staab itp 251 chapter 6 madd strategies

13

Click here to load reader

Upload: staabjg

Post on 07-Jul-2015

233 views

Category:

Business


2 download

TRANSCRIPT

Page 1: Staab   Itp 251   Chapter 6   Madd Strategies

Make a Difference Day

Chapter 6

John Staab

[email protected]

Page 2: Staab   Itp 251   Chapter 6   Madd Strategies

Make a Difference Day

Team Tasks

Presentation Dos and Don’ts

DFDs

Toolkit memo to Mr. Jeremy

Outsourcing memo to Ms. Hon

Page 3: Staab   Itp 251   Chapter 6   Madd Strategies

Presentation Dos and Don’ts

Dos

Limit the number of messages

The presentation should be limited to the main topics of what you

want the audience to remember

Keep it simple

Slides should have one idea each and contain only key points for

each idea

Don’ts

Complex sentences

Avoid complex sentences, instead use simple phrases

Use small fonts

Use 32 – 44 pt font, avoid anything less than 28 pt

Page 4: Staab   Itp 251   Chapter 6   Madd Strategies

Data Flow Diagram Improvement

Volunteers

Volunteers at Expo

Volunteers during event day

No volunteers at Start/Finish areas during setup

Decision Makers

Need less decision makers at the Expo

Page 5: Staab   Itp 251   Chapter 6   Madd Strategies

Memo to Mr. Jeremy Financial analysis toolkit contains three parts: Payback analysis: 4 step process of determining how long it takes an information

system to pay for itself1. Determine initial development cost2. Estimate annual benefits

3. Determine annual operating costs4. Determine payback period

Return on investment analysis: ROI = (total benefits – total costs) / total costs Measures profitability by comparing the return from a project to

the investment of a project

Present value analysis: Value of a future dollar is the amount of money that, when

invested today at a specified interest rate, grows to exactly one dollar at a certain point in the future

Page 6: Staab   Itp 251   Chapter 6   Madd Strategies

Memo to Ms. Hon 2009 Outsourcing Trends

1. Stay closer to home Popular outsourcing locations will be challenged by locations closer

to the United States

2. Declining rates Following the decline in the economy, outsource service rates are

declining as much as 5% in the last year

3. Valuable expertise As competition grows, the need for professional expertise with

increase

4. Strategy will prosper Well organized outsourcing companies will be more susceptible to

opportunities

5. New themes Employee welfare and going “green” are common themes

http://www.outsourcingprofessional.org/content/23/1 96/1782/

Page 7: Staab   Itp 251   Chapter 6   Madd Strategies

Make a Difference Day

Project

10 Tasks

Sequential and Concurrent Tasks

Sequential Task Order

Project Management Summary

Page 8: Staab   Itp 251   Chapter 6   Madd Strategies

10 Tasks1. Race Location

2. Expo Location

3. Participant Registration

4. Participant Packet Pickup

5. Expo Setup

6. Expo Teardown

7. Start/Finish Setup

8. Start/Finish Teardown

9. Event Clean-up

10. After Action Report

Page 9: Staab   Itp 251   Chapter 6   Madd Strategies

Tasks

Sequential Concurrent

Registration

Packet Pickup

Expo Setup

Expo Teardown

Start/Finish Setup

Start/Finish Teardown

Race Location

Expo Location

Event Clean-up

After Action Report

Page 10: Staab   Itp 251   Chapter 6   Madd Strategies

Sequential Task Order

Registration before Pickup

Participants must be registered before they can pick

up their Packets

Setup before Teardown

Obviously nothing can be torn down if it has not

been setup

Page 11: Staab   Itp 251   Chapter 6   Madd Strategies

Project Management Summary Methods Traditional – 5 components Initiation

Planning and Design

Execution and Production

Monitoring and Controlling

Completion

PRINCE2 – released 1996 Structured approach

Provides clear framework for managing projects

Automatic control of deviations

Common language

Process-based Driven by use of Capability Maturity Model Intigration

Contrast to Traditional method

Project is managed based on small tasks executed as the project demands rather than a predetermined path

Page 12: Staab   Itp 251   Chapter 6   Madd Strategies

Project Management Summary

Stages

Initiation

Determines the scope and need for a project

Planning and Design

Usually results in a prototype that can be tested

Executing and Producing

Following processes used to complete project requirements

Monitoring and Controlling

Identification of problems with execution and production

processes

Completion

Acceptance of the project and drafting of lessons learned

Page 13: Staab   Itp 251   Chapter 6   Madd Strategies

Project Management Summary

Project Management Triangle