![Page 1: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/1.jpg)
Oakland City Planning Commission STAFF REPORT
Case File Number: PLN16-090
Location:
Assessors Parcel Numbers:
Applicant: Contact Person/ Phone Number: Owner:
Proposal:
Case File Number: Planning Permits Required:
General Plan: Zoning: Environmental Determination:
Historic Status:
Service Delivery District: City Council District: Date Filed: Finality of Decision:
For Further Information:
SUMMARY
May 18, 2016
The Public Right of Way across from 6644 Ascot Drive/ Skyline Boulevard. (See map reverse)
Nearest lot adjacent to the project site ( 048D-7288-024-02)
To remove and relocate an existing telecommunications facility 24" x 16" antenna attached to an existing PG&E Pole to a new proposed 27' tall metal telecommunications monopole to be located across the street within the public right-of- way; an associated 54" tall x 48" wide ground -mounted equipment cabinet enclosure on a new cement pad located next to the pole will be housing all radio equipment.
Crown Castle Bob Gundermann & Jason Osborn (925)899-1999 City of Oakland PLN16-090 Major Conditional Use Permit and Design Review to install a new Monopole Telecommunications Facility within a residential zone, and Minor Variance to waive the required 1 : 1 ratio setback for the 27' tall monopole facility to be located from the adjacent residential property line.
Hillside Residential RH-4/S-10 Zone Exempt, Section 15303 of the State CEQA Guidelines; New construction of small structures. Section 15183 of the State CEQA Guidelines; projects consistent with a community plan, General Plan or zoning. Not a Potential Designated Historic Property; Survey Rating: NIA 3 4 3/31/2016 Appealable to City Council within 10 days Contact case planner Jason Madani at (510) 238-4790 or j [email protected]
The project involves removing and relocating an existing telecommunications facility consisting of 24" x 16" antenna attached to an existing PG&E Pole to a new proposed 27' tall metal telecommunications facility to be located across street within the City of Oakland public rightof- way; an associated 54" tall x 48" wide ground-mounted equipment cabinet enclosure on a
#3
![Page 2: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/2.jpg)
CITY OF OAKLAND PLAN ING COM ISSION
ASCOT DR
MELVJLLE_QR
11111mc=::m-=::::n111111111111111111111111111111111111111111111111111111111111-==========-1111111111111111111111111111111111111111111111111111111mFeet 0 100 200 400
Case File: PLN 16090 Applicant: Crown Castle
600 800
Address: Public Right-of-Way across from 6644 Ascot Drive Zone: RH-4/S- I 0
®
![Page 3: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/3.jpg)
Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090
new cement pad located next to the pole will be housing all radio equipment. Because this installation is a stand-alone telecommunication pole and not a joint-use utility pole, it is considered a Monopole by City of Oakland Planning regulations. A Major Conditional Use Permit and Design Review, and a Minor Variance to waive the required 1: 1 ratio setback to be located from the adjacent residential property line are required permits. Staff believes, given the topography, and a grove of mature tall trees, and approximately 30' separation from the nearest home, the project meets all the required findings listed below for an approval of the project.
BACKGROUND
This proposed telecom installation is within an area where all utilities were recently undergrounded pursuant to the City's underground utility program. This Ascot/Skyline location is a replacement location for 1 of 2 existing telecom installations for Crown Castle that are on former joint-utility poles that are no longer supporting other utilities due to the under-grounding program. The 2nd location is on Burton Drive and will be presented at a future Commission meeting. There are no other carriers that have remaining telecom installations in this underground area. Since telecom antennae cannot be under-grounded (due to the engineering aspects of their function), the antenna must be located above ground. In addition, they must be sited so as to fill the coverage and capacity requirements of the carrier, which, as the Commission is aware, is sometimes difficult in the hill areas due to intervening topography and heavy vegetation. As summarized in this report, staff believes this proposal is an appropriate replacement solution for the existing installation across Skyline Boulevard, which will be removed upon completion of this installation.
TELECOMMUNICATIONS BACKGROUND
Limitations on Local Government Zoning Authority under the Telecommunications Act of 1996 Section 704 of the Telecommunications Act of 1996 (TCA) provides federal standards for the siting of "Personal Wireless Services Facilities." "Personal Wireless Services" include all commercial mobile services (including personal communications services (PCS), cellular radio mobile services, and paging); unlicensed wireless services; and common carrier wireless exchange access services. Under Section 704, local zoning authority over personal wireless services is preserved such that the FCC is prevented from preempting local land use decisions; however, local government zoning decisions are still restricted by several provisions of federal law. Under Section 253 of the TCA, no state or local regulation or other legal requirement can prohibit or have the effect of prohibiting the ability of any entity to provide any interstate or intrastate telecommunications service. Further, Section 704 of the TCA imposes limitations on what local and state governments can do. Section 704 prohibits any state and local government action which unreasonably discriminates among personal wireless providers. Local governments must ensure that its wireless ordinance does not contain requirements in the form of regulatory terms or fees which may have the "effect" of prohibiting the placement, construction, or modification of personal wireless services. Section 704 also preempts any local zoning regulation purporting to regulate the placement, construction and modification of personal wireless service facilities on the basis, either directly or indirectly, on the environmental effects of radio frequency emissions (RF) of such facilities, which otherwise comply with FCC standards in this regard. See, 47 U.S.C. 332 ( c) (7) (B) (iv) (1996). This means that local authorities may not regulate the siting or
Page3
![Page 4: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/4.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number: PLN16-090
construction of personal wireless facilities based on RF standards that are more stringent than those promulgated by the FCC. Section 704 mandates that local governments act upon personal wireless service facility siting applications to place, construct, or modify a facility within a reasonable time. 47 U.S.C.332(c) (7) (B) (ii). See FCC Shot Clock ruling setting forth "reasonable time" standards for applications deemed complete. Section 704 also mandates that the FCC provide technical support to local governments in order to encourage them to make property, rights-of-way, and easements under their jurisdiction available for the placement of new spectrum-based telecommunications services. This proceeding is currently at the comment stage. For more information on the FCC's jurisdiction in this area, contact Steve Markendorff, Chief of the Broadband Branch, Commercial Wireless Division, Wireless Telecommunications Bureau, at (202) 418-0640 or e-mail "[email protected]".
PROJECT DESCRIPTION
Pursuant to the City's underground utility program, the applicant Crown Castle is proposing to remove and relocate an existing telecommunication facility attached to the existing PG&E Pole to a new location across street from 6644 Ascot Drive. The project involves installation of a new 27' tall metal pole as a telecommunication monopole facility located in the City of Oakland public right-of-way; installation one 24" x 16" antenna mounted on top of the pole; an associated equipment cabinet will be housing all radio equipment within a 54" tall x 48" wide enclosure mounted on ground on a new cement pad located next to the pole. The pole will resemble light pole and be painted a moss green. (See Attachment A)
PROPERTY DESCRIPTION
The project site is located within the City of Oakland public right-of-way located on the intersection of Skyline Boulevard I Ascot Drive and adjacent to a vacant down-sloped parcel and is located across Street from 6644 Ascot Drive and about 30 feet away from the residence located at 6621 Ascot Drive.
GENERAL PLAN ANALYSIS
The site is located in a Hillside Residential area under the General Plan's Land Use and Transportation Element (LUTE). The intent of the Hillside Residential area is: "to create, maintain, and enhance residential areas characterized by detached, single unit structures." Telecommunications constitute an Essential Service Civic Activity under the Planning Code. Given hillside residential customers increasing reliance upon cellular service for phone and internet, and as undergrounding districts are scheduled to be implemented in certain districts over time, the proposal will replaced an existing joint-utility poles telecommunication facility with a new monopole located across street to maintain their telecommunication services. In addition the proposed new location is bounded by a vacant lot with mature tall trees within the City of Oakland public right-of- way and will not obstruct a scenic view, therefore the proposal will conform to this Intent and to the following LUTE Policy:
"Policy N 12. 4 Undergrounding Utility Lines. Electrical, telephone, and related distribution lines should be undergrounded in commercial and residential areas, except where special local conditions such as limited visibility of the
Page 4
![Page 5: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/5.jpg)
Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090
poles and wires makes this unneeded. They should also be underground in appropriate institutional, industrial, and other areas, and generally along freeways, scenic routes, and heavily traveled streets. Programs should lead systematically toward the eventual undergrounding of all existing lines in such places. Where significant utility extensions are taking place in these areas, such as in new subdivisions utilities should be installed underground from the start".
Staff, therefore finds the proposal, as conditioned, to conform to the General Plan. The subject property is located within the Hillside Residential General Plan designation. The Hillside Residential Land Use Classification is intended "to identify, create, maintain and enhance neighborhood residential areas that are characterized by detached, single unit structures on hillside lots. This proposed telecom installation is within an area where all utilities were recently under-grounded pursuant to the City's underground utility program. The proposed relocation of an existing telecommunication facility located in the public right-of-away and is camouflaged with the existing mature tall trees; therefore, the proposed unmanned wireless telecommunication facility will not adversely affect or detract from the residential characteristics of the neighborhood.
ZONING ANALYSIS
The site is located within the RH-4 Hillside Residential and S-10 Scenic Route Combning Zones. The intent of the RH-4 zone is: "to create, maintain, and enhance areas for single-family dwellings on lots of 6,500 to 8,000 square feet and is typically appropriate in already developed areas of the Oakland Hills." The S-10 zone is intended to create, preserve and enhance areas where hillside terrain, wooded canyons and ridges, and fine vistas or panoramas of Oakland neighboring areas, or the Bay can be seen from the road, and it typically appropriate to roads along or near ridges, or through canyons, of the Oakland Hills which roads have good continuity and relatively infrequent vehicular access from abutting properties.
Monopole Telecommunications Facilities in residential zones require a Major Conditional Use Permit, Design Review and in this case also a Minor Variance to waive the 1: 1 ratio setback requirements for a 27' tall monopole facility located from the adjacent residential property line. The proposed monopole facility will be located within the public right-of-way adjacent to a residential lot line and will not meet the 1: 1 setback ratio requirement from a residential property lines. Given the topography, and vegetation the proposed monopole will be camouflaged by the existing mature tall trees. Staff finds that the proposal meets the applicable RH-4 and S-10 zoning and City of Oakland Telecommunication regulations.
ENVIRONMENTAL DETERMINATION
The California Environmental Quality Act (CEQA) Guidelines list the projects that qualify as categorical exemptions from environmental review. The proposed project is categorically exempt from the environmental review requirements pursuant to Section 15303, new construction of small structures, and 15183, Projects Consistent with a Community Plan, General Plan or Zoning.
Pages
![Page 6: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/6.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number: PLN16-090
KEY ISSUES AND IMPACTS
Staff believes this proposal is an appropriate replacement solution for the existing facility on Skyline Boulevard, which will be removed upon completion of this proposed new installation.
1. Conditional Use Permit and Design Review and Minor Variance
Section 17.17.040, 17.128.080 and 17.148.050 of the City of Oakland Planning Code requires a Conditional Use Permit and Design Review to install a Monopole Telecommunication facility within the RH-4 and S-10 zones and a Minor Variance to waive the 1: 1 ratio setback requirements for a monopole facility to be located from the adjacent residential property line. Pursuant to Section 17.134.020 (A) (3) (i) of the Planning code lists as a Major Conditional Use Permit is required for any telecommunications facility within 100' of a residential zone. The required findings for a Major Conditional Use Permit, Design Review and Minor Variance are listed and included in staffs evaluation as part of this report.
2. Project Site
Section 17.128.110 of the City of Oakland Telecommunication Regulations indicate that new wireless facilities shall generally be located on designated properties or facilities in the following order of preference: A. Co-located on an existing structure or facility with existing wireless antennas. B. City owned properties or other public or quasi-public facilities. C. Existing commercial or industrial structures in non-residential zones (excluding all HBX
Zones and the D-CE3 and D-C-4 Zones). D. Existing commercial or industrial structures in residential zones, HBX Zones, or the D-CE-
3 or D-CE-4 Zones.
E. Other non-residential uses in residential zones, HBX Zones, or the D-CE-3 or D-CE-4 Zones.
F. Residential uses in non-residential zones. (excluding all HBX Zones and the D-CE-3 and DCE-4 Zones).
G. Residential uses in residential zones, HBX Zones, or the D-CE-3 or D-CE-4 Zones.
*Facilities locating on an A, B or C ranked preference do not require a site alternatives analysis. Facilities proposing to locate on a D through G ranked preference, inclusive, must submit a site alternatives analysis as part of the required application materials.
Since the proposed project involves installation of a new monopole facility with new antennas and associated equipment cabinets on a site within the public right-of-way, the proposed project meets preference (B); hence a site alternatives analysis is not required, although the applicant did provide one.
Alternative Site Analysis:
Crown Castle considered alternative sites on other locations in this area but none of these sites are as desirable from a coverage perspective or from an aesthetics perspective to minimize visual
Page 6
![Page 7: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/7.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number: PLN16-090
impact. The proposed location is approximately equidistant from other DAS nodes proposed in the surrounding area so that service coverage can be evenly distributed.
Staff has reviewed the applicant's written evidence of an alternative sites analysis (see attachment C) and determined that the site selected conforms to the telecommunication regulation requirements. In addition, staff agrees that no other sites are more suitable.
3. Project Design
Section 17.128.120 of the City of Oakland Telecommunications Regulations indicates that new wireless facilities shall generally be designed in the following order of preference:
A. Building or structure mounted antennas completely concealed from view. B. Building or structure mounted antennas set back from roof edge, not visible from public rightof way. C. Building or structure mounted antennas below roof line (facade mount, pole mount) visible from public right-of-way, painted to match existing structure. D. Building or structure mounted antennas above roofline visible from public right of-way. E. Monopoles. F. Towers. * Facilities designed to meet an A or B ranked preference do not require a site design alternatives analysis. Facilities designed to meet a C through Franked preference, inclusive, must submit a site design alternatives analysis as part of the required application materials. A site design alternatives analysis shall, at a minimum, consist of:
a. Written evidence indicating why each higher preference design alternative can not be used. Such evidence shall be in sufficient detail that independent verification could be obtained if required by the City of Oakland Zoning Manager. Evidence should indicate ifthe reason an alternative was rejected was technical (e.g. incorrect height, interference from existing RF sources, inability to cover required area) or for other concerns (e.g. inability to provide utilities, construction or structural impediments).
City of Oakland Planning staff has reviewed and determined that the site selected conforms to all other telecommunication regulation requirements. The project has met design criteria (C) since the antennas will be mounted on a 27' tall metal pole resembling a city light pole and is adjacent to a vacant parcel with mature trees, and the metal pole will be camouflaged partially within the existing mature trees and ground mounted equipment cabinet enclosure will be painted moss green to match the color of the metal pole to minimize potential visual impacts from public view. (See Attachment C)
4. Project Radio Frequency Emissions Standards
Section 17.128.130 of the City of Oakland Telecommunication Regulations require that the applicant submit the following verifications including requests for modifications to existing facilities: a. The telecommunications regulations require that the applicant submit written documentation demonstrating that the emission from the proposed project are within the limits set by the Federal Communications Commission. In the document (attachment B) prepared by Jerrold T. Bushberg
Page7
![Page 8: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/8.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number: PLN16-090
Health and Medical Physics Consulting, Inc. Registered Professional Engineer, the proposed project was evaluated for compliance with appropriate guidelines limiting human exposure to radio frequency electromagnetic fields. According to the report on the proposal, the project will comply with the prevailing standards for limiting public exposure to radio frequency energy and, therefore, the proposed site will operate within the current acceptable thresholds as established by the Federal government or any such agency that may be subsequently authorized to establish such standards. b. Prior to final building permit sign off, an RF emissions report indicating that the site is actually operating within the acceptable thresholds as established by the Federal government or any such agency who may be subsequently authorized to establish such standards.
The RF emissions report, states that the proposed project will not cause a significant impact on the environment. Additionally, staff recommends that prior to the final building permit sign off; the applicant submits a certified RF emissions report stating that the facility is operating within acceptable thresholds established by the regulatory federal agency.
CONCLUSION
Oakland neighborhoods have large and increasing demand for wireless telecommunications service. Utilities will be undergrounded in several districts, and there are few viable sites for monopoles or other telecommunications facilities within underground districts. The new proposal would not obstruct private views, or be situated unduly close to windows of the adjacent residence and is camouflaged with the existing mature tall trees. Staff believes that the findings for approval can be made to support the Conditional Use Permit and Design Review and Minor Variance.
Page8
![Page 9: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/9.jpg)
Oakland Citv Planning Commission May 18,2016 Case File Number: PLN16-090
RECOMMENDATIONS:
Reviewed by:
Scott Miller Zoning Manager
Reviewed by: ~
~ ~ Darin Ranelletti, Deputy Director Bureau of Planning and Building
Approved for forwarding to the City Planning Commission
ATTACHMENTS:
1. Affirm staffs environmental determination
2. Approve Major Conditional Use Permit, and Design Review and Minor Variance application PLN16-090 to the attached findings and conditions of approval.
Prepared by:
Jason Madani Planner II
A. Project Plans & Photo simulations B. Site Safe RE Compliance Experts RF Emissions Report C. Site Alternative Analysis and Coverage Maps D. Correspondence
Page 9
![Page 10: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/10.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number: PLN16-090 Page 10
FINDINGS FOR APPROVAL
FINDINGS FOR APPROVAL: This proposal meets all the required findings under Section 17.134.050, of the General Use Permit criteria; all the required findings under Section 17.136.050. (B), of the Non-Residential Design Review criteria; all the required findings under Section 17.128.080 (B), of the telecommunication facilities (Monopole) Design Review criteria; and all the required findings under Section 17.128.080. (C), of the telecommunication facilities (Monopole) Conditional Use Permit criteria; and Variance finding 17.148.050 and as set forth below and which are required to approve your application. Required findings are shown in bold type; reasons your proposal satisfies them are shown in normal type.
SECTION 17.134.050 - GENERAL USE PERMIT FINDINGS:
A. That the location, size, design, and operating characteristics of the proposed development' will be compatible with, and will not adversely affect, the livability or appropriate development of abutting properties and the surrounding neighborhood, with consideration to be given to harmony in scale, bulk, coverage, and density; to the availability of civic facilities and utilities; to harmful effect, if any upon desirable neighborhood character; to the generation of traffic and the capacity of surrounding streets; and to any other relevant impact of the development.
Hillside residential areas are difficult coverage areas for radio frequencies. These neighborhoods also have large and increasing demand for wireless telecommunications service. Utilities will be undergrounded in several districts, anq there are few viable sites for monopoles. The proposed site will not obstruct views from or be situated unduly close to a private viewing location such as a living room of the adjacent residence. The presence of the existing mature tall trees will serve as a camouflaging background when viewed from the street. The siting will not preclude future development of the adjacent vacant lot. The project is accompanied by a satisfactory radio frequency. (RF) emissions report. Conditions of Approval require that the monopole be painted green to better camouflage it with the adjacent vegetation, and, a satisfactory review by the Public Works Agency prior to submitting for a Building Permit.(see Conditions of Approval #15) The facility will be unmanned and will not create additional vehicular traffic in the area and will not adversely affect the operating characteristics or livability of the hillside area.
B. That the location, design, and site planning of the proposed development will provide a convenient and functional living, working, shopping, or civic environment, and will be as attractive as the nature of the use and its location and setting warrant.
The proposed site will not obstruct views from or be situated unduly close to a private viewing location such as a living room of surrounding residences. The presence of mature trees will serve as camouflaging background when viewed from the street. The siting will not preclude future development of the adjacent vacant lot.
C. That the proposed development will enhance the successful operation of the surrounding area in its basic community functions, or will provide an essential service to the community or region.
Hillside residential areas are difficult coverage areas for radio frequencies. The neighborhoods have large and increasing demand for wireless telecommunications service for phone and internet. Utilities will be undergrounded in this district and there are few viable sites for monopoles.
![Page 11: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/11.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number PLN16-90 Page 11
D. That the proposal conforms to all applicable design review criteria set forth in the DESIGN REVIEW PROCEDURE of Chapter 17.136 of the Oakland Planning Code.
Design Review is required and findings are made as described in following sections of this attachment.
E. That the proposal conforms in all significant respects with the Oakland General Plan and with any other applicable plan or development control map which has been adopted by the City Council.
The site is located in a Hillside Residential area under the General Plan's Land Use and Transportation Element (LUTE). The intent of the Hillside Residential area is: "to create, maintain, and enhance residential areas characterized by detached, single unit structures. " Telecommunications constitute an Essential Service Civic Activity under the Planning Code. Given hillside residential customers increasing reliance upon cellular service for phone and internet, and as undergrounding districts will be implemented in certain districts over time, the proposal for a monopole that is not on a clear view corridor site or precluding development conforms to this Intent and to the following LUTE Policy:
Policy N12.4 Undergrounding Utility Lines. Electrical, telephone, and related distribution lines should be undergrounded in commercial and residential areas, except where special local conditions such as limited visibility of the poles and wires makes this unneeded. They should also be underground in appropriate institutional, industrial, and other areas, and generally along freeways, scenic routes, and heavily traveled streets. Programs should lead systematically toward the eventual undergrounding of all existing lines in such places. Where significant utility extensions are taking place in these areas, such as in new subdivisions utilities should be installed underground from the start.
Section 17.128.080(C) CONDITIONAL USE PERMIT (CUP) FINDINGS FOR MONOPOLE FACILITIES
1. The project must meet the special design review criteria listed in subsection B of this section (l 7.128.080C):
Design Review is required and findings are made as described in following sections of this attachment.
2. Monopoles should not be located any closer than one thousand five hundred (1,500) feet from existing monopoles unless technologically required or visually preferable:
No known monopoles exist within 1,500 feet of the site; nonetheless, this location is technologically required given minimal viable sites, and, visually preferable and is located to adjacent vacant lot and to several large trees.
3. The proposed project must not disrupt the overall community character:
The proposed site design would not obstruct private views, or be situated unduly close to a private viewing location such as a living room of nearby residences. The adjacent lot is vacant and not developed and is surrounded with mature tall trees. The siting of new telecommunication facility would not preclude future development of the adjacent vacant residential lot. The presence of mature tall trees
![Page 12: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/12.jpg)
Oakland Citv Planning Commission May 18,2016 Case File Number PLN16-90 Page 12
would serve as camouflaging background when viewed from the street. Hillside residential areas have large and increasing demand for wireless telecommunications service for phone and internet. Utilities will be undergrounded in several districts and there are few viable sites for monopoles. Conditions of approval ensure that the monopole be painted green color to better camouflage it with adjacent trees, and a satisfactory review by the Public Works Agency prior to submitting for a Building Permit. (see Conditions of Approval # 15)
4. If a Major Conditional Use Permit is required, the Planning Director or the Planning Commission may request independent expert review regarding site location, collocation and facility configuration. Any party may request that the Planning Commission consider making such request for independent expert review. a. If there is any objection to the appointment of an independent expert engineer, the applicant must notify the Planning Director within ten days of the Commission request. The Commission will hear arguments regarding the need for the independent expert and the applicant's objection to having one appointed. The Commission will rule as to whether an independent expert should be appointed. b. Should the Commission appoint an independent expert, the Commission will direct the Planning Director to pick an expert from a panel of licensed engineers, a list of which will be compiled, updated and maintained by the Planning Department. c. No expert on the panel will be allowed to review any materials or investigate any application without first signing an agreement under penalty of perjury that the expert will keep confidential any and all information learned during the investigation of the application. No personnel currently employed by a telecommunication company are eligible for inclusion on the list. d. An applicant may elect to keep confidential any proprietary information during the expert's investigation. However, if an applicant does so elect to keep confidential various items of proprietary information, that applicant may not introduce the confidential proprietary information for the first time before the Commission in support of the application. e. The Commission shall require that the independent expert prepare the report in a timely fashion so that it will be available to the public prior to any public hearing on the application. f. Should the Commission appoint an independent expert, the expert's fees will be paid by the applicant through the application fee, imposed by the city.
The Planning Director has not made such a request; this is however an option available to the Planning Commission.
17.136.0SO(B) - NONRESIDENTIAL DESIGN REVIEW CRITERIA:
1. That the proposal will help achieve or maintain a group of facilities which are well related to one another and which, when taken together, will result in a well-composed design, with consideration given to site, landscape, bulk, height, arrangement, texture, materials, colors, and appurtenances; the relation of these factors to other facilities in the vicinity; and the relation of the proposal to the total setting as seen from key points in the surrounding area. Only elements of design which have some significant relationship to outside appearance shall be considered, except as otherwise provided in Section 17.136.060;
The proposed project will help achieve consistency in design because it is designed to look like other City of Oakland utility light poles. The project involves installation of a new 27' tall metal pole as a
![Page 13: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/13.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number PLN16-90 Page 13
telecommunication monopole facility located in the public right-of-way; installation one 24" x 16" antenna mounted on top of the pole; an associated equipment cabinet will be housing all radio equipment within 54" tall x 48" wide ground mounted on a new cement pad located next to the pole. The presence of mature tall trees will serve as a camouflaging background when viewed from the street.
2. That the proposed design will be of a quality and character which harmonizes with, and serves to protect the value of, private and public investments in the area;
The design will be appropriate and compatible with current zoning and General Plan Land Use designations. The antennas will be located on a 27' tall monopole designed to look like a city light pole set in a wooded area and will have minimal visual impacts as seen from the roadway.
3. That the proposed design conforms in all significant respects with the Oakland General Plan and with any applicable design review guidelines or criteria, district plan, or development control map which have been adopted by the Planning Commission or City Council.
The site is located in a Hillside Residential area under the General Plan's Land Use and Transportation Element (LUTE). The intent of the Hillside Residential area is: "to create, maintain, and enhance residential areas characterized by detached, single unit structures." Telecommunications constitute an Essential Service Civic Activity under the Planning Code. Given hillside residential customers increasing reliance upon cellular service for phone and internet, and as undergrounding districts will be implemented in certain districts over time, the proposal for a monopole that is not on a clear view corridor and provide more than 27' separation for existing homes within subject site or precluding development conforms to this Intent and to the following LUTE Policy:
Policy N12.4 Undergrounding Utility Lines. Electrical, telephone, and related distribution lines should be undergrounded in commercial and residential areas, except where special local conditions such as limited visibility of the poles and wires makes this unneeded. They should also be underground in appropriate institutional, industrial, and other areas, and generally along freeways, scenic routes, and heavily traveled streets. Programs should lead systematically toward the eventual undergrounding of all existing lines in such places. Where significant utility extensions are taking place in these areas, such as in new subdivisions utilities should be installed underground from the start.
17.128.0SO(B) DESIGN REVIEW CRITERIA FOR MONOPOLE FACILITIES
1. Collocation is to be encouraged when it will decrease visual impact and collocation is to be discouraged when it will increase negative visual impact:
The proposal is to relocate an existing joint pole telecommunication facility to a new facility where no adjacent poles exist to offer collocation.
2. Monopoles should not be sited to create visual clutter or negatively affect specific views:
The monopole is sited so that no scenic view obstruction will occur, and will be painted green color to better camouflage it with adjacent trees. Given the topography, and the location of metal pole, the project will have minimal visual impacts in the hillside area.
![Page 14: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/14.jpg)
Oakland City Planning Commission May 18,2016 Case File Number PLN16-90 Page 14
3. Monopoles shall be screened from the public view wherever possible:
The monopole will be visible from a minimal number of vantage points in the immediate area. However, it will essentially have the appearance of a city light pole.
4. The equipment shelter or cabinet must be concealed from public view or made compatible with the architecture of the surrounding structures or placed underground. The shelter or cabinet must be regularly maintained:
Equipment will be ground mounted and painted along with the pole as camouflage. The equipment will be placed and secured such that it will not be accessed by the public and will be maintained by Crown Castle Company.
5. Site location and development shall preserve the preexisting character of the surrounding buildings and land uses and the zone district as much as possible. Wireless communication towers shall be integrated through location and design to blend in with the existing characteristics of the site to the extent practical. Existing on-site vegetation shall be preserved or improved, and disturbance of the existing topography shall be minimized, unless such disturbance would result in less visual impact of the site to the surrounding area:
The site is not located close to primary living space of existing homes. It is located within the public right-of-way adjacent to a vacant lot with a grove of mature tall trees and will be painted green color to blend in with the existing vegetation. Based on the location of site, the proposed monopole will not result in a significant visual impact and will blend in with the existing characteristics of the site.
6. That all reasonable means of reducing public access to the antennas and equipment has been made, including, but not limited to, placement in or on buildings or structures, fencing, anticlimbing measures and anti-tampering devices:
The antennas will be mounted to a monopole and will not be accessible to the public due to its location. The equipment cabinet will be secured such that it is only accessible to maintenance workers and not to the public.
VARIAN CE PROCEDURE/FINDINGS REQUIRED (OMC SEC. 17.148.0SO(A))
1. That strict compliance with the specified regulation would result in practical difficulty or unnecessary hardship inconsistent with the purposes of the zoning regulations, due to unique physical or topographic circumstances or conditions of design; or, as an alternative in the case of a minor variance, that such strict compliance would preclude an effective design solution improving livability, operational efficiency, or appearance.
Zoning regulation 17.128.080(A) (3) requires: "When a monopole is in a residential zone or adjacent to a residential use, it must be set back from the nearest residential lot line a distance at least equal to its total height of the pole". The proposed monopole facility is located close proximity of the adjacent side property line therefore it requires a Minor Variance. The purposes of the requirement are to create a "fall zone" between a monopole facility and a residence, to avoid a looming effect, and a view obstruction.
·Strict compliance would preclude an effective design solution improving livability and operational efficiency. Staff feels that this variance is justified for the following reasons: The proposed 27' tall
![Page 15: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/15.jpg)
Oakland City Planning Commission May18,2016 Case File Number PLN16-90 Page 15
monopole is located within the public right-of-way adjacent to the side portion of residential downsloped vacant parcel and any future home would be located at much lower elevation and is surrounded with mature tall trees, as result the proposal will not have significant impacts on the future development of a vacant residential property. In addition, the construction of the monopole will satisfy engineering and construction standards to ensure it would not fall. Hillside residential areas have large and increasing demand for wireless telecommunications service for phone and internet. Utilities will be undergrounded in several districts and there are few viable sites for monopoles within this vicinity.
2. That strict compliance with the regulations would deprive the applicant of privileges enjoyed by owners of similarly zoned property; or, as an alternative in the case of a minor variance, that such strict compliance would preclude an effective design solution fulfilling the basic intent of the applicable regulation.
Other existing poles in the hill side area do not meet the 1: 1 height/setback ratio requirement. The design will not obstruct views or create a looming effect.
3. That the variance, if granted, will not adversely affect the character, livability, or appropriate development of abutting properties or the surrounding area, and will not be detrimental to the public welfare or contrary to adopted plans or development policy.
The monopole will be subject to building permits, will maintain and enhance service without overhead lines, and will be relatively camouflaged by the existing vegetation on the site.
4. That the variance will not constitute a grant of special privilege inconsistent with limitations imposed on similarly zoned properties or inconsistent with the purposes of the zoning regulations.
Other nonconformities and variances to the regulation exist or have been granted.
5. That the elements of the proposal requiring the variance (e.g., elements such as buildings, walls, fences, driveways, garages and carports, etc.) conform with the regular design review criteria set forth in the design review procedure at Section 17.136.050.
Design Review is required and findings are made as described in following sections of this attachment.
6. That the proposal conforms in all significant respects with the Oakland General Plan and with any other applicable guidelines or criteria, district plan, or development control map which have been adopted by the Planning Commission or City Council.
The proposal conforms to the General Plan as described in a previous section of this attachment.
![Page 16: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/16.jpg)
Oakland City Planning Commission Case File Number PLN16-90
STANDARD CONDITIONS:
1. Approved Use
CONDITIONS OF APPROVAL PLN16-090
May 18,2016 Page 16
The project shall be constructed and operated in accordance with the authorized use as described in the approved application materials PLN16-090, and the plans dated March 23, 2016 submitted on March 31, 2016, as amended by the following conditions of approval and mitigation measures, if applicable ("Conditions of Approval" or "Conditions").
2. Effective Date, Expiration, Extensions and Extinguishment
This Approval shall become effective immediately, unless the Approval is appealable, in which case the Approval shall become effective in ten calendar days unless an appeal is filed. Unless a different termination date is prescribed, this Approval shall expire two years from the Approval date, or from the date of the final decision in the event of an appeal, unless within such period all necessary permits for construction or alteration have been issued, or the authorized activities have commenced in the case of a permit not involving construction or alteration. Upon written request and payment of appropriate fees submitted no later than the expiration date of this Approval, the Director of City Planning or designee may grant a one-year extension of this date, with additional extensions subject to approval by the approving body. Expiration of any necessary building permit or other constructionrelated permit for this project may invalidate this Approval if said Approval has also expired. If litigation is filed challenging this Approval, or its implementation, then the time period stated above for obtaining necessary permits for construction or alteration and/or commencement of authorized activities is automatically extended for the duration of the litigation.
3. Compliance with Other Requirements
The project applicant shall comply with all other applicable federal, state, regional, and local laws/codes, requirements, regulations, and guidelines, including but not limited to those imposed by the City's Bureau of Building, Fire Marshal, and Public Works Department. Compliance with other applicable requirements may require changes to the approved use and/or plans. These changes shall be processed in accordance with the procedures contained in Condition #4.
4. Minor and Major Changes
a. Minor changes to the approved project, plans, Conditions, facilities, or use may be approved administratively by the Director of City Planning
b. Major changes to the approved project, plans, Conditions, facilities, or use shall be reviewed by the Director of City Planning to determine whether such changes require submittal and approval of a revision to the Approval by the original approving body or a new independent permit/approval. Major revisions shall be reviewed in accordance with the procedures required for the original permit/approval. A new independent permit/approval shall be reviewed in accordance with the procedures required for the new permit/approval.
5. Compliance with Conditions of Approval
a. The project applicant and property owner, including successors, (collectively referred to hereafter as
![Page 17: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/17.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number PLN16-90 Page 17
the "project applicant" or "applicant") shall be responsible for compliance with all the Conditions of Approval and any recommendations contained in any submitted and approved technical report at his/her sole cost and expense, subject to review and approval by the City of Oakland.
b. The City of Oakland reserves the right at any time during construction to require certification by a licensed professional at the project applicant's expense that the as-built project conforms to all applicable requirements, including but not limited to, approved maximum heights and minimum setbacks. Failure to construct the project in accordance with the Approval may result in remedial reconstruction, permit revocation, permit modification, stop work, permit suspension, or other corrective action.
c. Violation of any term, Condition, or project description relating to the Approval is unlawful, prohibited, and a violation of the Oakland Municipal Code. The City of Oakland reserves the right to initiate civil and/or criminal enforcement and/or abatement proceedings, or after notice and public hearing, to revoke the Approval or alter these Conditions if it is found that there is violation of any of the Conditions or the provisions of the Planning Code or Municipal Code, or the project operates as or causes a public nuisance. This provision is not intended to, nor does it, limit in any manner whatsoever the ability of the City to take appropriate enforcement actions. The project applicant shall be responsible for paying fees in accordance with the City's Master Fee Schedule for inspections conducted by the City or a City-designated third-party to investigate alleged violations of the Approval or Conditions.
6. Signed Copy of the Approval/Conditions A copy of the Approval letter and Conditions shall be signed by the project applicant, attached to each set of permit plans submitted to the appropriate City agency for the project, and made available for review at the project job site at all times.
7. Blight/Nuisances
The project site shall be kept in a blight/nuisance-free condition. Any existing blight or nuisance shall be abated within 60 days of approval, unless an earlier date is specified elsewhere.
8. Indemnification a.To the maximum extent permitted by law, the project applicant shall defend (with counsel acceptable to the City), indemnify, and hold harmless the City of Oakland, the Oakland City Council, the Oakland Redevelopment Successor Agency, the Oakland City Planning Commission, and their respective agents, officers, ei;nployees, and volunteers (hereafter collectively called "City") from any liability, damages, claim, judgment, loss (direct or indirect), action, causes of action, or proceeding (including legal costs, attorneys' fees, expert witness or consultant fees, City Attorney or staff time, expenses or costs) (collectively called "Action") against the City to attack, set aside, void or annul this Approval or implementation of this Approval. The City may elect, in its sole discretion, to participate in the defense of said Action and the project applicant shall reimburse the City for its reasonable legal costs and attorneys' fees.
b. Within ten (10) calendar days of the filing of any Action as specified in subsection (a) above, the project applicant shall execute a Joint Defense Letter of Agreement with the City, acceptable to the Office of the City Attorney, which memorializes the above obligations. These obligations and the Joint Defense Letter of Agreement shall survive termination, extinguishment, or invalidation of the Approval. Failure to timely execute the Letter of Agreement does not relieve the project applicant of any of the obligations contained in this Condition or other requirements or Conditions of Approval that
![Page 18: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/18.jpg)
Oakland City Planning Commission May 18,2016 Case File Number PLN16-90 Page 18
may be imposed by the City.
9. Severability
The Approval would not have been granted but for the applicability and validity of each and every one of the specified Conditions, and if one or more of such Conditions is found to be invalid by a court of competent jurisdiction this Approval would not have been granted without requiring other valid Conditions consistent with achieving the same purpose and intent of such Approval.
10. Construction Activity in the Public Right-of-Way
a. Obstruction Permit Required Requirement: The project applicant shall obtain an obstruction permit from the City prior to placing any temporary construction-related obstruction in the public right-of-way, including City streets and sidewalks.
When Required: Prior to approval of construction-related permit
Initial Approval: Bureau of Building
Monitoring/Inspection: Bureau of Building
b. Traffic Control Plan Required Requirement: In the event of obstructions to vehicle or bicycle travel lanes, the project applicant shall submit a Traffic Control Plan to the City for review and approval prior to obtaining an obstruction permit. The project applicant shall submit evidence of City approval of the Traffic
Control Plan with the application for an obstruction permit. The Traffic Control Plan shall contain a set of comprehensive traffic control measures for auto, transit, bicycle, and pedestrian detours, including detour signs if required, lane closure procedures, signs, cones for drivers, and designated construction access routes. The project applicant shall implement the approved Plan during construction.
When Required: Prior to approval of construction-related permit
Initial Approval Public Works Department, Transportation Services Division
Monitoring/Inspection: Bureau of Building
c. Repair of City Streets Requirement: The project applicant shall repair any damage to the public right-of way, including streets and sidewalks caused by project construction at his/her expense within one week of the occurrence of the damage (or excessive wear), unless further damage/excessive wear may continue; in such case, repair shall occur prior to approval of the final inspection of the construction-related permit. All damage that is a threat to public health or safety shall be repaired immediately.
When Required: Prior to building permit final
Initial Approval: NIA
Monitoring/Inspection: Bureau of Building
![Page 19: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/19.jpg)
Oakland City Planning Commission May 18, 2016 Case File Number PLN16-90 Page 19
PROJECT SPECIFIC CONDTIONS:
11. Radio Frequency Emissions Prior to tlte final building permit sign off. The applicant shall submit a certified RF emissions report stating the facility is operating within the acceptable standards established by the regulatory Federal Communications Commission.
12. Operational Ongoing. Noise levels from the activity, property, or any mechanical equipment on site shall comply with the performance standards of Section 17 .120 of the Oakland Planning Code and Section 8.18 of the Oakland Municipal Code. If noise levels exceed these standards, the activity causing the noise shall be abated until appropriate noise reduction measures have been installed and compliance verified by the Planning and Zoning Division and Building Services.
13. Equipment cabinets Prior to building permit Issuances. The applicant shall submit revised elevations showing associated equipment cabinets are concealed within a single equipment box that is painted to match the utility pole, to the Oakland Planning Department for review and approval.
14. Radio Frequency Emissions Prior to the final building permit sign off The applicant shall submit a certified RF emissions report stating the facility is operating within the acceptable standards established by the regulatory Federal Communications Commission.
15. Public Works Review Prior to submitting a building permit application The plans shall receive a satisfactory review from the Public Works Agency, incorporating any required modifications.
16. Revised Plan Prior to issuance of building permit. Revised detail site plan to scale shall be submitted for review and approved by the Planning Bureau.
17. Height limitation Ongoing The Planning Bureau recommended approval, and the City Planning Commission approved a monopole height of 27'. This height is relatively consistent with the height of nearby light poles and was an important factor as to why approval is granted. Any modifications to the monopole, including an increase in height or addition of any equipment, could compromise this consistency and is not permissible.
![Page 20: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/20.jpg)
-0 :r 0 ,...........
0 l/) -· 3 c
I ' I
l OJ >
~· !:!. ~
~ ~
~ <Do > 3 ~ ~ )> = §5 0 ~ :;. -h ~
ro ~ 3 -0 ~ O..l)
-0 0 > ""O 0 (/')
ro CL. 11
"'O ., OJ 0 'O n 0 ([! -·
-· ,...........
"'<
![Page 21: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/21.jpg)
3/22/16
Node N22 Relocation
6644 Ascot Drive Oakland, CA
Aerial Map
Applied Imagination 510 914-0500
![Page 22: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/22.jpg)
Item Bon the map, This the existing location of the Facility. The JPA pole the equipment is attached to is part of a rule 20 underground
project so it will be removed.
![Page 23: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/23.jpg)
3/22/16
Node N22 Relocation
6644 Ascot Drive Oakland, CA
proposed antenna
Looking West from Ascot Drive
View # 1 Appl ied Imagination 510 914-0500
![Page 24: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/24.jpg)
existing pole to be removed
,,,--. ,,- ·~ CROWN
..._, CASTLE
3/22/16
Node N22 Relocation
6644 Ascot Drive Oakland, CA
Looking North from Melville Lane
View#3 Applied Imagination 510 914-0500
![Page 25: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/25.jpg)
NOTE
A COPY OF ALL REQUIRED PERMITS MUST BE PRESENT DURING ANY WORK ON THIS LOCA llON AND PERFORMING WORK AT THIS LOCATION INDICATES THAT THE CONTRACTOR HAS READ AND COMPLIED WITH THE REQUIREMENTS ST A TED IN THE PERMITS
ATTACHMENT A
CROWN CASTLE
NODE N22 RELOCATION PIEDMONT PINES RULE20 UNDERGROUNDING PH. 1
ALL WORK to.ND MATERIALS SHALL BE PERFORMED AND INSTALLED IN ACCORDANCE WITH THE CURRENT EDITIONS OF THE FOLLOWING CODES AS ADOPTE) BY THE LOCAL GOVERNING AUTHORITIES. NOTH NG IN THESE PLAl>lS IS TO BE CONSTRUED TO PERMIT WOR:< NOT CONFORMING TO THE AREAS GOVERNING CODES.
I. STATE ADMINISTP-Air/E CODE 2. STATE BUILDll\'G CODE 3. '"Sl/EIA-222-F LIFE SAFETY
CODE NFPA- 101-1990 4. STATE MECHANICAL CODE
5. STAiE PLUM31NG CODE 6. STATE ELECTRIC CODE 7, LOCAL BUILDIMG CODE 8. C!TY /COUNTY ORDINANCES
CODE COMPLIANCE
PROPERTY INFORMATION CUSTOMER:
PROJECT:
NODE:
L&\TITUDE:
LONGITUDE:
STREET 1\0DRESS:
CITY, STATE:
POLE#
POLE TYPE:
CROWN CASTLE
NODE N22 RELOC.A.TiON PIEDMONT PINES RULE20 UNDERGROUNDING PH 1 N22 {OAKLA"IO HILLS)
37.824752
-122.187383
6644 ASCOT DRIVE
0.A.KLAND, CA 94611
(N) STEEL POLE
RAD CENTER 26' -0" / ANTENM HEIGHT: 27' -0"
ANTENNA TYPE: 84010510 {KATHREl'-1 SCALA)
AZ IMUTH FOR ANTENNA: N/ A
POWER TO POLE: UNDERGROUND SECONDARY
6644 ASCOT DRIVE OAKLAND, CA 94611
THE PROJECT CONSISTS OF THE Jl-lSTALL.A.TION OF A STEEL
INSTALL STEEL PCLE AND FOUN)ATION !I\ ACCORDANCE \'!'!TH \'t1TH CONSTRUCTION SPECIFICATIONS.
SHEET
1 2 3
4 5 6
~
~00-227-2600 CALL AT LEAST TWO DAYS
BEFORE YOU DIG
TICK ET #---- - - --
DESCRIPTION
TITLE SHEET
SITE OVERVIEW
EXISTING NODE PHOTO & PROPOSED NODE PHOTO S!M
POLE & EQUIPMENT PROFILE
ENCLOSURE AND MOUNTING HARDWP..RE
EQUIPMENT SPECIF1CATIO\IS
SHEET INDEX
DO NOT SCALE DRAWINGS
POLE ACCESS: POL..E , FOUNDATION, ANTENNA, AND MISC. P;\SSIVE EQJIPMEN T INSTALL (N) ABOVE GROUND C.o\SJNET WITH (N) FOUNDATION. CONTRACTOR SHALL VERIFY AL L.. PLANS AND EXISTING DIMENSIONS AND STREET ACCESS
REV.
0
0
0
0
0
0
fFr" CROWN ~'-' CASTLE
695 RIVER OAKS PARKWAY
SAN JOSE, CA 9513-4 PHONE: (408) 954- 1580
PROJ ECT IN FORMATI ON :
6644 ASCOT DRIVE OAKLAND, CA 94611
PLANS PREPARED BY:
HP COMMUNICATIONS INC.
13341 Temescal Cyn. Rd . Corona, CA. 92883
PHONE: (951) +71-1919
IPLAN~~B:RQWN REP~...., CASTLE
COMME NTS:
SHEET TITLE:
CROWN CASTLE N22 NODE RELOCATION
PIEDMONT PINES RULE20 TITLE SHEET
~~kc~E~1LL BE OWNED. OPER.~ TED AND MAINTAINED BY CROWN INSTALL OMNI ANTENN.~ AND ALL ASSOCIATED BR.t;CKETS ON ~o~~~~N~s c?: ,.1~E D~~~R~~fNt°i~~ ~~~6~t~~gg~rf~1~GN~~~ i~f ~~~~1r5~r
ll~;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;~PO~L~E~o~w~·N~E~R:;;;;;;;;;;;;;;;;;;C~R~o~w~·N~C~A~S~TL~E;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;P~O~L~E~IN;;;;;;A~CC~O~R~D~''~C~E~W~IT~H;;;;;;CO~N~S~TR~U~C~Tl~ON;;;;;;S~P~EC~IF~: C~A~Tl~Ot~•S~.;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;B~E;;;;;;RE~S~P~O~NS~IB~L~E~F~O~R~S~A~M~E.;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;;:::;:Jl [r~1S=H=E=E=T=N==~=M=~=E=R=: ========~========d • ri'~=~~E~;:UMMARY PROJECT DESCRIPTION ~\;';!!~~~~::';;~~~;~ GENERAL CONTRACTOR NOTES • i':~J
![Page 26: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/26.jpg)
(
-------\
l \ r
__ \ I
-----------
PROPOSED
-------7 I
NODE 22 .·1
37.824752°, -122.187383° \' \
--··------··-----
(N) STEEL POLE PLACED IN THE CITY OF OAKLAND RIGHT-OF WAY,,
---- -------·--·-\
\\ \ \ \ \
\ '\ \ \ \ \ '
\ \ NEWCROWN
\\\\ -------~~~=RGRO~~-D~§.rn
/,/\\·---\ (:ARLES M~DULE · / \ \ \ENCLOSURE INSTALLED ON TOP \
r\.. \ \ OF CHARLES COMPOSITE PAD
1 ,
\ .. ,, \,,. FOUNDATION TO BE INSTALLED \ \ WITHIN THE CITY OF OAKLAND \,.,i
1
\ 1 \ RIGHT-OF-WAY. \ '---;--------;.-------'
\ ,,, ... -~' ,, \.:__-_ _:::._::-:-.:-~---~= ~-:E -:::-_:.:::.-= --~--:-=-~=~=-- -:::.:-:::-.=1-=~~::;~:;_.C: ./ \v//
/ /
//
/---i
I
ASCOT DR. NEW UNDERGROUND
----- ;- -----,- ------ FIBER AND POWER TO ' ' __ T ______ BE INSTALLED
I I I I
I -·------. , I
~/.1--.,, j I '
; '· ----- j
__ J _______ ·--···-----~/
f
z: / __; I 1
,_ I O ! U / (/) ! <:t: I :
j !
/
i
I \ \
\
/ \ \ \
\ \--------\ \ \ \
\
j
;'.r-- ·-......... -------r+-: ______ -_'-...,---.... EXISTING CROWN
·------ 1 CASTLE AERIAL
·---1--- - ---- L..F-'-l~B-=~=----_J ----·~-------- ---:7
\------- _____ _) I I
-·~-------~----~
\
,/ -/
/ ,/
EXISTING NODE 22
I 37.824810°, -122.187030° \ POLE ID:110135864 _J--c!o-------------,------=--'-,---=---=----,-1""
/J /
v
/ /
,/ J !
\ \
(/
!---
/
/ /
/
····· .......
EXISTING NODE AND WOOD POLE TO BE REMOVED >
/ /
/ /
/
//~
/ \ / \
/
\
\ \ \ \ I
EXISTING CROWN \ UNDERGROUND FIBER '~
& POWER >,_,,_/_,_,/_,_,....,,,~ -----'--.
/
/ I i i I
EXISTING CROWN UNDERGROUND FIBER
. J
I EXISTING POWER SOURCE FOR NODE N22 ON POLE #110135862
/ -- ··-.;
II .! j
I j
I I /
I I ; I i
I
rr'CROWN ~.,_, CASTLE
595 RIVER OAKS PARKWAY ~ JOSE, CA 9513-4 PHONL (<08) 95<-1580
_
1
° PROJECT INFORMATION
6644 ASCOT DRIVE OAKLAND, CA 94611
[
"'CURRENT ISSUE DATE:
1 3/23/2016
PLANS PREPARED BY:
HP COMMUNICATIONS INC .
13341 Temcscol Cyn. Rd. Corona, CA. 92883 PHONE: (951) 471-1919
ra:"~~~~~ COMMENTS:
~ ~ 1-800-227-2600
CALL AT LEAST TWO DAYS BEFORE YOU DIC
TICKET # ______ _
SHEET TITLE
CROWN CASTLE N22 NODE RELOCATION
PIEDMONT PINES RULE20 SITE OVERVI EW
![Page 27: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/27.jpg)
( 4) HELIN< LDF 4 COAXIAL CABLES ALL COAX CABLES ARE TO BE INSTALLED INSIDE PROPOSED POLE\P(4) HELIAX LOF4 COAXIAL CABLES
p.I) t;ATHRON SOJA ~0 I CS I OMT~IW..
6:00
POLE# N/A
~~:~·, RISER POLE DETAIL
SCALE: 11-- .-.T-.s.- UTILITY POLE DETAIL
B
(N) KATHREIN SCALA 840 10510 ANTENNA
ANTENNA KIT COLUMNS QTY: X3
ANTENNA KIT WILL 008H (MATERIAL: ABS PLASTIC)
(N)
(N) :r FIBER CONDUIT
{N) 1-3" SCH 40 PVC CONDUIT TO MH
{EXISTING LEASED CONDUIT TO BE USED FOR (N)-POWER SOURCE LOCATED ON
POLE#110135862 ON SKYLINE BLVD.
(N) KATHREIN SCALA ~ 84D 10510 ANTENNA
RAD CENTER
BOTIOM OF ANTENNA
TOP OF POLE
21· - o·
2s·- o·
DETAIL "A"
FOLLOWING EQUIPMENT 'Nill BE INSTALLED INSIDE Of CHARLES
MODULE ENCLOSURE..
{1} ION-Ill 7P 7P EU (1) ION-M 85P 19P
{1} RRUS 12
/ /
5'-0" (REfER TO SECTION •K• ON SHT-3 FOR SCALED DIMENSIONS)
(N) 4• SCH 80 PVC CONDUIT
23'-0"
(N) 8'-0" GROUND ROD INSTALLED MANUALLY WITH
HAMMER. #6 CU. GROUND COVERED IN PLASTIC MOULDING.
NAT!'vi;'. SOIL
REFER TO SECT!ON-E-FOR OOTING DETAIL
POLE# N/A
23'-8'
POLE & EQUIPMENT PROFILE
NON-SH?.1NK GROUT
MAKE READY
N/A
NEW CONSTRUCTION
CROWN CASTLE TO INSTALL (N) CONCRETE FOUNDATION FOR STEEL POLE, (N) STEEL POLE, (N) ANTENNA MOUNTING KIT, (N) ANTENNA, (N) COMPOSITE PAD FOUNDATION, (N) MODULE ENCLOSURE, (N) CONDUIT FROM MODULE ENCLOSURE TO STEEL POLE AND EQUIPMENT WITHIN MODULE ENCLOSURE .
INSTALL NEW UNDERGROUND FIBER AND POWER CONDUIT EXTENSION OFF EXISTING UNDERGROUND FACILITIES.
NOTES :
TOP OF POLE: 27 ' -0"
PROPOSED RAD CENTER OF ANTENNA: 26 ' -o"
ANTENNA TYPE: 24" HEIGHT X 16" DIA KATHREIN SCALA CYLINDER ANTENNA.
ANTENNA OUTPUT DOES NOT EXCEED GENERAL POPULATION EXPOSURE LIMITS.
RF EMISSION PLACARDS / SIGNAGE MEETING THE FCC REQUIREMENTS SHALL BE IN A LOCATION VISIBLE FROM CLIMBING SPACE AND BE AFFIXED TO THE POLE NO LOWER THAN 9' -0" ABOVE GROUND LINE & NO HIGHER THAN 3'-0 " BELOW THE ANTENNA.
PLACARDS / SIGNAGE ARE UVA RESISTANT AND SHALL BE ATTACHED TO THE POLE WITH GALVANIZED NAILS OR GALVANIZED SCREWS.
STEEL POLE
(4) GALVANIZED ANCHCR ..J ECLTS W/HEX NUTS ,\NC "l'IA5HER5 ASH.t A- 307
~~:.~~ POLE FOOTING/ DATA c
LOOKING WEST A
~r'CROWN ~.__, CASTLE
695 RIVER OAKS PARKWAY SN-I JOSE, CA 95134 PHONE: (408) 954-1580
PROJECT INFORMATION:
6644 ASCOT DRIVE OAKLAND, CA 94611
W1CURRENT ISSUE DATE
~ 3/23/2016 11 PERMIT SUBMISSION·
t, =~" ="""'"°' ="~
PLANS PREPARED BY:
HP COMMUNICATIONS INC.
13.341 T emescot Cyn. Rd. Corona , CA 92883 PHONE: (951) 471-1919
r;:;::ROWN ~,,,v- CASTLE
COMMENTS:
~ ~ 1- 800- 227- 2600
CALL AT LEAST TWO DAYS BEFORE YOU DIC
TICKET # ___ ___ _
SHEET TITLE :
CROWN CASTLE N22 NODE RELOCATION
PIEDMONT PINES RULE20 POLE & EQUIPMENT PROFILE
SHEET NUMBER: REVISION:
4
![Page 28: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/28.jpg)
~-~.,. w~
~.KATHAEJN -OA-
=;a;=>· GALTRONICS
"'"""' HOMOUAl ~IECES
""'""""""""""' ~~~~· ~ 0 .
'" ,, "'"""
NOTES:
1) FITSGAl...TRONICSfT5545, KA THREIN IMC>-1 0515 AND SM!.ARANTEN:-.IA BASES
2) SPUTTER BRACKET {1·LOW POWER) IS ll«;LUDED
1---•-:_L_•,_ ANTENNA BRACKET ASSEMBLY / KIT OOSH
- f------ -4 ' -0"---------
'.
. L ====;:;::::;tt:===;:;::::rl j_ .. J
1"
FAONTVJEW
ID~,--11 D 4'-6"
4'-1"
b .. a-a
A
0 0 dJ .LI .. -i" - 4" 1'-4"
. .. c:::::=i
3'
0 0
5 5 -
------4'-3"------
11 sprc If !CAT IONS I. LOAD TESTED TO 12,000LB WITH LESS TH.l.N 0.1 " DEFLECT ION 2. O.BINET PULLOVER FORCE EXEEDS ISO MPli WIND FORCE PER TELECORDIA GR·~87 3. MEETS ANSl/SCTE·77. PER ENVIRON LABS TESTING
-FLAMMABILITY · UV EXPOSURE - WATER ADSORPTION - IMPACT RESISTANCE -C HEMICAL RESISTANCE
.. . MEETS TELECORDIA GR-902 PER ENVIRON LABS TEST I NG -CHEMICAL RES ISTANCE
SCALE:
r,_,·1 +
•>---NT-. - CHARLES COMPOSITE PAD FOUNDATION FOR MODULE ENCLOSURE B
frr' CROWN ~._.,, CASTLE
695 RIVER OAKS PARKWAY SAN JOSE, CA 95134 PHONE' (<08) 95<-1580
PROJECT INFORMATION:
6644 ASCOT DRIVE OAKLAND, CA 94611
PLANS PREPARED BY:
HP COMMUNICATIONS INC.
13341 Teme~co! Cyn. Rd Corona, CA. 92883 PHONE: (951) 471 - 19 19
r::;:':ROWN ~"ev- CASTLE
COMMENTS:
~ ~ 1-800-227-2600
CALL AT LEAST TWO DAYS BEFORE YOU DIC
TICKET # ______ _
[
SHE- ET TITL: :ROWN CASTLE
N22 NODE RELOCATION PIEDMONT PINES RULE20
ENCLOSURE & MOUNTING HARDWARE
![Page 29: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/29.jpg)
--~~w..._
"" .... c........ OpiicdNlll..,lou, dl
f'Ntn>-.-
.... m.m ,.
-· H...._
., .... ,.,, ..... Mn .... ....... --..
~~""4C~
"""-"" ..... ..... _,
Description
Number of carriers
Frequencyl1l
Value
WCDMA and LTE: One to four carriers. GSM: One to eight carriers . CDMA: One to eight carriers. (subject to license handHng)
1,920 to 1,980 MHz uplink
2, 11 O to 2, 170 MHz downlink
Bl for WCDMA and L TE
ION Series °"""""""""''" ~...,,_..
001b:---.O., t9ir.
~MflflU
hi' ~-:::...,,,,. ......... , ............... ........ 518
1,650 to 1,910 MHz uplink
1,930 lo 1,990 MHz downlink
B2 for GSM, WCDMA, and LTE
ION-M7P /7P EU Mul,·band, Multi-operolo< Remele Optical 5y>tem
, ,__•:-·-~·-0
--< 10N-M7P /7P EU RADIO SPECIFICATIONS
ION Series
ION-M85P / 19P
,.. ...
41111 .,, .. $r>•q.6r.iaolblTS,_,..,dho
700 MH1. SISO/MIMO
fr-t.-.cr•..,.,ll.Mlir
ll'-1
Dowrlill
P«<ftlllo.i\:Jl,'fJIC""'W"p.-Cotriw•,dh
..... . t.riin
"'""' ... ... LI
lll;W !11;91.
. ll
• ..... !lt,'7N/l .'t
"'"~ .........
Hhm llh /11
12h 1Sl ... U l1 M • u • U l1 M
•••
Spw0ao.&n;n01 i11taof\o~o::Saw,.~
DL.~·~-'""'*'r;y.• DL.~.._..,-~,..·
<.CiAr/USVb
.u-
..... t11cl...t
Dl•~hlV PZhlh Ul
.... "' '-.-i r5S
~1o.;...w....--.. .......... ~1 ..... "40,,.,..(Ullil!l...,j.t
M1F..,_.,..IWfml.,.cil11•.,..j.-ofM...n..Jt:ild.
SCALE:
Unit of measurement mm
Fl{JUre 3 RRUS I 2 Height, Width, and Depth with Solar Shield
RAUS 12 Dimensions
Table 2 lists the technical data for the RAUS 12.
Table 2 RRUS 12 Technical Data
Description Value
Maximum nominal oulput 2x10 W, 2x20 W, 2x30 W, 2x40 W, 2x50 W, and power 2x60 W (subjeci to license handling)
1,710 to 1,785 MHz uplink
1,805 to 1,sao MHz downlink
B3 for GSM, WCDMA, and LTE
8BO lo 915 MHz upink
925 to 960 MHz downlink
B8 for GSM and WCDMA
Dimensions with Solor Shield and Handle and Feet
Heigh! 518mm
Width 470mm
Depth 190mm
Dimensions without Soler Shield and without Handle or Feet
Height 418mm
Width 458mm
Depth 159mm
Weight
RAUS 12 Bl and RAUS 22.4 kg B2
RAUS 12 B3 and RAUS 26.3 kg 12 B8
Color
Gray
A 11-- NT-, __, RRU-12 RADIO SPECIFICATIONS
Ele ctrical
MoWlsfX"V'I", Voe
Pow-er coruumprkxi, watb
OpHcol
Connecbn
Optical <01.>m los, ell
Ffber type,mm
Optical link budget, di
Compooilo i,..,.,i power 0 OTRx mashtr sid., ~
ln.tarfaeo
BTS S;de
t-bnberol connedon
7001Utt llOIUlt 1900 llltt . 2100 Ith
!lOIUlt . 190lll!t 210llliz . 700Mltz .
Sy•lom optmized be- BTS power, cllm
Anh!Jnno Port
Connector
Output power
Rolum lou, dB
850 MHz
. 85toU.4 115«2lll l6to71
55'
El1IOO/ll(r
45-
.. ,~ ""'' E!/12!
. Ot1ll
n4 nd nd
. . nx 1
.n
.41
N F....lt 850/1900 Miiz
lot loMspt<ificmon
15
1900 MHz
Frequency range, MHz:
Output pow or por carrier'", <&n
Spurio.n emicion
lfri« ol<01iots 65,11
lOJW!DG! CllllV!Y-00 wtDllMfltA
Dl output blerunce <Wer fr-cy. ell
DL output loleranc. over temperature, dB
Input ICP3, cllm
Noise tlgure, d8
ICPl ... iniu4
"""fiiui'"';,;," ICPl ... iri114
N...:ri,..~oif;,-i.;4
Sr.stem _Supervision on_d Control
Commands
Alonn•
Supervision
Mochanlcal•••
llllto1915 19301119'5
I 2 4 I 4l 41 ll 34 4l 41 l7 34 4l 41 l7 34 41 l! l6 ll
<·lHllm/lllltt
•I
-12 -11
Rfol\ioff b•"""""'dP"" ....,,,.., --im l'l'<~llwDlhl1" Ttnft1th.tt
C"'11"111-powu . POWlll icttctor fer trn.. _ ,.h
..... "" ..... "''" IOpliNI!
mquency range, MHz Heig,1, widt., d.pt. mm (in) 831•lSh 147 4>1;.,k 8!4to849 13l1'lhi!)
Kathrein'• dual band antennas ar• ready for LTE appltcations, covering al existing wireless bands as well as all spectrum under consideration for Mure systems.
• Wide band operation.
• Exceptk>nal intermorulaHon characteristics.
• High stren¢> fiberglass radome.
General specifications: F---VSWR
Polartra1ion
CoMeck>r lsdation intrasyDm
inWrsyMem
Wind load Sklo
Wlnd""""111,.lng' Shipping dmen$1ons
6~t-.1Hz 1710-2170 MHz
<1.5:1 50ohms IM3; <·160 cSc
4 x 7·15 DIN t.m.1• >30d8 >-40 dB ("'1H9' // 1711>4170 MHz) Brown or grwy ""'b(20.41og) 24 inchu (609 mm)
16 inchres (407 mm) at90mph(150kfl>) 321bf(138N)
100 mph (160 kph)
S2x20x19inc::hts (813 x 508 x 483 mm) 521b(2Ukg) O.ligned to be mounted on top of a utility_ pole uli"lg a cu.tom mounting bfacbt suppliitd by the customitr .
S.o NNOrM for ordot infonnalion.
• Mec:hMtcal dreaQl i.s based on envtronmtntal condtion• as stip.Jb:od In TIA-222-G-2 (lloeomb<tr 2009) and/Or ETS 300 019·1.._. ~ ildude .... Wllicm.chanical load i~Mdon an an-.nna bj wind at maximum w»city. Soe lhe Engineering Seeton of the catalog forturttMlrdttais.
840 10510 84010511
Dualband 700 MHz X-pol Omni Antenna
Downtmk 8'9to894 We1"t. kg (f:>l l0Uit.~5P/19' 211(4CJ lp!cilctiilicnl: .......,..... a..tllts. mo-i•lft l110o-1WDllHI lllZD>417UHs
B
frr'CROWN ~.._,CASTLE
695 RIVER OAKS PARKWAY SAN JOSE, CA 95134 PHONE: (<08) 95<-1580
PROJECT INFORMATION:
6644 ASCOT DRIVE OAKLAND, CA 94611
W1CURRENT ISSUE DATE
u 312312016 11 PERMIT SUBMISSION
~'" ''"' = """"'°' =~ ~
PLANS PREPARED BY:
HP COMMUNICATIONS INC.
13341 lemescol Cyn. Rd. Corona , CA. 92883
PHONE: (951) 471- 1919
r::;::ROWN ~'"V- CASTLE
COM ME NTS:
1-800-227-2600 CALL AT LEAST TWO DA.YS
BErORE YOU DIG
Ul«~DSEIMC(ALOOOfNMTHOINCALFOllNIA
TICKET #-------
SHEET TITLE:
CROWN CASTLE N22 NODE RELOCATION
PIEDMONT PINES RULE20 EQUIPMENT SPECIFICATIONS
ICll-M11PBI 13{2U} oMi t-~ ue ua tc91' ttJI ua
~~·~~-·;;;:-·;;;·L~•-'"~~10;;;N;;;-::;;:;;;M=8;;;5;;;P;;;/;;;1;;;9;;;P=R;;;A=D;;;IO=S;;;P;;;E;;::;C~I F;;::;IC;;::;A~T;;::;I O;;:N;;:;S~=~=;;;0u;;::;1pu1~powor=;;;pe<=conie<"=· ;;;,;;::;c11m~~~==~~=;;;E;;;Q=U=l;;;P~M~E=N=T=S=:;;;-111;;;~;;;~:;;w;;;:l;;;f=l'~:;;13
;;;:~;;;;;;T=l;;;~~N;;;;S~:::::::L•:' :;;;;;;K;;;A;;;T;;;;;;;R;;;:-;;;:;;::;;:-~~;;::;C;;::;~;;;~;:;;;;;;;~;;;~;;;:-;;;0!:;;;-;;;~;;;;;;;;;;;;1 ;;;1
0=~;;;~;;;~;;;~;;;~;;;N;;;~~;;;:;;;..,_;;;;;:..,;;;:::;;;· ;;:;:"';;:;,g;;;":';;;J;:_;;:;""';;;"==-;;;5";;;. ·;;;po;;;lariza;;;!"';;;~:.,;;;m=;;;;;;;;;."";;;45
;;;~=pa;;;na;;;;,,=====:;;;;:;:;;;D==~ [ ('""' '6 [~]
![Page 30: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/30.jpg)
ATTACHMENT B
JERROLD T. BUSHBERG Ph.D., DABMP, DABSNM, FAAPM, FHPS +HEALTH AND MEDICAL PHYSICS CONSULTING+
Ernesto Figueroa Sr. RF Engineer Crown Castle 695 River Oaks Parkway San Jose, CA 95134
7784 Oak Bay Circle Sacramento, CA 95831 (800) [email protected]
Introduction
February 18, 2016
This report provides an analysis of the technical specifications the proposed Crown Castle wireless facilities in order to determine compliance with public and occupational radiofrequency (RF) safety standards. The project scope for Crown Castle includes the installation of new wireless equipment and all associated brackets on utility poles in the public right-of-way in accordance with the construction specifications and governing construction guidelines as depicted in the node configuration drawing (attachment 1 ). These nodes will be used for wireless telecommunications transmission and reception utilizing one omni-directional Kathrein Scala antennae model 840-10510 mounted to a utility pole. The antenna and power specification details are depicted in attachment two. The distance from the antenna center to the ground for node N22m will be 26.0 feet. This analysis represents the worst case for this proposed node that is utilizing these transmission and antennae specifications. The node ID and address for this configuration proposed for Oakland Hills, CA is shown in Appendix A-0-1.
Calculation Methodology
Calculations atthe level of the antenna were made in accordance with the cylindrical model recommendations for near-field analysis contained in the Federal Communications Commission, Office of Engineering and Technology Bulletin 65 (OET 65) entitled "Evaluating Compliance with FCC-Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields." RF exposure calculations at ground level were made using equation 10 from the same OET document Several assumptions were made in order to provide the most conservative or "worse case" projections of power densities. Calculations were made assuming that all channels were operating simultaneously at their maximum design ERP. Attenuation (weakening) of the signal that would result from surrounding foliage or buildings was ignored. Buildings or other structures can reduce the signal strength by a factor of 10 (i.e., 10 dB) or more depending upon the construction material. In addition, for ground level calculations, the ground or other surfaces were considered to be perfect reflectors (which they are not) and the RF energy was assumed to overlap and interact constructively at all locations (which they would not) thereby resulting in the calculation of the maximum potential exposure. In fact, the accumulations of all these very conservative assumptions, will significantly overestimate the actual exposures that would typically be expected from such a facility. However, this method is a prudent approach that errs on the side of safety.
Page 1 of 4
![Page 31: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/31.jpg)
RF Safety Standards
The two most widely recognized standards for protection against RF field exposure are those published by the American National Standards Institute (ANSI) C95.l and the National Council on Radiation Protection and measurement (NCRP) report #86.
The NCRP is a private, congressionally chartered institution with the charge to provide expert analysis of a variety of issues (especially health and safety recommendations) on radiations of all forms. The scientific analyses of the NCRP are held in high esteem in the scientific and regulatory community both nationally and internationally. In fact, the vast majority of the radiological health regulations currently in existence can trace their origin, in some way, to the recommendations of the NCRP.
All RF exposure standards are frequency-specific, in recognition of the differential absorption of RF energy as a function of frequency. The most restrictive exposure levels in the standards are associated with those frequencies that are most readily absorbed in humans. Maximum absorption occurs at approximately 80 MHz in adults. The NCRP maximum allowable continuous occupational exposure at this frequency is 1,000 µW/cm2
• This compares to 5,000 µW/cm2 at the most restrictive of the PCS frequencies(~ 1,800 MHz) that are absorbed much less efficiently than exposures in the VHF TV band.
The traditional NCRP philosophy of providing a higher standard of protection for members of the general population compared to occupationally exposed individuals, prompted a two-tiered safety standard by which levels of allowable exposure were substantially reduced for "uncontrolled " (e.g., public) and continuous exposures. This measure was taken to account for the fact that workers in an industrial environment are typically exposed no more than eight hours a day while members of the general population in proximity to a source of RF radiation may be exposed continuously. This additional protection factor also provides a greater margin of safety for children, the infirmed, aged, or others who might be more sensitive to RF exposure. After several years of evaluating the national and international scientific and biomedical literature, the members of the NCRP scientific committee selected 931 publications in the peer-reviewed scientific literature on which to base their recommendations. The current NCRP recommendations limit continuous public exposure at PCS frequencies to 1,000 µW/cm2
•
The 1992 ANSI standard was developed by Scientific Coordinating Committee 28 (SCC 28) under the auspices of the Institute of Electrical and Electronic Engineers (IEEE). This standard, entitled "IEEE Standards for Safety Levels with Respect to Human Exposure to Radio Frequency Electromagnetic Fields, 3 kHz to 300 GHz" (IEEE C95.1-1991), was issued in April 1992 and subsequently adopted by ANSI. A complete revision of this standard (C95.1-2005) was completed in October 2005 by SCC 39 the IEEE International Committee on Electromagnetic Safety. The current version, including minor revisions, was published in March 2010. Theirrecommendations are similar to the NCRP recommendation for the maximum permissible exposure (MPE) to the public PCS frequencies (950 µW/cm2 for continuous exposure at 1,900 MHz) and incorporates the convention of providing for a greater margin of safety for public as compared with occupational exposure. Higher whole body exposures are allowed for brief periods provided that no 30 minute time-weighted average exposure exceeds these aforementioned limits.
On August 9, 1996, the Federal Communications Commission (FCC) established a RF exposure standard that is a hybrid of the current ANSI and NCRP standards. The maximum permissible exposure values used to
Page 2 of 4
![Page 32: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/32.jpg)
assess environmental exposures are those of the NCRP (i.e., maximum public continuous exposure at PCS frequencies of 1,000 µ W /cm2
). The FCC issued these standards in order to address its responsibilities under the National Environmental Policy Act (NEPA) to consider whether its actions will "significantly affect the quality of the human environment." In as far as there was no other standard issued by a federal agency such as the Environmental Protection Agency (EPA), the FCC utilized their rulemaking procedure to consider which standards should be adopted. The FCC received thousands of pages of comments over a three-year review period from a variety of sources including the public, academia, federal health and safety agencies (e.g., EPA & FDA) and the telecommunications industry. The FCC gave special consideration to the recommendations by the federal health agencies because of their special responsibility for protecting the public health and safety. In fact, the maximum permissible exposure (MPE) values in the FCC standard are those recommended by EPA and FDA. The FCC standard incorporates various elements of the 1992 ANSI and NCRP standards which were chosen because they are widely accepted and technically supportable. There are a variety of other exposure guidelines and standards set by other national and international organizations and governments, most of which are similar to the current ANSI/IEEE or NCRP standard, figure one.
The FCC standards "Guidelines for Evaluating the Environmental Effects of Radiofrequency Radiation" (Report and Order FCC 96-326) adopted the ANSI/IEEE definitions for controlled and uncontrolled environments. In order to use the higher exposure levels associated with a controlled environment, RF exposures must be occupationally related (e.g., PCS company RF technicians) and they must be aware of and have sufficient knowledge to control their exposure. All other environmental areas are considered uncontrolled (e.g., public) for which the stricter (i.e., lower) environmental exposure limits apply. All carriers were required to be in compliance with the new FCC RF exposure standards for new telecommunications facilities by October 15, 1997. These standards applied retroactively for existing telecommunications facilities on September 1, 2000.
The task for the physical, biological, and medical scientists that evaluate health implications of the RF data base has been to identify those RF field conditions that can produce harmful biological effects. No panel of experts can guarantee safe levels ofexposure because safety is a null concept, and negatives are not susceptible to proof. What a dispassionate scientific assessment can offer is the presumption of safety when RF-field conditions do not give rise to a demonstrable harmful effect.
Summary & Conclusions
All Crown Castle antenna systems operating with the maximal exposure conditions characteristics as specified above and observing a 5 foot (public) exclusion zone directly in front of and at the same elevation as the antenna, will be in full compliance with FCC RF public and occupational safety exposure standards (see appendix A-1 ). These transmitters, by design and operation, are low-power devices (see attachment 2). An RF safety notice sign, as depicted in appendix A-2 should be placed near the antenna. This sign should contain appropriate contact information and indicate that RF exposures at 5 feet or closer to the face of the antenna may exceed the FCC public exposure standard. Thus only qualified RF workers may work within the 5 foot exclusion zone. The maximum RF exposure at ground level from this node will not be in excess of9.5% of the FCC public safety standard, (see appendix A-3). A chart of the electromagnetic spectrum and a comparison of RF power densities from various common sources is presented in figures two and three respectively in order to place exposures from wireless telecommunications systems in perspective.
Page 3 of 4
![Page 33: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/33.jpg)
Given the low levels ofradiofrequency fields that would be generated from all Crown Castle omni-directional antenna installations of this configuration, (e.g., antenna specification and input power); where the center of the antenna is 26.0 or more feet above grade, and the 5 foot public exclusion zone directly in front and at the same elevation as the antenna is observed, there is no scientific basis to conclude that harmful effects will attend the utilization of these proposed wireless telecommunications facilities. This conclusion is supported by a large numbers of scientists that have participated in standard-setting activities in the United States who are overwhelmingly agreed that RF radiation exposure below the FCC exposure limits has no demonstrably harmful effects on humans.
These findings are based on my professional evaluation of the scientific issues related to the health and safety of non-ionizing electromagnetic radiation and my analysis of the technical specification as provided by Crown Castle Networks. The opinions expressed herein are based on my professional judgement and are not intended to necessarily represent the views of any other organization or institution. Please contact me if you require any additional information.
Sincerely,
~y~ Jerrold T. Bushberg Ph.D., DABMP, DABSNM, FAAPM Diplomate, American Board of Medical Physics (DAB MP) Diplomate, American Board of Science in Nuclear Medicine (DABSNM) Fellow, American Association of Physicists in Medicine (FAAPM) Fellow, Health Physics Society (FHPS)
Enclosures: Figures 1-3; Attachment 1,2; Appendix A-0, A-1, A-2, A-3 and Statement of Experience.
Page 4 of 4
![Page 34: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/34.jpg)
·························································································································································· National and International Public RF
Exposure Standards (DAS @ 1,950 MHz)
1.4-------------------t 1.2-------------------t
1
0.8 0.6 0.4
0.2 0 & # "' b"' 0~ l§' ·~"' ~b ~ ~ ~c; ~~ ti'~ ~ ~,,,~ ~(Ji ~~ -:l~
#' v ~ ~(/) 'r'.;y "'-.~ t" ~~
*International Commission on Non-Ionizing Radiation Protection (ICNIRP) Public Safety Exposure Standard. ICNIRP standard recommended by the World Health Organization (WHO). Memben of the ICNIRP Scientific Committee were from:
• Australia • Finland • France • Germany • Hungary •Italy •Sweden •Japan •United Kingdom • United States
, ................................................................................... f.i&"!!!.~ .. J .................................................................... . © HAMPC 2008 All Rights Reserved
![Page 35: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/35.jpg)
Non Ionizing Electromagnetic Radiation (Nl/EMR)
: ._ Ionizing Electromagnetic,... 1 Radiation
Wireless } PCS - 1,900 MHz Power Line Communication Cellular - 900 MHZ
60 Hertz Services
I I
Visible 1 Television light 1
(((((c il))))Mlcrowaves 4\ ~::.:; ~:~.~ -.m...,....-.~T©r f ~
Medical diagnosis
and therapy a;o CF
Electric and Magnetic Radio & TV waves Infra-red
Ultra- +-- X-rays-+ Cosmic
Fields Rays
Energy(ev) ~.1..-..L-...1.-..1.1-....1.--1...--1..--L...&....1~.L.....1..1.-..1--1-....u..u...--1---1-~~-=-~""'"""LL--L--L~ 10·" 10·12 10·11 Hr" 10-' 10·• 10" 10"" ur' 10-" I 10 102 103 104 105 106 107 108 109 101• 1011 IO"" 10" ·I
The Electromagnetic Spectrum
© HAMPC 2008 All Rights Reserved Figure 2
![Page 36: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/36.jpg)
.................................................................................................................................................................... Typical Exposure from Various Radio Frequency I Microwave Sources
350 N s 300 ~ -(ll ...... 250 ...... = ~ Q
200 -~ .... ~
150 = .... ~ ~ - 100 = (ll
Q c. 50 ~ ~
0 Cordless Bluetooth Phone Headset
CB Mobile Radio
Outside WiFi Microwave Laptop
Oven
Figure 3
Baby Typical Max. Typical DAS Monitor Public Public
Exposure Exposure in from a DAS Neighborhood
Transmission Site
.................................................................................................................................................................... C HAMPC 2008 All Rlgba Reserved
![Page 37: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/37.jpg)
Attachment 1 Site Configuration Examples
![Page 38: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/38.jpg)
AOCl'r'7-AL.LIE<ll.HDl'&NTS....,-El'!'IEENfOl.RilOIM'f WOllCCHlHSLOCATDHMD~WCft::ATTlm 1.DCATDlllDCATBl~TTI-ECOH'f'ftACTOl'IH.l.llE#O»Cl CXU'l..IDllf!HnEIEO.ll&&ITllTA1mtl'll-El'BUIS -- CROWN
CASTLE NODE N22 RELOCATION
PIEDMONT PINES RULE20 UNDERGROUNDING PH. 1 6644 ASCOT DRIVE
,\IJ,.-l»C*1UWS~ll~-IWS~• ~-fll[~~OT-rew>llNC:CalQ
-.-..-tWC.-~NM:ltll"·ti. IClfM.N:• nte::$1:PVHllS">O•~TI)--NQI" tDllf'OlllilM(;IO~llllU.$OIMFMCCIXIC.
CODI! COMPUANce!
--J'llO,la:f'l =~..:ist)Ol,~~1'11.1 llOC<i till (OIWHI ltlU)
"'---"'~~ W-<" 27-~
IOO!OUO~~
"l.Ml'IH "°" ltflOloW H./• --PROJECT SUMMARY
OAKLAND, CA 94611
-.<C"""'"'OCMSTSOT...:llC\'Jll.U.._OTAITUI. "CU.~-...... -""°...c.~..nw:~ 9tCM WLL• -.cD_ Ol'U•'llll •IC) 11-TMCD I>'~·
PROJECT DESCRIPTION
MSf>IJ.f'IDl,,IOQ..lMID~TlOH.H~.WX.-<XtfflllUCl'IOllP(Cf'CAJQIS.
~l;N)-QIQ.fCl('.Aml(TMll(ll)~
llCWJ,WIMIO!MltlJllLl.U!IOCW[O~m'l:Oll '°"tt~M!ll~~
IOWJ.lltW~llll!ll-"'°""ClllClUIJ OODnlOllOTPDrSIUIS--'11Cutn.
PROJECT SCOPE
~-227-1!00 -~ ... ":t-
TICmj ____ _
2
SHEET INDEX
CO NOT SCALE CRAWHQS
GENERAL CONTRACTOR NOTES
tf"'r' CROWN 'V-CASTLE
.... -. .,~ HPCOMMUNICA'nONS
IM:. llJOl-~1111.
-~--(lll)G1- 111t
,.,,.,,....,
![Page 39: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/39.jpg)
I \
-{ I
\ ,\ I ___,.
- -----· ~- r.(HJ::-::STEE=:-:L POL=-:-:E PUC::-:±:~ ED::--::· ,.:-=ll!E:"':c=1TY-:-::OF::-i__ \
1 ~ ' i\
OAKl...ANJ RIGHT-Of WAY. •.-
/
I\ \ \
I ASCOT DR. ==~-:.
NEW utlJERGROlJN) ....- ~-, -11-1- ~BE:S,.ANOPO'M:R TO -- _. ,:;..EXl-STNG- CROW-H ~
I ( ~ -~}_L LJ /;/ [""" I \ _ -
1-- r- ----r ----==....,.,'""" ___..J /
r 1_-=--______ _J
SITE OVERVIEW
c· \.- - --~~:STIN~ . T\ NODE22 '\
37.824810°, -122.187030° \
i J
POLE 10:110135864 ...-- )
~ EXISTNG HOOE <',> AHO WOOO POLE 9i. TOBERal'.)VED ~
EXISTING CROMt UNOERGROUNO FIBER
I
I I
I
I I EXISTHG POWER SOURCE FOR NOOE N220NPCl..E #11 01358S2
I I
If"/"' CROWN 'V-CASTLE
IMC ASCOT DRIVE OAKLAND, CA 94111
-·~ HP COMMUNICATIONS INC.
•D<••-q.o. ... -••l• ........
5~0rf:
tf"'I"" CROWN V - CASTLE
![Page 40: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/40.jpg)
=~= R • -••
POl.£f N/A
-· 1RISER POLE: DETAIL le
I I I
a.:;;..--\ ,1 - r n ~· ' " -•=-Y~ . ; .. "-::
=
MAKE READY
H/A
NEW CONSTRUCTION
CflOMi CAS1l.E TO INS'IALL {N) COOCRETE srm POL!. (N) srm
tf<M.IOJNllHCKIT,(M) POSfTE PMl ft'U().l.TlO!l,
R£. ~) c:otWT 10 STffi POU
-~
NOTES:
TQP OF PO..£: 21' -0-
PftOPOSED RAO WITTJt Of ~ 2(/- rf'
NfTtNKA TrP£: 24" HEIGHT X 16° ~ KAlHRClf SCN.A C'l'lKO AHTDIMot..
NfTENKA OlJfPVT DOCS NOT EXCEt0 GENDW. f'OPUl.AllON EXPOSUR£ LNTS.
"' EMISS(lH PVGUIOS I S1CHN;£ MEEl'»IC lliE P'tC R(OIJll6EHTS S1-W..L BE N A lOCAllOM V!Sl8l..E fMOM QJ~lllNC SP1'1CEAH08EAfflXWTOHPOlEMO UWO TIWI 9'-0" li!itNE QtCOM) LllE • MO HKHR nwi J'-o" enow n£
"""'"' Pl.JCNl!DS / Sl()W';E>Rf. WA J!fSISTANT ~ StWJ. BE ATTN::tfl> TO TI£ POU: 'MTl1 CN.VAKIZED PW.$ Oft CN.VAHllED
""""""
.=.iPOLE F"OOTINC/ DATA le
tf"">,...CROWN V - CASTLE
---1844 ASCOT DRIVE
OAKLAND, CA MS11
I 3123/2015
.V~TI- K#i biOiiiiiiiOOi
~::::...-. I ,__!Ne. •D<ll-(\oo.M.
-~__ ,,.,._,
...... s~o~
If"',.... CROWN V-CASTLE
~ ...
ncm1 ____ _
- ...... ====-..... _._...._..
II C::::::::::::::::::::::::::::::::::::::::::::::::::::::::~~~:::::::::::::::::::::::::::::::::::::::I :=::::'OOKJ= G ~sr::::::::::I~· ~I~ ,...,.4~~·~ IL--=~UTIUTY PO...E DETAIL Pa.El N/A m:. ,...
POLE & EQUIPMENT PROFILE
![Page 41: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/41.jpg)
,.
~ li__J . .. =
rr CROWN V-CASTLE
![Page 42: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/42.jpg)
ION-M7P/ 7P EU ~---~~°"'""s,-
ION-M7P/7P EU R...010 SPECIFICATIONS
ION-M85P/ l9P
10N-M 8SP/19P RADIO SPEC1F1CATIONS
-~-_ ... _. :a:"".::--·-::,,_ ..
------~--· --~ ............ _.,._ •Ofto-...... ·-.. ... M•
.. ... M• ~ ........ wrrs--
------o..,.._., .... -.-
.. -~-:::
..
:!::'- :;-_
-tE ... ::::.--
.......
:::. : =....z.::-..:w ,._ .. ___ ..... __
··~ us.,. ... ·-..,.. ..... m
·-::: ...
-~'
J
'~
__ ... ~
°""""- .... --::-"------« ..... ....__._.. Cl....,...._ __ • ....,. ..
~-.... _ _,_. .... i... ......
..,.-s..,.r--~
l-llillllM __ ....... _..,l. r-: _..,,,_,_
'M:DM.11-Ln.0...•- ........ GSl.t0...•e911-CDMA:O...lllelfN..-..
~--- ......... - 1,i.iii; ,.,._..,... 1,110112.110-
•1·~-llf. ,...,.l,tlO- ..... 1.ao.1..0..v--. N•CllM.WClCllM.-LTI 111D•l,1'16 MHr ....
, ... , ... """"_ lll!IWCllW.WCCMA.-LTI
l~-~-~:~i:!~MOW,d: ~-~~~'.:'.'j~~~'.'.'.:".~".:'.:".'.:::=l
0 ... ,. ... ,. G. 1' JI . ,. ..
·u ·-.... ........ ~ ::::;... ::::..-...... ::-..:: z;*'-.... -
-
-·-----.•ui:.....-. ..-. .. ---·--·-- .... -......... ·--..-.. · ~----."""' ............... -
l<ATHREIN SC.t.LA 840 10510 ANTENNA
84010510 14010511
Dul:bend 700 MHz X·pol Omni Anlenna
~~ --w--~ -- ---- --
fF"'r" CROWN V-CASTLE ---w.-.0.•1>4 _,..,...__
HP COMMUNICATIONS INC:
/F'r"CROWN 'V-CASTLE
6
![Page 43: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/43.jpg)
Attachment 2 Antenna Specifications
![Page 44: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/44.jpg)
KATH SCALA DIVISION
VSWR <1..6:1
4lt7-16DIN~
>80dB >40 dB (~I/ 1710-.2170 Mt%)
4& I> (20.4 kg)
16 tnclMil& (407 mm)
100 ms:*\ (160 l(ph) 32x20x19 lllltlcile (813 x608 x483 mm) 62 I> (23.8 ltg)
•MQCnanicat ~n IS baS4IO on 8l'Wll'OCV'nenla.I cordlons as suputall!<I WI TIA422-G-2 ~ 2000) ant\'OI' ET8 300 019-1-4Wl*:h hlell$ lh8 fillltD l'l'IOChalUC8l loacl ~on an I~ ~Wlnclatm&Jll'IUn WfOClt/. SllOtne Engh«tng ~Im Of tt» ClllalOg '°' tllrth« ~
84010510 84010511
700 MHz Dual Band Omni Antenna
Antenna 1 Antenna2 Dual Barnt (MHZ) 698-894 1710-2170 Dual PolarlzaUOn x x HPSW 360° 360°
698-894 MHz
~
HOl1ZM8' pattQm VOt1ICaJ pa1t8m :t40"-polartzatlon :H&•i>Olartzasla"I
1710-2170 MHz
~ In:.., SCllS DIVl$10n Post OCllC$ BOX -4680 MealOro, OR 97601 (USA) PnonO: (641) 77D-e600 FU (641) 779-3991 Emal: COOll'.ILWClttonsOICllllnrl.com ,,.ern«: www.JlaUlrWl«:ala.com
![Page 45: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/45.jpg)
, (,
Antenna Power Detail - Config #1
- .,_., - ,,_
-~- T"" ""-- T-....
T-
.... _ - T- - - .. ..,_ - ._ ._ -- -- - .. --- .. ... --D .,,,.. ·-· ... - - -- ~- -- - ... ""'*' - - i- (- (- --- c.,, ..... - --· --· - ---- IM'll ·- .. ., ..., .. ..., .. -(IHI)
N22M ··- Kllhein~·
"'" .... 412!5 ·~ .. .... ...,. WI .... 84010510 - "'"
..,. """" ,~,. I NIA NIA 37.82475 122. 18738 --"' ""'""·""
![Page 46: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/46.jpg)
Appendix A-0
Node IDs, Configuration & Locations
![Page 47: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/47.jpg)
AppendixA-0 Node IDs, Configuration & Locations
Conf1gurat1on 1: Omni
Antenna Pole Antenna Ground Site ID Config Number Rad Center Azimuths Latitude Longitude Street Address City. CA Antenna Type Node Equipment Elevation
![Page 48: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/48.jpg)
Appendix A-1 RF EXPOSURE AT THE LEVEL OF THE ANTENNA
![Page 49: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/49.jpg)
![Page 50: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/50.jpg)
Appendix A-2 RF NOTICE SIGN
![Page 51: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/51.jpg)
The radio frequency (RF) emissions at this site have been evaluated for potential RF exposure to personnel who may need to work near these antennae.
RF EXPOSURE AT 5 FEET OR CLOSER TO THE FACE OF THE ANTENNA MAY EXCEED THE FCC PUBLIC EXPOSURE STANDARD AND THUS ONLY QUALIFIED RF WORKERS MAY WORK IN THIS 5 FOOT EXCLUSION ZONE. OTHERS WHO NEED TO WORK IN THE EXCLUSION ZONE SHOULD CALL
FOR INSTRUCTIONS. REFER TO SITE # ------
Reference: Federal Communications Commission (FCC) Public Exposure Standard. OET Bulletin-{)5, Edition 97-01 , August 1997.
![Page 52: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/52.jpg)
ppendix -3
RF Exposure At Ground Level
![Page 53: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/53.jpg)
RF EXPOSURE AT GROUND LEVEL PERCENTAGE OF FCC MAXIMUM PUBLIC EXPOSURE (MPE) LIMIT
Red: Greaterthan 100% Public MPE
0 Yellow: Less than 100% Public MPE
• Blue: Less than 20% Public MPE
Green: Less than 5% Public MPE
• Brown: Less than 1 % Public MPE
![Page 54: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/54.jpg)
\ \
ATTACHMENT C
CROWN CASTLE
CROWN CASTLE OAKLAND HILLS OHN22
SITE ALTERNATIVES
![Page 55: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/55.jpg)
)> r-+ ro l ::J OJ ct. < ro-r 0 n OJ ct. 0 ::J (/)
![Page 56: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/56.jpg)
Overview
• This is an existing site on a JPA pole that needs to be relocated as its part of a Rule 20 underground project.
• This project will replace the wooden pole with a new metal pole
• The area Crown is looking to cover is all residential with no commercial property in the area.
• The only existing structures in the area metal light poles owned by the city. The city has refused to work with Crown on allowing them to attach equipment to the poles.
• The search area for this site is extremely small as it's replacing an existing site in an existing DAS network.
![Page 57: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/57.jpg)
Item Con the map - Stop Sign Street light. Oakland has not been willing to allow Crown to mount equipment to city owned
infrastructure.
![Page 58: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/58.jpg)
• <
Item Don the map - This is one of the existing light poles in the area, just north of the existing location .
![Page 59: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/59.jpg)
\, '
Item E is another city light pole which is just south of the existing site. This photo shows the existing location and the new light pole.
![Page 60: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/60.jpg)
Madani, Jason
From: Sent: To:
Miller, Scott Wednesday, May 04, 2016 3:06 PM Madani, Jason
ATTACHMENT D
Subject: FW: Proposed New Relocated Pole Ascot/Skyline
Jason, this is in regard to your Skyline/Ascot application.
Scott
Scott Miller, Zoning Manager I Bureau of Planning I 250 Frank H. Ogawa Plaza, Suite 2114 I Oakland, CA 94612 Phone: (510) 238-2235 I Fax: (510) 238-4730 I Email: [email protected] I Website: www.oaklandnet.com/planning
-----Original Message-----From: Robbie [mailto:[email protected]] Sent: Wednesday, May 04, 2016 2:53 PM To: 'Robert Meyers' Cc: Maxson, Nayeli; Campbell Washington, Annie; Miller, Scott; [email protected]; [email protected] Subject: RE: Proposed New Relocated Pole Ascot/Skyline
Bob, I'm told that the info sent/posted by planning and the construction company were retracted. Per my conversation today with Annie: we're calling for an in-person meeting with Crown, Planning (up through Director), Annie, me--and you and John Rabold if you'd like to join. Nayeli (Annie's aide) is setting it up. Issues include burying the fan and other nonantenna overhead equipment; having CROWN install and pay for power for a light on the two poles (and matching the City's street light poles). I believe resident John Rabold has posted more current info, but I hear details are still being worked out.
Robbie Neely Administrator/Consultant Piedmont Pines Neighborhood Association [email protected]
-----Original Message-----From: Robert Meyers [mailto:[email protected]] Sent: Wednesday, May 04, 2016 10:23 AM To: Robbie Subject: Proposed New Relocated Pole Ascot/Skyline
Hi Robbie - Yes, pis let me know because I'd like to get our comments to the planner at least to tell him that the advertised address is incorrect as well as the street names on CC's map submitted with their drawings.
Thanks, Bob
On Wed, 5/4/16, Robbie <[email protected]> wrote:
1
![Page 61: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/61.jpg)
Subject: RE: Proposed New Relocated Pole in Undergrounded District Ascot/Skyline To: '"Robert Meyers'" <[email protected]> Date: Wednesday, May 4, 2016, 10:02 AM
I had mistaken the location cited in your earlier email. I've been working this site and one other on Burton for almost 2 years. They're
antena poles for Crown Castle, construction company for Verizon. CC is seeking a variance. There's nowhere to put the poles that won't end up in one phase or another. Verizon customers need the antennas. It's very thorny. I'll have more info on this this afternoon. I'm phone-meeting with Annie/staff about this and several other issues. Crown Castle has
Robbie Neely Administrator/Consultant Piedmont Pines Neighborhood Association [email protected]
-----Original Message-----From: Robert Meyers [mailto:[email protected]]
Sent: Tuesday, May 03, 2016 2:08 PM To: Robert Meyers; 'Jay Ward'; Robbie Cc: Nayeli"Maxson; Linda"Swartz Subject: Proposed New Relocated Pole in Undergrounded District Ascot/Skyline
Robbie et. al. - Need help on this ASAP. Aren't the ONLY poles allowed in an Undergrounding District such this one in Phase -1 to be metal and
ONLY for lighting? While the subject proposed pole would be metal, it will be for telecom transmission, but NOT for lighting. Please inform. Thanks. Bob
On Sun, 5/1/16, Robert Meyers <[email protected]> wrote:
Subject: New Relocated Pole in Undergrounded District
To: "'Robert Meyers"' <[email protected]>, '"Jay Ward"' <[email protected]>, "Robbie" <[email protected]>
Cc: "Nayeli"Maxson" <[email protected]>, "Linda"Swartz" <[email protected]> Date: Sunday, May 1, 2016, 5:32 PM
Hi Robbie - Maybe we don't have to call up the cavalry just
yet. On carefully reviewing the info sheet I noted that the project is titled: "NODE N22 RELOCATION - PIEDMONT PINES RULE 20 UNDERGROUNDING PHASE - 1" So, do we know how this fits into the bigger undergrounding picture? Note that it says it's within Phase - 1 Undergrounding, but what's Rule 20?
2
![Page 62: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/62.jpg)
The sheet notes that a new metal pole will be installed across Skyline from the existing wood pole, and rather than having a bunch of telecom equipment boxes stuck onto it, the equipment would be housed in a new box on the ground next to the new pole. However, the address and street names on the location map are incorrect and I'll handle that with the planner. I'll need to monitor planning to ensure that the old existing pole gets removed.
Best, Bob
On Sun, 5/1/16, Robbie <[email protected]> wrote:
Subject: RE: New Pole in Undergrounded District To: "'Robert Meyers"'
<[email protected]>, '"Jay Ward"' <[email protected]> Cc: "'Maxson, Nayeli"'
<N Maxson@oa kla nd net.com>, "'Swartz, Linda'" <[email protected]> Date: Sunday, May 1, 2016, 4:32 PM
Bob, that pole should definitely be moved outside the
undergrounding district phase 3, which
means it has to go on Skyline, south of
Castle.I'm copying Nayelli Maxson in Councilmember's office and Linda
Swartz, our undergrounding project
manager. In the meantime, yes, let the planner know it's not okay.
Robbie Neely Administrator/Consultant
Piedmont Pines Neighborhood Association
-----Original Message-----From: Robert Meyers
[mailto:[email protected]]
Sent: Sunday, May 01,
3
![Page 63: STAFF REPORT Case File Number: PLN16-090...Oakland City Planning Commission May 18,2016 Case File Number: PLN16-090 new cement pad located next to the pole will be housing all radio](https://reader034.vdocuments.net/reader034/viewer/2022042122/5e9d8a4b74057050d746099b/html5/thumbnails/63.jpg)
2016 4:18 PM To: Jay Ward Cc: Ward; Robbie Neely Subject: New Pole in Undergrounded District
Hi Jay - As part of my
august role as head of PPNA Zoning Committee I monitor those yellow Planning Commission public hearing signs as well as Commission
agendas for projects in our
neighborhood.
The most recent one is at intersection of
Ascot and Skyline with an Ascot address,
((6644 Ascot Drive) announcing proposed
placement of new metal pole with telecom equipment on it and next to it. The proposed site lies
within a recently Undergrounded
District. Not only is the site address and vicinity map incorrectly noted on the announcement, our main concern is how
can the City allow new poles to be placed in an already Undergrounded District?
Aren't the only new poles allowed to
be metal light poles? Before I contact
the planner, I'd appreciate your take
on this. Please inform. Thanks and best
regards. Bob Meyers 510-530-5590