spa haul road solutions - stabilised pavements
TRANSCRIPT
SPA HAUL ROAD SOLUTIONS
Solutions for haul road construction, reconstruction and maintenance that focus on improving safety, operating costs and maintenance costs to allow a more effi cient overall process for getting product to market.
ABN: 90 002 900 736
➔
➔
➔
BENEFITS OF THE SPA HAUL ROADS SYSTEM INCLUDE:
HAUL ROAD PRODUCTIVITY:• Reduced dust emissions from haul roads (safety, environment and cost)
• Reduced surface roughness (reduced maintenance and running costs of mine haulage plant)
• Reduced travel times for haulage (rolling resistance)
• Reduced braking distances for haul trucks (safety)
• Less downtime due to wet, slippery or unserviceable haul roads
HAUL ROAD COSTS:• Reduced road maintenance and repair activities
• Reduced water usage within haul road operations
• Improved road performance and life
EM INCLUD
RODUCTIVITY:sions from haul roads (sa
oughness (reduc)
for haulag
nces fo
et, s
r haul trucks (s
ippery or unserv
AUL
n
e haul roads
ost)
of
Costs
Min
Max
Minimum total cost solutionLOW VOLUME
SURFACEROADS
Maintenance Frequency
Max
Min
Rolling Resistance
➔
CONSTRUCT OR REHABILITATE PAVEMENT
INVESTIGATION AND SAMPLING OF HAUL ROAD MATERIALS
CONSULTATION WITH CLIENT ON TRAFFIC BEHAVIOUR AND ASSET FUNCTIONALITY
SELECT AND DESIGN A PAVEMENT SOLUTION FIT FOR PURPOSE
MONITOR PERFORMANCE IMPROVEMENTS
HOW OUR SOLUTION DIFFERENTIATES US FROM ALTERNATIVES:• We are not selling a proprietary product or material
• Our solutions are tailored to each situation based on client feedback, research and previous practice within the resource industry
• We utilise an engineering approach to account for all variables
• Our system utilises proven methods common throughout transport and civil infrastructure
• Our company has been successfully utilising this system for over 30 years
WHAT IS THE PROCESS FOR IMPLEMENTING THE SPA SYSTEM: THE 5 STEP PROCESS
www.stabilisedpavements.com
New South Wales234 Wisemans Ferry RoadSomersby NSW 2250P 02 4340 0111 1800 656 835E [email protected]
Queensland (South)67 Boundary StreetBeenleigh QLD 4207P 07 3807 7600E [email protected]
Queensland (North)17 Titanium PlaceBohle Qld 4818P 07 4412 0100E [email protected]
Queensland (West)Cloncurry Qld 4824P 0408 914 187E [email protected]
Victoria59 Yellowbox DriveCraigieburn VIC 3064P 03 8339 4063E [email protected]
Western Australia81 John StreetWelshpool WA 6106P 08 9258 4349E [email protected]
South AustraliaPO Box 10186, Adelaide BC SA 5000P 0459 600 814E [email protected]
➔
➔
OPPORTUNITIES TO UTILISE THE SPA HAUL ROAD SYSTEM:• To construct new haul roads using overburden and
other locally available less expensive products
• To improve existing haul road performance
• To repair existing haul roads
• On all haul road locations including ramps, turning locations, intersections or hardstands
OTHER SPA MINING APPLICATIONS:• Rehabilitation/repair of mine access roads
• Improving hardstands
• Camp/offi ce infrastructure
• Dam linings/structures
• Rail
• Footings for buildings and conveyors
General EnquiriesDavid BergM 0408 274 642E [email protected]