sparrows offshore modular rental crane presentation august 2014
DESCRIPTION
Sparrows has the largest fleet of API2C Offshore modular cranes for hire. These are used in a wide variety of lifting application on offshore platforms and are a cost effective option compared to lift boats and rigs. Flexible to work and not affected by sea states.TRANSCRIPT
MODULAR RENTAL CRANES
Why Modular Rental Cranes
2
VS
Modular Rental Crane •Self Erecting •Cost •Weather Limitations •Flexibility
Lift Barge
CONTENTS
• Common uses
• Sparrows Fleet
• Fleet Examples
• ECR20
• ECR120
• Installation Examples
• Project Examples
• BP – Crane Installation
• Dolphin Qatar – ESD Valve Installation
• Feasibility Study
3
Common Uses
•Common Uses • Replacements
– Cranes
– Engines & Turbines
– Compressors
– Heat Exchangers & Coolers
– Ball (ESD) Valves & Actuators
– Motors & Gearboxes
• Plug and abandonment work on wells
• General Well Services, Coiled tubing
• Construction work
• Conductor pulling / driving
• Underwater demolition
• Brownfield platform modifications & decommissioning
4
Sparrows Rental Fleet
Crane Models Boom Lgth Feet Max Capacity Tons ECR-16000 120' 120
ECR-16000 120' 120
ECR-120-90 90' 110
ECR-100-80 80' 100
ECR-12000-120 120' 90
ECR-12000-120 120' 90
ECR-650-110 110' 90
ECR-70-80 80' 80
ECR-70-60-BJ 60' 70
ECR-BF-50 100' 40
ECR-40-70 70' 40
ECR-18-100 100' 35
ECR-20-50 50' 20
ECR-SL-20-60 60' 20
ECR-SL-20-60 60' 20
ECR-15-60 50' 15
ECR-SL-20-60 60' 20
ECR-SL-15-60 50' 15
ECR-SL-5-25 25' 5
ECR-SL-4-20 20' 4
ECR-SL-2-20 20' 2
ECR-JIB LB LB
ECR-KB-38 38' 2
5
FLEET EXAMPLES
6
Fleet Examples – ECR20 Stiff Leg
Model Features
•Very Light weight modular components
•All lifts less than 3Te
•Fast Build Time
•Rig Up and Test – 4 days
•Good lifting capacity
•16Te with 50ft boom
•11.5Te with 60ft boom
•11Te with 70ft boom
•Attachment Options
•Both hot and cold clamping options
7
ECR20
Fleet Examples – ECR120
Model Features
•Full offshore pedestal crane versatility
•Very high lifting capacity
•80Te with 90ft boom @ minimum radius and 10 part line
•45Te with 90ft boom @ 50ft radius and 10 part line
•Light component weight
•Maximum component weight 9.5Te
•Build Time
•7 days build time using ECR20
•Attachment Options
•Both hot and cold clamping options
8
ECR120
9
INSTALLATION EXAMPLES
ECR20 Installation
10
ERC20 Load tested and ready for operations
11
ECR1200 INSTALLATION SEQUENCE
12
SKID BEAM INSTALLATION
SUB STRUCTURE INSTALLATION
CATRIDGE INSTALLATION BODY INSTALLATION
13
DECK INSTALLATION
GANTRY INSTALLATION
BOOM INSTALLATION FULLY ASSEMBLED CRANE
ECR1200 INSTALLATION SEQUENCE
ECR120 Installation using ECR20
14
ECR20 lifting on base beams ECR120
RENTAL CRANE INSTALLATION ON HELI DECK
15
16
PROJECT EXAMPLES
BP Crane Installation using Sparrows Modular Rental Crane
17
18
BP Crane Installation using Sparrows Modular Rental Crane
Sparrows Modular Rental Crane ECR20 on LA/LB offshore platform India
ECR20 modular rental crane used for
CTU/Capillary string jobs by Offshore operating
Company in India
19
Sparrows Modular Rental Crane ECR120 on DOL1 Qatar
20
Feasibility Study
A Feasibility Study has to be conducted on each platform to determine if use of modular rental crane is viable and if so, which model and installation type to use.
This will cover broadly:-
• Identify lifting capacity of existing deck cranes
• Determine module weights of new / replacement cranes / equipments
• Define key lift weights & description
• Identify installation space on platform
• Verify platform support strength including moment reactions
• Identify all lay down areas
• Identify any limiting factors
21
Discussions
? Thank You