st coal indonesia
TRANSCRIPT
-
8/10/2019 St Coal Indonesia
1/2
BarruLocation: South Sulawesi
Operator: PT PLN PerseroConfiguration: 2 X 50 MW
Fuel: coalOperation: 2013
Boiler supplier: Hangzhou
T/G supplier: NanjingEPC: Hubei Hongyuan Power Engineering Co Ltd, PTBagus Karya, PT Gemilang Pratama Karya
Quick facts: Emerson supplied an Ovation control systemfor PLTU Labuanm Banten. The first unit was connected
in Jul 2009 and officially opened by President SusiloBambang Yudhoyono on 28 Jan 2010, but the plant did
not go into full commercial service until 2013.
Photograph courtesy of PT PLNPosted 12 Aug 2012
Bukit AsamLocation: South Sumatra
Operator: PT PLNConfiguration: 4 X 65 MW
Operation: 1989-1995Fuel: subbituminous coal, oilBoiler supplier: Stein
T/G supplier: Rateau, GEC-AlsthomEPC: Sogeah, Japan Jurong Engineering
Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005
LampungLocation: South Sumatra
Operator: PT PLNConfiguration: 2 X 100 MW
Operation: 2012Fuel: coal
Boiler supplier: JinanT/G supplier: Wuhan Turbine
EPC: Jiangxi Electric Power Overseas Engineering, PT Adhi Karya
Quick facts: In Mar 2008, PLN broke ground on PLTULampung in Kec Katibung, Tarahan Lampung. In Jul
2009, PLN secured financing for the $154.3mn projectfrom Bank Rakyat Indonesia.
Photograph by RiZaL MuKhTaR (Panoramio)Posted 30 Sep 2012
Nagan RayaLocation: Aceh
Operator: PT PLNConfiguration: 2 X 110 MW
Operation: 2013-2014Fuel: coal
Boiler supplier: WuxiT/G supplier: Nanjing
EPC: Sinohydro, Sinohydro No 8, Northwest Power Construction Group Corp
Quick facts: Nagan Raya is atSuak Puntong Village,Kuala District, Nagan Raya Regency. The kickoff meeting
was held on on 8 May 2008, the first pile was driven on25 Nov. It was a $247mn contract for Sinohydro.
Photograph courtesy of PT PLNPosted 25 Jan 2014
OmbilinLocation: West Sumatra
Operator: PT PLNConfiguration: 2 X 100 MW
Operation: 1996-1997Fuel: subbituminous coal, oil
Boiler supplier: SteinT/G supplier: GEC-Alsthom
EPC: GEC-Alstom, Cegelec, Lahmeyer Quick facts: EPC contract awarded in late 1993. TheESPs were built by Walther.
Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005
PaluLocation: Central Sulawesi
Operator: PT Pusaka Jaya Palu Power Configuration: 2 X 15 MW
Operation: 2006Fuel: coal
Boiler supplier: WuxiT/G supplier: Qingdao, Jinan
EPC: SEPCO No 3Quick facts: This is an IPP project of PT Toba Sejahtera.
Coal is supplied by PT PLN via barge from EastKalimantan.
Photograph courtesy of SEPCO No 3Posted 6 Nov 2011
-indonesia http://www.industcards.com/st-coal-indonesia.htm
10/10/2014 10:49
-
8/10/2019 St Coal Indonesia
2/2