22
DIREKTORAT PENGEMBANGAN SPSE, LKPP BEKASI, 24 NOVEMBER 2020 SPSE ICB International Competitive Bidding

Upload: others

Post on 09-Nov-2021

13 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SPSE ICB - ukpbj.kemdikbud.go.id

DIREKTORAT PENGEMBANGAN SPSE, LKPPBEKASI, 24 NOVEMBER 2020

SPSE ICBInternational Competitive Bidding

Page 2: SPSE ICB - ukpbj.kemdikbud.go.id

Rizky Dwi Raharjo

Penelaah Kebijakan Pengadaan Barang/Jasa

Seksi Pengembangan Aplikasi SPSE

Direktorat Pengembangan SPSE, LKPP

Page 3: SPSE ICB - ukpbj.kemdikbud.go.id

PERBANDINGAN UMUM

SPSE 4.3 SPSE ICBBerdasarkan Peraturan PresidenNomor 16 Tahun 2018 tentangPengadaan Barang/Jasa Pemerintahdan turunannya

Berdasarkan Procurement GuidelineDonor (ADB, WB, JICA, dll)

Dibuat sangat spesifik berdasarkanPerpres No. 16/2018, butuh resourcesyang banyak untuk pengembangan

Fleksibel untuk pengembangan lebihlanjut

Pertukaran informasi Pokja Pemilihandan Penyedia berbasis isian form padaaplikasi dan berbasis dokumen (file)

Pertukaran informasi Pokja Pemilihandan Penyedia berbasis dokumen (file)

Page 4: SPSE ICB - ukpbj.kemdikbud.go.id

PERBANDINGAN METODE SELEKSI

SPSE 4.3 SPSE ICBJasa Konsultansi Badan Usaha

§ Prakualifikasi, 2 File, Kualitas dan Biaya§ Prakualifikasi, 2 File, Kualitas§ Prakualifikasi, 2 File, Pagu Anggaran§ Prakualifikasi, 2 File, Biaya Terendah

Firm Consultancy

Procurement Guideline Donor:§ Empanelment, 1 Envelope, Elimination System§ Call Down, 2 Envelopes, Quality and Cost Based

Selection§ Regular Consultant Selection, 2 Envelopes,

Quality and Cost Based Selection§ Regular Consultant Selection, 2 Envelopes,

Elimination System§ Regular Consultant Selection, 1 Envelope,

Elimination System§ Quality Based Selection, 2 Envelopes, Quality

Based Selection§ Consultant Qualification Selection, 1 Envelope,

Elimination System

Page 5: SPSE ICB - ukpbj.kemdikbud.go.id

PERBANDINGAN METODE TENDER

SPSE 4.3 SPSE ICBPekerjaan Konstruksi

§ Pascakualifikasi, 1 FIle, Harga TerendahSistem Gugur

§ Pascakualifikasi, 2 FIle, Sistem Nilai§ Pascakualifikasi, 2 FIle, Harga Terendah

Ambang Batas§ Prakualifikasi, 2 Tahap, Sistem Nilai

Construction Work

ADB Procurement Guideline:§ Post Qualification, 1 Envelope, Pass-Fail

System§ Pre Qualification, 1 Envelope, Pass-Fail

System§ Single Stage Two Envelope Bidding with PQ,

2 Envelopes, Elimination System§ Single Stage Two Envelope Bidding, 2

Envelopes, Elimination System

Page 6: SPSE ICB - ukpbj.kemdikbud.go.id

PERBANDINGAN METODE TENDER

SPSE 4.3 SPSE ICBPengadaan Barang

§ Pascakualifikasi, 1 File, Harga Terendah SistemGugur

§ Pascakualifikasi, 2 File, Sistem Nilai§ Pascakualifikasi, 2 File, Penilaian Biaya Selama

Umur Ekonomis§ Pascakualifikasi, 2 File, Harga Terendah Ambang

Batas§ Prakualifikasi, 2 File, Sistem Nilai§ Prakualifikasi, 2 File, Penilaian Biaya Selama

Umur Ekonomis§ Prakualifikasi, 2 Tahap, Sistem Nilai§ Prakualifikasi, 2 Tahap, Penilaian Biaya Selama

Umur Ekonomis

Procurement of Goods

Belum diimplementasikan

Page 7: SPSE ICB - ukpbj.kemdikbud.go.id

PERBANDINGAN METODE TENDER

SPSE 4.3 SPSE ICBJasa Lainnya

§ Pascakualifikasi, 1 File, Harga Terendah SistemGugur

§ Pascakualifikasi, 2 File, Sistem Nilai§ Pascakualifikasi, 2 File, Penilaian Biaya Selama

Umur Ekonomis§ Pascakualifikasi, 2 File, Harga Terendah Ambang

Batas§ Prakualifikasi, 2 File, Sistem Nilai§ Prakualifikasi, 2 File, Penilaian Biaya Selama

Umur Ekonomis§ Prakualifikasi, 2 Tahap, Sistem Nilai§ Prakualifikasi, 2 Tahap, Penilaian Biaya Selama

Umur Ekonomis

Other Services

Belum diimplementasikan

Page 8: SPSE ICB - ukpbj.kemdikbud.go.id

PERBANDINGAN METODE TENDER

SPSE 4.3 SPSE ICBJasa Konsultansi Perorangan

§ Pascakualifikasi, 2 File, Kualitas

Individual Consultant

Belum diimplementasikan

Page 9: SPSE ICB - ukpbj.kemdikbud.go.id

1. Announcement

2. Submission of EOI

3. Shortlist Appointment

4. Shortlist Announcement and Issuance of RFP

5. Clarification Request Period

6. Submission of Technical and Financial Proposals

7. Evaluation of Technical Proposals

8. Technical Rank Announcement

9. Opening of Financial Proposals

10. Evaluation of Financial Proposals

11. Combined Evaluation

12. Final Ranking

13. Contract Negotiation

14. Contract Signing and Winner Announcement

FIRM CONSULTANCYRegular Consultant Selection - 2 Envelopes - Quality and Cost Based Selection

Page 10: SPSE ICB - ukpbj.kemdikbud.go.id

1. Announcement

2. Submission of EOI

3. Shortlist Appointment

4. Shortlist Announcement and Issuance of RFP

5. Clarification Request Period

6. Submission of Technical and Financial Proposals

7. Evaluation of Technical Proposals

8. Technical Rank Announcement

9. Opening of Financial Proposals

10. Evaluation of Financial Proposals

11. Combined Evaluation

12. Contract Negotiation

13. Contract Signing and Winner Announcement

FIRM CONSULTANCYRegular Consultant Selection - 2 Envelopes - Elimination System

Page 11: SPSE ICB - ukpbj.kemdikbud.go.id

1. Announcement

2. Submission of EOI

3. Shortlist Appointment

4. Shortlist Announcement and Issuance of RFP

5. Clarification Request Period

6. Submission of Technical and Financial Proposals

7. Opening Proposals

8. Evaluation

9. Contract Negotiation

10. Contract Signing and Winner Announcement

FIRM CONSULTANCYRegular Consultant Selection - 1 Envelope - Elimination System

Page 12: SPSE ICB - ukpbj.kemdikbud.go.id

1. Announcement

2. Submission of EOI

3. Shortlist Appointment

4. Shortlist Announcement and Issuance RFP

5. Clarification Request Period

6. Submission of Technical and Financial Proposals

7. Evaluation of Technical Proposals

8. Technical Rank

9. Opening of Financial Proposals

10. Evaluation of Financial Proposals

11. Contract Negotiation

12. Contract Signing and Winner Announcement

FIRM CONSULTANCYQuality Based Selection - 2 Envelopes - Quality Based Selection

Page 13: SPSE ICB - ukpbj.kemdikbud.go.id

1. Announcement

2. Submission of EOI

3. Shortlist Appointment

4. Issuance of RFP

5. Clarification Request Period

6. Submission of Technical and Financial Proposals

7. Opening Proposals

8. Evaluation of Technical Proposals

9. Evaluation of Financial Proposals

10. Contract Negotiation

11. Contract Signing and Winner Announcement

FIRM CONSULTANCYConsultant Qualification Selection - 1 Envelopes - Elimination System

Page 14: SPSE ICB - ukpbj.kemdikbud.go.id

Empanelment

1. Announcement

2. Classification Forum

3. Submission of EOI

4. Evaluation of EOI

5. Notification of Selection

Call Down

1. Sending RFP to Panel Members

2. Clarification Request Period

3. Submission of Technical and Financial Proposals

4. Evaluation of Technical Proposals

5. Technical Rank Announcement

6. Opening of Financial Proposals

7. Evaluation of Financial Proposals

8. Combined Evaluation

9. Final Ranking

10. Contract Negotiation

11. Contract Signing and Winner Announcement

FIRM CONSULTANCYPanel System

Page 15: SPSE ICB - ukpbj.kemdikbud.go.id

1. Announcement

2. Submission of Bids

3. Clarification Request Period

4. Submission of Bids

5. Evaluation of Bids

6. Contract Negotiation

7. Contract Signing and Winner Announcement

CONSTRUCTION WORKPost Qualification - 1 Envelopes - Pass-Fail System

Page 16: SPSE ICB - ukpbj.kemdikbud.go.id

1. Announcement

2. Submission of Pre Qualification Document

3. Determination of Prequalified Firm

4. Issuance of Bidding Document to Prequalified Firm

5. Clarification Request Period

6. Submission of Bids

7. Bid Opening

8. Evaluation of Bids

9. Contract Negotiation

10. Contract Signing and Winner Announcement

CONSTRUCTION WORKPre Qualification - 1 Envelopes - Pass-Fail System

Page 17: SPSE ICB - ukpbj.kemdikbud.go.id

Admin PPE

Admin Agency

Pokja Pemilihan

Admin Panel Verifikator

MANAJEMEN USER

Page 18: SPSE ICB - ukpbj.kemdikbud.go.id

SPSE ICB

• Kementerian Pekerjaan Umum dan Perumahan Rakyat:https://spseicb.pu.go.id/eproc-icb/

• Lembaga Ilmu Pengetahuan Indonesia:https://spseicb.lipi.go.id/eproc-icb/

• Kementerian ATR/BPN:http://lpse.atrbpn.go.id/spse-icb/

• Badan Informasi Geospasial:https://spseicb.big.go.id/spse-icb/

• Kementerian Agama:http://spseicb.kemenag.go.id/spseicb/

Page 19: SPSE ICB - ukpbj.kemdikbud.go.id

https://lpse-support.lkpp.go.id/

Page 20: SPSE ICB - ukpbj.kemdikbud.go.id

URL SPSE:

https://latihan-lpse.lkpp.go.id/esp-adb/

Admin PPE:

U: ppe1

P: 123456

Admin Agency:

U: agency.kemdikbud

P: 123456

SIMULASI SPSE ICB

Pokja Pemilihan:

U: kemdikbud1a, kemdikbud1b, kemdikbud1c

P: 123456

Verifikator:

U: verifikator

P: 123456

Pelaku Usaha:

U: vendor1 s.d. vendor5

P: 123456

Page 21: SPSE ICB - ukpbj.kemdikbud.go.id

LEMBAGA KEBIJAKAN PENGADAAN BARANG/JASA PEMERINTAH

Gedung LKPP, Lantai 5, Kawasan Rasuna Epicentrum, Jl. Epicentrum Tengah Lot 51 B Jakarta Selatan

[email protected] (021) 2993 5577 / 144

DIREKTORAT PENGEMBANGAN SISTEM PENGADAAN SECARA ELEKTRONIK

www.lkpp.go.id

Page 22: SPSE ICB - ukpbj.kemdikbud.go.id

TERIMA KASIH

DIREKTORAT PENGEMBANGAN SPSE, LKPP

[email protected]

0813-8287-3397