srldc welcomes

28
SRLDC WELCOMES SHRI R.R.P.N. SAHI CVO POWERGRID

Upload: tal

Post on 05-Jan-2016

65 views

Category:

Documents


5 download

DESCRIPTION

SRLDC WELCOMES. SHRI R.R.P.N. SAHI CVO POWERGRID. THE SOUTHERN REGION IN BRIEF. INSTALLED CAPACITY OF SOUTHERN REGION. IN MW. NUCLEAR. IPP. WIND. HYDRO. GAS. THERMAL. 31,316 MW. MICRO AND CAPTIVE CAPACITIES ARE NOT INCLUDED IN THE INSTALLED CAPACITY. SOUTHERN REGION:QUICK FACTS. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: SRLDC WELCOMES

SRLDC WELCOMES SHRI R.R.P.N. SAHI

CVO POWERGRID

Page 2: SRLDC WELCOMES

THE SOUTHERN THE SOUTHERN REGION IN BRIEFREGION IN BRIEF

Page 3: SRLDC WELCOMES

14886 (46%)

10579 (33%)830 (3%)

3975 (12%)

828 (2.6%)

1018 (3%)

HYDRO THERMAL GAS WIND IPP NUCLEAR

INSTALLED CAPACITY OF SOUTHERN REGION IN MW

31,316 MW

HYDRO

THERMAL

WIND

IPPNUCLEAR

GAS

MICRO AND CAPTIVE CAPACITIES ARE NOT INCLUDED IN THE INSTALLED CAPACITY

Page 4: SRLDC WELCOMES

SOUTHERN REGION:QUICK FACTSSOUTHERN REGION:QUICK FACTSINSTALLED CAPACITY:31,316 MW MAX

DEMAND MET:21,928 MW MAX CONSUMPTION: 457 MUKARNATAKA

MAX DEMAND MET

5445 MWINSTALLED CAPACITY

5802 MWDAILY CONSUMPTION AVG

84 MU

ANDHRAPRADESH

MAX DEMAND MET

7441 MW

9515 MWINSTALLED CAPACITY

DAILY CONSUMPTION AVG

130 MU

TAMILNADUMAX DEMAND MET

7228 MW

7037 MW

INSTALLED CAPACITY

DAILY CONSUMPTION AVG

126 MU

KERALAMAX DEMAND MET

2426 MW

2610 MWINSTALLED CAPACITY

DAILY CONSUMPTION AVG

34 MU

DAILY CONSUMPTION MAX

107 MU

DAILY CONSUMPTION MAX

166 MU

DAILY CONSUMPTION MAX

39 MUDAILY CONSUMPTION MAX

147 MU

Page 5: SRLDC WELCOMES

GENERATING UNITS AND CAPACITYGENERATING UNITS AND CAPACITY

UNIT CAPACITY AP KAR KER TN CGS TOTAL

THERMAL(500 MW) 2 6 8

THERMAL (200-250 MW)

10 7 13 15 45

GAS/THER(100-150 MW)

9 2 3 10 24

HYDRO(>50 MW) 27 27 16 15 85

TOTAL 48 36 19 38 162

Page 6: SRLDC WELCOMES

KHAMMAM

VIJAYAWADANAGARJUNASAGAR

VISAKHAPATNAM

(POWERGRID)HYDERABAD

RAICHUR

GOOTY

HOODY

SALEM

UDUMALPET

TRICHUR

MADURAI

TRICHY

MADRAS

NEYVELI

CUDDAPAHDAVANAGERE

KAIGA

115

317

RSTPP

BHADRAVATI

130x216

4x2

182

151

181

173

302

308172

277

279

155

178x

2

PONDICHERY

BANGALORE

SIRSI

MUNIRABAD

PP

P

P

P

P

P

P

P

P

P

PP

P

P

N

KOLAR

PALLOM

KAYANKULAM EDAMON

TALCHER

JEYPORE

63

187

2x78

2x221

54

HOSUR

KADRA

KODASAALY

Nagjhari

1

120

60

MAPS

P

SSLMM

MMDP

THIRUVANATHAPURAM

ALMATHI

NELLORE

400 KV LINE PRESENTLY

OPERATED AT 220 KV

NELAMANGALA

KURNOOL

GAZUWAKA(AP)

SIMHADRI NTPC

HIRIYUR

189

195

267x

2

258

242

175

179

127

130x

2

221x2

146x252x2

197x2

301x2

8x4

15x2

300

28

330

ABOUT 12000 CKM

400KV TRANSMISSION

TALGUPPA

3500 MW TRANSFER CAPABILITY ON HVDC.ANOTHER 500 MW POLE TO BE ADDED AT GZK. TALCHER POLE CAPABILITY TO BE ENHANCED TO 2500 MW

GRID MAPGRID MAP

TYPICAL FLOWS ARE FROM NORTH TO SOUTH

GRID FOCAL POINT SHIFTED TO KOLAR AFTER COMMISSIONING OF HVDC

QUANTUM CHANGES IN FLOW PATTERN LIKELY AFTER COMMISSIONING OF KOODANKULAM 2000 MW

Page 7: SRLDC WELCOMES

TRANSMISSION IN SOUTHERN INDIATRANSMISSION IN SOUTHERN INDIAVOLTAGE

LEVEL AP KAR KER TN CGS TOTAL

400 KV 2042 1614     8462 12118

220/230 KV 10050 7590 2650 6270 366 26926

132/110 KV 12360 6060 3720 10220   32360

TOTAL 23710 15110 6370 16490 6899 71404

ABOUT 2800 CKM OF 400 KV LINES ADDED IN THE PAST 2 YEARS

Page 8: SRLDC WELCOMES

LINK TO FOLDER

3D DEMAND, LOAD CURVES

HOURLY AVERAGE DEMAND

AND FREQUENCY DATA

Page 9: SRLDC WELCOMES

ABT @ WORKABT @ WORK

Page 10: SRLDC WELCOMES

AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF

A RATIONAL TARIFF A RATIONAL TARIFF STRUCTURESTRUCTURE

SCIENTIFIC SETTLEMENT SCIENTIFIC SETTLEMENT SYSTEMSYSTEM

……....COMPLEMENTS COMPLEMENTS GRID GRID SECURITY……RATHER THAN SECURITY……RATHER THAN

COMPROMISINGCOMPROMISING IT !!! IT !!!

Page 11: SRLDC WELCOMES

GRID OPERATION IN THE PAST GRID OPERATION IN THE PAST LOW FREQUENCY PROBLEMSLOW FREQUENCY PROBLEMS

– FREQUENCY REMAINED AT 48 HZ AND BELOW FOR FREQUENCY REMAINED AT 48 HZ AND BELOW FOR MOST PARTMOST PART

LOW VOLTAGE OPERATIONLOW VOLTAGE OPERATION– VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300 VOLTAGE AT BANGALORE DIPPED TO AS LOW AS 300

Kv!!!!Kv!!!! FREQUENT GRID DISTURBANCESFREQUENT GRID DISTURBANCES

– A DISTURBANCE ALMOST EVERY MONTHA DISTURBANCE ALMOST EVERY MONTH– IMMENSE FINANCIAL LOSSES FOR INDUSTRYIMMENSE FINANCIAL LOSSES FOR INDUSTRY– LOADS FREQUENTLY CUT OFF DUE TO RELAY LOADS FREQUENTLY CUT OFF DUE TO RELAY

OPERATIONOPERATION INCREASED ELECTRICAL LOSSESINCREASED ELECTRICAL LOSSES

– INEFFICIENT OPERATION OF ELECTRIC EQUIPMENTSINEFFICIENT OPERATION OF ELECTRIC EQUIPMENTS GRID OPERATION FOCUSSED ON FIRE-FIGHTING GRID OPERATION FOCUSSED ON FIRE-FIGHTING

RATHER THAN OPTIMISATION AND ECONOMYRATHER THAN OPTIMISATION AND ECONOMY

Page 12: SRLDC WELCOMES

LANDMARK EVENTSLANDMARK EVENTS

ADDITION OF GENERATING CAPACITYADDITION OF GENERATING CAPACITY TALCHER-KOLAR AND ASSOCIATED TALCHER-KOLAR AND ASSOCIATED

SYSTEMSYSTEM UNIFIED LOAD DESPATCH SCHEMEUNIFIED LOAD DESPATCH SCHEME TRANSMISSION SYSTEM AUGMENTATIONTRANSMISSION SYSTEM AUGMENTATION AVAILABILITY BASED TARIFFAVAILABILITY BASED TARIFF

Page 13: SRLDC WELCOMES

IMPROVEMENTS IN GRID IMPROVEMENTS IN GRID OPERATIONOPERATION

POWER SYSTEM PARAMETERSPOWER SYSTEM PARAMETERS– FREQUENCY IMPROVEDFREQUENCY IMPROVED– VOLTAGES STABLE ACROSS THE GRIDVOLTAGES STABLE ACROSS THE GRID

OPTIMAL OPERATIONOPTIMAL OPERATION– LOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRIDLOSSES REDUCED BY 1-1.5 % THROUGHOUT THE GRID– SAVINGS OF ABOUT Rs 450 CRORES EVERY YEARSAVINGS OF ABOUT Rs 450 CRORES EVERY YEAR!!– MERIT ORDER OPERATION :- OPTIMISATIONMERIT ORDER OPERATION :- OPTIMISATION

HYDRO CONSERVATIONHYDRO CONSERVATION– HEALTHY RESERVOIR LEVELS HEALTHY RESERVOIR LEVELS – USE HYDRO GENERATION FOR PEAKING AND RESERVEUSE HYDRO GENERATION FOR PEAKING AND RESERVE– PUMP MODE OPERATION AT KADAMPARAIPUMP MODE OPERATION AT KADAMPARAI

TALCHER – KOLAR LINK TALCHER – KOLAR LINK – INTER REGIONAL POWER :- INTER REGIONAL POWER :- 9770MUs/1600MW MAX9770MUs/1600MW MAX

UTILISATION OF COMMERCIAL MECHANISMUTILISATION OF COMMERCIAL MECHANISM– TURNOVER OF 4800 MU ON UI WORTH MORE THAN 900 CRORESTURNOVER OF 4800 MU ON UI WORTH MORE THAN 900 CRORES

– COSTLY GENERATION REDUCED.COSTLY GENERATION REDUCED.

Page 14: SRLDC WELCOMES

47.50

48.00

48.50

49.00

49.50

50.00

50.50

51.00

25 26 27 28 29 30 31

DAYS ----->

FR

EQ

UE

NC

Y IN

HZ

---

->FREQUENCY PROFILEFREQUENCY PROFILE

2002, 2003 & 2004

Page 15: SRLDC WELCOMES

320

330

340

350

360

370

380

390

400

410

42000

:05

01:0

5

02:0

5

03:0

5

04:0

5

05:0

5

06:0

5

07:0

5

08:0

5

09:0

5

10:0

5

11:0

5

12:0

5

13:0

5

14:0

5

15:0

5

16:0

5

17:0

5

18:0

5

19:0

5

20:0

5

21:0

5

22:0

5

23:0

5

TIME IN HRS --->

VO

LT

AG

E IN

KV

---

>

REALITY BITE:

FARMERS IN KARNATAKA ARE HAPPY WITH FEWER HOURS OF QUALITY POWER!!.

EFFICIENCY OF PUMPS AT TG HALLI WATER WORKS IMPROVED!

COMPARISION OF BANGALORE VOLTAGE-TYPICAL DAY

BETTER VOLTAGE PROFILE MEANS LESS ELECTRICAL LOSSES

Page 16: SRLDC WELCOMES

WATER SUPPLY TO BANGALOREWATER SUPPLY TO BANGALORE

LOW VOLTAGE PROBLEMS AROUND BANGALORE HAMPERED WATER SUPPLY EARLIER

WITH BETTER VOLTAGE NOW, PUMPING EFFICIENCY HAS IMPROVED

400 KV STATION AT MYSORE BEING COMMISSIONED ON WAR FOOTING TO FURTHER FORTIFY THIS PART OF THE GRID

PUMPING LOSSES REDUCED

ENORMOUS SAVINGS TO THE STATE

MOTOR BURNING AND MAINTENANCE COSTS ALSO CAME DOWN DRASTICALLY

Page 17: SRLDC WELCOMES

600

300

150

Page 18: SRLDC WELCOMES

12000

13000

14000

15000

16000

17000

18000

19000

00:0

1

01:0

1

02:0

1

03:0

1

04:0

1

05:0

1

06:0

1

07:0

1

08:0

1

09:0

1

10:0

1

11:0

1

12:0

1

13:0

1

14:0

1

15:0

1

16:0

1

17:0

1

18:0

1

19:0

1

20:0

1

21:0

1

22:0

1

23:0

1

TIME --->

DE

MA

ND

IN M

W -

-->

49.00

49.20

49.40

49.60

49.80

50.00

50.20

50.40

FR

EQ

UE

NC

Y IN

HZ

---

>

DEMAND Vs FREQUENCY FOR 30-JULY-04DEMAND Vs FREQUENCY FOR 30-JULY-04

FREQ

DEMAND

Page 19: SRLDC WELCOMES

SR DEMAND Vs FREQUENCY FOR JULY-04

6000

8500

11000

13500

16000

18500

2100001

-Jul

-04

02-J

ul-0

4

03-J

ul-0

4

04-J

ul-0

4

05-J

ul-0

4

06-J

ul-0

4

07-J

ul-0

4

08-J

ul-0

4

09-J

ul-0

4

10-J

ul-0

4

11-J

ul-0

4

12-J

ul-0

4

13-J

ul-0

4

14-J

ul-0

4

15-J

ul-0

4

16-J

ul-0

4

17-J

ul-0

4

18-J

ul-0

4

19-J

ul-0

4

20-J

ul-0

4

21-J

ul-0

4

22-J

ul-0

4

23-J

ul-0

4

24-J

ul-0

4

25-J

ul-0

4

26-J

ul-0

4

27-J

ul-0

4

28-J

ul-0

4

29-J

ul-0

4

30-J

ul-0

4

31-J

ul-0

4

DAYS ---->

DE

MA

ND

IN M

W -

--->

49.20

49.60

50.00

50.40

50.80

51.20

51.60

FRE

QU

EN

CY

IN H

Z --

-->

SR DEMAND FREQUENCY

Page 20: SRLDC WELCOMES

SR DEMAND Vs FREQUENCY FOR OCT-03

1000

3000

5000

7000

9000

11000

13000

15000

17000

19000

2100001

-Oct

-03

02-O

ct-0

3

03-O

ct-0

3

04-O

ct-0

3

05-O

ct-0

3

06-O

ct-0

3

07-O

ct-0

3

08-O

ct-0

3

09-O

ct-0

3

10-O

ct-0

3

11-O

ct-0

3

12-O

ct-0

3

13-O

ct-0

3

14-O

ct-0

3

15-O

ct-0

3

16-O

ct-0

3

17-O

ct-0

3

18-O

ct-0

3

19-O

ct-0

3

20-O

ct-0

3

21-O

ct-0

3

22-O

ct-0

3

23-O

ct-0

3

24-O

ct-0

3

25-O

ct-0

3

26-O

ct-0

3

27-O

ct-0

3

28-O

ct-0

3

29-O

ct-0

3

30-O

ct-0

3

31-O

ct-0

3

DAYS ---->

DE

MA

ND

IN M

W -

--->

48.50

48.90

49.30

49.70

50.10

50.50

50.90

51.30

51.70

52.10

52.50

FRE

QU

EN

CY

IN H

Z --

-->

SR DEMAND FREQUENCY

Page 21: SRLDC WELCOMES

MERIT ORDER : UNITS BOXED UPMERIT ORDER : UNITS BOXED UP

POWER STATION STATE CAPACITY(MW) FUELVARIABLE

COST

TATA DIESELKARNATAK

A 79 DIESEL 308

RAYALSEEMA DGPP

KARNATAKA 27 DIESEL 360

YELEHANKA DIESEL

KARNATAKA 128 DIESEL 314

THANRBHAVIKARNATAK

A 220 NAPTHA 325

SUB-TOTAL 454    

BRAHAMPURAM DPP KERALA 107 DIESEL 275

BSES KERALA 157 NAPTHA 308

KASARGODE PCL KERALA 22 NAPTHA 298

KAYAMKULAM KERALA 360 NAPTHA 322

SUB-TOTAL 646    

BASIN BRIDGETAMIL NADU 120 NAPTHA 584

P.P.NALLURTAMIL NADU 330 NAPTHA 415

SUB-TOTAL 450    

TOTAL 1550    

Page 22: SRLDC WELCOMES

OPTIMAL RESERVOIR UTILISATIONOPTIMAL RESERVOIR UTILISATIONLINGANAMAKKI IN KARNATAKALINGANAMAKKI IN KARNATAKA

ENERGY STORAGE IN MU (THIS YEAR) :- 3524MILLION UNITS

ENERGY STORAGE IN MU (LAST YEAR) :- 2356 MILLION UNITS

MORE THAN 400 MILLION UNITS OF ENERGY SAVED DUE TO IMPROVED OPERATIONAL EFFICIENCY AND OPTIMISATION

THIS IS WORTH Rs 80 CRORES

Page 23: SRLDC WELCOMES

-250-200-150-100-50

050

100150200

00:0

001

:00

02:0

003

:00

04:0

005

:00

06:0

007

:00

08:0

009

:00

10:0

011

:00

12:0

013

:00

14:0

015

:00

16:0

017

:00

18:0

019

:00

20:0

021

:00

22:0

023

:00

00:0

0

TIME ---->

IN M

W --

-->

49.00

49.50

50.00

50.50

FREQ

UENC

Y IN

HZ

---->

PUMP MODE

GEN MODE

KADAMPARAI UNITS OPERATION ON A TYPICAL DAY

Page 24: SRLDC WELCOMES

UI DETAILSUI DETAILS

Page 25: SRLDC WELCOMES

APAP KARKAR KERKER TNTN PONDPONDYY

Total UI Total UI exported(-) / exported(-) / Imported(+) Imported(+)

in MUsin MUs

-2703-2703 22792279 998998 815815 -38-38

Total amount Total amount paid in paid in

Crores Rs.Crores Rs.-515-515 397397 172172 198198 -5-5

Average rate Average rate of UI in of UI in

paise/unitpaise/unit190190 174174 173173 243243 118118

SUMMARY OF UI – 84 WKSSUMMARY OF UI – 84 WKS(FROM 01/JAN/03 TO 08/AUG/04)(FROM 01/JAN/03 TO 08/AUG/04)

Page 26: SRLDC WELCOMES

INTER REGIONAL UI IN SRINTER REGIONAL UI IN SR (FROM 01/01/03 TO 08/08/04) (FROM 01/01/03 TO 08/08/04)

TOTAL UI TURNOVER :- 4831 MUTOTAL UI TURNOVER :- 4831 MU TOTAL UI AMOUNT DISBURSED:- 917 CRTOTAL UI AMOUNT DISBURSED:- 917 CR INTER REGIONAL UI:- +942 MU (-)191 MUINTER REGIONAL UI:- +942 MU (-)191 MU AVG WEEKLY TRANSACTION:- 57 MUAVG WEEKLY TRANSACTION:- 57 MU AVG WEEKLY UI AMT DISBURSED:- 11 CRAVG WEEKLY UI AMT DISBURSED:- 11 CR AVG RATE OF UI WITH WR IN PS/UAVG RATE OF UI WITH WR IN PS/U

– 155 PS/U155 PS/U @SR @SR– 255 PS/U255 PS/U @WR @WR

AVG RATE OF UI IMPORT FROM ER IN PS/UAVG RATE OF UI IMPORT FROM ER IN PS/U– 144 PS/U 144 PS/U @ ER @ ER

Page 27: SRLDC WELCOMES

INTER-REGIONAL EXCHANGES A/C DETAILS UPTO INTER-REGIONAL EXCHANGES A/C DETAILS UPTO 84 WKS (TILL 08/08/04)84 WKS (TILL 08/08/04)

1. SR IMPORTED 295 MU AND EXPORTED 181 MU TO WR.

2. AMOUNT ACCRUED IN SREB – IRE DUE TO DIFF. IN WR A/C = 36.5Crs

3. AMOUNT ACCRUED IN WREB – IRE DUE TO DIFF. IN SR A/C = 23.25Crs

4. AMOUNT DUE TO SR CONSTITUENTS ON 50:50 BASIS = 29.83Crs

5. 100 % DISBURSEMENT

Page 28: SRLDC WELCOMES