stage one estate plan...tempo ra y drainage 333swale 59. 0 road l ev l accesstrestriction red...

1
1 2 . 5 1 2 . 5 1 5 1 5 1 5 1 4 . 3 7 1 2 . 5 1 2 . 5 1 5 1 4 . 3 6 1 1 . 3 6 1 5 1 5 1 5 1 2 . 5 1 2 . 5 1 2 . 5 1 2 . 5 6 . 4 9 1 1 . 3 5 1 5 1 2 . 5 8.5 4.25 28.31 34.33 34.33 34.32 34.33 34.33 31.19 34.32 34.32 34.32 34.2 34.2 31.33 4.25 1 487m² 8 428m² 10 411m² 11 429m² 12 429m² 13 429m² 14 515m² 15 515m² 16 515m² 17 515m² 489m² 1 5 1 5 1 5 1 5 1 2 . 5 1 5 1 5 1 2 . 5 1 5 1 5 1 5 1 5 34.2 34.2 34.2 34.2 34.2 34.2 2 513m² 3 513m² 4 513m² 5 513m² 6 513m² 7 428m² 9 3 1 . 4 3 5 . 5 3 1 . 4 3 1 . 4 3 4 . 8 2 3 5 . 5 3 5 . 5 3 3 . 4 2 3 1 . 4 2 3 1 . 7 1 3 2 10.44 12 12 6.38 12.5 12.5 12.5 12.5 12.5 10.4 15 15 12.7 12.5 10.4 10.44 12.58 6.16 12.78 18 377m² 19 471m² 24 328m² 25 333m² 26 415m² 27 426m² 28 442m² 29 444m² 30 444m² 3 1 . 4 3 1 . 4 3 1 . 4 3 1 . 4 16 11.53 14 15 20 502m² 21 471m² 22 440m² 23 362m² 15 16 11.53 14 H H 55.00 56.00 57.00 58.00 59.00 60.00 60.50 59.50 61.50 62.00 62.00 Drainage Swale Temporary Turning Head Existing Residential Existing Residential Future Development by Others Drainage Swale REIHILL ROAD PROMENADE KILCHURN CAWDOR LANE HAMPTON ROAD KINGSWAY BELGRAVE VISTA APPLEBY PARK DISCLAIMER: This brochure is presented for infor- mation purposes only and does not constitute nor is to constitute a representation term or condition in respect to any other offer to purchase which may be made by any prospective buyer or acceptance by the seller of any such offer. It is believed that state- ments made in this brochure are correct but no representation or warranties in relation thereto are being made. Liability to the extent permitted by law is disclaimed for any loss or damage which may arise from any person acting on any statements of diagrammatic representations or of measure- ments contained therein. Pictures are for illustra- tive purpose only. Plans subject to council approval. MNG Ref: 100698sa-029g Date: 06/02/2020 ©Copyright For more information contact: 0412 579 522 [email protected] | land4salewa.com.au NORTH Lot Level Footpath Connection/Manhole Sewer Housing Drainage Manhole Drainage Grate Side Entry Pit Water Connection and Connection Western Power Dome Padmount Site Western Power H Water Hydrant Water Valve NBN Connection Retaining Wall Limestone Street Light Turning Head Temporary Drainage Swale 59.00 Road Level Access Restriction Red Asphalt (for lots 18-21) Temporary Bin Pads Fence - Limestone effect Concrete Retaining Wall Gas Connection Bushfire Prone Area Lot affected by and Connection Uni Pillar Western Power by Others Development Future Residential Existing Stage 1 Release Stage 2 Release LEGEND

Upload: others

Post on 04-Apr-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STAGE ONE ESTATE PLAN...Tempo ra y Drainage 333Swale 59. 0 Road L ev l AccesstRestriction Red Asphalt (for 5lots 518- 21) ... Existing Residential Existing Residential Future Development

12

.51

2.5

15

15

15

14

.37

12

.51

2.5

15

14

.36

11

.36

15

15

15

12

.5

12

.51

2.5

12

.56

.49

11

. 35

15

12

.5

8.5

4.25

28.31

34.33

34.33

34.32

34.33

34.33

31.19

34.32

34.32

34.32

34.2

34.2

31.33

4.25

1 487m²

8 428m² 10

411m²

11

429m²

12

429m²

13

429m²

14

515m²

15

515m²

16

515m²

17

515m²

489m²

15

15

15

15

12

.51

5

15

12

.51

51

51

51

5

34.2

34.2

34.2

34.2

34.2

34.2

2513m²

3513m²

4513m²

5513m²

6513m²

7428m²

9

31

.43

5.5

31

.4

31

.4

34

.82

35

. 5

35

.5

33

.42

31

.42

31

.71

32

10.44

12

12

6.38

12.512.512.512.5

12.5

10.4

15

15

12.7

12.5

10.410.44

12.58 6.16

12.78

18

377m²

19

471m²

24

328m²

25

333m²

26

415m²

27

426m²

28

442m²

29

444m²

30

444m²

31

.4

31

.4

31

.4

31

.4

1611.53 14 15

20

502m²

21

471m²

22

440m²

23

362m²

15 1611.53 14

H

H

55.00

56.00

57.00

58.00

59.00

60.0060.50

59.50

61.50

62.00 62.00

Lot Level

Footpath

Connection/M anholeSewer Housing

Drainage M anhole

Drainage Grate

Side Entry Pit

W ater Connection

and ConnectionW estern Power Dom e

Padm ount SiteW estern Power

H W ater Hydrant

W ater Valve

NBN Connection

Retaining W allLim estone

Street Light

Turning HeadTem porary

Drainage Swale

59.00 Road Level

Access Restriction

Red Asphalt

(for lots 18-21)Tem porary Bin Pads

Fence

- Lim estone effectConcrete Retaining W all

Gas Connection

LEGEND

Bushfire Prone A reaLot affe cted by

and ConnectionUni PillarW estern Power

by OthersDevelopmentFuture

ResidentialExisting

Stage 1 Release

Stage 2 Release

Drainage Swale

DISCLAIMER: This brochure is presented for infor -mation purposes only and does not constitute nor is to constitute a representation term or condition in respect to any other offer to purchase which may be made by any prospective buyer or acceptance by the seller of any such offer. It is believed that state -ments made in this brochure are correct but no representation or warranties in relation thereto are being made. Liability to the extent permitted by law is disclaimed for any loss or damage which may arise from any person acting on any statements of diagrammatic representations or of measure -ments contained therein. Pictures are for illustra -tive purpose only. Plans subject to council approval.

N TemporaryTurningHead

ExistingResidential

ExistingResidential

FutureDevelopment

byOthers

DrainageSwale

MNG Ref: 100698sa-029g Date: 06/02/2020 ©Copyright

REIHILL ROAD

PRO

MEN

ADE

KILC

HU

RN

CAWDOR LANE

HAMPTON ROAD

KINGSWAY

BELG

RAVE

V

ISTA

APPLEBY PARK

STAGE ONE

KINGSWAY

ROAD

LANE

HAMPTON

CAWDOR

REIHILL ROAD

PRO

ME N

ADE

K ILC

HU

RN

B ELG

RAV

EVI

S TA

1 2.5

12.5

1515

1514.37

1 2.5

12.5

15

14.36

11.36

1515

15

12.5

12.5

12.5

12.5

6 .49

11. 35

15

12.5

8.5

4.25

28.31

34.33

34.33

34.32

34.33

34.33

31.19

34.32

34.32

34.32

34.2

34.2

31.334.25

1 487m²

8 428m² 10

411m²

11

429m²

12

429m²

13

429m²

14

515m²

15

515m²

16

515m²

17

515m²

489m²

1515

1515

12.5

1 51512.5

1515

1515

34.2

34.2

34.2

34.2

34.2

34.2

2513m²

3513m²

4513m²

5513m²

6513m²

7428m²

9

31.4

35.5

31.4

31.4

34.82

35. 5

35.5

33.42

3 1.42

31.71

32

10.4412

12

6.38

12.512.512.512.5

12.5

10.415

15

12.7

12.5

10.410.44

12.58 6.16

12.78

18

377m²

19

471m²

24

328m²

25

333m²

26

415m²

27

426m²

28

442m²

29

444m²

30

444m²

31.4

31.4

31.4

3 1.4

1611.53 14 15

20

502m²

21

471m²

22

440m²

23

362m²

15 1611.53 14

H

H

55.00

56.00

57.00

58.00

59.00

60.00 60.5059.50

61.50

62.00 62.00

STAGE ONE

Lot Level

Footpath

Connection/ManholeSewer Housing

Drainage Manhole

Drainage Grate

Side Entry Pit

Water Connection

and ConnectionWestern Power Dome

Padmount SiteWestern Power

H Water Hydrant

Water Valve

NBN Connection

Retaining WallLimestone

Street Light

Turning HeadTemporary

Drainage Swale

59.00 Road Level

Access Restriction

Red Asphalt

(for lots 18-21)Temporary Bin Pads

Fence

- Limestone effectConcrete Retaining Wall

Gas Connection

LEGEND

Bushfire Prone AreaLot affected by

and ConnectionUni PillarWestern Power

by OthersDevelopmentFuture

ResidentialExisting

Stage 1 Release

Stage 2 Release

Drainage Swale

DISCLAIMER: This brochure is presented for infor-mation purposes only and does not constitute nor is to constitute a representation term or condition in respect to any other offer to purchase which may be made by any prospective buyer or acceptance by the seller of any such offer. It is believed that state-ments made in this brochure are correct but no representation or warranties in relation thereto are being made. Liability to the extent permitted by law is disclaimed for any loss or damage which may arise from any person acting on any statements of diagrammatic representations or of measure-ments contained therein. Pictures are for illustra-tive purpose only. Plans subject to council approval.

N TemporaryTurningHead

ExistingResidential

ExistingResidential

FutureDevelopment

byOthers

Appleby Park

DrainageSwale

MNG Ref: 100698sa-029g Date: 06/02/2020 ©Copyright

ESTATE PLAN

This is an extremely rare opportunity to secure premium quality land, just 20 minutes to the City.For more information, please call Philip Stannard 0408 947 624

0412 579 522 land4salewa.com.auFor more information contact: 0412 579 522 [email protected] | land4salewa.com.au

NORTH

STAGE ONE

KINGSWAY

ROAD

LANE

HAMPTON

CAWDOR

REIHILL ROAD

PRO

ME N

ADE

K ILC

HU

RN

B ELG

RAV

EVI

S TA

1 2.5

12.5

1515

1514.37

1 2.5

12.5

15

14.36

11.36

1515

15

12.5

12.5

12.5

12.5

6 .49

11. 35

15

12.5

8.5

4.25

28.31

34.33

34.33

34.32

34.33

34.33

31.19

34.32

34.32

34.32

34.2

34.2

31.334.25

1 487m²

8 428m² 10

411m²

11

429m²

12

429m²

13

429m²

14

515m²

15

515m²

16

515m²

17

515m²

489m²

1515

1515

12.5

1 51512.5

1515

1515

34.2

34.2

34.2

34.2

34.2

34.2

2513m²

3513m²

4513m²

5513m²

6513m²

7428m²

9

31.4

35.5

31.4

31.4

34.82

35. 5

35.5

33.42

3 1.42

31.71

32

10.4412

12

6.38

12.512.512.512.5

12.5

10.415

15

12.7

12.5

10.410.44

12.58 6.16

12.78

18

377m²

19

471m²

24

328m²

25

333m²

26

415m²

27

426m²

28

442m²

29

444m²

30

444m²

31.4

31.4

31.4

3 1.4

1611.53 14 15

20

502m²

21

471m²

22

440m²

23

362m²

15 1611.53 14

H

H

55.00

56.00

57.00

58.00

59.00

60.00 60.5059.50

61.50

62.00 62.00

STAGE ONE

Lot Level

Footpath

Connection/ManholeSewer Housing

Drainage Manhole

Drainage Grate

Side Entry Pit

Water Connection

and ConnectionWestern Power Dome

Padmount SiteWestern Power

H Water Hydrant

Water Valve

NBN Connection

Retaining WallLimestone

Street Light

Turning HeadTemporary

Drainage Swale

59.00 Road Level

Access Restriction

Red Asphalt

(for lots 18-21)Temporary Bin Pads

Fence

- Limestone effectConcrete Retaining Wall

Gas Connection

LEGEND

Bushfire Prone AreaLot affected by

and ConnectionUni PillarWestern Power

by OthersDevelopmentFuture

ResidentialExisting

Stage 1 Release

Stage 2 Release

Drainage Swale

DISCLAIMER: This brochure is presented for infor-mation purposes only and does not constitute nor is to constitute a representation term or condition in respect to any other offer to purchase which may be made by any prospective buyer or acceptance by the seller of any such offer. It is believed that state-ments made in this brochure are correct but no representation or warranties in relation thereto are being made. Liability to the extent permitted by law is disclaimed for any loss or damage which may arise from any person acting on any statements of diagrammatic representations or of measure-ments contained therein. Pictures are for illustra-tive purpose only. Plans subject to council approval.

N TemporaryTurningHead

ExistingResidential

ExistingResidential

FutureDevelopment

byOthers

Appleby Park

DrainageSwale

MNG Ref: 100698sa-029g Date: 06/02/2020 ©Copyright

ESTATE PLAN

This is an extremely rare opportunity to secure premium quality land, just 20 minutes to the City.For more information, please call Philip Stannard 0408 947 624

12

.51

2.5

15

15

15

14

.37

12

.51

2.5

15

14

.36

11

.36

15

15

15

12

.5

12

.51

2.5

12

.56

.49

11

. 35

15

12

.5

8.5

4.25

28.31

34.33

34.33

34.32

34.33

34.33

31.19

34.32

34.32

34.32

34.2

34.2

31.33

4.25

1 487m²

8 428m² 10

411m²

11

429m²

12

429m²

13

429m²

14

515m²

15

515m²

16

515m²

17

515m²

489m²

15

15

15

15

12

.51

5

15

12

.51

51

51

51

5

34.2

34.2

34.2

34.2

34.2

34.2

2513m²

3513m²

4513m²

5513m²

6513m²

7428m²

9

31

.43

5.5

31

.4

31

.4

34

.82

35

. 5

35

.5

33

.42

31

.42

31

.71

32

10.44

12

12

6.38

12.512.512.512.5

12.5

10.4

15

15

12.7

12.5

10.410.44

12.58 6.16

12.78

18

377m²

19

471m²

24

328m²

25

333m²

26

415m²

27

426m²

28

442m²

29

444m²

30

444m²

31

.4

31

.4

31

.4

31

.4

1611.53 14 15

20

502m²

21

471m²

22

440m²

23

362m²

15 1611.53 14

H

H

55.00

56.00

57.00

58.00

59.00

60.0060.50

59.50

61.50

62.00 62.00

Lot Level

Footpath

Connection/M anholeSewer Housing

Drainage M anhole

Drainage Grate

Side Entry Pit

W ater Connection

and ConnectionW estern Power Dom e

Padm ount SiteW estern Power

H W ater Hydrant

W ater Valve

NBN Connection

Retaining W allLim estone

Street Light

Turning HeadTem porary

Drainage Swale

59.00 Road Level

Access Restriction

Red Asphalt

(for lots 18-21)Tem porary Bin Pads

Fence

- Lim estone effectConcrete Retaining W all

Gas Connection

LEGEND

Bushfire Prone A reaLot affe cted by

and ConnectionUni PillarW estern Power

by OthersDevelopmentFuture

ResidentialExisting

Stage 1 Release

Stage 2 Release

Drainage Swale

DISCLAIMER: This brochure is presented for infor -mation purposes only and does not constitute nor is to constitute a representation term or condition in respect to any other offer to purchase which may be made by any prospective buyer or acceptance by the seller of any such offer. It is believed that state -ments made in this brochure are correct but no representation or warranties in relation thereto are being made. Liability to the extent permitted by law is disclaimed for any loss or damage which may arise from any person acting on any statements of diagrammatic representations or of measure -ments contained therein. Pictures are for illustra -tive purpose only. Plans subject to council approval.

N TemporaryTurningHead

ExistingResidential

ExistingResidential

FutureDevelopment

byOthers

DrainageSwale

MNG Ref: 100698sa-029g Date: 06/02/2020 ©Copyright

REIHILL ROAD

PRO

MEN

ADE

KILC

HU

RN

CAWDOR LANE

HAMPTON ROAD

KINGSWAY

BELG

RAVE

V

ISTA

APPLEBY PARK

LEGEND