powell dobson architects Charterhouse, Links Business Park, Fortran Road, Cardiff CF3 0LT • T +44 (0)29 20799699 • [email protected] Project Title St. Athan, Vale of Glamorgan Client Wales & West HA Programme Completed May 2010 Budget £1.2m Accommodation 16 units Sustainability CfSH Level 4 facts and figures St. Athan Wales & West Housing Association The scheme was chosen by WAG to be a pilot project designed to achieve the Code for Sustainable Homes Level 4 for the delivery of 16 houses and flats of a variety of sizes. The site was designed with a southerly aspect to take advantage of free solar gains to offset heating, to achieve good quality day lighting and sunny external spaces. Sustainability targets were an important aspect of the scheme from an early stage. The strategy was to develop a modular form scheme to reduce the carbon footprint within the construction process by utilizing MMC principles. Thus a high percentage of the building fabric was prefabricated off-site and renewable materials and local supply chains were utilized to their greatest potential.

Upload: others

Post on 29-Jan-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

  • powell dobson architects

    Charterhouse, Links Business Park, Fortran Road, Cardiff CF3 0LT • T +44 (0)29 20799699 • [email protected]

    Project Title St. Athan, Vale of GlamorganClient Wales & West HAProgramme Completed May 2010Budget £1.2mAccommodation 16 units Sustainability CfSH Level 4

    facts and figures

    St. AthanWales & West Housing Association

    The scheme was chosen by WAG to be a pilot project designed to achieve the Code for Sustainable Homes Level 4 for the delivery of 16 houses and flats of a variety of sizes. The site was designed with a southerly aspect to take advantage of free solar gains to offset heating, to achieve good quality day lighting and sunny external spaces.

    Sustainability targets were an important aspect of the scheme from an early stage. The strategy was to develop a modular form scheme to reduce the carbon footprint within the construction process by utilizing MMC principles. Thus a high percentage of the building fabric was prefabricated off-site and renewable materials and local supply chains were utilized to their greatest potential.