spotlight on quality manufacturing in raleigh, nc
TRANSCRIPT
![Page 1: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/1.jpg)
© 2013 Eaton, All Rights Reserved.
Spotlight on quality and manufacturing: Power Xpert™ 9395 UPS
Learn more at Eaton.com/9395
![Page 2: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/2.jpg)
© 2013 Eaton, All Rights Reserved.
Eaton is flexible and equipped to build your pre-configured and custom UPS systems.
Learn more at www.powerquality.eaton.com
![Page 3: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/3.jpg)
© 2013 Eaton, All Rights Reserved.
Title
Raleigh Plant Operations (RPO) in Raleigh, NC, currently has over 150 manufacturing employees.
![Page 4: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/4.jpg)
© 2013 Eaton, All Rights Reserved.
One 9395 universal power module (UPM) comes off the line every 45 minutes.
![Page 5: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/5.jpg)
© 2013 Eaton, All Rights Reserved.
We use a continuous flow manufacturing process, with sub-assemblies feeding the center assembly line.
![Page 6: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/6.jpg)
© 2013 Eaton, All Rights Reserved.
Each UPM goes through comprehensive testing on the assembly line.
![Page 7: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/7.jpg)
© 2013 Eaton, All Rights Reserved.
The base of the integrated system bypass module (ISBM) is built and wired.
![Page 8: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/8.jpg)
© 2013 Eaton, All Rights Reserved.
Title
First pass yield is shown in real time providing instant feedback on the day’s assembly. It also shows day, month and YTD performance.
![Page 9: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/9.jpg)
© 2013 Eaton, All Rights Reserved.
An 825 kVA 9395 UPS takes about 12 ½ hours of assembly while a 550 kVA UPS takes about 10 hours.
![Page 10: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/10.jpg)
© 2013 Eaton, All Rights Reserved.
Wireless mobile stations can move as needed during assembly. The instructions are also accessible to service teams in the field.
![Page 11: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/11.jpg)
© 2013 Eaton, All Rights Reserved.
Title
The conveyor is adjusted to prepare the ISBM for loading of the UPM.
![Page 12: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/12.jpg)
© 2013 Eaton, All Rights Reserved.
One UPM comes off the line every two hours
Title
The ISBM is populated with the required number of UPMs to create the final UPS.
![Page 13: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/13.jpg)
© 2013 Eaton, All Rights Reserved.
One UPM comes off the line every two hoursRoughly two days of work for the 550 kVA and three days for the 825 kVA.
![Page 14: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/14.jpg)
© 2013 Eaton, All Rights Reserved.
Title
Each unit spends between five and nine hours in test, depending on kVA rating.
![Page 15: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/15.jpg)
© 2013 Eaton, All Rights Reserved.
Units are double checked in button up before proceeding to final wrap.
![Page 16: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/16.jpg)
© 2013 Eaton, All Rights Reserved.
• 9395 UPSs are shipped dedicated truck. This extra measure reduces risk of shipping damage in transit.
• Warranty is 12 months from date of installation or 18 months from date of shipment, whichever comes first. Extended warranty options are available.
Shipping and Warranty
![Page 17: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/17.jpg)
© 2013 Eaton, All Rights Reserved.
Typical lead times range from 2-6 weeks for standard 9395 orders. For specific information or to order contact [email protected]
![Page 18: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/18.jpg)
© 2013 Eaton, All Rights Reserved.
Eaton Raleigh Plant Operations (RPO)
![Page 19: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/19.jpg)
© 2013 Eaton, All Rights Reserved.
Eaton would be proud to be a part of your data center solutions.
To learn more go to Eaton.com/9395
![Page 20: Spotlight on quality manufacturing in Raleigh, NC](https://reader035.vdocuments.net/reader035/viewer/2022062902/58edd9351a28abb1628b4617/html5/thumbnails/20.jpg)
20© 2013 Eaton, All Rights Reserved.