TRANSCRIPT
SS CMMS TrainingDave Knight
10 September 2015
What We Will Cover
• Program Familiarization• How to Create a Work Order• How to Sign-off a Work Order• Updating Hours on Forklifts
Program FamiliarizationTabs and Functions
Familiarization
• SS CMMS (Computerized Maintenance Management System)• Manage the day-to-day maintenance at GLFP.• Account for the hours spent on maintenance actions on machinery.
• Cost (coming soon).• Paper trail of all maintenance actions.• Increase safe operation of equipment.• Keep track of Preventative Maintenance Actions.• Reduce Down Time.• Increase Productivity.
Website
https://ss-cmms.com/
Login
Login
Work Order Tab
PM Tab
Equipment Tab
Locations Tab
Parts Tab
Reports Tab
How to Create a Work Order
Step 1: Work Order Tab – Create New
Step 2: Fill in Discrepancy
Step 3: Fill Equipment by Location
Step 4: Equipment
Step 5: Priority
Step 5: Priority (Cont.)
• 1 – Urgent:• Hard-Down Equipment (INOP).• Failure of safety devices.• Unsafe operation.• Fixed immediately.
• 2 – Priority:• Partial loss of functionality not affecting safe operation.• Slight adverse affects on quality of products.• Fixed during next scheduled down time.
• 3 – Normal:• Issues not affecting day-to-day operations.• Fixed during next hard-down.
• 4 – Low:• Issues to be repaired when no other priorities exist.
• 5 – None:• Shall never be used.• All maintenance actions must have a priority code to be passed to maintenance personnel.
Step 6: Type
Step 6: Type (Cont.)
• Corrective• To correct a discrepancy.
• Repeat• “Fixed” and signed off by maintenance only to materialize again
shortly.• Project
• Special projects not pertaining to corrective actions on machinery.• Cleaning
• Cleaning machinery or facilities.• PM
• Conducting Preventative Maintenance.
Step 7: Notes
Step 7: Notes (Cont.)
• Be descriptive of additional details.• Location of discrepant part on machine.• History of issue.• Desired end-state.• Ordering info for part (when necessary).
• NEVER USE COMMAS.
Step 8: Create Work Order
How to Sign-off a Work Order
Step 1: Work Order Tab
Step 2: Find Work Order
Step 3: Select Complete (Cmp)
• Actions Heading:• CMP = Complete.• QCMP = DO NOT EVER USE.• CNX = Cancel (only use if Maintenance is no longer required).
Step 3: Select Complete (Cmp) (Cont.)
Step 4: Action
Step 4: Action (Cont.)
• Be descriptive of additional details.• What was done to repair the issue.• Issues experienced in the process of repair.• Who was on the job.• Serno of replacement part (when applicable).
• NEVER USE COMMAS.
Step 5: Hours
Step 5: Hours (Cont.)
• Man Hours• 1hr x 2people = 2 Man Hours.• 2hr x 3people = 6 Man Hours.• 3hr x 4people = 12 Man Hours.
MAN HOURS
Step 6: Parts (When Applicable)
Step 7: Total Cost
Step 8: Complete Work Order
How to Update Forklift Hours
Step 1: Equipment Tab
Step 2: Type Forklift in Search Bar
Step 4: Update Hours
Step 5: Save Changes
Questions?