Page 1: SSPC Standards Update Presentation

SSPC Standards Update NSRP SP-3 Panel

William L. Shoup SSPC Executive Director

NSRP 2012

February 2012 Orlando, Florida

Page 2: SSPC Standards Update Presentation

Learning Objectives Update on standards of interest to the Navy community •Revisions in Progress

> SSPC-WJ 1, 2, 3, 4 Waterjetting Standards > SSPC-PA 2 DFT measurement > SSPC-SP 11, Power Tool Cleaning Bare Metal > SSPC-SP 15, Commercial Grade Power Tool Cleaning > SSPC-Guide 15, Field Methods for Retrieval and Analysis

of Soluble Salts on Steel and Other Nonporous Substrates > SSPC-QP 1, Evaluating Qualifications of Industrial/Marine Painting

Contractors (Field Application) > SSPC-AB 1, Mineral and Slag Abrasives > SSPC-AB 2, Cleanliness of Recycled Ferrous Metallic Abrasive Work Mix

•New Standards in Development > Wet Abrasive Blast Cleaning Standards > Determining Compliance to Steel Profile Range > Selecting Coatings for Galvanized Steel Substrates

Page 3: SSPC Standards Update Presentation

SSPC-SP 12/NACE No. 5 Surface Preparation by Waterjetting

(revision) • Current SP 12/NACE No. 5 will be broken

into separate standards based on level of cleanliness > SSPC/NACE WJ 1 – Clean to Bare Substrate > SSPC/NACE WJ 2 – Very Thorough Cleaning –

most commonly referenced in Navy specifications

> SSPC/NACE WJ 3 – Thorough Cleaning > SSPC/NACE WJ 4 -- Light Cleaning

Page 4: SSPC Standards Update Presentation
Page 5: SSPC Standards Update Presentation

Revised Waterjetting Standards • Definitions of cleanliness unchanged • Description of flash rust levels unchanged • Added non-mandatory appendices for

assessing levels of flash rust: > wipe test (based on NSRP Flash Rust

Evaluation Guidelines) > tape test (based on ISO dust level test)

Page 6: SSPC Standards Update Presentation

Revised Waterjetting Standards

• Specific recommended levels of nonvisible contaminants removed from non-mandatory appendix > Replaced with more general discussion of nonvisible contamination

• Examples of language for specifying level of nonvisible contaminants provided in non-mandatory appendix > “Immediately prior to the application of the coating, the surface

extract shall not contain more than xx µg/cm2 of the specific contaminant (e.g., chloride) when tested with a [specified method].”

> “Immediately prior to the application of the coating, the conductivity of the surface extract shall not exceed xx µS/cm when tested with a [specified method].”

• Expected release date – April 15, 2012

Page 7: SSPC Standards Update Presentation

SSPC-PA 2, Procedure for Determining Conformance to Dry Coating Thickness

Requirements (revision)

• Includes options to specify more or less stringent compliance requirements for coating thickness depending on project > Default compliance requirements for DFT same

as current version unless otherwise specified • Revised language for assessing

nonconformities • Added appendices for measuring DFT on

edges, pipe exterior

Page 8: SSPC Standards Update Presentation

PA 2 Options for Specifier Thickness Gage Reading Spot

Reading Area Measurement

Level 1

Minimum Unrestricted As specified As specified

Maximum Unrestricted As specified As specified

Level 2

Minimum Unrestricted As specified As specified

Maximum Unrestricted 120% of maximum As specified

Level 3 DEFAULT (same as current PA 2 requirement) Minimum Unrestricted 80% of minimum As specified

Maximum Unrestricted 120% of maximum As specified

Level 4

Minimum Unrestricted 80% of minimum As specified

Maximum Unrestricted 150% of maximum As specified

Level 5

Minimum Unrestricted 80% of minimum As specified

Maximum Unrestricted Unrestricted Unrestricted

Page 9: SSPC Standards Update Presentation
Page 10: SSPC Standards Update Presentation

SSPC-PA 2, Procedure for Determining Conformance to Dry Coating Thickness

Requirements (revision) • Current version of PA 2 requires measurement of every

100 ft2 area painted during work shift if a nonconforming area is identified

• Revised language for determining extent of nonconforming areas painted during a work shift is: > Take spot measurements at 5 ft. intervals radiating in 8 equally

spaced directions from non-conforming area > Each spot measurement must comply with project requirements > Stop measuring in a given direction when 2 consecutive

measurements are in compliance > (Worst case scenario may result in measurement of entire

surface area coated in work shift) > Document areas of nonconformity

• Expected release date: April 1, 2012

Page 11: SSPC Standards Update Presentation

PA 2 Spot Measurement Diagram

Page 12: SSPC Standards Update Presentation

NO

OK

OK

STOP

OK NO

OK

OK

STOP

OK

OK STOP

OK

OK

OK STOP OK

STOP

OK

OK

OK

OK

STOP

OK

OK

OK

OK

NO OK

OK OK

OK

STOP

OK

STOP

OK

Dashed line indicates boundary of area painted during work shift

OK STOP

5 ft area preceding a nonconfor-ming spot must be remeasured after corrections are made

Page 13: SSPC Standards Update Presentation

5 ft NO

OK

OK

STOP

OK

OK

STOP

OK STOP OK

STOP

OK

OK

Dashed line indicates boundary of area painted during work shift

Suspect area preceding a nonconforming spot must be remeasured after corrections are made

OK

NO

STOP

OK

OK

(Limit of area coated during work shift)

5 ft

5 ft

STOP OK

5 ft

Dashed line indicates boundary of area painted during work shift

Dashed line indicates boundary of area painted during w

ork shift Das

hed

line

indi

cate

s bo

unda

ry o

f are

a pa

inte

d du

ring

wor

k sh

ift

(Limit of area coated during work shift)

STOP

(Limit of area coated during work shift)

Page 14: SSPC Standards Update Presentation

SSPC-SP 11, Power Tool Cleaning to Bare Metal (revision)

• No change in SP 11 cleanliness definition or minimum 1 mil profile requirement

• Profile measurement method default now ASTM D 4417 Method B (depth micrometer) unless otherwise specified

• Compressed air used for tools must be verified clean in accordance with ASTM D 4285 (“blotter test”)

Page 15: SSPC Standards Update Presentation

SSPC-SP 11, Power Tool Cleaning to Bare Metal (revision)

• Tools reclassified to include the wire bristle impact tool

• Feathering of existing coating is required unless otherwise specified

• Expected release date May 1, 2012

Page 16: SSPC Standards Update Presentation
Page 17: SSPC Standards Update Presentation

SSPC-SP 15, Commercial Grade Power Tool Cleaning

(revision) • No change in existing SP 15 cleanliness

definition or profile requirement • Parallel language to SSPC-SP 11 will be

adopted for SP 15 > Use ASTM D 4417 Method B unless otherwise

specified > Tool descriptions and feathering requirements

same as revised SP 11 • Expected release date: May 15, 2012

Page 18: SSPC Standards Update Presentation

SSPC Guide 15, Field Methods for Retrieval and Analysis of Soluble Salts on Steel and

Other Nonporous Substrates (revision)

• Reorganization based on methodology of measurement techniques

• Revision includes descriptions of new fully automated one-step meters

• ASTM, ISO references have been updated • Expected release date: August 1, 2012

Page 19: SSPC Standards Update Presentation

SSPC-QP 1, Evaluating Qualifications of Industrial/Marine Painting Contractors –

Field Application (revision)

• Added definition and training requirements for Environmental Health and Safety Manager

• Requires implementation of Coating Application Specialist (CAS) certification as part of QP 1 unless otherwise specified

• Added clarifications to training requirements for QC inspectors and QC Supervisors

• Expected release date: March 15, 2012

Page 20: SSPC Standards Update Presentation
Page 21: SSPC Standards Update Presentation

SSPC-AB 1, Mineral and Slag

Abrasives (revision) • Appendix B to address Navy requirements

from MIL-A-22262 added • Appendix B is mandatory when called out in

project specification > Includes requirements for friability, radioactivity,

soluble and total metal content, TCLP, others > Reviewed by Navy personnel

• Requirements for QC of recyclable work mix in separate Appendix A

• Still undergoing committee review • Expected release date December 1, 2012

Page 22: SSPC Standards Update Presentation

SSPC-AB 2, Cleanliness of Recycled Ferrous Metallic Abrasives (revision)

• Revision started August 2011 • Committee discussing simplification of

sampling requirements for testing work mix • May reference new standard for

determining compliance with steel profile requirements

• Some discussion of lowering conductivity limit (not decided yet)

• Expected release March 1, 2013

Page 23: SSPC Standards Update Presentation
Page 24: SSPC Standards Update Presentation

Wet Abrasive Blast Cleaning Standards (new)

• 5 standards parallel organization of dry blasting standards

• Define cleanliness levels for steel surfaces prepared using wet abrasive blast cleaning > Cleanliness levels identical to the dry blast cleaning

standards > Flash rust levels (same definitions as in WJ

standards) included > Appendices for evaluating flash rust and for

information on nonvisible contaminants included (same as WJ standards)

• Expected release date March 1, 2013

Page 25: SSPC Standards Update Presentation

Determining Compliance with Specified Profile Range (new)

• ASTM Methods from D 4417 and D 7127 establish number of instrument readings required

• SSPC standard provides requirements for frequency (how often to take readings) and location (where to take readings) that are not addressed by ASTM standards

• Example: Take 3 readings at XX locations on surface YY times during surface prep process

• Committee still deciding values for XX and YY

Page 26: SSPC Standards Update Presentation
Page 27: SSPC Standards Update Presentation

Determining Compliance with Specified Profile Range (new)

• Nonmandatory appendix provides an option for specifying number of measurements > Contractor must prepare a 2 x 2 area at jobsite for

acceptance by owner’s rep > Document list of production parameters (pressure,

nozzle size, abrasive size, etc.) > Measurements required if any changes occur during

production work > Measurements required after completion of

production work • Expected release date November 1, 2012

Page 28: SSPC Standards Update Presentation

Selecting Coatings for Galvanized Steel Substrates (new)

• Guide for selecting coatings to overcoat galvanized surfaces

• Coatings to protect galvanizing from aggressive environments

• Assumes that the decision to galvanize the substrate has already been made

Page 29: SSPC Standards Update Presentation

Selecting Coatings for Galvanized Steel Substrates (new)

• Coating selection based on > Service environment of structure (agents that

attack galvanizing) > Condition of galvanized substrate (new, aged

sound, or deteriorated galvanizing) > Extent and degree of surface preparation

required for optimum coating performance (washing only, spot or large area cleaning using blasting or power tools)

Expected release date October 1, 2012

Page 30: SSPC Standards Update Presentation

Questions and Comments Welcome

William L. Shoup SSPC 1/877-281-7772 ext. 2230 [email protected]

Thank you