    BarruLocation: South Sulawesi

    Operator: PT PLN PerseroConfiguration: 2 X 50 MW

    Fuel: coalOperation: 2013

    Boiler supplier: Hangzhou

    T/G supplier: NanjingEPC: Hubei Hongyuan Power Engineering Co Ltd, PTBagus Karya, PT Gemilang Pratama Karya

    Quick facts: Emerson supplied an Ovation control systemfor PLTU Labuanm Banten. The first unit was connected

    in Jul 2009 and officially opened by President SusiloBambang Yudhoyono on 28 Jan 2010, but the plant did

    not go into full commercial service until 2013.

    Photograph courtesy of PT PLNPosted 12 Aug 2012

    Bukit AsamLocation: South Sumatra

    Operator: PT PLNConfiguration: 4 X 65 MW

    Operation: 1989-1995Fuel: subbituminous coal, oilBoiler supplier: Stein

    T/G supplier: Rateau, GEC-AlsthomEPC: Sogeah, Japan Jurong Engineering

    Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005

    LampungLocation: South Sumatra

    Operator: PT PLNConfiguration: 2 X 100 MW

    Operation: 2012Fuel: coal

    Boiler supplier: JinanT/G supplier: Wuhan Turbine

    EPC: Jiangxi Electric Power Overseas Engineering, PT Adhi Karya

    Quick facts: In Mar 2008, PLN broke ground on PLTULampung in Kec Katibung, Tarahan Lampung. In Jul

    2009, PLN secured financing for the $154.3mn projectfrom Bank Rakyat Indonesia.

    Photograph by RiZaL MuKhTaR (Panoramio)Posted 30 Sep 2012

    Nagan RayaLocation: Aceh

    Operator: PT PLNConfiguration: 2 X 110 MW

    Operation: 2013-2014Fuel: coal

    Boiler supplier: WuxiT/G supplier: Nanjing

    EPC: Sinohydro, Sinohydro No 8, Northwest Power Construction Group Corp

    Quick facts: Nagan Raya is atSuak Puntong Village,Kuala District, Nagan Raya Regency. The kickoff meeting

    was held on on 8 May 2008, the first pile was driven on25 Nov. It was a $247mn contract for Sinohydro.

    Photograph courtesy of PT PLNPosted 25 Jan 2014

    OmbilinLocation: West Sumatra

    Operator: PT PLNConfiguration: 2 X 100 MW

    Operation: 1996-1997Fuel: subbituminous coal, oil

    Boiler supplier: SteinT/G supplier: GEC-Alsthom

    EPC: GEC-Alstom, Cegelec, Lahmeyer Quick facts: EPC contract awarded in late 1993. TheESPs were built by Walther.

    Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005

    PaluLocation: Central Sulawesi

    Operator: PT Pusaka Jaya Palu Power Configuration: 2 X 15 MW

    Operation: 2006Fuel: coal

    Boiler supplier: WuxiT/G supplier: Qingdao, Jinan

    EPC: SEPCO No 3Quick facts: This is an IPP project of PT Toba Sejahtera.

    Coal is supplied by PT PLN via barge from EastKalimantan.

    Photograph courtesy of SEPCO No 3Posted 6 Nov 2011