spicewood beach, texas drought response case study

21
Spicewood Beach, Texas Drought Response Case Study

Upload: others

Post on 29-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Spicewood Beach, Texas Drought Response Case Study

Spicewood Beach, Texas Drought Response Case Study

Page 2: Spicewood Beach, Texas Drought Response Case Study

Introduction

2

• US EPA Drought Response and Resilience Guide

─ Step-by-step approach for small and medium sized drinking

water utilities to plan for and respond to drought

─ www.epa.gov

• Case Study in the Guide is the Spicewood Beach

Drinking Water System

Page 3: Spicewood Beach, Texas Drought Response Case Study

Presenters

3

Infrastructure Utilities

Ed Yanoshita General Manager

Corporate Development

Darrin Barker General Manager

Corix Utilities (Texas)

Page 4: Spicewood Beach, Texas Drought Response Case Study

Corix at a Glance

4

• Corix Utilities is a leader in ,

and utility infrastructure.

• We design, supply, build, finance, manage and own local

utility infrastructure on behalf of educational, municipal,

institutional, military and private sector customers.

Page 5: Spicewood Beach, Texas Drought Response Case Study

Corix Footprint

5

Page 6: Spicewood Beach, Texas Drought Response Case Study

University of Oklahoma

OU Utility Partnership

50-year contract for operations, maintenance and asset management of:

• 18 MW Gas-Fired CHP Plant (STG)

• 15 MW Gas-Fired Co-Gen (CT)/10,000 Tons Chilling

• Steam Heat Distribution System and Tunnels

• 3 Chilled Water Plants and Distribution

• Potable Water Distribution/De-ionized Water

• Wastewater Collection

• Electricity Distribution

• Natural Gas Distribution

Corix Institute for Water and

Sustainability

• Corix donation established the Institute and an

endowed Faculty Chair position

• The OU WaTER Center is a program of the Corix Institute

6

Page 7: Spicewood Beach, Texas Drought Response Case Study

Background Information

• Spicewood Beach is a small community of approximately

1,100 residents

• Located 40 miles northwest of Austin, Texas

• In 2011, the community began experiencing a prolonged

severe drought

2013 2015

Page 8: Spicewood Beach, Texas Drought Response Case Study

Drought Stages and Triggers

8

• Elevation 681 Lake at full capacity storage

• Elevation 650 Mild water shortage (Stage 1)

• Elevation 645 Moderate water shortage (Stage 2)

• Elevation 640 Severe water shortage (Stage 3)

• Elevation 630 Emergency Water Conditions (Stage 4)

• Elevation 626.7 January 2012 level

Page 9: Spicewood Beach, Texas Drought Response Case Study

Topographic Map

9

Page 10: Spicewood Beach, Texas Drought Response Case Study

Impact of the Drought

10

• Groundwater wells ceased producing

sufficient supply

• Stage 4 Water Restrictions

implemented

− Limit of 8,000 gallons per month per

household

− No outdoor watering

• Daily water delivery by tanker truck

Page 11: Spicewood Beach, Texas Drought Response Case Study

Innovative P3 Delivery

11

• Innovative Partnerships: Collective team effort by

government agencies, elected officials, private

company and the residents of the Spicewood Beach

community

• Innovative Project Financing: Emergency federal

grant funding, state agency funding, private funding

and regional utility rate structure

• Innovative Project Design: Local operations/operator

driven solution

Page 12: Spicewood Beach, Texas Drought Response Case Study

Innovative Partnership

12

• US Department of Agriculture: Federal agency

providing Drought and Disaster assistance

• Texas Commission on Environmental Quality (TCEQ):

State agency tasked to protect public health and its

natural resources

• Lower Colorado River Authority (LCRA): State agency

that manages the water supply and environment of the

lower Colorado River basin

Page 13: Spicewood Beach, Texas Drought Response Case Study

Innovative Partnership con’t

13

• Burnet County: Home county of Spicewood Beach

with a County government proactively addressing water

issues

• Spicewood Beach: Close-knit with strong community

spirit

• Corix Utilities: Private, investor-owned Utility

Page 14: Spicewood Beach, Texas Drought Response Case Study

Innovative Project Financing

14

• Federal Emergency Grant Assistance: Provided

through US Department of Agriculture and available

only to County or City government applicants

• State Funding: Operation and Management contract,

and sale of assets to Corix

• Private Funding: Corix Operation and Management,

and acquisition of the Spicewood Beach Water System

from LCRA

Page 15: Spicewood Beach, Texas Drought Response Case Study

Innovative Project Design

15

Design Challenges

• No viable nearby alternative groundwater source

• No interconnection option with another water system

• Needed affordable solution to mitigate impact on

customer rates – many seniors on fixed incomes

• Timing was urgent

The Solution

• Infiltration gallery intakes connected to new

pre-fabricated surface water treatment plant meeting

TCEQ specifications

Page 16: Spicewood Beach, Texas Drought Response Case Study

Innovative Project Design

16

Innovation = Positive Outcome for Spicewood Beach

• Operator knowledge of local conditions led to solution!

• Infiltration gallery intakes using the same construction and

design as typical groundwater wells

• Modular, pre-fabricated plant sections manufactured by

Corix in BC, Canada, shipped by truck to site

• Existing components and pipe reused as much as possible

• Connection to existing groundwater wells left intact - to be

primary water source when original wells recharged

Page 17: Spicewood Beach, Texas Drought Response Case Study

Infiltration Gallery Construction

17

• D

Drilling Rig

Finished Intake

Page 18: Spicewood Beach, Texas Drought Response Case Study

Plant Construction

18

Building Slab

Water Treatment Plant

Setting Tanks in place

Outer Building Shell

Page 19: Spicewood Beach, Texas Drought Response Case Study

Successful Outcome

19

• New water treatment plant began delivering water to the

community on June 22, 2014

− New plant blends in well with the community

− Efficient integration of existing plant buildings and components

Page 20: Spicewood Beach, Texas Drought Response Case Study

Capstone Course Case Study

20

• OU Engineering Science/Environmental Engineering Capstone Course - Spring Semester 2014

• Two case studies used

− Ethiopia – mitigation of excess fluoride in drinking water

− Spicewood Beach Water System

Page 21: Spicewood Beach, Texas Drought Response Case Study

Questions