Page 1: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Massachusetts Water Resources Authority

Spot Pond tank and pump station

January, 2015

Page 2: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

2

Outline

•  Area  Served  by  Project  •  Need  for  Project  •  Project  approach:    Design  /  build.  •  Project  features  •  Construc@on  photos  •  Opera@onal  Challenges  

Page 3: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

3

Area Served by Project

Page 4: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

4

Need for Project: Gillis Pump station redundancy

Page 5: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

5

Need for Project: Low Service System

Page 6: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

6

Need for Project: No Storage in “Northern Low”

Shaft W

Loring Road Tanks 20 MG Nonantum Rd

Shaft 7B

Shaft 8

Shaft 9

Shaft 9A

Charles R.

Mystic R.

Malden R.

Chelsea Cr.

Spot Pond

Chestnut Hill

‘Northern Low’

‘Boston Low’

Page 7: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

7

Two Problems. One project.

•  Spot  Pond  Water  Storage  Facility  

•  Design/build  project  awarded  to  Walsh  Construc@on  Company  in  November  2011  

•  Project  consists  of    –  20  MG  storage  tank  in  two  separate  cells    –  Pump  sta@on  for  NIH  and  NH  service  area  

•  Construc@on  underway  

Page 8: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

8

Plan: Ravine Road

New England Regional Hospital

To Gillis P.S. and Spot Pond

To Fells Covered Storage

Tank 1 Tank 2

Pump Station

Low Service connection (suction)

High and Intermediate High service connections (discharge)

Detention Basin

Overflow pipe

Page 9: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

9

Rendering:

Page 10: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

10

Rendering:

Page 11: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Site Prior to Construction, October, 2010

Page 12: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Site Prior to Construction, October, 2010

Page 13: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Blasting Operation, Oct, 2012

Page 14: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Pump Station Suction Piping, June, 2013

Page 15: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Pump Station Slab, July, 2013

Page 16: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Miles of Steel Rebar, July, 2013

Page 17: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Rock Crushing and Material Sorting, Sept, 2013

Page 18: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Steel and Concrete for Roof Slab, Sept, 2013

Page 19: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Clearing Pipeline Road for New Pipe Installation, Sept, 2013

Page 20: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Concrete Slab Placement, Oct, 2013

Page 21: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Starting to Take Shape, Oct, 2013

Page 22: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Tons of Steel to Tie

Page 23: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Interior Baffle Walls, Oct, 2103

Page 24: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Staging to Support Roof Slab Installation, Oct, 2013

Page 25: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Staging to Support Roof Slab, Oct, 2013

Page 26: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Tank Overflow pipe Installation, March 2014

Page 27: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Jacking Pit with Soil Being Removed, March, 2014

Page 28: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Last Section of jacked pipe, March, 2014

Page 29: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Mobile Pumps Behind Gillis Pump Station, March, 2014

Page 30: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Standby Pump If Needed, March, 2014

Page 31: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Discharge Connection to Section 89, March, 2104

Page 32: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Overflow Pipe completion, May, 2014

Page 33: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Tank 2 Interior, May, 2014

Page 34: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Pump Station Piping, July, 2014

Page 35: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Switch gear, July 2014

Page 36: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Low Service Tie-in, Ravine Road, September, 2014

Page 37: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Duct bank installation in pipeline road, September, 2014

Page 38: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Pump Station, September, 2014

Page 39: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Landscaping underway, September, 2014

Page 40: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

Slope Protection, Oct, 2014

Page 41: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

41

Northern High/Northern Intermediate High Pumping

Page 42: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

42

Operational Challenges

9.1 MGD

6 MG

20 MG

20 MG

2.6 MGD

4.2 MGD

11.7 MGD

4.2 MGD

Page 43: Spot Pond project - MWRAand Spot Pond To Fells Covered Storage Tank 2 Tank 1 Pump Station Low Service connection (suction) High and Intermediate High service connections (discharge)

43

Low Service System

Shaft W

Loring Road Tanks 20 MG Nonantum Rd

Shaft 7B

Shaft 8

Shaft 9

Shaft 9A

Charles R.

Mystic R.

Malden R.

Chelsea Cr.

Spot Pond

Chestnut Hill

‘Northern Low’

‘Boston Low’