Page 1: SR 0001 Sec DTB Case Study

SR 0001 Sec DTBTownship Line Road over SEPTA

Route 100Case Study – Final Design Considerations

Karl W. Schreiter, PE

March 4, 2015

Page 2: SR 0001 Sec DTB Case Study

May 3, 2023SR 0001 Sec DTB Page 2

US Route 1 over SEPTA Route 100

Page 3: SR 0001 Sec DTB Case Study

May 3, 2023SR 0001 Sec DTB Page 3

US Route 1 over SEPTA Route 100

Page 4: SR 0001 Sec DTB Case Study

Final Design Project Considerations

– Temporary Pedestrian Bridge

– SEPTA Coordination & Right-of-Way Acquisition

– PECO Relocation

– Philadelphia Department of Parks & Recreation

– Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 4

Page 5: SR 0001 Sec DTB Case Study

Temporary Pedestrian Bridge and Walkways

– Accommodate SEPTA customers and occasional pedestrians

– Includes temporary walkways and stairways

May 3, 2023SR 0001 Sec DTB Page 5

Page 6: SR 0001 Sec DTB Case Study

Temporary Pedestrian Bridge and Walkways

May 3, 2023SR 0001 Sec DTB Page 6

Page 7: SR 0001 Sec DTB Case Study

Temporary Pedestrian Bridge and Walkways Construction

May 3, 2023SR 0001 Sec DTB Page 7

Construction photos courtesy of JBC Associates, Inc.

Page 8: SR 0001 Sec DTB Case Study

Temporary Pedestrian Bridge and Walkways Construction

May 3, 2023SR 0001 Sec DTB Page 8

Page 9: SR 0001 Sec DTB Case Study

Temporary Pedestrian Bridge and Walkways Construction

May 3, 2023SR 0001 Sec DTB Page 9

Page 10: SR 0001 Sec DTB Case Study

SEPTA Coordination

– Route 100 Norristown High Speed Line

– Connects 69th Street (Philadelphia) and Norristown

May 3, 2023SR 0001 Sec DTB Page 10

Page 11: SR 0001 Sec DTB Case Study

SEPTA Coordination

– ROW acquisition for guide rail at access driveway

– Temporary Construction Easement for access road

– Drainage Easement for pipe outlets south of bridge

May 3, 2023SR 0001 Sec DTB Page 11

Page 12: SR 0001 Sec DTB Case Study

SEPTA Coordination

May 3, 2023SR 0001 Sec DTB Page 12

Page 13: SR 0001 Sec DTB Case Study

PECO Relocation

– Relocate four PECO aerial electric poles away from roadway before construction

May 3, 2023SR 0001 Sec DTB Page 13

Page 14: SR 0001 Sec DTB Case Study

Phila. Dept. of Parks & Recreation

– Northeast quadrant of bridge

– Requested weathering steel guide rail

– Special plantings

– Permits

May 3, 2023SR 0001 Sec DTB Page 14

Page 15: SR 0001 Sec DTB Case Study

Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 15

– Existing sub-standard curb ramp at Grove Place intersection

Page 16: SR 0001 Sec DTB Case Study

Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 16

– PennDOT District ADA Review

– Form CS-4401

Page 17: SR 0001 Sec DTB Case Study

Curb Ramp ADA Review

May 3, 2023SR 0001 Sec DTB Page 17

Page 18: SR 0001 Sec DTB Case Study

113th US Open – Merion Golf Club

– June 2013 – Delayed start of construction

May 3, 2023SR 0001 Sec DTB Page 18