st. louis streetcar

7
ST. LOUIS STREETCAR

Upload: vernon

Post on 08-Feb-2016

47 views

Category:

Documents


1 download

DESCRIPTION

ST. LOUIS STREETCAR. Goals and Objectives. Increase population and employment in the corridors Attract new residents and employers and create new jobs Support neighborhoods and connect jobs Catalyze and support future development Increase economic vitality of downtown and the corridor - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: ST. LOUIS STREETCAR

ST. LOUIS STREETCAR

Page 2: ST. LOUIS STREETCAR

St. Louis Streetcar www.facebook.com/STLstreetcar

Goals and Objectives• Increase population and employment in the corridors

- Attract new residents and employers and create new jobs- Support neighborhoods and connect jobs

• Catalyze and support future development- Increase economic vitality of downtown and the corridor- Increase mixed-use, transit supportive development- Improve the built environment- Create walkable, sustainable neighborhoods

• Integrate and complement the existing transit system- Provide connectivity - connect with existing transit, bike and pedestrian facilities

• Increase ridership within the corridors and system-wide- Attract choice riders by providing passenger amenities, technologies- Increase visibility of the transit system- Reduce auto traffic and improve air quality

Page 3: ST. LOUIS STREETCAR

St. Louis Streetcar www.facebook.com/STLstreetcar

Page 4: ST. LOUIS STREETCAR

St. Louis Streetcar www.facebook.com/STLstreetcar

Market Analysis • Strong transit corridors• Employment concentration• Residential density

Page 5: ST. LOUIS STREETCAR

St. Louis Streetcar www.facebook.com/STLstreetcar

Development Potential

• New development: $540 million first five years• $2.1 billion over 20 years

Page 6: ST. LOUIS STREETCAR

St. Louis Streetcar www.facebook.com/STLstreetcar

Complete Streets

Chestnut Street at 7th Street Olive Street at 9th Street

Olive Street at Compton Street

• New lighting• New trees and landscaping• New technology and

wayfinding – cameras and signs• New sidewalks and bike paths

Page 7: ST. LOUIS STREETCAR

St. Louis Streetcar www.facebook.com/STLstreetcar

Implementation Next Steps• Adopted into East-West Gateway

Long Range Plan, April 2013• Environmental Assessment• Preliminary Engineering/Final

Engineering• Construction