spe knowledge forum...confidential. not to be copied, distributed, or reproduced without prior...

Download SPE Knowledge Forum...Confidential. Not to be copied, distributed, or reproduced without prior approval. Slide 15 Well Life Cycle Information Management, Drilling E ngineering, Data

If you can't read please download the document

Upload: others

Post on 29-Mar-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.© 2017 Baker Hughes, a GE company, LLC

    - All rights reserved.

    SPE Knowledge Forum

    10 Rules for Cost Effective Reservoir

    Management

    - RiskGuardTM

    - FullStream

    14 March 2019

    David Bowling Business Development ManagerGeoscience and Petroleum Engineering

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 2

    Plan for the unexpected

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 3

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 4

    Impact of Information on E&P cash flow

    Source: The Digital Oil Field Oil and Gas Investor April 2004

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 5

    GeomechanicsRelatedIncidents

    Incident Identification

    Source of increasing Risk (2011)

    COST OF NPT

    26BUS

    D

    AN ESTIMATED

    25 %OF TOTAL DRILLING

    COSTS

    KEY FACTORSP

    OO

    RANALYSIS

    PLANNING

    COMMUNICATION

    BARRIER MONITORING

    CHANGE MANAGEMENT

    SOLUTIONS

    GEOMECHANICS ANALYSIS

    PRE-DRILLING

    REAL -TIME

    COMMUNICATION

    WHILE DRILLING

    LOGGING

    Our Industry Performance The Hard Facts

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Casing and Mud Design More Realistic

    6

    Include Geomechanics in wellbore stability mud weight design

    Without Geomechanics (PP/FG Study) With Geomechanics

    Both pore pressure AND collapse pressure needed

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 7

    Exploration Drilling loss of investment

    Days

    De

    pth

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 8

    Bias

    Availability Bias prior experience influences concepts

    Confirmation Bias only use facts that support our decision

    Blinkered mindset

    Hindsight Bias

    Overconfidence believing too much in our own decision competencies and estimates

    -Invented-

    Sunk Cost Fallacy to continue with a project after money, time and effort already invested

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 9

    Experience

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 10

    Integrate and align goals

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 12

    RiskGuard

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 13

    70% reduction in NPT

    Optimize drilling, faster reaction time. Proactive not reactive

    Optimise completion, larger hole size = more production

    Explore deeper, further

    RiskGuardTM Assessment

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 14

    Integrated RT Geomechanics- saved $30M

    Background and Challenges

    Wildcat deepwaterexplorationOffset well is 100km awayPoor 2D seismic, complex geologyUncertain pressure mechanisms AND stress distribution Narrow margin drilling

    Approach and Solution

    Real Time GeomechanicsTransition zone deeper, less dramaticDeepened hole section, lower mud weightDrilled faster

    Results and Benefits

    Safely drilled to planned TD Omit un-Reduce well costs by $30M

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 15

    Well Life Cycle

    Information

    Management,

    Drilling Engineering,

    Data Mudlogging,

    Rig-Site SupervisionDrilling Dynamics

    Drilling Fluid Systems

    Formation

    Evaluation MWD

    Steerable

    Drilling

    Systems

    High

    Performance Bits

    Completion

    Fluids

    Pumping,

    Stimulation,

    Filtration

    Completion

    Hook-ups

    Tubing Conveyed

    Perforating

    Packers

    Pre-Pack Well

    Screens

    Gravel

    Packing

    Services

    Safety Systems

    Flow Control

    Equipment

    Performance

    Chemicals

    Packers

    Cementing

    Equipment

    Automated Production

    Systems

    Drilling Completion Production

    D&E, C&P, Pressure Pumping D&E, C&P, Pressure Pumping D&E, C&P, Pressure Pumping

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 16

    Horizontal well tested validated

    Geological uncertainties eliminated: structural plans clarified, gas-water contact location established, resource base defined Horizontal well achievable with high flow ratesCommercial Discovery

    Background and Challenges

    1037m horizontal Low-permeability sand Thin reservoir

    Solution

    Pre-drill modellingReal Time GeomechanicsReal Time PetrophysicsReservoir Navigation ServicesWell efficiency close to 100%.Gas inflow exceeded 1 mm3/dPotential to exceed 3 mm3/d

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 17

    Benchmark Asset Performance

    Possible (3P) into Proven (1P)

    Sub commercial (3C) into commercial (1C)

    Explore deeper, further

    Enhanced Recovery and Company Wealth

    GeologyGeomechanics

    Geophysics

    Reservoir Engineering

    Petrophysics

    Production Technology

    Completions

    Project Management

    and Economics

    Drilling Engineering

  • Confidential. Not to be copied, distributed, or reproduced without prior approval.

    Slide 18

    Country Stress map (Kuwait)

    BAHRAH

    RATQA ABDALI

    DHABI

    RAUDHATAINSABRIYAH

    UMM -NIQA

    ABDULIYAH

    AHMADI

    ARIFJANBURGAN

    DHARIF

    KAHLULA

    KRA -ALMARU

    MAGWA

    UMMGUDAIR

    MINAGISH

    RAHIYA

    Najmah Horizon

    Nor

    thin

    g (m

    )

    Easting (m)

    XX,000

    YY,000