel Structure for first lotOffers expected to arrive for the following MRsDrum InternalsLV Switchgear LV Bus DuctNeutral Grounding Resistor (NGR)Award Recommendation submission to COMPANYIssue of Award Recommendation for Steel Structure Issue of Award Recommendation for Steel Structure Anchor BoltsIPCS - Integrated Plant Control SystemDrums acc. to ASMEReactors acc. to PD-5500Column InternalsStorage TanksHV SwitchgearsTransformersSteel StructuresSteel Structure Anchor BoltsAward Recommendation to be Approved by COMPANYDrums acc. to ASMEReactors acc. to PD-5500Column InternalsStorage TanksHV SwitchgearsTransformersSteel StructuresSteel Structure Anchor BoltsLOI/PO’s to be IssuedIssue of PO for Steel Structure Issue of PO for Steel Structure Anchor BoltsIssue of PO for Steel RebarDrums acc. to ASMEReactors acc. to PD-5500Column InternalsStorage TanksHV SwitchgearsTransformersSteel StructuresSteel Structure Anchor BoltsSteel RebarsOther pointsIssue of balance Procurement Procedures: “Vendor Prequalification Procedure”, “Request to Import Procedure”.Issue of revised Procurement Procedures, including COMPANY’s comments.Issue of Vendors’ Prequalification documents to COMPANY, for approval of additional Vendors proposed/to be proposed by Consortium. Issuance of reviewed Vendor list.Company Items:Refrigerant Compressors: follow-up meeting will be held with Siemens in the month of July 2010Export Gas Compressors: review meeting of EPC3 Report to be held in Tehran with participations of COMPANY and Siemens and OTC/MIGT Issuing of TBE for Steel Structure.AREA OF CONCERNSDelay on procurement activities due the unresolved contractual issues.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 30 of 39

Company Items: finalization of the open contractual and technical issues highlighted by EPC3 are awaited from PPL/Vendor to allow the finalization of the Partial Assignment Agreement.CONSTRUCTION AND PRECOMMISSIONINGOVERALL CONSTRUCTION AND PRECOMMISSIONING S-CURVEN.A.ACHIEVED GOALS DURING THE PERIODExcavation of Export Gas Compressor foundations (106-K-101,201,301,401) has been done.Excavation of Sub-Station No.7 foundation has been started.

Excavation of Pipe Rack Foundation (WP 17) continued.

Excavation of Foundation 106-K-201, 106-K-301 & 106-K-401 is finished.Grading and Compaction of Foundation 106-K-201,106-K-301 & 106-K-401 is done.Polyethylene Sheet for Foundation 106-K-101, 106-K-201, 106-K-301 & 106-K-401 is done.Lean Concrete for Foundation 106-K-101, 106-K-201, 106-K-301 & 106-K-401 is done.Bar Bending for Foundation 106-K-101, 106-K-201, 106-K-301 is done.

Lean Concrete for Foundation 111-K-201 A/B is done.Bar Bending for Foundation 111-K-201 A/B is done.Form Work for Foundation 111-K-201 A/B is done.Grading and Compaction for Foundation 111-K-501 A/B is done.Polyethylene Sheet for Foundation 111-K-501 A/B is done.Lean Concrete for Foundation 111-K-501 A/B is done.Bar Bending for Foundation 111-K-501 A/B is started. (90% Completed).Grading and Compaction for Foundation 111-K-601 A/B is done.Polyethylene Sheet for Foundation 111-K-601 A/B is doneLean Concrete for Foundation 111-K-601 A/B is done.Bar Bending for Foundation 111-K-601 A is started. (7% Completed).Bar Bending for Foundation 111-K-601 B is started. (42% Completed)

Grading and Compaction for Foundation Substation No.07 is started. (45% Completed).

Continuing of SS05 Foundations Excavation (95% Completed) Completion of SS06 foundation Excavation.Continuation of interconnecting pipe racks (PR-3-160) Foundations Excavation.Completion of Main Concrete for 111-K-101 BConcrete Pouring for 111-K-101 B FoundationCompletion of Form Work for 111-K-101 ACompletion of bar bending for 111-K-301 A / B & 111-K-401 A / BContinuation of preparation and levelling of west construction area Continuation of foundation works for batching plants Relocation of construction area to the new 35Ha of land located on the east side of SP12 site

Mobilization of field engineering team at site140794324.91268.2Form Work

M2 873.16

141.72Concrete Pouring M3 198

Rebar Kg 189390

l858153PLANNED FOR THE NEXT PERIODFoundation of Sub-Station No.7 will be started.Excavation of common pipe rack foundations will be done.Excavation of substation foundations.Excavation of Interconnecting pipe rack foundations

Form Work of FDN 106-K-101 will be started.Excavation of refrigerant compressors foundation unit 111Pocket of FDN 106-K-101 will be started.Insert Plate of FDN 106-K-101 will be started.Concrete Pouring of FDN 106-K-101 will be started.Curing of FDN 106-K-101 will be startedForm Work of FDN 106-K-201 will be started.Pocket of FDN 106-K-201 will be started.Insert Plate of FDN 106-K-201 will be started.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 31 of 39

Concrete Pouring of FDN 106-K-201 will be started.Curing of FDN 106-K-201 will be started.

Form Work of FDN 106-K-301 will be started.Pocket of FDN 106-K-301 will be started.Bar Bending of FDN 106-K-401 will be started.

Pocket of FDN 111-K-201 A will be started.Concrete Pouring of FDN 111-K-201 A will be started.Curing of FDN 111-K-201 A will be started.

Pocket of FDN 111-K-201 B will be started.Concrete Pouring of FDN 111-K-201 B will be started.Curing of FDN 111-K-201 B will be started.

Bar Bending of FDN 111-K-501 A will be Completed.Form Work of FDN 111-K-501 A will be started.Pocket of FDN 111-K-501 A will be started.Concrete Pouring of FDN 111-K-501 A will be startedCuring of FDN 111-K-501 A will be started.

Bar Bending of FDN 111-K-501 B will be completedForm Work of FDN 111-K-501 B will be started.Pocket of FDN 111-K-501 B will be started.Concrete Pouring of FDN 111-K-501 B will be started.Curing of FDN 111-K-501 B will be started.

Bar Bending of FDN 111-K-601 A will be Completed.Form Work of FDN 111-K-601 A will be started.Pocket of FDN 111-K-601 A will be started.Concrete Pouring of FDN 111-K-601 A will be started.Curing of FDN 111-K-601 A will be started.

Bar Bending of FDN 111-K-601 B will be completed.Form Work of FDN 111-K-601 B will be started.Pocket of FDN 111-K-601 B will be started.Concrete Pouring of FDN 111-K-601 B will be started.Curing of FDN 111-K-601 B will be started.

Grading & Compaction of SUB STATION NO.07 will be completed.Polyethylene Sheet of SUBSTATION NO.07 will be started.Lean Concrete of SUBSTATION NO.07 will be started.Bar Bending of SUBSTATION NO.07 will be started.

Excavation of Pipe Rack PR-3-160 will be started.Grading & Compaction of Pipe Rack PR-3-160 will be started.Polyethylene Sheet of Pipe Rack PR-3-160 will be started.Lean Concrete of Pipe Rack PR-3-160 will be started.Bar Bending of Pipe Rack PR-3-160 will be started.

Completion of foundations of 6 refrigerant compressors in Units 111 (finish concreting)Completion of Interconnecting Pipe rack Foundation ExcavationStart of Lean Concrete for of Interconnecting Pipe rack FoundationStart of bar bending for interconnecting pipe rack foundationsCompletion of SS 5 Foundations ExcavationStart of Lean Concrete for SS5Start of bar bending & Form Working for SS 5 FoundationsStart of bar bending & Form Working for SS 6 Foundations

AREA OF CONCERNS

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 32 of 39

Idle time of manpower and construction equipment due to holding of temporary facility activities at eastern area.

Approval of Method Statement for foundation bed preparation for Substation No.07 highlighted through CXCS-3-L-00087.

Receiving of NIOPDC letter for TNDG Consortium regarding Gas/Oil Consumption.general servicesOVERALL GENERAL SEVICES S-CURVEN.A.ACHIEVED GOALS DURING THE PERIODAccomodation Camp “Foreign Labour Camp”Architectural Drawings for Toilet and Shower Type B.

HV Drawings for Admin, Laundry, Work Shop, Toilet and Shower Type A, Toilet and Shower Type B.

Structural Drawings for Clinic, Toilet and Shower Type B.Achieving approval with Comment & Review for:Material requisition for painting and coating materials.(Architectural Documents) Material requisitions for Diesel Generator, Main Switchgear, Fire Alarm system, UPS &

Battery Bank, and PA/GA System.(Electrical Documents)Submitting following Drawing and Document to client for comment:

Electrical Drawings in Admin, Clinic, Labour Dormitory Type A, Work shop, Toilet and Shower Type A, Material requisition for Earthing Material and electrical Documents.  

Material requisition for piping material.( HV Documents)Achieving approval for “Foreign Labour Camp”:

DescriptionTotal Drawingsto be issued

Issued Drawings

Balance

Iranian Labour Camp 417 243 174

Foreign Labour Camp 336 158 178

Foreigners Labour CampIssue Bid Inquiry for Diesel Generator for Foreign Labour Accommodation CampIranian Labour Camp:Bid Inquiry completed for Painting & Coating Material for Iranian Labour

Accomodation CampPO issued for Painting & Coating Material for Iranian Labour Accomodation Camp

Cutting of Foreigner Camp Construction has been started.Filling of Foreigner Camp Construction has been started.Disposal of Foreigner Camp Construction has been started.

EngineeringAchieving Approval for:Architectural Drawing in Generator Block, Engineers Dormitory, Managers

Dormitory, Staff Dormitory, Service Staff Dormitory, Sport Hall

Des Total Issue Bala

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 33 of 39

Irani 386 212 174

Fore 356 163 193

Tota 742 375 367

Iranian Labour Camp:Completion of Excavation of 43 Buildings up to nowCompletion of Lean Concrete for 35 Buildings up to nowCompletion of Rebar for 32 Buildings up to nowCompletion of Form working for 30 Buildings up to nowCompletion of Main Concrete Pouring for 26 Buildings Continuing of Steel Structure Fabrication in Shop Continuing of Steel Structure Sand Blasting in Shop Continuing of Steel Structure Painting in Shop

Activity Meas. UnitWork Performed

Cumulative

Foreigners Camp

Cutting M³ 4560

Filling M³

Disposal M³ 4560

Iranian Camp

Excavation M³ 6137

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 34 of 39

Grading & Compaction M2 8908

Form Work M2 3260

Lean Concrete M³ 295

Concrete Pouring Kg 616

Rebar EA 38500

Anchor Bolt M³ 1124

U/G Surface Coating M³ 520

Disposal M³ 6401

Rubble Stone M³ 215

Sub Base Course M³ 2469

Fabrication Ton 65.8

Structure Sand Blasting Ton 26.1

Structure Painting Ton 27.9

Chipping & Padding EA 440

Erection Ton 13.4

Electrical DocHV Drawing in Clinic, Engineers Dormitory, Managers Dormitory, Laundry, Mosque, Service Staff Dormitory, Staff DormitoryStructural Drawing in Generator Block, Engineers Dormitory, Managers Dormitory, Staff DormitoryAchieving Approval with Comment & Review for:Architectural Drawing in Generator Block, Kitchen & RestaurantElectrical Drawing in Admin Generator Block , Kitchen & Restaurant, Engineers Dormitory, Managers Dormitory, Service Staff Dormitory, Staff Dormitory & Electrical DocumentHV Drawing in Clinic, Generator Block, Engineers Dormitory, Managers Dormitory, Laundry, Mosque, Service Staff Dormitory, Staff Dormitory, Work ShopMR Issued:MR for Diesel Generators issued.Procurement:TBE for selection of steel structure fabricator (for camps) completed.1st batch of steel structure materials purchased. (for Labor camps)1st batch of rebar purchased (for foundation works)Construction:Completion of Excavation & Grading & Compaction of Iranian Labors' Dormitories ( 23 Buildings ) – Total Volume is 45 Completion of Form Work for 6 BuildingsCompletion of Excavation & Compacting for dormitory Bul. (Zone A & B)Starting of Excavation Fabrication for WC & Shower Bul. (Zone A) Completion of lean Concrete for dormitory Bul. (Zone A & B) Completion of Rebar Foundation for dormitory Bul. (Zone A) Form Work Foundation for dormitory Bul. (Zone A) In ProgressConcrete Foundation for dormitory Bul. (Zone A) In ProgressStarting of Steel Structure Fabrication for dormitory Bul. (Zone A) Starting of lean Concrete for dormitory Bul. (Zone B) Starting of Rebar & Form work Foundation for dormitory Bul. (Zone B)

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 35 of 39

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 36 of 39

Site MobilizationPO’s Issued for:4 X 100 Tons Cement Silos

Micro-Silica Batching PlantIssue of PO for temporary site offices Cutting and filling activities for site preparation of temporary facility area.Fabrication and Installation of Site Fencing between EPC2 and EPC.Continuation of preparation and levelling of west construction area.Continuation of foundation works for batching plants. Installation of rebar shop at site. Relocation of construction area to the new 35Ha of land located on the east side of SP12 site

Activity Meas. UnitWork Performed

Cumulative

Cutting M³ 93.630

Filling M³ 85.399

Preparation of land for rebar workshop and warehouse at west side of site Mobilization of temporary site offices in plant areaCompletion of Mobilization in Managerial and Iranian Labour Camp areas.Site Mobilization including setting out of caravans, warehouse canteens, Generator block and transportation of construction equipments completed.Home Office preparatory works for mobilization of Batching Plants at site.Coordination works for mobilization of Customs Office at sulphur export Gate.Complementary survey study and land mark were done to help finalization of the Plot Plan.Cost estimation for completion of remedial works left by site preparation subcontractor prepared and submitted to CompanyPLANNED FOR THE NEXT PERIODAccomodation Camp

DescriptionCutting Total DWGsM³Issued Dwgs93.630

Balance

Iranian Labour Camp 174 60 114

Foreigner Labour CampFilling 178M³ 6085.399 118

Foreign Labour camp:Getting Approval for:Architectural Drawings in Site plan 9D4, Kitchen & Restaurant, Generator Block, Sport Hall Electrical Documents and Drawings in Site and Clear Comments for all Electrical Drawings

and Documents.HV Drawings in Site and Sport Hall, Kitchen & Restaurant and Generator Block.Structural Drawings in Kitchen & Restaurant, Sport hall and Generator Block.

Issue of Vendors’ Prequalification documents for Diesel Generator for Iranian/Foreign Labour Accommodation CampIssue of Vendors’ Prequalification documents for Steel Structure for Iranian/Foreign Labour Accommodation CampIssue of Vendors’ Prequalification documents for Main Switchgear for Iranian/Foreign Labour Accommodation CampIssue Bid Inquiry for Steel Structure for Iranian/Foreign Labour Accommodation CampIssue Bid Inquiry for Main Switchgear for Iranian/Foreign Labour Accommodation Camp

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 37 of 39

Issue Bid Inquiry For Earthing System and Lighting And Distribution Panels of Iranian/Foreign Labour Accomodation CampIssue Bid Inquiry For Power & Control & Telecom Cables of Foreign Labour Accomodation CampIssue Bid Inquiry For Waste Water Treatment package of Iranian Labour Accomodation Camp Award Recommendation submission for Steel Structure for Foreign Labour Accommodation CampAward Recommendation submission for Diesel Generator for Iranian/Foreign Labour Accommodation CampPO Issue for Diesel Generator for Iranian/Foreign Labour Accommodation CampForeign Labour campShop fabrication of steel structure will be startedIranian Labour campContinuation erection of steel frames for area "A" dormitories

Start masonry works for area "A" dormitories Continuation foundation works for area "D" buildingsCompletion of remaining foundations in areas "B" and "C" of Iranian labour camps Start of Fabrication of steel structure for restaurant & mosque

Receiving PPL reply to the submitted drawings and documents for:Electrical Drawing in OverallHV Drawing in Sport HallStructural Drawing in Kitchen & RestaurantIssue of inquiry package for diesel generator vendorsIssue of TBE for diesel generator setsIssue of Award Recommendation for diesel generator setsIssue of inquiry package for LV switch gearsIssue of TBE for LV switch gearsIssue of Award Recommendation for LV switch gearsEngineeringMR Will Be Issued for Waste Water Treatment PackageProcurementTBE for Diesel generators Will Be IssuedSteel structure vendor selection.Issue of P.O for steel structure ConstructionSteel structure vendor selection.Starting of Steel structures erection (fabricated by GAMMA at site) at zone A Continued of construction work such as bar bending, formwork, concrete foundation at zone B & C.Site MobilizationSite preparation for Workshop, Warehouse continues in construction east area.

Fabrication and installation of site fencing between EPC2 and EPC3 will be continued.Completion of batching plant foundation.Delivery of 4 X 100 Tons cement silos to site.Delivery of Micro-Silica batching plant to site.

Issue of PO for batching plant silos Delivery of batching plant’s main parts to the sitePreparation of land for workshop and warehouse at west side of siteTransportation of Batching Plant.Temporary site offices mobilization in plant area has been performed area of concernAREA OF CONCERNSAccomodation Camp

Remedial works of Site preparation subcontractor should be solved by Company.Site Mobilization

Delay in mobilization and its impact on the work time schedule.Finalization of Area for site mobilization (West, East or North)Finalization of handing over adequate land for mobilization. It is worth mentioning that allocation of proper land on east side of plant is still under negotiation with PSEEZ by PPL.commissioning and start upOVERALL COMMISSIONING AND START S-CURVEN.A.ACHIEVED GOALS DURING THE PERIOD

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 38 of 39

Marked-up P&IDs Rev D0 covering first production train has been completed. Thorough review is ongoing. Additional and/or change in the sub-system number is expected due to some Revision on P&IDs.Tag collection for process area ISBL has been finished. Although detailed equipment lists for each process system as required per item (d) of Annex D13, page 10 of 31 and item (f) of SP12-2Y-PR-PP-999-001_B0, page 6 of 17 are already complete according to FEED documentation and ready for submission to PPL in Excel format. This deliverable was not issued as planned because Contractor is waiting to know if the collected data shall be supplied by entering them in ICAPS Database or in any other database provided by EPC2/Company. Confirmation of using ICAPS as system completion software by COMPANY. The main issue is, who will provide this software?Level -4 scheduling & planning for pre-commissioning/commissioning with respect to sub-system; is in progress.

Data collection and identification of pre-commissioning methods for pre-commissioning

manuals is in progress.SP12-2Y3-CO-CM-993-001-D0_System Definition

SP12-2Y3-CO-SH-993-003-D0_Site Commissioning Organization

SP12-2Y3-CO-SH-993-002-D0_Integrated Systems Completion Schedule up to

Provisional AcceptancePreparation of Home Office Commissioning Deliverables as required by Agreement, Appendix D/ Annex 20/ Project Procedures/ SP12-2Y-PR-PP-999-001-Rev B0: Commissioning and Acceptance Procedure. Drafts of the following deliverables are in progress:

SP12-2Y3-CO-CM-993-001-D0_System DefinitionSP12-2Y3-CO-SH-993-002-D0_Integrated ScheduleSP12-2Y3-CO-SH-993-003-D0_Site Commissioning Organization

Data collection of plant components subsystem-wise for population of Status Index and Technical Database in progress for process systems/subsystems. Data collection and data loading in Excel of Check List/Test Sheets/Etc. subsystem-wise and equipment type-wise is in progress for process systems/subsystems in order to populate Status Index and Technical Database.Preparation of Piping Test Pack Management Procedure is in progressPLANNED FOR THE NEXT PERIODRevision and updating of Marking Up of P&IDs Rev D0 in Acrobat 8 Pro will continuePreparation and issue of pending commissioning Home Office deliverables will continue depending upon clarifications to be provided by EPC2/Company.Detailed definition of scope of work of precommissioning and commissioning activities is in progress. Pressure Testing and Piping Cleaning requirements identification are in progress. This activity is aiming to allow Level 4 planning and scheduling of precommissioning and commissioning activities subsystem-wise.Preparation of detailed procedure of Commissioning will be started. Gathering template procedures from previous SP4&5Database population if ICAPS software availableIssue of the following Deliverables:

SP12-2Y3-CO-CM-993-001-D0_System DefinitionSP12-2Y3-CO-SH-993-002-D0_Integrated ScheduleSP12-2Y3-CO-SH-993-003-D0_Site Commissioning Organization

Prepare draft & structure and schedules for the following deliverables:System Completion Manual (Structure)Precommissioning Manuals Turnover Procedure

Marked P&IDs in Acrobat Reader 8 Professional for Vendor Package P&IDsData collection of plant components subsystem-wise for population of Status Index and Technical Database in progress for process systems/subsystems.Data collection and data loading in Excel of Check List/Test Sheets/Etc. subsystem-wise and equipment type-wise is in progress for process systems/subsystems in order to populate Status Index and Technical Database.AREA OF CONCERNSUnavailability of a dedicated interface for commissioning within PPL; establishment of a Commissioning Management Team by PPL is awaited at the soonest There is still no communication or dialog between EPC3 Contractor Commissioning Team and EPC2/Company Commissioning interfaces. This lack of communication is affecting performance of Commissioning Home Office activities Unavailability of a dedicated interface for commissioning within PPL; establishment of a Commissioning Management Team by PPL is awaited at the soonest.

This document is the property of N.I.O.C.. Any unauthorised attempt to reproduce it, in any form, is strictly prohibited.

Filename: document.doc

document.doc Date: 09th July 2010

Page: 39 of 39

ICAPS Software availability to be obtained soon.

attacHmentsNCRCRITICAL PATHONE MONTH LOOK AHEAD SCHEDULEWPAMANPOWER HISTOGRAMSDETAILED S-CURVESINVOICE PAYMENT HISTORYVARIATION ORDER STATUSDOCUMENT STATUS REPORTPURCHASING STATUS REPORT (PSR)SUBCONTRACTING STATUSPHOTOSNCRCRITICAL PATHONE MONTH LOOK AHEAD SCHEDULEWPAMANPOWER HISTOGRAMSDETAILED S-CURVESINVOICE PAYMENT HISTORYVARIATION ORDER STATUSDOCUMENT STATUS REPORTPURCHASING STATUS REPORT (PSR)SUBCONTRACTING STATUSPHOTOS