St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction Engineer paul.kivisto@state. mn.us

Upload: greyson-tolly

Post on 11-Dec-2015

224 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

St. Croix River CrossingS.P. 8221-82045

Contractor Informational MeetingMay 15, 2013

Contact: Paul Kivisto, P.E.St. Croix Crossing Bridge Construction Engineer

[email protected]

Page 2: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

The contract will be the governing document and anything we say here is to help contractors understand the draft plans and clarify items that may be in the contract. If there is a conflict between what is presented and the final plans and specifications the plans and specifications will prevail.

Page 3: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Bridge Plan and Elevation

Page 4: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Bridge 82045 – River Spans

• Extradosed with 5 towers• 3360 feet in length• Precast segments 18’ deep– Twin three cell boxes with longitudinal closure

• Piers constructed to 15’ above normal pool as part of early foundation contract

Page 5: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Br. 82045 Major Components

• Concrete box segments– Approximately 600 segments (twin segments)– Max weight about 150 to 180 tons

• Five towers– Variable height - 200 to 230 feet above water– Towers 67’ above deck – Wisconsin slope pier – 100 ft tall

• Drilled Shafts, Footings, Pier Starters already constructed

Page 6: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Typical River Span

600’

Page 7: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Main Span Cross SectionVaries 102’-5” to 98’-6” out to out

Closure Pour

100’ +/-’ +/-

18’

Closure Pour

Page 8: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

82045 – Approach Spans

• Precast concrete box superstructure• Alignment separated• 1600 feet in length• Vary in depth from 18 to 10 feet• Gore area is complex, cast-in-place on

falsework• H-pile foundations

Page 9: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Ramps 82047 and 82048

• Concrete box superstructure• On ramp will be cast in place on falsework• Off ramp designed as precast segmental• Vary in depth from 14 to 10 feet• H-pile foundations

Page 10: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Environmental Constraints

• Wetlands on Minnesota Approach• Forested Wetlands near Minnesota bank• St. Croix River• Wisconsin Bluff• Commitments made to minimize impacts and to

preserve water quality• Remove Xcel Barge Unloader Facility

Page 11: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Wetland Minnesota Approach

Page 12: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Minnesota ShorelineForested Wetland

Page 13: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Minnesota Approach

ForestedWetland

Wetland

Page 14: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Wisconsin Bluff

• Last pier is similar to MN side– Smaller footing

• Precast segments, 18 ft deep• 275 ft box girder end span• Minimize impact to bluff,

especially near river• 24” CIP steel shell piles• Access from abutment

Page 15: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Wisconsin Bluff

Page 16: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction
Page 17: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Reference Information Documents (RID)

• ftp://ftp2.dot.state.mn.us/pub/outbound/StCroix• Geotech Information, Construction Options,

Wisconsin Bluff, Cross Beam• Other information including permits are on other

folders in same directory• Information provided will not be contractual

Page 18: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

(1301) BEST VALUE METHOD(Pre-qualification)

• Technical Proposals will be due approximately 4 weeks after advertisement

• Some of the following may be pre-qualified• Experience of Personnel (1 or more)– Project Manager– Environmental Compliance Officer– Structures Superintendent (Precast Segmental)– Casting Yard Engineer/Superintendent– Superstructure Construction Engineer– Quality Control Manager

Page 19: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

(1511) Inspection of Work

• Implementing Critical Activity Hold Points– Environmental Reviews– Casting segments: geometry, rebar, ducts– Cross beam construction: geometry, rebar, ducts– Tower construction: anchor box placement– Cast-in-place boxes: geometry, rebar, ducts

Page 20: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

(1701) Environmental Program Delivery

• Environmental Training– Required for all personnel on site

• Contractor shall have an Environmental Compliance Officer– Ensure all permits are adhered to

Page 21: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

(1803) CPM Schedule

• Contractor will access and update MnDOT Enterprise Project Management System (EPMS) P6 software

• Schedule to be cost and resource loaded• Will need to tie to 4D Synchro model– Contractor must maintain links for all activities

Page 22: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

(1803) Prosecution of Work• Haul roads not permitted in environmentally sensitive

areas• Access sites include the Xcel Energy ramp and

underneath the bridge. No agreements or permits have been obtained for other areas.

• MnDOT may consider keeping Stillwater Barge Facility Access, but no agreement with City.

• No permits have been obtained for Wisconsin shore access

• Trestle under bridge part of COE permit

Page 23: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Trestle from Minnesota shore

• Allowed as contractor option to minimize wetland impacts

Page 24: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

(1806) Contract Time

• All work completed by November, 2016.• Piers 8, 9, and 12 early foundations will be ready

by Dec 20, 2013. • Piers 10 and 11 early foundations will be ready

by April 30, 2014.

Page 25: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Mass Concrete

• Will be included on pier blades, crossbeams, some pier segments, towers, pier columns,

• Will include maximum temperature and temperature differential

Page 26: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Concrete Properties

• Contractor mix design – Require testing as detailed in specs

• 4,000 psi concrete strength in approach substructures.

• 6,000 psi to 9,000 psi in segments – 9,000 psi is at 180 days

• 8,000 psi in crossbeams• 7,000 – 8,000 psi in pier blades and towers

Page 27: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Payment Items

• Construct Access Facilities (MN and WI) __LS• Foundation Prep (all piers) __LS• Box Girders– Structural Concrete CIP Box __CY– Structural Concrete Extradosed __SF– Rebar (60 and 75 ksi) ___LBS– Post Tensioning (longitudinal, transverse, & bars) __LB– Surface Finish __SF

Page 28: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Payment Items

• Cable Stay System __LS• Precast Segmental Construction __LS• Segmental Erection Equipment (Extrados) __LS• Cable Vibration Testing __LS

Page 29: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Questions Questions or comments related to the project can be directed to Paul Kivisto and will be considered in final development of the plans and [email protected]

Page 30: St. Croix River Crossing S.P. 8221-82045 Contractor Informational Meeting May 15, 2013 Contact: Paul Kivisto, P.E. St. Croix Crossing Bridge Construction

Thanks for your interest!Paul Kivisto, P.E.St. Croix Crossing Bridge Construction [email protected](651) 366-4306 office (651) 470-9862 cell

ftp site: ftp://ftp2.dot.state.mn.us/pub/outbound/StCroixProject web site: http://www.dot.state.mn.us/stcroixcrossing/