Sr. No. Name & Address Capital Investment Applied For Section Page No. Remarks Resubmission 1 HBS View Pvt Ltd., "Veard View Preisses", CTS No. 12/738, at Tardeo main road, PlotNo. 14 of Malbar Hill Division. 118 Crs. Establish RO(HQ) 1 to 13 2 SIM Reality, "Swaraj", Gat No. 212 New 1331 Old Gat No. 209 New (P) 1327 Old, Moshi, Tal - Haveli, Dist - Pune 54.72 Crs. 1st Operate (Part) RO(HQ) 14 to 29 3 R Mall Developer (Runwall Developer) Pvt. Ltd., CTS No. 166, 166/1 to 23, R City Mall, LB Marg, Ghatkopar (W), Mumbai 91.32 Crs. 1st Operate (Part) RO(HQ) 30 - 52 4 Ruby Mills Ltd., F. P. No. 29, The Ruby - Pvt. I.T. park, F. P. No. 29, TPS III, Mahim Div. Senapati Bapat Marg, Dadar (W) 176.33 Crs. Renewal RO(HQ) 53 - 75 Fresh Agenda 1 Benchmark Townplanning LLP, "Sirocco Grand", Survey No. 11, Hissa No. 6/1, 6/2, 7, Village - Punavale, Tal - Mulshi, Dist - Pune 97 Crs. Establish RO(HQ) 76 - 84 2 MARS International India Pvt. Ltd., Plot No. I-9/IIA, Khed City, At Post Nimgaon, Tal - Khed, Dist - Pune 434.14 Crs. Estbalish JD(WPC) 85 - 100 3 Oasis Alcohol Ltd., S. No. 240, 241, Adrushya Kadsidhha Nagar, S/p - Pangarkhel, Tal - Khatav, Dist - Satara. 60.84 Crs. Establish JD(WPC) 101 - 110 4 Citywood Builders Pvt Ltd., C.S. 12(pt), Raoli Camp, Sion Division, F/N Ward for AdarshGharkul CHS, Hemamnt Manjarekar Road, Sardar Nagar, Sion. 162 Crs. Establish RO(HQ) 111 - 135 5 TI Cycles of India, Plot No. E-8, MIDC Malegaon Sinnar, Tal - Sinnar, Dist - Nashik 32.11 Crs. Establish JD(APC) 136 - 149 6 Chloride Metals Ltd., Gat No. 1241 - 1242 Markal, Tal - Khed, Dist - Pune 21.75 Crs. Establish (Expansion) RO(HQ) 150 - 166 7 Darode Jog Associates, "Green Land Country', S. No. 42 at Village - Narhe, Tal - Haveli, Dist - Pune 51.63 Crs. Establish (Phase-II) RO(HQ) 167 - 178 8 Pentokey Organy India Ltd., Plot No. D-1/1, MIDC Parshuram, Tal - Khed, Dist - Ratnagri 59.73 Crs. Establish (Product mix change) AS(T) 179 - 196 9 Sun Universe (Mittal Group), S. No. 51/1/3/1 and 51/1/4 to 51/1/20, Mumbai Banglore Highway, Narhe, tal - Haveli, Dist - Pune 250 Crs. 1st Operate (Part) RO(HQ) 197 - 209 10 Housing Development and Infrastructure Ltd., S. No. 212(13), Hissa No. 2, 3/1, 3/2, S. No. 213(12), Hissa No. 1(pt), 2/1, 2/2, 2/2(pt), Sr. No. 215(79), Hissa No. 1pt, 4pt, 5pt, Sr. No. 218(80), Hissa No. 1(pt) to 5(pt), 9(pt) to 16(pt), Village - Dongre, Virar (West) 93.44 Crs. 1st Operate (Part) RO(HQ) 210 - 256 List of Cases to be submitted before 3rd Consent Committee Meeting of 2014-15 scheduled on 08.05.2014 at 02:00 p.m.

Upload: vankhanh

Post on 30-Mar-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Sr. No. Name & Address Capital

Investment Applied For Section Page No. Remarks

Resubmission

1

HBS View Pvt Ltd., "Veard View Preisses", CTS No. 12/738, at Tardeo main road, PlotNo. 14 of Malbar Hill Division. 118 Crs. Establish RO(HQ) 1 to 13

2SIM Reality, "Swaraj", Gat No. 212 New 1331 Old Gat No. 209 New (P) 1327 Old, Moshi, Tal - Haveli, Dist - Pune

54.72 Crs. 1st Operate(Part) RO(HQ) 14 to 29

3

R Mall Developer (Runwall Developer) Pvt. Ltd., CTS No. 166, 166/1 to 23, R City Mall, LB Marg, Ghatkopar (W), Mumbai 91.32 Crs. 1st Operate

(Part) RO(HQ) 30 - 52

4Ruby Mills Ltd., F. P. No. 29, The Ruby - Pvt. I.T. park, F. P. No. 29, TPS III, Mahim Div. Senapati Bapat Marg, Dadar (W)

176.33 Crs. Renewal RO(HQ) 53 - 75

Fresh Agenda

1

Benchmark Townplanning LLP, "Sirocco Grand", Survey No. 11, Hissa No. 6/1, 6/2, 7, Village - Punavale, Tal - Mulshi, Dist - Pune 97 Crs. Establish RO(HQ) 76 - 84

2MARS International India Pvt. Ltd., Plot No. I-9/IIA, Khed City, At Post Nimgaon, Tal - Khed, Dist - Pune

434.14 Crs. Estbalish JD(WPC) 85 - 100

3Oasis Alcohol Ltd., S. No. 240, 241, Adrushya Kadsidhha Nagar, S/p - Pangarkhel, Tal - Khatav, Dist - Satara.

60.84 Crs. Establish JD(WPC) 101 - 110

4

Citywood Builders Pvt Ltd., C.S. 12(pt), Raoli Camp, Sion Division, F/N Ward for AdarshGharkul CHS, Hemamnt Manjarekar Road, Sardar Nagar, Sion.

162 Crs. Establish RO(HQ) 111 - 135

5TI Cycles of India, Plot No. E-8, MIDC Malegaon Sinnar, Tal - Sinnar, Dist - Nashik 32.11 Crs. Establish JD(APC) 136 - 149

6 Chloride Metals Ltd., Gat No. 1241 - 1242 Markal, Tal - Khed, Dist - Pune 21.75 Crs. Establish

(Expansion) RO(HQ) 150 - 166

7Darode Jog Associates, "Green Land Country', S. No. 42 at Village - Narhe, Tal - Haveli, Dist - Pune

51.63 Crs. Establish(Phase-II) RO(HQ) 167 - 178

8Pentokey Organy India Ltd., Plot No. D-1/1, MIDC Parshuram, Tal - Khed, Dist - Ratnagri 59.73 Crs.

Establish(Product mix

change)AS(T) 179 - 196

9

Sun Universe (Mittal Group), S. No. 51/1/3/1 and 51/1/4 to 51/1/20, Mumbai Banglore Highway, Narhe, tal - Haveli, Dist - Pune

250 Crs. 1st Operate(Part) RO(HQ) 197 - 209

10

Housing Development and Infrastructure Ltd., S. No. 212(13), Hissa No. 2, 3/1, 3/2, S. No. 213(12), Hissa No. 1(pt), 2/1, 2/2, 2/2(pt), Sr. No. 215(79), Hissa No. 1pt, 4pt, 5pt, Sr. No. 218(80), Hissa No. 1(pt) to 5(pt), 9(pt) to 16(pt), Village - Dongre, Virar (West)

93.44 Crs. 1st Operate(Part) RO(HQ) 210 - 256

List of Cases to be submitted before 3rd Consent Committee Meeting of 2014-15 scheduled on 08.05.2014 at 02:00 p.m.

11

Kanakiya Design & Construction Pvt. Ltd., CTS No. 5, 5/1 to 4, 6, 6/1 to 27,7,7/1 to 5 & 9 of village Kurla at S. G. Barve Marg & L.B.S. Marg, Kurla(W), Mumbai

347.76 Crs. 1st Operate(Part-II) RO(HQ) 257 - 272

12 Indian Oil Corporation Ltd., Pir Pau Trombay, Mumbai 27.24 Crs. Renewal

(Increase in C.I.) AS(T) 273 - 283

13 FDC Ltd., Plot No. 19, 20/2, 118 MIDC Dhatav, Dist. Raigad 58.22 Crs. Renewal (Increase

in C.I. ) AS(T) 284 - 292

14

Rama Krishi Rasayan, Loni-Kalbhor, Gat No. 43, Tal. Haveli, Pune\ 37.73 Crs.

Renewal & Amendment in consent with

increase in C.I.

AS(T) 293 - 319

15

Hindustan Petroleum Corporation Ltd (LPG Bldg Plant), A-2, Usar Alibag, Dist Raigad 67.10 Crs.

Renewal & Amendment in consent with

increase in C.I.

AS(T) 320 - 335

16 Indo European Breweies Ltd., Plot No. B-74/2, MIDC Aarea, Waluj, Aurangabad 29.14 Crs. Renewal (Increase

in C.I.) JD(WPC) 336 - 349

17Pam Glatt Pharma Technologies Pvt. Ltd., Gat No. 1100, 1109 & 1116/1, A/p. Shirwal, Tal. Khandala, Dist. Pune

41.26 Crs. Renewal (Expansion) JD(APC) 350 - 365

18 Menon Alkop Pvt. Ltd., Five Star MIDC, Kagal 28.13 Crs. Renewal JD(APC) 366 - 380

19Trend Electronics Ltd., Gat No. 350, Village Bhalgaon, Aurangabad-Beed Road, Aurangabad

48.5 Crs. Renewal JD(APC) 381 - 387

20Ganga Papers India Ltd., Gat No. 241 to 244, Vill. Bobedohal, Borgaon, Tal. Mval, Dist. Pune

39.03 Crs. Renewal JD(WPC) 388 - 397

21

Kumuda Sugar & Agro Product Ltd., (Formerly known as Rayat SSK Ltd,) At Shewalewadi(Mhasoli) Tal. Karad, Dist. Satara

44.69 Crs. Renewal JD(WPC) 398 - 408

22Cane Agro Energy India Ltd., A/p. Raigaon (Hinganaon(BK), Tal, Kadegaon, Dist. Sangli 43.62 Crs. Renewal JD(WPC) 409 - 418

23

Ajara Shetkari Sahakari Sakhar Karkhana Ltd., Gat No. 25, 27/1, 381/383/1, 373, Village Gavase Daredewadi, Dist. Kolhapur 51.57 Crs. Renewal JD(WPC) 419 - 427

24 Cummins India Ltd. , Plot No. A-1, Tal. Phaltan, Dist. Satara 45.94 Crs. Establish JD(APC) 428 - 456

25Lloyds Metals & Energy Ltd., Surjagarh Iron Ore Mine, Mouza Surjagarh, Tal. Etapalli, Dist. Gadchiroli

40.74 Crs. Renewal JD(APC) 457 - 472

26 Bel Optronics Devices Ltd., Plot No. EL-30, J Block, MIDC Bhosari, Pune 52.88 Crs. Renewal JD(APC) 473 - 486

27 Sneha Foods Feeds Ltd., Village - Mahakurla, Tal & Dist - Chandrapur 60.78 Crs. Renewal JD(WPC) 487 - 501

28

Shri Adinath Sahakari Sakhar Karkhana Ltd., Shelgaon, Bhalwani, Adinathnagar, Tal - Karmala, Dist - Solapur 28.30 Crs. Renewal JD(WPC) 502 - 512

29Shrinivas Pride Purple Properties Pvt. Ltd., "Park Xpress", Sr. No. 5, 18, 19, Balewadi, Pune

98.95 Crs. Renewal RO(HQ) 513 - 524

30

Larsen & Toubro Ltd., (Tower A & B), Tower A, B, TC-II, CTS No. 117 A, 117A/1, Village - Tungwa, Sakivihar Road, Powai, Mumbai

317 Crs. Renewal RO(HQ) 525 - 564

31 Royal Energy Ltd., Vill - Vanivali, Tal - Khalapur, Dist - Raigad 35.71 Crs. Renewal AS(T) 565 - 578

32Cytec Speciality Chemicals & Material Pvt. Ltd., Plot No. G-54 MIDC Butibori, Dist - Nagpur.

33.37 Crs.Amendment

(Change in product Mix)

AS(T) 579 - 606

33Godrej & Boyce Mfg. Co. Ltd., Gat No.1267, Shirwal, Palashi Road, Tal- Khandala, Dist - Satara

53.77 Crs Renewal (Amlagamation) JD(APC) 607 - 620

34Godrej & Boyce Mfg. Co. Ltd., Gat No.431, Shindewadi, Shirwal, Tal- Khandala, Dist - Satara

73.24 Crs Renewal JD(APC) 621 - 634

35ACB (India) Limited, Plot No. 11 & 18, Village - Pandharpauni, Tal - Rajura, Dist - Chandrapur

34.98 Crs. Renewal JD(APC) 635 - 652

36 Trinity India Ltd., (Shikarpur Plant II), Gat No. 1425/3/2, Tal - Shirur, Dist - Pune 29.81 Crs. Renewal JD(APC) 653 - 673

Review Item1

SHV Energy Pvt. Ltd., Plot No. D-233/2, Phase-II MIDC Chakan, Tal - Khed, Dist - Pune

_____ _____ AS(T) 674 - 699

2 Cipla Ltd., Plot No. D-2, MIDC Kurkumbh, Tal. Daund, Dist. Pune _____ Establish AS(T) 700 - 732

3Kalyan Toll Infrastructure (Nimgaon), Gat No. 583/84, Nimgaon, Mahalungi, Tal. Shirur, Dist. Pune

_____ _____ JD(APC) 733 - 748

JD(WPC) 9 `AS(T) 7RO(HQ) 13JD(APC) 11PSO 0Total 40

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    1 

 

CC-Resubmission Agenda no. 1 Region : RO Mumbai Section :RO(HQ) Date :

Name & Address M/s. HBS Views Pvt. Ltd ,

“Veard View Preisses”

CTS No.12/738,at tardeo main road,

Plot No.14 of Malbar Hill division

Consent For C to E

Capital Investment Rs.118 Cr

Previous Consent Validity

--

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water consumption - 68 CMD.

Effluent Generation- 66 CMD

STP Proposed -100 CMD

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    2 

 

Other Relevant Information

Application for grant of Consent to Establish for

construction of residential project for

Total Plot area - 2,688.98 Sq. mtrs

Total Construction BUA - 42,056.89 Sq.mtrs

Applicant has not submitted CA Certificate.as per C.I. mentioned by PP, PP has required to submit consent Fee of Rs.2,36,000/- but PP has submitted consent fee of Rs.50,100/- only.Said project require CRZ Clearance and EC from competent authority but applicant has not furnish copy of same alongwith consent processing form details.SRO Reported that Project proponent has not applied for EC towards GOM.

Nonhazardous waste –

Wet garbage:108 Kg/Day(through mechanical composting)

Dry garbage:162 Kg/Day(will be handed over to MCGM)

Applicant has not submitted,

1)CA Certificate

2) Addition consent fee of Rs.1,86,000/-

3)Architect map showing area statement details for Total construction BUA-42,056.89 Sq.Mtrs.

4)details of said project.

4)EC/CRZ Clearance Copy.

5)Affidavit for compliance of EC/CRZ Conditions.

The case was discussed in CC Meeting dated 18/3/2014 and It was decided to keep the case in abeyance and put up in next CC after clarification regarding project cost and construction status.

Mail to applicant regarding submission of above details dated 15/2/2014,10/3/2014,25/3/2014 to applicant but reply is awaited.

SRO Mumbai I has communicated vide mail dated 18/3/2014, on site the existing old building of 10 floor structure is there. The tenants have been evacuated.

Recommendation of SRO/RO

SRO Recommended the grant of C to E after submission of required documents and subject to obtaining EC/CRZ Clearance.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    3 

 

Agenda no. 2 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 26/12/2013

Date RO(HQ):- 28/02/2014

Name & Address M/s. SIM Reality, “Swaraj” 

Gat No. 212 New 1331 old Gat No. 209 New (P)1327 old, Moshi, Taluka‐ Haveli, Dist. Pune. 

Consent For C to O (Part)

Capital Investment 54.72 Crore

Previous Consent Validity

COU

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Water Consumption :- 649.0 CMD , Effluent Generated :- 500.0

Proposed STP Capacity :-500.0 CMD

BG Details Amount : Validity :

Other Relevant Information

Applied for C to O (Part) Residential 16 buildings

Plot Area 40, 400.0 m2 Total Built up area 66490.47m2

C to E Obtained (Valid) Dated 24/08/2011

Plot area as per CE 40,400.0 m2 BUA as per CE 66491.0 m2

EC Status Obtained (valid) Dated 21/10/2011

Plot area as per EC 40,400.0 m2 BUA as per EC 66490.87 m2

Water Consumption 649.0 CMD Effluent Generated 500.0 CMD

STP installed 500.0 CMD Recycle water 298.25 CMD

Bio-degradable 1270 Kg/D Treatment OWC provided

Non-Boi degradable 850.0 Kg/D Treatment Local Body

No of DG Sets 1 Capacity 400.0 KVA

Construction status 16 bldg Part operate BUA 51688.75 m2

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    4 

 

completed

Project proponent has provided Sewage Treatment Plant for treatment which is located about 60 mtr from HFL of River Indrayani. As per consent to establish condition STP location shall be beyond 100 mtr from HFL.

In view of above we may issue SCN for refusal of consent to establish as PP has installed STP at 60 meters from HFL and not complied c to E condition.

Resubmission 

• The  application  for  consent  to  establish  was  discussed  in  CC  meeting  held  on 13/03/2014, during discussion  it was decided to  issue SCN  for refusal of consent to operate as applicant has failed to comply with the consent to establish condition no 15 i.e location of STP more than 100 mtrs from Indrayani River. 

•  Applicant  has  submitted  reply  on  22/04/2014  in  reply  applicant  stated  that  “Our project boundary is 155 m from the Indrayani River and location of STP is 275 m from the  same  which  is  certified  by  our  architect.”  Applicant  has  submitted  architect certificate along with letter.

• As applicant has submitted architect certificate, we may consider part operate with BG and part operate affidavit. 

Recommendation of SRO/RO

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    5 

 

Agenda no. 3 Region : RO Mumbai Section :RO(HQ) Date :

Name & Address M/s.R Mall Developer (RunwalDeveloper)Pvt.Ltd , CTS No.166,166/1to23, R City Mall, LB MArg, Ghatkopar (W).Mumbai400071

Consent For 1st C to O(part)

Capital Investment Rs.91.32Cr

Applicant has submitted Undertaking in which land cost is not mentioned

Previous Consent Validity

COU

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water consumption - 950 CMD.

Sewage Generation - 793 CMD

Capacity of STP Provided (2 Nos) - 630CMD

400CMD

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant

Application for grant of Consent to 1st Operate(part) for residential cum commercial mall for

Applicant has not submitted area statement of constriction completed building for

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    6 

 

Information part C to O for which applicant has applied alngwith consent processing form.

Applicant has obtained C to E dated 27/10/2005 for 80,873 Sq.Mtrs with condition of obtaining EC from Competent authority

Total Plot area and Total Construction BUA is not mentioned.

Applicant has obtained EC from GOI dated 24/2/2006

for total area 80,873 Sq.Mtrs

Total Plot area and Total Construction BUA is not mentioned in EC.

Nonhazardous waste

Wet garbage: 11550 Kg/Day

Dry garbage:16500 Kg/Day

SRO reported that ,PP is praposed to installation of invessel composting of organic waste at site only.

As mentioned in EC, Said project consist of

1. residential complex comprises of 10towers of 13 floors each having 500 flats.

2. Commercial complex has 240 rooms hotel, shopping mall with seven screens.

Construction Status

SRO reported that, During the visit, it was observed that the construction work of residential complex was found completed and more than 80% occupancy were observed.

The construction work of commercial building (phase –II) was found under construction. The construction work upto fifth floor completed. The construction work of upper floor is going on.

The case was discussed in CC Dated 13/3/2014 and it was decided to issue SCN for refusal of consent to 1st operate ,as PP has not submitted BUA of part operate and C to E & EC is expired.

SCN issued on 26/3/2014 and PP has submitted reply of SCN which is received in HQ Dated 19/4/2014. In which applicant has submitted architect certificate mentioning constriction area of Commercial Bldg No.1 is approx.2,34,094 Sq.Mtrs.

Recommendation of SRO/RO

SRO Recommended grant of C to O at HQ

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    7 

 

Agenda no. 4 Region : RO Mumbai Section :RO(HQ) Date :

Name & Address M/s.Ruby Mills Ltd., F.P no. 29 ,

The Ruby - Pvt I.T. Park, F.P No 29, TPS III,

Mahim Div, Senapati Bapat Marg, Dadar (W)

Consent For Renewal of Consent.

Capital Investment Rs.176.33 Cr

Previous Consent Validity

30/09/2014

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water consumption - 543 CMD.

Effluent Generation- 493 CMD

STP Provided - 500 CMD

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

Application for grant of Renewal of consent for IT Park project for

Total Plot area - 12,204.58 Sq. mtrs

Total Construction BUA - 62,586.00 Sq.mtrs

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    8 

 

Applicant has obtained C to 1st O (part) Dated 28/1/2013 which is valid upto 31/7/2013

Total Plot area - 12,204.58 Sq. mtrs

Total Construction BUA - 62,586.00 Sq.mtrs

Nonhazardous waste

Wet garbage: 6 Kg/Day

Dry garbage:10 Kg/Day(will be handed over to MCGM)

STP Sludge: 15 Kg/Day (Manure).

The case was discussed in CC Dated 18/3/2014 and it was decided to issue SCN for refusal of renewal of consent ,as PP has not submitted BR+BG as per previous consent conditions.

SCN issued to PP Dted 28/3/2014 and PP has submitted reply of SCN (Copy attached) in which PP has mentioned that PP has submitted BG of Rs. 10 Lakh+ 2 Lakh to RO Office.

Mailed to RO/SRO for confirmation report regarding submission of BG by PP or not & reply awaited.

Recommendation of SRO/RO

RO recommended grant of renewal of Consent may be taken at higher level.

 

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    9 

 

CC-Fresh Agenda Agenda no. 1

Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 31/01/2014

Ro (HQ) Date of receipt;- 01/04/2014

Name & Address M/s. Benchmark Townplanning LLP “Sirocco Grande”, Survey No. 11, Hissa No. 6/1, 6/2, 7, Village Punavale, Tal. Mulsi, Dist Pune.

Consent For C to E 

Capital Investment 97.0 Crore 

Previous Consent Validity

-

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Water Consumption :- 210 CMD , Effluent Generated :- 164.0 CMD

Proposed STP Capacity :- 170.0 CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

--

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    10 

 

Other Relevant Information

Applied for C to E Residential

Plot Area 14,300.0 sq.mt Built up area 32,086.24sq.mt

EC Status Applied Dated Not submitted

River Distance 500 mtrs Name of River Pawana (A-II)

Water Consumption 210 CMD Effluent Generated 164.0 CMD

STP Capacity 170.0 CMD Recycle water 88.0 CMD

Bio-degradable 243.0 Kg/D Treatment OWC

Non-Boi degradable 365.0 Kg/D Treatment Local Body

No of DG Sets 2 Capacity 82.5 + 125.0 KVA

Construction status Started Date of Visit 26/02/2014

Applicant has completed construction of 3 building , applicant has not submitted architect plan showing STP & MSW location from Pawana River. In view of above we may issue SCN for refusal of consent to establish.

Recommendation of SRO/RO

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    11 

 

Agenda no. 2 Region : RO Pune Section : JD (WPC) Date :

Name & Address M/s. MARS International India Pvt. Ltd. , Plot No. I-9/IIA, Khed City, At Post Nimgaon, Tal:- Khed, Dist:- Pune 410505

Consent For Applied for C to E.

Capital Investment C.I. of Rs. 434.14 Cr.

Previous Consent Validity

Khed SEZ development authority has obtained consent to establish on 17.08.2011.

Khed SEZ development authority has obtained consent to operate on 15.02.2014, valid upto: 31.03.2015.

Industry Type O30 Food and food processing including fruits & vegetable proc

Industry Category Orange/LSI.

YES Compliance Of Water Pollution Related Conditions Details :- Proposed ETP, comprises primary, secondary & tertiary

Compliance of Air Pollution Related Conditions

Boiler- fly ash arrestor followed by bag filter type dust collector will be provided.

Water Cess Assessment Done : -- Paid Upto : ---

BG Details Amount : --- Validity : ----

BG Obtained against :

Submission of Environmental Statement

Period

----

Other Relevant Information

As per the consent to operate condition no. 11, applicant shall provide common pollution control infrastructure facility and ensure that individual industry/ projects shall obtain consent to Establish and Operate from the Board and shall provide their own treatment and disposal arrangement till common infrastructure facility comes up.

Unit attract environment clearance as proposed BUA will be more than 20,000 Sq.m tr.

Recommendation of SRO/RO

Decision of grant of consent to establish may be taken by reviewing applicability of Environmental Clearance.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    12 

 

Agenda no. 3 Region : RO Pune Section : JD (WPC) Date :

Name & Address M/s. Oasis Alcohol Ltd. , S.No 240, 241, Adrushya Kadsidhha Nagar, A/p- Pangarkhel, Tal.- Khatav, Dist- Satara.

Consent For Applied for C to E for blending & bottling (IMFL) plant & country liquor.

Capital Investment Previous C.I. as per consent is of Rs. 54.84 Cr.

C.I. of the proposed unit is of Rs. 6.00/- Cr.

Total C.I. of Rs. 60.84 Cr.

Previous Consent Validity

Previous consent dtd. 20.10.2012 valid up to: 31.03.2014 granted for molasses & grain base distillery.

Industry Type R15 Distillery including Fermentation industry

Industry Category Red/LSI.

YES Compliance Of Water Pollution Related Conditions Details :- ETP comprising collection tank, filtration unit &filter water collection tank.

5, acres land available for disposal of treated effluent, which is adequate.

Water Cess Assessment Done : --- Paid Upto : ----

BG Details Amount : Rs. 2.0/ Lakhs.

Amount : Rs. 2.0/ Lakhs.

Validity : Not submitted.

Validity : Not submitted.

BG Obtained against : Towards the providing of AAQM station.

BG Obtained against : Towards O & M of of pollution control system.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

----

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    13 

 

Other Relevant Information

Applied for blending & bottling (IMFL) plant & country liquor.

Environmental clearance is not required.

Total water requirement is 50 CMD, out of which 40 CMD will be consumed in product and remaining 10 CMDF will be used for new bottle washing, which will came as effluent. Further, after filtration, it will be re-sued

Recommendation of SRO/RO

RO recommended consent to establish may be granted subject to provision of adequate ETP.

 

 

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    14 

 

Agenda no. 4 Region : SRO Mumbai I Section :RO(HQ) Date :

Name & Address M/s. Citywood Builders Pvt.Ltd. ,

C.S. 12 (pt), Raoli Camp, Sion Division,

F/N ward for Adarsh Gharkul CHS,

Hemamnt Manjarekar Road, Sardar Nagar, Sion,

Consent For C to E

Capital Investment Rs.162 Cr.

Previous Consent Validity

--

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water consumption - 367 CMD.

Sewage Generation -317 CMD

Capacity of STP Praposed -350 CMD

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

Application for grant of Consent to Establish for construction of residential redevelopment project under SRA Scheme for

Total Plot area -7,365.55 Sq. mtrs

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    15 

 

Total Construction BUA -22,417.39 Sq. mtrs

PP has not obtained EC from competent authority and applied for EC Dated 12/11/2013

Nonhazardous waste

Wet garbage: 0.47 Kg/Day(will be treated in organic waste Converter)

Dry garbage:0.59 Kg/Day(will be handed over to authorized party)

Construction status:

There are total 6 rehab building with 7 floors and one sale building of 21 floors

The construction work of three rehab building has completed and the work of one rehab building is upto 6th floor and one is at plinth level is completed.

The Project proponent has obtained full Occupation for wing A & B of rehab bldg no.1 dated 24/5/2006 part occupancy for blgd .no.3.LOI from SRA Dated 19/10/2004

Applicant has not submitted architecture plan for total construction BUA

PP has submitted affidavit for condition which will be stipulated in EC and C to E.

PP has submitted area statement of constructed building till date is 12,536.32 Sq.Mtrs

Recommendation of SRO/RO

RO recommended, consent to establish may be granted if approved by imposing the appropriate B.G. for to providing STP for rehab building.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    16 

 

Agenda no. 5 Region : Nasik Section : JD(APC) Date : /04/2014

Name & Address M/s. T I Cycles of India, Plot No. E - 8, MIDC Malegaon Sinnar, Tal. Sinnar, Dist. Nashik.

Consent For Establish for wear housing activity.

Capital Investment Total Rs.32.11 Crs [ Proposed CIRs.12.20 Crs + Existing CI RS.18.92 Crs]

Previous Consent Validity

28.02.2016

Industry Type R36 Industry Involving metal surface treatment

Industry Category Red

YES ( √ ) Compliance Of Water Pollution Related Conditions Details: - Dom. Eff: – 30.00 CMD, STP proposed.

Industrial Eff: Nil.

Compliance Of Air Pollution Related Conditions.

YES ( √ )

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Validity :

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

1. Industry has applied for consent to Establish for: Ware House activity.

2. Earlier consent obtained vide No. BO/JD(APC)/EIC No. NK-13790-13/O-CC-1100; dated 04/07/2013 valid till 28/02/2016,For: Manufacturing of Bicycles & Bicycle parts: 100000 Nos. /Month

3. Industry has proposed warehouse activity with additional built up area of 5751.0 Sq. mtr. For storage of bicycles and bicycle parts.

Recommendation of SRO/RO

Recommended for grant of consent to establish.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    17 

 

Agenda no. 6 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 14/01/2014

Ro (HQ) Date of receipt;- 25/03/2014

Name & Address M/s. Chloride Metals Ltd., Gat No. 1241-1242 Markal, Tal-Khed, Dist. Pune.

Consent For C to E ( Expansion & Modernization of existing plant )

Capital Investment 21.75 Crore

Previous Consent Validity

31/01/2015

Industry Type R34 Industry engaged in recycling/reprocessing/recovery/reuse.

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Water Consumption :- Nil CMD , Effluent Generated :- Nil CMD

Proposed ETP Capacity :- Nil CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Other Relevant Information

1. Industry applied for consent to establish for expansion and modernization activity for lead recovery activity.

2. Existing consent is valid for 31/01/2015 for lead and lead ingot having capacity 3000 MT/M.

3. Now industry applied for additional 1500 MT/M lead and lead ingot recovery. 4. Proposed Capital investment for expansion and modernization 21.75 Cr. 5. Modernization involves 1)Installation of oxy fresh burner for rotary Furness 2) installation

of nano filtration plant for acid recovery from scrap battery 3)modification of battery breaking plant 4) extension of battery breaking and rotary shed 5)shed for covered storage for lead bearing residue.

6. There is no change in water consumption and effluent generation plant. 7. Industry having existing ETP having capacity 25 CMD and STP having capacity 7.5 CMD 8. During visit on 08/01/2014 observed that started construction work of shed and one oxy

fresh burner for trial basis for existing Furness. 9. Industry submitted irrigation department certificate showing distance for HFL of Indrayani

river 2.223Km. 10. 11. In view of above we may consider Expansion and Modernization of existing plant as not

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    18 

 

attract RRZ criteria. With condition applicant shall obtain registration under H.W. recycling category.

Recommendation of SRO/RO

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    19 

 

Agenda no. 7 Region : Pune Section : RO(HQ) Date :SRO Date of receipt;- 22/01/2014

Ro (HQ) Date of receipt;- 25/02/2014

Name & Address M/s. Darode Jog Associates “Green Land Country” S. No. 42 at Village : Narhe, Tal : Haveli Dist : Pune.

Consent For C to E (Phase-II)

Capital Investment 51.63 Crore

Previous Consent Validity

-

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Water Consumption :- 346.34 CMD , Effluent Generated :- 311.71 CMD

Proposed STP Capacity :- 315.0 CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Other Relevant Information

• Applicant has applied for C to E expansion.

• Applicant has obtained amendment in Environment clearance.

• As per EC total plot area 46,255.0 and BUA changes from 43,250.79 sq.mt to 74185.68

sq.mt. on 21/01/2014.

• Applicant has obtained consent to establish for plot area 46291.0 m2 and builtup area

43,734.69 m2 on 15/04/2009.

• Board has granted consent to operate for first phase-I project having BUA 25,300.04

sq.mtrs.

• Now applied for consent to establish for second phase having BUA 48,885.64 sq.mtrs.

• Applicant has completed construction of 2 building out of 6 building in second phase.

• Proposed effluent generation 311.71 CMD, STP capacity 315.0CMD.

• Capital investment of second phase is 51.63 Cr for which applicant has pad consent fees of

Rs 1,00,000/-

• RO Pune has recommended that as PP has started construction of second phase, decision

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    20 

 

of grant of consent to establish may be taken at HQ level.

• In view of above as PP has obtained Amendment in Environment clearance we may

consider consent to establish as per amended Environment clearance having BUA 74185.68

sq.mt. with BG.

Recommendation of SRO/RO

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    21 

 

Agenda no. 8 CC Item –

Region : Kolhapur Section : AST Date: 21/04/2014

Name & Address M/s. Pentokey Organy India Ltd.; Plot No. D-1/1, MIDC Lote Parshuram, Tal. Khed, Dist. Ratnagiri.

Consent for Consent to Establish for Product mix Change.

Capital Investment Existing Rs. 30.43 Crore + Proposed Rs. 29.30 Crore = Total CI will be Rs. 59.73 Crore

Consent Valid up to Existing Consent valid up to 28.02.2018.

Industry Type R-56, Organic Chemicals

Industry Category RED

YES (√ ) NO ( )

Compliance of Water Pollution Related Conditions

Details: Existing IE generation is 117 CMD. DE generation is 30 CMD. Industry has provided primary & secondary treatment. Treated effluent is recycled for floor washing, flushing etc. and remaining is used for gardening within premises.

Presently industry is not discharging any effluent to CETP. JVS results are within consented limits. Due to proposed product mix change, water consumption for cooling purpose will increase from 140 m3/d to 450 m3/d, however effluent generation will not change.

YES (√ ) NO ( )

Compliance of Air Pollution Related Conditions

Details: - Industry has provided two scrubbers for process emission control and Bag Filter & MDC to Boiler stack.

Water Cess Assessment Done: Dec. 2012 Paid up to: Dec. 2012.

BG Details Amount: 5 Lakh Validity: 30.06.2018

BG obtained against: O & M of PCS as per consent condition.

Details of BG forfeited/ enchased, if any: No

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

This is chemicals industry engaged in manufacturing of organic chemicals. Now industry has applied for consent to establish for change in product mix by rearranging existing acetic acid quantity for MPO, Perfumery Material Base and Ammonium Sulphate (Salt). The quantity of other consented products remains same. Industry submitted that the above-proposed change in product mix can be

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    22 

 

implemented in existing plant & machinery set up with additional capital investment. Water consumption will be increased for cooling tower make up from 140 M3/day to 450 M3/day. Cooling tower effluent increase by 10 CMD. However, process waste water quantity, Air emissions, Hazardous waste will remain same. DG set of 500 KVA will be added to take care of power failures in emergency only. Industry has submitted BG of Rs. 5 lacs towards O & M of PCS, valid up to 30.06.18 as per existing consent condition. The CI of the factory as per last consent is Rs. 30.43 crore. Additional investment of Rs. 29.3 crore towards replacement of old equipment, infrastructure developments, up-gradation of pollution control facilities etc. Industry has also submitted that old turbine will replace with advanced technology steam turbines so as to achieve 0.6 MW to 0.75 MW as mentioned in covering letter. Industry has paid necessary fees towards consent to establish for above additional investment. Industry has submitted Performa for assessment/computation of pollution load before & after the proposed change in product mix in prescribed format. Also industry has submitted No increase in Pollution load certificate from ICT Mumbai dtd. 14.03.2014.

Recommendation of SRO/RO

Decision regarding consent to establish for change in product mix may be taken at higher level after verification of no increase in pollution load and applicability of EC.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    23 

 

Agenda no. 9 Region : Pune Section : RO(HQ) SRO Date : 06/03/2014

RO(HQ) date:-23/04/2014

Name & Address Sun Universe (Mittal Group) , S.No. 51/1/3/1 and 51/1/4 to 51/1/20, Mumbai Banglore Highway, Narhe, Tal:- Haveli, Dist:- Pune

Consent For C to O (Part)

Capital Investment 250 Crore

Previous Consent Validity

--

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( )

NO ( ) Compliance Of Water Pollution Related Conditions

Details :-Water Consumption;- 517.0 CMD, Effluent generated 455.0 CMD Provided STP capacity 470.0 CMD

Water Cess Assessment Done :- Paid Upto :

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Other Relevant Information

1. PP has applied for consent to 1st Operate (Part). 2. The Residential project covering total area of around 57847.0 sq.mtrs with total built 

up area of  85845.52 sq mtrs 3. PP has obtained environment clearance From GoM on 18th October 2011. For same 

area  4. PP has obtained consent to establish from Board on 16/01/2013 for same BUA & plot 

area. 5. Total water  consuming  for  this  phase  517.0 m3/day  of water  out  of which  310.0 

m3/day fresh water will be supplied by Local Body & generating about 455.0 m3/day of  sewage,  which  PP  has  provided  STP  of  capacity  470.0  m3/day,  Treated  207 m3/day waste water will be used for utilities, and partially of which 52.0 m3/day will be used for gardening. 

6. OWC installed by PP for bio‐degradable waste, Non‐biodegradable waste will send to authorized vender.   

7. 2 no. of DG sets each having capacity of 160 KVA.  8. At present applicant has completed construction of BUA 25,697.12 sq.mtrs. 

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    24 

 

9.  PP has not submitted BG of Rs 10 Lakhs as per consent to establish condition. 10. RO, Pune has recommended that grant of consent to operate may be taken at HQ level. In  view  of  above  we may  consider  consent  to  operate  part  having  BUA  25,697.12 sq.mtrs with BG and part BUA affidavit.

Recommendation of SRO/RO

RO, Pune has recommended that the decision regarding grant of consent to establish may be taken at HQ level.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    25 

 

Agenda no. 10 Region : Thane Section : RO(HQ) Section Date : / 04/2014

Name & Address M/s. Housing Development and Infrastructure Ltd. , s S.No. 212(13), Hissa.No. 2, 3/1, 3/2, S.No. 213(12), Hissa .No. 1(pt), 2/1, 2/2, 2/2pt, S. No.215(79), Hissa .No. 1pt, 4pt, 5pt, S.No. 218(80), Hissa.No. 1 (pt) to 5(pt), 9 (pt) to 16 (pt), Vill. Dongre, Virar(West

Consent For Applied for 1st Consent to Operate (Part)

Capital Investment 9344 Lacs

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Rs. 5 lakhs Validity : 06/11/2013

BG Obtained against : compliance of consent to establish conditions.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

M/s. Housing Development and Infrastructure Ltd., has submitted application for 1st Consent to Operate ( Part) for residential cum commercial project at S.No. 212(13), Hissa.No. 2, 3/1, 3/2, S.No. 213(12), Hissa .No. 1(pt), 2/1, 2/2, 2/2pt, S. No.215(79), Hissa .No. 1pt, 4pt, 5pt, S.No. 218(80), Hissa.No. 1 (pt) to 5(pt), 9 (pt) to 16 (pt), Vill. Dongre, Virar(West) Tal: Vasai Dist: Thane.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    26 

 

Capital Investment for Part of Project is Rs. 93.44 Crs and Capital investment of complete project as per Environmental Clearance is Rs. 233 Crs. Earlier project proponent has obtained Consent to Establish from MPC Board vide no: BO/RO(HQ)/Thane/CE/CC-100 dated: 23/06/2011 for construction activity of residential cum commercial project ( Phase-I) of the project having area details as under:

Total Plot Area: 48,969 sq.meters.

Proposed BUA ( As per FSI) : 44,022.41 sq.meters. Total Construction BUA of: - 54,175.12 sq.meters.

Project proponent has obtained Environmental Clearance from Environment Department ( SEAC) GoM vide no: SEAC 2010/CR.160/TC.2 dated: 23/09/2011 having area details as under : a) Total Plot Area :- 1,28,500 sq.meters b) Total Built up Area : 54,775.12 sq.meters

Now project proponent has applied for Part Consent to Operate residential complex having details as under :

• Total Plot Area 48,969 sq.meters • Total Construction Built up Area : 45,000 sq.meters out of 54,775.12

sq.meters.

Provided STP of 650 CMD capacity for treatment of sewage. details of water consumption as under :-

Domestic Water consumption -776 CMD

Sewage Generation –531 CMD

Non-hazardous Waste generation details Bio- Degradable : - 1.00 T/Day

Non- Bio Degradable :- 0.80 T/day

Project proponent has provided Vermi composting facility for treatment of MSW.

Project proponent to provided rain water harvesting system.

• Project proponent has submitted copy of Occupancy certificate obtained from Vasi Virar Municipal Corporation dated: 21/05/2013.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    27 

 

As per visit report of Field officer of SRO Thane-I , dated: 15/03/2014, reported as under :

• During visit, construction of approx 45,000 sq.meters ( Built up area) is completed and remaining construction work will be completed in two months. ,

• STP of capacity 650 CMD completed.

• Provided rainwater harvesting, vermin composting for treatment of solid waste.

• Query letter was issued by SRO Thane-II MPC Board on 18.2.2014 for

want of additional information and clarification wrt Survey Nos as there is change in S.No shown in EC and Consent to establish granted and S.No shown in consent to operate application.

• The reply is submitted by project ( M/s. HDIL) proponent on 21.3.2014 stating that, they have applied for part consent and by oversight S.No. 217 and 226 are shown in consent application and requested to delete these two S.Nos.

• M/s. Housing Development and Infrastructure Ltd., has also stated in

their reply dated: 21/03/2014, that as per the judgment of Hon’ble Delhi High Court in LPA No. 895 of 2010, Section 25 and 33A of the Water Act and Section 21 and 31A of the Air act are not applicable to the building housing residential apartment/units as there is no trade effluent discharge from such type of activities and requested to give suggestion regarding applicability of the judgment.

Project proponent has paid fees of Rs. 1,25,100/- towards grant of 1st Consent to Operate ( Part)

As reported by SRO Thane –II , as per

consent conditions, project proponent has submitted the Bank Guarantee of Rs. 5 Lakhs vide BG no: 550 LG 0534/12 dated: 16/11/2012 which was valid up to 06/11/2013. The Regional Officer has instructed vide letter dated: 20/11/2013 to submit revalidated Bank Guarantee , However the same is not yet submitted

Recommendation of SRO/RO

SRO Thane –II has submitted application to HQ stating that, The project proponent has submitted copy of judgment dtd. 23.01.2012 of the Hon'ble Delhi High Court wherein a Division Bench of the said Court in, Delhi High Court in LPA no. 867 /2011 Section 25 and 33A of the Water Act and Section 21 and 31A of the Air act are not applicable to the building housing residential apartment/units as there is no trade effluent discharge from such type of activities and requested to give suggestion regarding.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    28 

 

Agenda no. 11 Region : SRO Mumbai II. Section :RO(HQ) Date :

Name & Address M/s.Kanakiya Design & Construction Pvt.Ltd. ,

CTS no.5,5/1,to4,6,6/1 to 27,7,7/1 to 5 & 9 of Village Kurla

at S.G.Barve Marg & L.B.S.Marg,Kurla (W),Mumbai.

Consent For C to O(PART-II)

Capital Investment C.I. of project (part-II)is Rs.315.88Cr.

C.I. of project (part-I)is Rs.31.88Cr

Hence C.I. of total project is Rs.347.76Cr.

Previous Consent Validity

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-

Water consumption - 245 CMD.

Sewage Generation -162 CMD

Quantity of waste water from bus washing-65 CMD

As per EC, PP has provided STP having capacity,

For staff quarters-100 CMD.

For commercial Bldg -70 CMD.

For best workshop-72 CMD( 1 ETP)

Water Cess Assessment Done : Paid Upto :

BG Details Amount : 10 Lalk+2 Lakh

(not submitted)

Validity :

BG Obtained against : Operation and maintenance of pollution control system.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    29 

 

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

Application for grant of Operate(part)for construction of residential and commercial building(remodeling of BEST Bus depot) for

Total Plot area -30,820 Sq. mtrs

Total Construction BUA -40,598.76 Sq. mtrs

PP has obtained EC from GOM dated 10/12/2012 for

Total Plot area -30,820.00 Sq. mtrs

Total Construction BUA -44,175.89 Sq. mtrs

PP has obtained C to E dated 12/2/2013 for C.I.277.78 Cr for

Total Plot area -30,820.00 Sq. mtrs

Total Construction BUA -44,175.89 Sq. mtrs

PP has obtained C to 1ST O(Part) dated 8/5/2013 for period upto 31/10/2014.

Total Plot area -30,820.00 Sq. mtrs

Total Construction BUA - 3,577.13 Sq. mtrs

Nonhazardous waste

Wet garbage: 309 Kg/Day

Dry garbage:478 Kg/Day( handed over to authorized party)

E-Waste:118 Kg/M(disposed through authorized recyclers)

STP Sludge:22 Kg/Day(Used as manure)

SRO reported that, The PP has not provided MSW treatment facility.

Applicant has communicated vide mail dated 4/4/2014 that they have installed OWC Plant at project site.

Accordingly mailed to SRO Dated 9/4/2014 for submission of verification report

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    30 

 

regarding installation of OWC Plant at project site but verification report is awaited.

Draft of Consent to Operate for period upto 31/10/2016 ie. 2 years for complete project is submitted alongwith CC Agenda with following conditions, if C to Operate(full project) is approved

1.after obtaining verification report from SRO regarding installation of OWC Plant.

2.additional submission of earlier BG of C to 1st Operate(Part-I)ie. Rs.10 Lakh.

3.overriding effect of earlier C to 1st operate(part-I)

4.Submission of additional consent Fee.,since C to 1st O(part-I) is valid upto 31/10/2014

Recommendation of SRO/RO

RO recommended that decision regarding grant of C to O(PART) may be taken at higher level.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    31 

 

Agenda no. 12 Region : Mumbai Section : AST Date : April 2014

Name & Address M/s Indian Oil Corporation Ltd.,Pir Pau Trombay, Mumbai.

Consent For C to R with increase in CI

Capital Investment Previous –Rs.23.37 Cr, Increase in Rs. 3.87 Cr

Total CI Rs. 27.24 Cr

Previous Consent Validity

31/08/2013

Industry Type R 44 Manufacturing of lubricating oils,grease OR petroleum based products.

Industry Category Red

NO Compliance Of Water Pollution Related Conditions Details :-

1. As per existing consent IE- 40 M3/D ,DE-1.5 M3/D.

2. As per application IE- 1.5 M3/D ,DE-20 M3/D.

3. Industry has submitted justification for decrease in IE stating that they are utilizing treated effluent in boiler.

4. JVS report not submitted.

Water Cess Assessment Done : 31.12.2013 Paid Upto : ….

Yes Compliance Of Air Pollution Related Conditions Stack provided to boiler.

BG Details Amount : Nil Validity : NIL

BG Obtained against : NA

Details of BG forfeited/encashed , if any : NA

Submission of Environmental

Period

2012-2013

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    32 

 

Statement

Other Relevant Information

1. Industry has applied for grant of C to R with increase in CI . 2. Previous CI –Rs.23.37 Cr ,Current CI Rs. 27.24 Cr. Submitted

justification for increase in CI is submitted stating that CI increased due to improvement in plant infrastructure facility. In CA certificate land value is not given.In balance sheet CI is not reflected.

3. SRO has reported that industry has not obtained membership of CHWTSDF.

4. Industry has reported that waste oil generated during production process is recycled back into process.

5. This office has call additional information from industry regarding membership of CHWTSDF ,HW generation & disposal, balance sheets etc. vide email dtd26/02/2014,15/3/2014 & 21/3/2014 .

6. Industry has submitted their reply on 29.03.2014 stating that HW generation is Nil & not obtained membership of CHWTSDF till date .

Recommendation of SRO/RO

SRO has recommended for renewal of consent to operate subject to receipt of CHWTSDF membership/satisfactory reply.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    33 

 

Agenda no. 13 CC Item

Region :Raigad │Section : AST Date:

Name & Address FDC Ltd, Plot No- 19,20/2,118 MIDC Dhatav Dist:- Raigad

Consent for Renewal of Consent with increased in C.I.

Capital Investment Previous-29.2 Cr new-58.22 Cr

Consent Valid upto 30/09/2013.

Industry Type R60Pharmaceuticals(excluding formulation)

Industry Category RED

YES ( √) NO ( ) Compliance of Water Pollution Related Conditions Details: Full fledge ETP is provided..

YES ( ) NO ( ) Compliance of Air Pollution Related Conditions Details: - Process scrubbers provided, Air Handling unit, Blowers.

Water Cess Assessment Done: returns upto- Sept-2013. Paid upto: 31/3/13

BG Details Amount: NA Validity:- NA

BG obtained against: NA

Details of BG forfeited/ enchased, if any: NA

Submission of Environmental Statement

Period 2012-13

Other Relevant Information

Industry has applied for renewal of Consent with increase in C.I from 29.2 Cr to 58.22 Cr since 2009.SRO has reported that Industry has submitted that:-1) The increase in C.I is due to replacement of old machinery and installation of new machinery and equipment to improve cGMP and production level.2)Industry have constructed new ETP in plot no- 118 with investment of 2.5 Cr.3) Industry has paid the difference fee for additional C.I.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    34 

 

Recommendation of SRO/RO

Visited the industry on 17/02/2014.During the visit following non compliance were observed:- 1] The industry not recycling /reusing treated effluent as per consent. 2] The industry has not provided STP (sewage qtyl 16 m3). 3] The H.W Storage facility not provided. 4] The industry has changed fuel from FO to briquette without consent of the Board. 5] The industry has installed one additional thermo pack without consent of the Board. 6] There was no adequate stack monitoring facility to boiler, thermo pack, D.G Set and scrubber chimney. 7] The industry not sending H.W i.e- spent catalyst to CHWTSDF a per consent .It is reported that it is being send to Hindustan Platinum for which consent not obtained. In view of the above consent may be refused or may be granted only for 1 year subject to submission of suitable B.G to ensure the above compliance.

 

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    35 

 

Agenda no. 14 Region : RO Pune Section : AS(T) Date : April 2014

Name & Address Rama Krishi Rasayan. , Loni-Kalbhor, Gat No-43, Tal-Haveli.

Consent For Renewal & amendment in consent with increase in CI.

Capital Investment Previous CI- Rs. 35.65 cr. Current CI- Rs. 37.73 Cr ( increase in CI Rs. 2.08 cr )

Previous Consent Validity

31/12/2013

Industry Type R20 Fertilizer (Basic) (excluding formulation)

Industry Category Red

YES Compliance Of Water Pollution Related Conditions Details :-    IE- 103.50 CMD, DE-7.0 CMD. Industry has provided full-fledged

ETP ,treated effluent reused in process & remaining used on land for gardening. JVS reports are within limit.

Water Cess Assessment Done : ….. Paid Upto : March 2013

Yes Compliance Of Air Pollution Related Conditions Details :- Industry has provided scrubber at different sections to control process

emissions. Also reported that from introduction of by-product there is generation of air emissions.

BG Details Amount : 1. Rs.5 lakh 2. Rs.5 lakh. 3. Rs.5 lakh.

Validity : 1. 14.03.2014 2. 14.03.2014 3. 14.03.2014

BG Obtained against :

1. O & M of air pollution control system . 2. Use of raw material shall be restricted to 22309 MT/M against 22819

MT/M. 3. Use of imported coal having sulphur content 0.4 – 0.5 % in place of Indian

coal having sulphur 1 %. Details of BG forfeited/encashed , if any : Nil

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    36 

 

Submission of Environmental Statement

Period

2012-13

Other Relevant Information

1. Industry has applied for renewal of consent with change in production quantity ,introduction of byproduct & enhancement in CI .Industry is going to decrease existing product SSP (powder) by 100 MT/M & introduce by product Sodium silico fluoride S(SSF) by using waste liquor generated during manufacturing of SSP. Total quantity remain unchanged.

2. Industry has reported that from introduction of by-product there is no water consumption ,no generation of effluent ,air emissions & HW .

3. Industry located 0.5 km away from river Mula-Mutha (class IV).Location attracts RRZ distance criteria.

4. SRO has reported that there are frequent complaints of smell nuisance from nearby residents .RO has issued PD on 13.12.2013 for discharging treated effluent outside the premises. for which industry has submitted their reply stating that they had stopped the discharge outside factory premises. Same was confirmed during visit dtd.20.01.2014.

5. Industry has submitted three separate BG’s of Rs. 5 lakh towards compliance of specific condition in consent .As per report submitted by SRO industry has complied with specific condition .  

                

Recommendation of SRO/RO

RO has recommended to take decision at HQ level with condition to achieve Zero discharge as location attracts RRZ policy.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    37 

 

Agenda no. 15 CC Item

Region : Raigad │Section : AST Date:

Name & Address Hindustan Petroleum Corporation Ltd, (LPG Bottling Plant) A-2 Usar Alibag Dist- Raigad.

Consent for Renewal with increase in C.I

Capital Investment Existing-59.12 Cr Applied for 67.10 Cr

Consent Valid upto 28/02/2014.

Industry Type LPG Bottling Plant

Industry Category RED

YES (√ ) NO ( ) Compliance of Water Pollution Related Conditions Details: Industry had provided ETP consisting of –Oil & Grease Trap, Settling

Tank-I, Primary settling tank, aeration tank, and filters, carbon filters SBD.

YES ( ) NO ( ) Compliance of Air Pollution Related Conditions Details: - D.G sets of 25 KVA, 380 KVA, and 500 KVA are used.

Water Cess Assessment Done: Paid upto: 31/12/2013.

BG Details Amount: NA Validity: NA

Details of BG forfeited/ enchased, if any: NA

Submission of Environmental Statement

Period 2012-13.

Other Relevant Information

The plant is located at Usar Alibag engaged in LPG Bottling. Industry has applied for renewal of consent with increase in C.I from 59.75 Cr to 67.10 Cr. Industry vide letter dtd- 26/3/14 has given the details of increase in C.I during last 3 years and paid necessary fee for the same.

Recommendation of SRO

Renewal of Consent may be granted.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    38 

 

Agenda no. 16 Region : Aurangabad Section :JD-WPC Date :10/04/2014

Name & Address Ms. Indo European Breweies Ltd , Plot No B-74/2, MIDC Area , Waluj, Aurangabad.

Consent For Renewal of consent with increased in CI.

Capital Investment Earlier CI was Rs. 22.46/- Cr. and now it is Rs. 29.14/- Cr.

Previous Consent Validity

26.02.2014(in Orange category now category of industry is Red as per new categorization)

Industry Type Breweies

Industry Category Red/ LSI

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- An existing industry, applied for renewal of consent. The category of

industry is Red as per new categorization. The previous CI of unit was Rs. 22.46 Cr. and now it is Rs. 29.14 Cr. CI increased due to installation & replacement of machineries and revamp of plant. The industry has paid fees for four years along with fees towards consent to establish and consent to operate for additional investment ie. up to 30.04.2018 .There is no increase in production level due to additional investment. The distance from Godavari river is 25 Km.Earlier consent was valid up to 26.02.2014 in Orange category.The industry has provided pri, Sec & Tert. treatment system for D.E.14 CMD & I.E.536 CMD, out of which 432 CMD trade effluent generated from bottle washing activity. The treated effluent connected to CETP.JVS analysis reports are within the prescribed limits. HSD & FO being used as fuel for boiler and DG set.

Water Cess Assessment Done : upto Dec. 2013 Paid Upto : March-2013.

BG Details Amount : NIL Validity :NA

BG Obtained against : NA

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

It is reported that the unit was not in operation from June 2013 to Feb. 2014 and now it is recommissioned in March 2014.

Recommendation of SRO/RO

SRO Aurangabad has recommended the case for renewal of consent.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    39 

 

Agenda no. 17 Region : SRO Satara Section : JD(APC) Date : 05/04/2014

Name & Address Pam Glatt Pharma Technologies Pvt. Ltd. , Gat No. 1100,1109 & 1116/1, A/P. Shirwal, Tal. Khandala., Dist- Pune

Consent For Renewal with expansion

Capital Investment Total 41.26 Cr. ( Existing 21.63 Cr + Exp. 1.62 Cr)

Previous Consent Validity

31.07.2013

Industry Type G47 Jobbing and machining

Industry Category Red

YES

Compliance Of Water Pollution Related Conditions

Details :- ETP Provided 12 M3 Per Day

STP Provided 12 M3 Per Day

Compliance Of Air Pollution Related Conditions

Provided Acostic Enclosure to Stack to DG Set

Water Cess Assessment Done : Aug 2013 Paid Upto :

BG Details Amount : -- Validity :

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

Industry has applied for grant of renewal of consent to operate with expansion, earlier consent was issued under Orange Category, now falls under RED Category. This industry does not satisfy RRZ Policy 2009. Industry has already undertaken excess production quantity

Recommendation of SRO/RO

This decision may be taken at HQ Level.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    40 

 

Agenda no. 18

Region : SRO Aurangabad I Section : Date :

Name & Address Trend Electronics Ltd. , Gat No. 350, Village Bhalgaon, Aurangabad-Beed Road, Aurangabad

Consent For CR

Capital Investment 4850.00 Lacs

Previous Consent Validity

31/01/2014

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

NO Compliance Of Water Pollution Related Conditions Details :- Indl effluent is nil, domestic effluent is 35 CMD, provided STP, but O &

M is poor, but no JVS results.

NO Compliance Of Air Pollution Related Conditions Painting section & lead soldering section is not provided with APCS

Water Cess Assessment Done :March-2013 Paid Upto :March-2013

BG Details Amount : NIL Validity :NA

BG Obtained against : NA

Details of BG forfeited/encashed , if any :NA

Submission of Environmental Statement

Period

2012-2013

Other Relevant Information

Applied for renewal of consent. No change in product & its quantities. CI is Rs.48.5 crores, no change in CI. Indl. Effluent is NIL. For domestic effluent of 35 CMD, provided STP SRO reported that O & M is poor, but JVS results are not enclosed. SRO reported that no APC system to painting section & lead soldering activity. E-waste & other solid waste are stored haphazardly.

Recommendation of SRO/RO

Case may be decided at CC level

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    41 

 

Agenda no. 19

Region : SRO Aurangabad I Section : Date :

Name & Address Trend Electronics Ltd. , Gat No. 350, Village Bhalgaon, Aurangabad-Beed Road, Aurangabad

Consent For CR

Capital Investment 4850.00 Lacs

Previous Consent Validity

31/01/2014

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

NO Compliance Of Water Pollution Related Conditions Details :- Indl effluent is nil, domestic effluent is 35 CMD, provided STP, but O &

M is poor, but no JVS results.

NO Compliance Of Air Pollution Related Conditions Painting section & lead soldering section is not provided with APCS

Water Cess Assessment Done :March-2013 Paid Upto :March-2013

BG Details Amount : NIL Validity :NA

BG Obtained against : NA

Details of BG forfeited/encashed , if any :NA

Submission of Environmental Statement

Period

2012-2013

Other Relevant Information

Applied for renewal of consent. No change in product & its quantities. CI is Rs.48.5 crores, no change in CI. Indl. Effluent is NIL. For domestic effluent of 35 CMD, provided STP SRO reported that O & M is poor, but JVS results are not enclosed. SRO reported that no APC system to painting section & lead soldering activity. E-waste & other solid waste are stored haphazardly.

Recommendation of SRO/RO

Case may be decided at CC level

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    42 

 

Agenda no. 20 Region : Pune Section :JD-WPC Date :01/04/2014

Name & Address M/s. Ganga Papers India Ltd. , Gat No.241 to 244, vill. Bobedohal, Borgaon, Tal - Mval, Dist - Pune

Consent For Renewal of consent with interchange in production quantity.

Capital Investment 3903 Lacs

Previous Consent Validity

31/12/2013

Industry Type R61 Pulp and Paper (Paper manufacturing with or without

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- An existing industry, applied for renewal of consent with interchange in

production quantity. Earlier consent was valid up to 31.12.2013 - for the production of Consented proposed Kraft Paper-2000 MT/M & 1300 MT/M White Printing Paper / news paper 1000 MT/M 1700 MT/M. Industry has provided ETP for industrial effluent 232 CMD Treated effluent reused in

the process at maximum extent and remaining used on land for land for gardening within premises. (area 72843 sq mtrs). Analysis report of the ETP outlet are exceeding the limit in case of BOD, COD and SS parameters. Domestic effluent is 20 CMD for which septic tank provided further it is treated in to existing ETP along with industrial effluent.

Show cause notice had been issued by RO Pune, Industry has replied that, they have already started erection work of new ETP (Sedicell) of 330 CMD, SRO Pune –II HAS reported vide e-mail dtd.15.03.2014, that presently erection work is completed and took under trial run.

Earlier bagasse and coal used as fuel. Industry has discontinued use of bagasse in existing boilers and added pet coke with existing coal as a catalyst to achieve required temperature and requested to amend the same in fuel pattern. The 2 nos of coal fired boiler having individual stacks of 31 mtrs and 27 mtrs respectively with dust collector and wet scrubber

Water Cess Assessment Done : Sep 2013 Paid Upto : June 2012

BG Details Amount : NA Validity :NA

BG Obtained against : NA

Details of BG forfeited/encashed , if any :NIL

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    43 

 

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information

The distance from River Pawana is about 1.18 Km.in A-II class of water. Industry has submitted self assessment report regarding no increase in pollution load due to modification & interchange in existing unit. Industry has submitted undertaking of Rs. 100/- stamp paper and evolution of pollution load report There is no change in existing pollution load with respect to waste water & H.W. but so2 value increased by 2 Kg/day.

Industry has obtained consent to establish on 14.08.2013 for installation of paper board making activity by using ETP sludge. Industry has requested to amend disposal of ETP sludge as Sun board manufacturers / reusing for making side discs instead to send to CHWTSDF Ranjangaon, also Industry has requested to remove haz waste cat. no. 32.2 and 32.3 as there is no generation of haz waste in said categories. The undertaking of Rs. 100 stamp paper in this respect is enclosed with application.

Recommendation of SRO/RO

RO/SRO has forwarded the application for taking appropriate decision at higher (HQ) level.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    44 

 

Agenda no. 21 Region : RO Pune Section : JD (WPC) Date :

Name & Address M/s. Kumuda Sugar & Agro Product Ltd., (Formerly Known as: Rayat SSK Ltd., ) At. Shewalewadi (Mhasoli) Tq. Karad Dist. Satara.

Consent For Applied for renewal of consent.

Capital Investment C.I. of Rs. 44.69 Cr.

Previous Consent Validity

31.12.2013.

Industry Type R74 Sugar (excluding Khandsari)

Industry Category Red/LSI

YES Compliance Of Water Pollution Related Conditions Details :- ETP comprising bar screen, oil & grase trap, equalization tank, Neut. Tank,

Primary clarifier, aeration tank, secondary clarifier, holding tank, sand filter & SDB provided.

JVS result exceed the consented limit.

Industry has provided 75 acres of land for disposal of treated effluent, which is adequate.

Compliance Of air Pollution Related Conditions

Boilers – multi-cyclone fly ash arrestor provided.

Assessment Done : done Paid Upto : Nov. 2012

Amount : Rs. 5.0/- Lakhs

Amount : Rs. 2.0/- Lkahs.

Amount : Rs. 4.0/- Lkahs

Validity : Not submitted

Validity: Not submitted.

Validity: Not submitted.

BG Obtained against : O & M of ETP & air pollution control system.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    45 

 

BG Obtained against : Providing necessary arrangement to cover the effluent

collection system.

BG Obtained against : Towards the compliance of CREP norms.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

September 2013.

Other Relevant Information

Wet scrubber not provided.

Total BG of Rs. 11.00/- not submitted.

JVS result exceed the consented limit.

Industry has provided 75 acres of land for disposal of treated effluent

Recommendation of SRO/RO

RO recommended, in view of above non compliances, decision regarding refusal of

consent may be taken at HQ level.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    46 

 

Agenda no. 22 Region : SRO Sangli Section : JD(WPC) Date :15.04.2014

Name & Address Cane Agro Energy India Ltd. , A/p-Raigaon (Hingangaon(BK), Tal.- Kadegaon, Dist.- Sangli.

Consent For CR

Capital Investment 4362.8 Lacs

Previous Consent Validity

31/12/2013

Industry Type R74 Sugar (excluding Khandsari)

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- The industrial effluent generation is 200 CMD is as per the CREP.

• ETP is provided with primary and secondary treatment. • JVS analysis results dtd.16.01.2013 are exceeding, analysis results

dtd.22.02.2013 are within consented limit and analysis results dtd.12.03.2013 are marginally exceeding.

Compliance Of Air Pollution Related Conditions

Provision of Emission Control system i.e ESP/Bag filter/Venture scrubber – Not complied.

(However industry has provided Multicyclone type fly ash arrestor as an APC system.)

Water Cess Assessment Done :Nov. 2013 Paid Upto : August.2012

BG Details Amount : 1. Rs.5.0 Lacs.

2. Rs.1.0 Lacs

Validity : 1) 31.03.2014

2) 19.10.2013

BG Obtained against : 1. For O & M of pollutio0n control systems.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period 2012-13

Other Relevant Information

• Industry has submitted the BG of Rs.5.0 Lakhs for O & M of PCS as per previous consent condition.

• However industry has not submitted BG’s of Rs.2.0 lacs towards provision of covering system and Rs.2.0 lacs towards compliance of CREP conditions as per the previous consent condition.

Recommendation of SRO/RO

Renewal of consent may be decided upto 31.07.2015 as per sectoral approach.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    47 

 

Agenda no. 23 Region : SRO Kolhapur Section : JD(WPC) Date : 11.04.2014

Name & Address Ajara Shetkari Sahakari Sakhar Karkhana Ltd , Gat No-25,27/1,381/383/1, 373, Village-Gavase-Dardewadi, Dist.- Kolhapur

Consent For CR

Capital Investment 5157 Lacs

Previous Consent Validity

31/12/2013

Industry Type R74 Sugar (excluding Khandsari)

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :- Industrial effluent generation is 340 CMD.

• ETP is provided comprising primary and secondary treatment. • JVS analysis results of dt.24.01.2013 & 20.02.2013 are exceeding.

Water Cess Assessment Done : Dec 2013 Paid Upto :Oct 2010

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

1) CREP Compliance is as follows;

a. Effluent generation to the tune of 100 litrs/ Ton of cane crushed – Not

Complied.

b. Provision of 15 Days storage tank – Not complied.

c. Provision of Emission Control system i.e ESP/Bag filter/Venture

scrubber – Not complied.

2) Industry has not submitted the BG’s imposed as per the previous consent conditions of Rs.5.0 Lacs for O & M of PCS, Rs.2.0 Lacs to avoid ingress of bagasse and Rs.2.0 lacs for provision of ESP/wet scrubber as an APC system.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    48 

 

Recommendation of SRO/RO

JVS results are exceeding the consented standards. O & M of ETP needs improvement. Industry has not submitted BG’s. We may consider conditional consent subject to submission of BG. CREP compliances etc.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    49 

 

Agenda no. 24 Region : SRO Satara Section : JD(APC) Date: 21.03.2014.

Name & Address Cummins India Ltd.(PMUC) , Plot No.A-1, MIDC Survadi, Phaltan-Lonand Road, Tal-Phaltan, Dist-Satara

Consent For Renewal of consent to operate.

Capital Investment Rs. 28.17 Crs.

Previous Consent Validity

31.12.2013.

Industry Type R27 Heavy engineering including ship building (With investment o

Industry Category Red

YES ( √ ) Compliance Of Water Pollution Related Conditions - Details: - Industrial effluent: 8.40 CMD, Domestic Effluent: 2.60 CMD

combined ETP/STP provided. - Analysis results are within the consented limits.

Water Cess Assessment Done : Paid Upto :

Compliance Of Air Pollution Related Conditions

Wet type paint booth and acoustic system with stacks provided to DG Set.

BG Details Amount : 5.0 Lakhs Validity : 17.03.2014

BG Obtained against: Provision of separate VOC arrangement.

Details of BG forfeited/encashed , if any :------

Submission of Environmental Statement

Period -----

Other Relevant Information

- Industry has not provided separate VOC control system to paint booth section as per the earlier consent condition no.10.Industry has submitted BG of RS.5.0 Lakhs valid up to 17.03.2014.

- Industry has submitted letter dated 24.01.2014 stating that they are carrying painting operation in a close system. The VOC control system is the integral part of the said paint booth section.

Recommendation of SRO/RO

Recommended to grant renewal of consent to operate up to 31.12.2014.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    50 

 

Agenda no. 25 CC Item –

Region : Nagpur │Section : JD(APC) Date: 10/04/2014

Name & Address M/s. Lloyds Metals & Energy Ltd, Surjagarh Iron Ore Mine,

Mouza Surjagarh,Tal-Etapalli,Dist-Gadchiroli.

Consent for Plain renewal of consent.

Capital Investment Rs.40.74 Crores

Consent Valid up to 31.03.2014

Industry Type Iron Ore Mine

Industry Category RED/LSI

YES ( ) Compliance of Water Pollution Related Conditions

Domestic Effluent-7.0 CMD. Septic Tank & Soak pit provided.

Industrial Effluent – Nil CMD.

YES ( )

Compliance of Air Pollution Related Conditions

Water sprinkling during transportation/loading/unloading

Water Cess Assessment Done: ---. Paid up to: ---.

BG Details

Amount: ---

Validity: ---

BG obtained against: ---

Details of BG forfeited/ enchased, if any: ---

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    51 

 

Submission of Environmental Statement

Period: ---

Other Relevant Information ---

Recommendation of SRO/RO

The said mine is in dense forest area and this area is controlled by Naxalites and hence due to law and order problems, the industry could not able to start mining activity till date. Recommended Renewal up to 31.03.2018.

Agenda no. 26

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    52 

 

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    53 

 

Agenda no. 27 Region : SRO Chandrapur Section : JD (WPC) Date :

Name & Address Sneha Foods & Feeds Ltd. , Village Mahakurla, Tal & Dist -

Chandrapur

Consent For CR

Capital Investment 60.78 Cr.

Previous Consent Validity 31.03.2014

Industry Type R 83 Vegetable oils including solvent extraction and refinery

Industry Category Red

YES ( ) NO ( ) Compliance of Water Pollution Related Conditions Details :-

Water Cess Assessment Done : Paid Up to :30.06.2012

BG Details Amount : Validity :

BG Obtained against :

Submission of Environmental Statement

Period 1 April 2012 – 31 March 2013

Other Relevant Information • JVS dt. 24.09.2012 and 17.01.2013 are exceeding.

• Office has issued SCN to this industry dt. 20.11.2013 for

exceeding the JVS

Recommendation of SRO/RO • Renewal of consent to operate is recommended for three

years i.e. up to 31/03/2017

Recommendation of HQ (including consent fees details /

delay payment charges)

• Industry has paid fees of Rs. 3,50,000/-

• It is recommended to grant renewal of with double the BG

for O & M and PCS Rs. 10 Lakhs since JVS results are

exceeding.

Consent Recommended Upto 31.03.2017

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    54 

 

Agenda no. 28 Region : RO Pune Section : JD (WPC) Date :

Name & Address M/s. Shri Adinath Sahakari Sakhar Karkhana Ltd. , Shelgaon, Bhalwani, Adinathnagar, Tal-Karmala,Dist-Solapur

Consent For Applied for renewal of consent.

Capital Investment C.I. of Rs. 28.30 Cr.

Previous Consent Validity

Previous consent granted dtd. 17.10.2012 valid upto: 31.12.2013.

Industry Type R74 Sugar (excluding Khandsari)

Industry Category Red/LSI.

YES Compliance Of Water Pollution Related Conditions Details :- ETP comprising screen chamber, O & G trap, equalization tank, aeration

tank, clarifier & SDB.

JVS result are exceeding standards.

Industry has provided 60 acres land for disposal of treated effluent, which is adequate

Compliance Of Air Pollution Related Conditions

Boiler, fly ash arrestor provided.

As per CREP guidelines ESP/wet scrubber not provided.

Water Cess Assessment Done : Submitted regularly Paid Upto : Paid regularly.

BG Details Amount : Rs. 5.00/- Lakhs.

Amount : Rs. 2.00/- Lakhs.

Amount : Rs. 4.00/- Lakhs

Validity : Not submitted.

Validity : Not submitted.

Validity : Not submitted.

BG Obtained against : O & M of ETP and pollution control devices.

BG Obtained against : Necessary arrangement to to cover effluent collection

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    55 

 

system.

BG Obtained against : Compliance of CREP norms.

Details of BG forfeited/encashed , if any :--

Submission of Environmental Statement

Period

Submitted.

Other Relevant Information

As per CREP guidelines ESP/wet scrubber not provided to boiler.

Industry has provided 60 acres land for disposal of treated effluent, which is adequate

As per consent granted dtd. 17.10.2012, industry has not submitted B.G. of Rs. 11.00/- lakhs.

Recommendation of SRO/RO

Decision regarding grant of consent may be taken at HQ level.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    56 

 

Agenda no. 29 Region : RO PUNE Section :RO(HQ) Date :

Name & Address M/s. Shrinivas Pride Purple Properties Pvt. Ltd,  

“Park Xpress” Sr. No. 5,18,19 Balewadi Pune. 

Consent For C to R

Capital Investment 98.95 Cr.

Previous Consent Validity

28/02/2014

Industry Type O08 Building and construction projects more than 20,000 Sq mtr

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-Water Consumption: 417.0 CMD, Effluent generated 345.0 CMD. Provided

STP of Capacity : 450.0 CMD

BG Details Amount : Validity :

BG Obtained against :

Submission of Environmental Statement

Period

1. PP has applied for plain renewal of part project. 

2. Applicant has obtained consent to operate (phase‐I) having total plot area 57920.0 

m2  and  BUA    25810.32  m2  out  of  1,41,357.87  first  phase  consent  valid  upto 

28/02/2014. 

3. PP has obtained environment clearance  from SEIAA having  total plot area 57920.25 

m2 BUA 141357.87 sq.mtrs on 17th November 2009. 

4. Capital investment of the project is 98.95 Cr.  

5. Total water consuming 417 m3/day & generating about 345.0 m3/day of sewage, PP 

has provided Sewage treatment plant of capacity 450.0 CMD. 

6. PP  has  provided  organic  waste  convertor  for  bio‐degradable  waste,  Non‐

biodegradable waste send to authorized vender.   

7. 1 no. of DG sets having capacity, 100KVA.  

8. Applicant has submitted BG of Rs.5.0 Lakh as per C to O (part) which is valid for period 

28/09/2017. 

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    57 

 

9. In view of above we may consider plain renewal as total BUA 25810.32 sq.mtrs with 

part operate affidavit and BG for compliance of consent condition. 

Recommendation of SRO/RO

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    58 

 

Agenda no. 30 Region : SRO Mumbai II. Section :RO(HQ) Date :

Name & Address M/s.Larsen & Toubro Ltd.(Tower A &B) ,

Tower A B ,TC-II,CTS no.117 A,117A/1,Village Tungwa,Sakivihar Road,Powai,Mumbai-400072

Consent For C to R

Capital Investment Rs.317 Cr.

Previous Consent Validity

30/11/2013

Industry Type IT & ITES Activity

Industry Category Orange

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details :-Water consumption - 265 CMD.

Sewage Generation -216 CMD

As per SRO report, PP provided STP.

Water Cess Assessment Done : Paid Upto :

BG Details Amount : Rs.10 Lakh Validity :31.12.2014

BG Obtained against : Operation and maintenance of pollution control system

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

Other Relevant Information

Application for grant of renewal of Consent with incorporation of Tower B for

Total Plot area -1,19,022 Sq. mtrs

Total Construction BUA -84,068 Sq. mtrs

PP has obtained EC from GOM Dated 7/11/2008 for construction of 10 storied IT

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    59 

 

building for

Total built up area admeasuring is 84,068 Sq. mtrs and

Total Plot area is not mentioned in EC

and having C.I. 190 Cr for

PP has obtained C to E Dated 23/12/2008

Total Plot area -1,19,022 Sq. mtrs

Total Construction BUA -84,068 Sq. mtrs for C.I.190 Cr.

PP has obtained C to 1st Operate dated 7/4/2012 for period upto 30/11/2013 & having C.I.Rs.202.76 Cr for tower A.

Total Plot area -1,19,022 Sq. mtrs

Total Construction BUA - 84,068Sq. mtrs

Nonhazardous waste

Wet garbage: 300 Kg/Day

As per EC , Organic waste will be handed over to Municipal waste collection system)

As per EC Dry garbage:465 Kg/Day(will be handed over to authorized party)

STP Sludge:15 Kg/Day (used as manure)

Hazardous Waste:

Electrical & Electronic Waste:1500 Nos/A

Used/spent oil-1200 Kg/D

Lead acid batteries scrap:150 Nos/A

Sale to authorized recycler.

Construction status:

The site visited by SRO on 27.02.2013 and reported that said IT Park comprises one composite building ie.TC-II having two wings as Tower A & B with double basement

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    60 

 

+Ground + 10th floor. Obtained full occupation certificate for Tower B vides letter dated 25.06.2013 from local body and it was occupied and in operational for IT activity.

SRO reported that,

1.The PP has applied for amendment in consent to operate for incorporation of tower B clarifying that, Total plot area as well as built up area in relation to “Tower B” was already included in the existing consent.

PP in his letter addressed SRO Mumbai-II, it is mentioned that during application of 1st C to O,PP has not applied for tower b as its construction was incomplete now the construction of tower B is completed , and PP apply herewith renewal with amendment in C to O with incorporation of tower B and other consent Conditions will remain same.

Recommendation of SRO/RO

RO recommended, As per the consent condition no 2 (iv) the PP has to provide composting to treat Wet Garbage and STP sludge but failed to comply , therefore, the BG obtained may be forfeited. Obtaining fresh appropriate bank guarantee renewal of consent by incorporating tower B may be considered

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    61 

 

Agenda no. 31 Region : Nagpur Section :AST Date :

Name & Address Royal Energy Ltd,Vill- Vanivali, Tq- Khalapur, Dist- Raigad

Consent For Renewal of consent.

Capital Investment 35.71 Cr.

Previous Consent Validity

31/03/2014.

Industry Type Pyrolyis process

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details:-Nil effluent

Compliance Of Air Pollution Related Conditions

Details :-Scrubber & Dust collector provided

Water Cess Assessment Done : Paid Upto: March-2013.

BG Details Amount : Validity :

BG Obtained against :

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

2012-13

Other Relevant Information

Industry has applied for renewal of consent with reduction in C.I from 41.9 Cr to 35.71 Cr. In this regards industry has submitted the CA certificate with investment as on 31/03/2010 & 31/03/2013 showing the difference of 6.22 Cr and with justification on reduction in cost. The industrial effluent generation from process is Nil.

Recommendation of SRO

Industry operation is intermittently.

Renewal may be considered.

.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    62 

 

Agenda no. 32 Region : Nagpur Section :AST Date :

Name & Address Cytec Specialty Chemicals & Material P Ltd, Plot No-G-54 MIDC Butibori,

Dist-Nagpur.

Consent For Amendment in consent with change in product mix.

Capital Investment 33.37 Cr

Previous Consent Validity

31/05/2016

Industry Type Ro5 Basic chemicals and electro chemicals and its derivatives

Industry Category Red

YES ( ) NO ( ) Compliance Of Water Pollution Related Conditions Details:-Unit has provided primary treatment facility for treatment of trade

effluent. Treated effluent send to CETP, Butibori for further treatment and disposal.

Compliance Of Air Pollution Related Conditions

Details :-Dust collector, centrifugal blower provided

Water Cess Assessment Done :Sept-13 Paid Upto :

BG Details Amount : 5.0 Validity :31/05/2016

BG Obtained against : consent condition for O &M.

Details of BG forfeited/encashed , if any :

Submission of Environmental Statement

Period

2012-13

Other Relevant Information

Industry has applied for Amendment in the existing consent with change in product mix. Industry has submitted the details of material balance and water balance for change in product mix.

Recommendation of SRO

The application is recommended & submitted for placing before CC.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    63 

 

Agenda no. 33 CC/CAC Item –

Region : Pune │Section : JD(APC) Date

Name & Address

M/s. Godrej & Boyce Mfg. Co. Ltd..

Gat No. 1267, SHirwal, Palashi Road,

Tal:- Khandala, Dist:- Satara 412 801 

Consent for Renewal of consent to operate with amalgamation of both CTO

Capital Investment 53.77 Crs

Consent Valid upto C to O (Existing) – 31/12/2013.

C to O (Expansion) – 28/02/2014.

Industry Type Furniture

Industry Category RED

YES (√) NO ( ) Compliance of Water Pollution Related Conditions

Industrial effluent after primary treatment is further treated with domestic effluent (25 CMD +15 CMD) in secondary & tertiary facilities. for treated effluent disposal by gardening.

YES (√ ) NO ( )

Compliance of Air Pollution Related Conditions

Industry has provided stacks of adequate height to Hot water generator, PCO & WDO and two nos of D.G. Sets (750 KVA each)

Water Cess Assessment Done: Dec 2013 Paid upto: July 2013

BG Details Amount: 5.0 Lakh Validity -22/02/2015

BG obtained against: O & M of pollution Control System

Details of BG forfeited/ enchased, if any:

Submission of Environmental Statement

Period Sep 2013

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    64 

 

Other Relevant Information

Recommendation of SRO/RO

Recommended for renewal of consent with amalgamation.

Recommendation of HQ (including consent fees details/ delay payment charges)

We may grant renewal of consent upto 31/12/2018 with amalgamation of both CTO.With operational B.G. of Rs.5/- lakh.

Rs.5,00,000/-,75,000/-

Consent Recommended upto

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    65 

 

Agenda no. 34

CC/CAC Item –

Region : Pune │Section : JD(APC) Date

Name & Address

M/s. Godrej & Boyce Mfg. Co. Ltd.

Gat No. 431, Shindewadi, Shirwal,

Tal-Khandala, Dist: - Satara.

Consent for Renewal of consent to operate

Capital Investment 73.24 Crs

Consent Valid upto 31/12/2013.

Industry Type Engineering

Industry Category RED

YES (√) NO ( ) Compliance of Water Pollution Related Conditions ETP & STP provided

YES (√ ) NO ( ) Compliance of Air Pollution Related Conditions Industry has provided scrubber to annealing furnace, painting booth.

Water Cess Assessment Done: -- Paid upto: Narch-2013

BG Details Amount: Nil Validity -Nil

BG obtained against: Nil

Details of BG forfeited/ enchased, if any:

Submission of Environmental Statement

Period Sep 2013

Other Relevant Information

• Capital investment is Rs 73.24 Cr. (Existing Rs. 67.26 Cr + Increased C.I Rs. 5.98 Cr.).

• Industry has submitted justification for increased C.I. & reported that increased C.I. is due renovation of building & plant machinery. Production

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    66 

 

capacity & other details remain as per previous consent (Copy enclosed).

Industry location is about 1.6 Km from Nira River (A-II) & attracts RRZ distance criteria.

Recommendation of SRO/RO

Decision of grant of consent may be taken at H.Q. Level.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    67 

 

Agenda no. 35

CC Item –

Region : Nagpur │Section : JD(APC) Date: /04/2014

Name & Address M/s ACB (India) Limited,Plot No.11 & 18, Village-Pandharpauni, Tal-Rajura, Dist-Chandrapur

Consent for Applied for renewal of consent.

Capital Investment C.I. is Rs.34.98 Crores

Consent Valid upto 31.03.2014

Industry Type Coal Washery

Industry Category RED/LSI

YES ( ) Compliance of Water Pollution Related Conditions

Domestic Effluent is 3.0 CMD. Septic Tank provided.

Industrial Effluent is – 32.0 CMD. Primary treatment provided.

YES ( )

Compliance of Air Pollution Related Conditions

1) Fixed Water Sprinkler provided to Coal feeding bunker &Transfer point.

2) Scrubber provided to crusher and screen.

Water Cess Assessment Done: 31.03.2013 Paid up to: 31.03.2012

BG Details

Amount: 1) Rs.5/- Lakhs

2) Rs.1/- Lakhs

3) Rs.1/- Lakhs

Validity: 1) 1.9.2014

2) 1.9.2014.

3) 1.9.2014

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    68 

 

BG obtained against: --- 1) washery direction dated 27.10.2010.

2) As per Conditions of consent dated 31.07.2009.

Details of BG forfeited/ enchased, if any: ---

Submission of Environmental Statement

Period: 2012-13

Other Relevant Information

SRO vide email dated 11.4.2014 reported that industry has not submitted the Bank Guarantee of Rs.5.0/- Lakhs and Rs.2.0/- Lakhs as per the earlier conditions of consent dated 21.11.2013.

Recommendation of SRO/RO

Renewal of Consent to Operate is recommended for the period up to 31.03.2017.

 

Web agenda of 3rd CC meeting of 2014‐15 dtd. 08.05.2014    69 

 

Agenda no. 36

Region : Pune Section : JD(APC) Date: 23/04/2014.

Name & Address M/s. Trinity India Ltd. (Shikrapur Plant II), Gat No. 1425/3/2, Tal. Shirur, Pune

Consent For Renewal

Capital Investment Rs.29.81 Crs

Previous Consent Validity 31/12/2013

Industry Type R72 Steel and Steel products using various furnace like blast

Industry Category Red

YES ( √ ) Compliance Of Water Pollution Related Conditions Details: - D.E.: – 14.00 CMD, STP provided.

I.E. 01.00 CMD,ETP provided

Compliance Of Air Pollution Related Conditions

YES (√) Dust collector to shot blasting section and heat treatment section provided.

Water Cess Assessment Done :--------- Paid Upto :31.10.2011

BG Details Amount : --------- Validity :---------

BG Obtained against :----------

Details of BG forfeited/encashed , if any : -----------

Submission of Environmental Statement

Period 2012-2013

Other Relevant Information 1. Applied for renewal of consent. 2. Earlier consent obtained vide no. MPCB/JD (APC)/EIC No. PN-

9526-11/O/-769 dated 22/01/2013 valid till 31/12/2013. 3. C.I was increased Rs.6.0 crs due to plant and machineries.

Recommendation of SRO/RO

RO Pune has commented that CI is increased without change in production and TPM results exceeding the consented quantity. Recommended for decision at H.Q.level.