    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 1.

    Multipurpose Relay for

    Applications where non-directionalovercurrent and earth-fault protectionsare needed, e.g.- feeder protection- transformer protection- back-up protection

    Application areas, e.g.- power utilities- industries- marine and offshore installations

    RS 611 Ser.No.

    n =

    n =

    SPAJ 140 C

    Uaux

    SPCJ 4D29

    REGISTERS OPER.IND.

    0 0 0 0 0

    2

    5

    878E

    I

    ( )I

    ( )oI

    1I> START

    I

    80...265 V ac/dc

    18...80 V dc

    5A1A

    1A 5A

    fn = 50Hz

    60Hz

    SGR

    SGB

    SGF

    SPCJ 4D29

    TRIP

    PROGRAM

    RESET

    STEP

    L1 L2 L3 o IRF

    3 >I

    I>/In

    879B

    I

    X

    X

    I I I I

    1 IL1 /In2 IL2 /In

    3 IL3 /In4 Imax (15 min)

    5 t(I>)[%]

    6 t(I>>)[%]

    7 I0 /In

    8 t(I0>)[%]

    9 t(I0>>)[%]

    2I> TRIP

    3I>> START

    4I>> TRIP

    5I0> START

    6I0> TRIP

    7I0>> START

    8I0>> TRIP

    9 GBFP

    t> [s]k

    I>>/In

    t>> [s]

    I0>/In

    t0> [s]k0

    I0>>/In

    t0>> [s]

  • 8/2/2019 Spaj140c Electronic Relays

    2/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 2.

    Protective Functions

    Three-phase, low-set phase overcurrent protection with definite time orinverse definite minimum time (IDMT) characteristic

    Three-phase, high-set phase overcurrent protection with instantaneous ordefinite time function

    Low-set, non-directional earth-fault protection with definite time or

    inverse definite minimum time (IDMT) characteristic

    High-set, non-directional earth-fault protection with instantaneous ordefinite time function

    Circuit-breaker failure protection

  • 8/2/2019 Spaj140c Electronic Relays

    3/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 3.

    Protective FunctionsTHREE PHASE DEFINITE TIMEOR INVERSE TIME LOW-SETOVERCURRENT PROTECTION

    SERIAL COMMUNICATION PORT

    TRIP

    SIGNAL 1

    SERIAL I/O

    IL1

    IL2

    IL3

    Io

    BS

    Blockingor reset

    THREE PHASE INSTANTANEOUSOR DEFINITE TIME HIGH-SETOVERCURRENT PROTECTION

    INSTANTANEOUS OR DEFINITETIME HIGH-SET EARTH-FAULTPROTECTION

    REMOTE RESET, REMOTE SETTINGCONTROL OR BLOCKING INPUT FORTHE DIFFERENT CURRENT STAGES

    SIGNAL 2

    START 1

    IRF

    START 2

    CIRCUIT BREAKER FAILUREPROTECTION

    DEFINITE TIME OR INVERSE TIMELOW-SET EARTH-FAULTPROTECTION

    51

    50

    51 N

    51BF

    50 N

    Prot. functions

  • 8/2/2019 Spaj140c Electronic Relays

    4/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 4.

    Features

    Wide and accurate numerical settings with perfect long-time stability

    Possibility for two sets of relay settings

    Local man-machine communication with push-buttons and a digital display

    High immunity to electrical and electromagnetic interference

    Rigid aluminium relay case with a degree of protection by enclosure to IP 54

    Extensive data communication capability over built-in serial port

    Enhanced system reliability and availability due to continuous

    hardware and software self-supervision

  • 8/2/2019 Spaj140c Electronic Relays

    5/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 5.

    Versions of the Earth-fault Protection

    Relay versions SPAJ 140 C SPAJ 141 C SPAJ 142 C

    Measuring module SPCJ 4 D 29 SPCJ 4 D 24 SPCJ 4 D 29Rear module SPTK 4E1 SPTK 4E2 SPTK 4E2

    Start current of I> stage, definite time 0.5 ... 5.0 x In

    0.5 ... 5.0 x In

    0.5 ... 5.0 x In

    Start current of I> stage, inverse time 0.5 ... 2.5 x In

    0.5 ... 2.5 x In

    0.5 ... 2.5 x In

    Start current of I>> stage 0.5 ... 40 x In

    and 0.5 ... 40 x In

    and 0.5 ... 40 x In

    and

    In

    of earth-fault unit 1 A / 5 A 0.2 A / 1 A 0.2 A / 1 ASetting range of I

    o> 0.1 ... 0.8 x I

    n0.01 ... 0.25 x I

    n0.1 ... 0.8 x I

    n

    Setting range of Io>> 0.1 ... 10.0 x I

    n0.1 ... 10.0 x I

    n0.1 ... 10.0 x I

    n

    Lowest primary setting of Io> 100 mA 2 mA 20 mA

    Operation characteristic Definite time Definite time Definite time

    IDMT - IDMT

  • 8/2/2019 Spaj140c Electronic Relays

    6/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 6.

    Block Diagram

    6162

    SPAJ 140 C

    63 25 26 271 2 3 4 5 6 7 8 9

    L1

    L2

    L3

    70 71 72

    0

    65 66

    + (~)

    - (~)

    3I>

    3I>>

    Io>

    Io>>

    IRF

    I/O

    68 6977 78

    IRF SIGNAL 2

    -

    +

    TRIP

    74 75

    START 1

    80 811011

    SGB/1

    SGB/2

    SGB/3

    SGB/4

    SGB/6SGB/7

    SGB/5

    LATCHING

    SIGNAL 1START 2

    RESET

    I-

    I 0

    ++

    +

    B

    +

    C

    +

    F

    +

    E

    +

    D

    +

    A

    U1

    1 1

    T2

    T4

    T6

    T8

    T1

    T3

    T5

    T7

    RC SETTINGS

    SGB/8 SGF/40.1...1s

    SGR2/8

    SGR1/6

    SGR1/8

    SGR1/2

    SGR1/4

    U3TRIP

    R

    U2

    U1T9

    TS2SS3SS2SS1TS1

    SPA-ZC_

    Rx Tx

    SERIALPORT

    + -

    SGR2/6

    SGR2/4

    SGR2/2

    1

    SGR2/7

    SGR2/5

    SGR2/3

    SGR2/1

    1

    SGR1/7

    SGR1/5

    SGR1/3

    SGR1/1

    1

    SGR3/8

    SGR3/7

    SGR3/6

    SGR3/5

    SGR3/4

    SGR3/3

    SGR3/2

    SGR3/1

    ~

    EXTERNALCONTROL

    Connections

    1A5A1A

    5A1A5A 1A5A

    Uaux

    SPCJ 4D29

  • 8/2/2019 Spaj140c Electronic Relays

    7/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 7.

    SGR

    SGB

    SGF

    SPCJ 4D29

    TRIP

    PROGRAM

    RESET

    STEP

    L1 L2 L3 o IRF

    3 >I

    > nI I/

    ks>t [ ]

    n>>I I/

    s>>[ ]t

    so >

    ko

    [ ]t

    no>I I/

    s>>ot [ ]

    n>>o I/I

    879B

    I

    I I I I

    Indicators for readout of the measured phase currents,doubling as phase-fault indicators

    Indicator for readout of the measured neutral current,doubling as earth-fault indicator

    Indicator for signalling of internal relay faults

    Digital display for readout of numerical parameters, i.e.settings, measured and recorded values including start andoperation indications, auto-diagnostic fault messages, etc.

    Indicator showing that the main trip relay of the protectionrelay has operated

    Readouts and Operation Indicators

  • 8/2/2019 Spaj140c Electronic Relays

    8/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 8.

    SGR

    SGB

    SGF

    SPCJ 4D29

    TRIP

    PROGRAM

    RESET

    STEP

    L1 L2 L3 o IRF

    3 >I

    > nI I/

    ks>t [ ]

    n>>I I/

    s>>[ ]t

    so >

    ko

    [ ]t

    no>I I/

    s>>ot [ ]

    n>>o I/I

    879B

    I

    I I I I

    Push-button Operations

    Use the RESET/STEP push-button to:- reset operation indicators

    - step forward or backward in main menus or submenus- set adjustable parameter values when in the setting mode

    Use the PROGRAM push-button to:- enter a submenu from the main menu

    - enter the setting mode of an adjustable parameter- control the cursor in the setting mode or to control theselected output in the test mode

    Use both push-buttons simultaneously to:- make a complete relay reset, i.e. erase recorded valuesand release latched output relays

    - save a new setting value- carry out an output relay test

  • 8/2/2019 Spaj140c Electronic Relays

    9/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94- 11. 9.

    Main Settings Second Settings

    Two Setting Banks

    Actual operate time t> ormultiplier k for stage I>

    Actual start current I>>

    Actual operate time t>>of stage I>>

    Actual start current Io>

    Actual operate time to>or multiplier ko

    Actual start current Io>>

    Actual operate time to>>

    Operate time t> ormultiplier k

    Start current ofstage I>>

    Operate time t>>

    Start current ofstage Io>

    Operate time to> ormultiplier ko

    Start current of

    stage Io>>

    Operate time to>>

    Start current ofstage I>Actual start current I>

    1

    1

    1

    1

    1

    1

    1

    1

    2

    2

    2

    2

    2

    2

    2

    2

    Operate time t> ormultiplier k

    Start current ofstage I>>

    Operate time t>>

    Start current ofstage Io>

    Operate time to> ormultiplier ko

    Start current of

    stage Io>>

    Operate time to>>

    Start current ofstage I>

    Dualsetting

    bank

    s

  • 8/2/2019 Spaj140c Electronic Relays

    10/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 10.

    SGR

    SGB

    SGF

    SPCJ 4D29

    TRIP

    PROGRAM

    RESET

    STEP

    L1 L2 L3 o IRF

    3 >I

    > nI I/

    ks>t [ ]

    n>>I I/

    s>>[ ]t

    so >

    ko

    [ ]t

    no>I I/

    s>>ot [ ]

    n>>o I/I

    879B

    I

    I I I I

    Settings of the Overcurrent Unit

    Low-set stage I>:

    Start current I> at definite time 0.5 ... 5.0 x InStart current I> at inverse time 0.5 ... 2.5 x In*)

    Operate time t> at definite time 0.05 ... 300 sTime multiplier k> at inverse time 0.05 ... 1.00

    High-set stage I>>:

    Start current I>> 0.5 ... 40 x In or infinite

    Operate time t>> 0.04 ... 300 s

    *) Any setting greater than 2.5 x In will be regarded as equal to 2.5 x In

  • 8/2/2019 Spaj140c Electronic Relays

    11/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 11.

    SGR

    SGB

    SGF

    SPCJ 4D29

    TRIP

    PROGRAM

    RESET

    STEP

    L1 L2 L3 o IRF

    3 >I

    > nI I/

    ks>t [ ]

    n>>I I/

    s>>[ ]t

    so >

    ko

    [ ]t

    no>I I/

    s>>ot [ ]

    n>>o I/I

    879B

    I

    I I I I

    Settings of the Earth-fault Unit

    Low-set stage Io>:

    Start current Io>, 0.1 ... 0.8 x In

    Operate time to> for definite time 0.05...300 sTime multiplier k at inverse time 0.05...1.00

    High-set stage Io>>:

    Start current Io>> 0.1...10 x In or infinite

    Operate time to>> 0.05...300 s

  • 8/2/2019 Spaj140c Electronic Relays

    12/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 12.

    SGR

    SGB

    SGF

    SPCJ 4D29

    TRIP

    PROGRAM

    RESET

    STEP

    L1 L2 L3 o IRF

    3 >I

    > nI I/

    ks>t [ ]

    n>>I I/

    s>>[ ]t

    so >

    ko

    [ ]t

    no>I I/

    s>>ot [ ]

    n>>o I/I

    879B

    I

    I I I I

    Switchgroup Settings

    Switchgroups SGF1 and SGF2 for selection of operationcharacteristics and other functional parameters

    Switchgroup SGB for routing of blocking signals and forselection of the latching function for the trip relay

    Switchgroups SGR1, SGR2 and SGR3 for configuration ofthe output relays

  • 8/2/2019 Spaj140c Electronic Relays

    13/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 13.

    Flexible Configuration of Output Signals

    SGR3 / 6

    SGR1 / 8

    IL1

    IL2

    IL3

    SGR3 / 1SGR1 / 1SGR3 / 2SGR2 / 1SGR2 / 2SGR1 / 2

    SGR3 / 3SGR1 / 3

    SGR3 / 4SGR2 / 3SGR2 / 4SGR1 / 4

    SGR3 / 5SGR1 / 5

    SGR2 / 5SGR2 / 6SGR1 / 6

    SGR3 / 7SGR1 / 7SGR3 / 8

    SGR2 / 7SGR2 / 8

    I>

    I>> t>>

    t>, k

    to>, koIo>

    to>>Io>>

    Io

    BS

    SGB / 1

    SGB / 2

    SGB / 3

    SGB / 4

    SGB / 5

    SGB / 8REMOTE SETTINGS

    RELAY RESET

    1

    SGB / 6RESET+PROGRAM

    1

    SGB / 7RESET+PROGRAM

    1

    1

    1

    SGF1 / 4

    SS1

    SS2

    SPCJ 4D29

    TS1

    TS2

    SS3

    RESETTRIP

    0.1...1s

    A

    B

    C

    D

    FIRF

    ESTART 1

    START 2

    SIGNAL 1

    SIGNAL 2

    TRIP

    IRF

    (AR2)

    (AR1)

    (AR3)SGF2 / 8

    SGF2 / 7

    SPTU ___R1SIGNAL DIAGRAM

    Relay

    Outputsignals

  • 8/2/2019 Spaj140c Electronic Relays

    14/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 14.

    Settings of Switchgroup SGF 1

    0.0

    5...

    300sD

    ef.time

    Extremelyinverse

    Veryinverse

    Normalinvers

    e

    Long-terminv

    erse

    RIcharacteris

    tic

    RXIDGcharac

    teristic

    Notinuse

    Yes

    No

    Defaultprogramming

    Setting

    Main set

    Second set

    SGF1 1 Operation characteristic 0 1 0 1 0 1 0 1 0 x 1 =

    2 of the low-set overcurrent 0 0 1 1 0 0 1 1 0 x 2 =3 stage (I>) 0 0 0 0 1 1 1 1 0 x 4 =4 Circuit breaker failure protection selected 1 0 0 x 8 =5 Energizing will double the I>> setting 1 0 0 x 16 =6 Operation characteristic 0 1 0 1 0 1 0 1 0 x 32 =7 of the low-set earth-fault 0 0 1 1 0 0 1 1 0 x 64 =

    8 stage (Io>) 0 0 0 0 1 1 1 1 0 x 128 =Checksum =

    (Default = 000)

    PROGRAM

    SGR

    SGB

    TRIP

    SGF

    SPCJ 4D29

  • 8/2/2019 Spaj140c Electronic Relays

    15/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 15.

    Settings of Switchgroup SGF 2

    Yes

    No

    Defaultprogramming

    Setting

    Main set

    Second set

    SGF2 1 Manual resetting of I> start indication 1 0 0 x 1 =

    2 Manual resetting of I>> start indication 1 0 0 x 2 =3 Manual resetting of I

    o> start indication 1 0 0 x 4 =

    4 Manual resetting of Io>> start indication 1 0 0 x 8 =

    5 I>> stage is blocked 1 0 0 x 16 =6 I

    o>> stage is blocked 1 0 0 x 32 =

    7 I>> start signal to autoreclose output AR1 1 0 0 x 64 =

    8 Io> start signal to autoreclose output AR2 0 0 x 128 =Io>> start signal autoreclose output AR3 1

    Checksum =(Default = 000)

    PROGRAM

    SGR

    SGB

    TRIP

    SGF

    SPCJ 4D29

  • 8/2/2019 Spaj140c Electronic Relays

    16/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 16.

    Yes

    No

    Defaultprogramming

    Setting

    Settings of Switchgroup SGB

    Main set

    Second set

    SGB 1 BS input = I> stage blocking 1 0 0 x 1 =

    2 BS input = I>> stage blocking 1 0 0 x 2 =3 BS input = I

    o> stage blocking 1 0 0 x 4 =

    4 BS input = Io>> stage blocking 1 0 0 x 8 =

    5 BS input or command V150 activates the second setting 1 0 0 x 16 =6 Overcurrent unit latches the relay A (signal TS2) 1 0 0 x 32 =7 Earth-fault unit latches the relay A (signal TS2) 1 0 0 x 64 =

    8 BS input resets latched output relay and recorded values 1 0 0 x 128 =Checksum =

    (Default = 000)

    PROGRAM

    SGR

    SGB

    TRIP

    SGF

    SPCJ 4D29

  • 8/2/2019 Spaj140c Electronic Relays

    17/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 17.

    Settings of Switchgroup SGR 1

    Yes

    No

    Defaultprogramming

    Setting

    Main set

    Second set

    SGR1 1 I> start signal routed to relay D (signal SS1) 1 0 1 x 1 =

    2 I> start signal routed to relay A (signal TS2) 1 0 1 x 2 =3 I>> start signal routed to relay D (signal SS1) 1 0 0 x 4 =4 I>> start signal routed to relay A (signal TS2) 1 0 1 x 8 =5 I

    o> start signal routed to relay D (signal SS1) 1 0 0 x 16 =

    6 Io> start signal routed to relay A (signal TS2) 1 0 1 x 32 =

    7 Io>> start signal routed to relay D (signal SS1) 1 0 0 x 64 =

    8 Io>> start signal routed to relay A (signal TS2) 1 0 1 x 128 =Checksum =

    (Default = 171)

    PROGRAM

    SGR

    SGB

    TRIP

    SGF

    SPCJ 4D29

  • 8/2/2019 Spaj140c Electronic Relays

    18/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 18.

    Settings of Switchgroup SGR 2

    Yes

    No

    Defaultprogramming

    Setting

    Main set

    Second set

    SGR2 1 I> operate signal routed to relay C (signal SS2) 1 0 1 x 1 =

    2 I> operate signal routed to relay B (signal SS3) 1 0 0 x 2 =3 I>> operate signal routed to relay C (signal SS2) 1 0 1 x 4 =4 I>> operate signal routed to relay B (signal SS3) 1 0 0 x 8 =5 I

    o> operate signal routed to relay C (signal SS2) 1 0 0 x 16 =

    6 Io> operate signal routed to relay B (signal SS3) 1 0 1 x 32 =

    7 Io>> operate signal routed to relay C (signal SS2) 1 0 0 x 64 =

    8 Io>> operate signal routed to relay B (signal SS3) 1 0 1 x 128 =Checksum =

    (Default = 165)

    PROGRAM

    SGR

    SGB

    TRIP

    SGF

    SPCJ 4D29

  • 8/2/2019 Spaj140c Electronic Relays

    19/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 19.

    Settings of Switchgroup SGR 3

    Yes

    No

    Defaultprogramming

    Setting

    Main set

    Second set

    SGR3 1 I> operate signal routed to relay E (signal TS1) 1 0 0 x 1 =

    2 I> operate signal routed to relay E (signal TS1) 1 0 0 x 2 =3 I>> operate signal routed to relay E (signal TS1) 1 0 0 x 4 =4 I>> operate signal routed to relay E (signal TS1) 1 0 0 x 8 =5 I

    o> operate signal routed to relay E (signal TS1) 1 0 0 x 16 =

    6 Io> operate signal routed to relay E (signal TS1) 1 0 0 x 32 =

    7 Io>> operate signal routed to relay E (signal TS1) 1 0 0 x 64 =

    8 Io>> operate signal routed to relay E (signal TS1) 1 0 0 x 128 =Checksum =

    (Default = 000)

    PROGRAM

    SGR

    SGB

    TRIP

    SGF

    SPCJ 4D29

  • 8/2/2019 Spaj140c Electronic Relays

    20/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 20.

    Comprehensive Post-fault Analysis

    The trip reason and phase conditions can be read on the front of the relay

    The latest five values of the measured values are stored in the memory

    The number of starts of all the protection stages available in the memory

    1 2IL1

    2 1 2

    3 1 2

    4 1 2tI>

    5 1 2

    6 1 2

    7 1 2

    8 1 2

    1

    Io

    53

    3

    3

    3

    3

    3

    3

    4

    4

    4

    4

    4

    4

    4

    4

    5

    5

    5

    3

    nI>

    nI>>

    nIo>

    nIo>>

    IL2

    IL3

    tI>>

    tIo>

    tIo>>

  • 8/2/2019 Spaj140c Electronic Relays

    21/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 21.

    Missing protection or

    nonselective operation

    Relay availability

    Without self-supervision

    With self-supervision

  • 8/2/2019 Spaj140c Electronic Relays

    22/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 22.

    Continuous Self-supervision

    U ref

    A

    D

    P

    8 888

    P

    WD

  • 8/2/2019 Spaj140c Electronic Relays

    23/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 23.

    Serial Communication Features

    The following parameters can be accessed via serial communication overthe SPA bus:

    - Actual measured values can be read

    - Setting values for main and second sets and switchgroup settingscan be read and, if necessary, changed using a security password

    - Status information of output relays etc. can be read and written withpassword

    - Recorded fault parameters can be read and erased

    - Spontaneous reporting of selected events to an event recorder or aprinter

  • 8/2/2019 Spaj140c Electronic Relays

    24/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 24.

    Insulation tests

    Dielectric test, inputs and outputsbetween themselves and to the relay frameas per IEC 255-5 2 kV

    Impulse test, inputs and outputsbetween themselves and to the relay frame

    as per IEC 255-5 5 kV , 1.2/50 s, 0.5 J

    Insulation resistance, inputs and outputsbetween themselves and to the relay frame >100 Mohm, 500 Vdc

  • 8/2/2019 Spaj140c Electronic Relays

    25/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 25.

    Disturbance tests

    High frequency interference test,as per IEC 255-22-1,class III, 1 MHz, 400 bursts per sec

    - common mode / differential mode 2.5 kV / 2.5 kV

    Fast transient test as per IEC 255-22- 4, class IIIand IEC 801- 4, level IV

    - power supply inputs 4 kV , 5/50 ns

    - other inputs and outputs 2 kV , 5/50 nsElectrostatic discharge test as per IEC 255-22-2and IEC 801-2, class III, 150 pF

    - air discharge / contact discharge 8 kV / 6 kV

    Electromagnetic field test as per IEC 801-3, class III 10V/m,150 kHz1000 MHz

    Magnetic field as per IEC 521 400 A/m

  • 8/2/2019 Spaj140c Electronic Relays

    26/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 26.

    Mechanical tests

    Seismic test as per ANSI/IEEE C37.98-1987- operating basis earth-quake tests (OBE) 0.55.25 g

    - safe shutdown earth-quake tests (SSE) 0.57.5 g

    Vibration test 213.2 Hz, 1.0 mm13.2100 Hz, 0.7 g

    Shock/bump test as per IEC 255-21-2 20 g, 1000 bumps/direction

  • 8/2/2019 Spaj140c Electronic Relays

    27/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 27.

    Environmental conditions

    Corrosion test as per Battelle-test, class G3 20days

    Specified ambient service temperature range -10...+55 C

    Long term damp heat withstand according toIEC 68-2-3 < 95 % at 40 C for 56 days

    Transport and storage temperature range -40...+70 C

    Degree of protection by enclosure of the re-lay case as per IEC 529 when panel mounted IP 54

  • 8/2/2019 Spaj140c Electronic Relays

    28/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 28.

    Dimensions and Panel Cut-out

    Flush mounting

    RAISING FRAMESPA-ZX 111SPA-ZX 112SPA-ZX 113

    176136

    96

    74114154

    a b

    a b

    PANEL

    CUT-OUT

    129 1

    139

    1

    142

    162

    136

    30

    34

    250

    186

    216

    Semi-flush mounting

  • 8/2/2019 Spaj140c Electronic Relays

    29/29

    ABB Network Control & Protection

    Combined O/C and E/F Relay SPAJ 140 C

    SPAJ 140 EN 94-11. 29.

    Mounting Plates

    Mounting in 19" cabinets Surface mounting

    SPA-ZX 104 SPA-ZX 110482,6 0 (19")

    101,6 7

    177

    0

    (4U)

    +0,4

    +0,4

    21,5

    482,6 0 (19")

    101,6 7

    177

    0

    (4U)

    +0,4

    +0,4

    21,5

    SPA-ZX 106

    263

    6

    115

    292

    312

    10

    115

    158

    6

    98