Stakeholder Register/Analysis
Stakeholder Name: Dr. Lipsett (Project Owner/client)Key Stakeholder
(Y/N): YES
Interests: Dr. Lipsett (the client) needs a smooth transition to the new laboratory. He needs the
complete plan for the new laboratory to be finished by the end of the winter term. He expects no
disruption to existing research projects.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
Updates upon completion of
milestones and consultations
regarding any major problems
or difficulties
Meetings are to be scheduled
well in advance and should,
preferably, take place at the
University of Alberta
Stakeholder has a busy
schedule limiting availability
for meeting.
Avenues For Communication:
Meeting (Y/N): YES Telephone (Y/N): YES E-mail (Y/N) : YES
SWOT Analysis
Strengths:Valuable knowledge regarding laboratory and researcher needs as well as
experience dealing with the University of Alberta and its administrations.
Weakness
es: Has a busy schedule and requires advanced notice.
Opportuni
ties:
Stands to benefit from project primarily through the reusability of the plan slated
for development
Threats:Missing the relocation deadline could hinder other University research programs as
well as Dr. Lipsetts own research.
Stakeholder Influence On Project:
The stakeholder, being the project teams client, has the greatest influence on this project.
Schedule, cost, objectives, requirements and virtually all other project aspects have and continueto be developed around the clients needs.
Stakeholder Expectations Management (Key Stakeholders only):
The stakeholder requires a relocation plan and laboratory layout plan. These requirements put
major emphasis on scheduling. Scheduling must be completed precisely and with significant time
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
-
8/7/2019 Stakeholder register and analysis 1
2/19
Stakeholder Register/Analysis
allocated for last minute changes, unforeseen stakeholder needs, and relocation time slot
flexibility. The project scope needs to be wide enough to accommodate a potential large amount
of needs from Dr. Lipsetts researchers.
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:Efficiency, safety, functionality, organization and schedule adherence.
Key Stakeholder
Priorities:
A well devised plan that meets the needs of himself, his researches
and colleagues.
Principal Objective: To relocate and setup a new laboratory with the use of the teams plan
and strategies.
Consequences Resulting From Missed Principal Objective: Interruption to research,
colleagues and the daily activities at the University of Alberta.
Stakeholder Name: Shannon MacDonald (Project Manager)Key Stakeholder
(Y/N): NO
Interests: Project manager needs timely achievement of project goals within the approved
budget. She expects improvement in her professional growth as well as to gain project
management experience.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
Updates upon completion of
tasks and advanced notice of
difficulties and prompt
circulation in new information.
Team Meetings take place
every Monday at 5:00 pm. Any
additional meeting must
scheduled well in advance and
take place at the University of
Alberta (ETLC).
Stakeholder has a busy
schedule limiting availability
for meeting making efficiency
a priority.
Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): YES E-mail (Y/N) : YES
SWOT Analysis
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
-
8/7/2019 Stakeholder register and analysis 1
3/19
(DNA
(DNA
Stakeholder Register/Analysis
Strengths: Experience with project management, efficient, and has great organizational skills
Weakness
es:
Has a busy schedule and requires advanced notice to address issues.
Opportuni
ties:
Stands to benefit from project primarily through the gaining experience and
expanding her references.
Threats: Failure to accomplish goals will lead to loss or reputation and academic standing.
Stakeholder Influence On Project:
The stakeholder, being the project manager, has the final say on project direction as well as
facilitates communication between the client (Dr. Lipsett) and the teams Supervisor (Dr. Sami
Fahmy ). The stakeholder defines the teams culture and takes responsibility for the projectsdeliverables.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:
Key Stakeholder
Priorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective
-
8/7/2019 Stakeholder register and analysis 1
4/19
(DNA
Stakeholder Register/Analysis
Stakeholder Name: The University of Alberta andAdministration
Key Stakeholder
(Y/N): YES
Interests: The University of Albertas interests lay in the commissioning a fully functional
laboratory compliant to relevant technological and safety standards. It expects introduction of a
new laboratory to provide more experimentation options to the professors, students and
researchers. Thus, the University is interested in a well developed laboratory relocation and
layout plan.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
No communication initiation
from the project team isrequired. In the event the
university is needed it can be
contacted through its
representatives
Stakeholders representatives
have a busy schedule limitingavailability for meeting
making.
Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): YES E-mail (Y/N) : YES
SWOT Analysis
Strengths:
Stakeholder represents a great deal of knowledge and experience. The stakeholder
will also provide infrastructure, personnel, furnishings, supplies and various other
pieces of equipment.
Weakness
es:Contact and consultation will be difficult.
Opportuni
ties:
The University will benefit from as a result of the research yielded from students
who have benefited for the laboratory design.
Threats: Failure to accomplish goals could lead to loss of research time and quality.
Stakeholder Influence On Project:
The University of Alberta will provide many of the resources needed for the project to be
completed and will, in some areas, control the scope of the project. The project must also meet
and adhere to all of the Universities policies, rules, and regulations.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
-
8/7/2019 Stakeholder register and analysis 1
5/19
Stakeholder Register/Analysis
Stakeholder Name: The Project Team Key Stakeholder(Y/N): NO
Interests: Project team is interested in completing this project to the satisfaction of the client
(Dr. Lipsett) and the teams supervisor (Sami Fahmy). The team is also looking to gain
experience in the field of project management and to further develop each members skills.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
Updates upon completion of
tasks and advanced notice of
difficulties and prompt
circulation in new information.
Team Meetings take place
every Monday at 5:00 pm. Any
additional meeting must
scheduled well in advance and
take place at the University of
Alberta (ETLC).
Stakeholders have a busy
schedule limiting availability
for meeting making efficiency
a priority.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
The stateholder requires a plan that does not affect operations of its other research projects,
departments, and personnel. The University has allocated laboratory space currently being
occupied by Dr. Lipsetts researchers to another research team. In order for the other research
team to move forward Dr. Lipsetts must vacate his current laboratory. University students must
not be affected by the move ether.
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:Laboratory is vacated and a new one is setup.
Key Stakeholder
Priorities:Safety is a priority and also scheduled deadlines are met.
Principal Objective: The lab Space is available and new research can begin while Dr. Lipsetts
research continues.
Consequences Resulting From Missed Principal Objective: Loss of research time and
potential losses in research due to experimentation alterations and or delays.
-
8/7/2019 Stakeholder register and analysis 1
6/19
(DNA
(DNA
Stakeholder Register/Analysis
Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): YES E-mail (Y/N) : YES
SWOT Analysis
Strengths:Together, the teams represents a great deal of knowledge and experience and are
proficient communicators and problems solvers
Weakness
es:Varying schedules make holding additional meetings difficult.
Opportuni
ties:
The team stands to benefit from this project primarily through the acquiring
experience and expanding our references.
Threats: Failure to accomplish goals will lead to loss or reputation and academic standing.
Stakeholder Influence On Project:
The stakeholders, being the project team, collectively control the quality of work that is done.
Our experiences, thoughts, and ideas will shape every aspect of this project in an attempt to
provide a high quality finished product. The project team members are all held accountable to
each other and the project manager to meet the needs of the team and client.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:
Key Stakeholder
Priorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective
-
8/7/2019 Stakeholder register and analysis 1
7/19
(DNA
Stakeholder Register/Analysis
Stakeholder Name: Undergraduate Mechanical
Engineering Students
Key Stakeholder
(Y/N): NO
Interests:The undergraduate mechanical engineering students interest in this project revolves
around their productivity remaining unencumbered. The students are to be minimally affected by
the move and in no way is their safety to be compromised. The new laboratory must not create
any noise that may affect students learning in class room or study areas.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
None of the undergraduate
students have expressed any
need or desire to be informed
of the about planning progress
or direction
This stakeholder group
represents a large number of
individuals, it is nearly
impossible to all of them..
Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): NO E-mail (Y/N) : NO
SWOT Analysis
Strengths:Students represent a great deal of knowledge and can be polled for ideas,
concerns, and constraints.
Weakness
es:Their numbers will make them difficult to survey.
Opportuni
ties:Future labs in which they can utilize for their research.
Threats: Disruption to the students can hinder their productivity.
Stakeholder Influence On Project:
The stakeholder group must be affected as little as possible. The arrangement of the lab must
ensure that the limited study and classroom space in the Mechanical Engineering building is not
affected by laboratory noise. Students must also be able to access the laboratory in the event
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
-
8/7/2019 Stakeholder register and analysis 1
8/19
(DNA
(DNA
Stakeholder Register/Analysis
teachers or researchers are T.As for their respective courses.
Stakeholder Name: Researchers and Individuals Using theLaboratory
Key Stakeholder
(Y/N): YES
Interests: This stakeholder group requires a well equipped laboratory which allows them to
experiment and conduct analysis in a comfortable atmosphere. They expect that the new
laboratory will not be unfamiliar to them and that it is a safe place to work and study. This
stakeholder group must also not be greatly affected by the migration. The plan must
accommodate their schedules and experiments.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
They require no updates or
communications on a regular
basis. They need only to be
This stakeholder group is
extremely busy and do not
require meetings.
Stakeholders have a busy
schedule.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:
Key Stakeholder
Priorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective
-
8/7/2019 Stakeholder register and analysis 1
9/19
Stakeholder Register/Analysis
given specifics.
Avenues For Communication:
In Person Meeting (Y/N):YES
Telephone (Y/N): NO E-mail (Y/N) : YES
SWOT Analysis
Strengths:
Stakeholder group represents a great deal of knowledge and experience. The
stakeholder will also provide details regarding their needs to help successfully plan
the move and laboratory.
Weakness
es:Contact and consultation will be difficult.
Opportuni
ties:
A laboratory and migration which accommodates their schedule and research
needs.
Threats: Failure to accomplish goals could lead to loss of research time and quality.
Stakeholder Influence On Project:
This stakeholder groups requirements must be met as they work for the project teams client Dr.
Lipsett. Their needs will help to define the true project scope as well as every aspect of both the
laboratory layout plan and migration plan.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
The stakeholder group requires a plan that does not affect their research projects or education.
Their equipment must be moved safely and securely during a research phase that allows for it to
be moved.
-
8/7/2019 Stakeholder register and analysis 1
10/19
Stakeholder Register/Analysis
Stakeholder Name: Mechanical Engineering TechniciansKey Stakeholder
(Y/N): NO
Interests:The provide the team with an idea of what assistance and resources will be made
available and can be used during both the planning and actual moving portions of this project.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
No communication is needed.
Details regarding the schedule
and plan will need to be
communicated.
In person during working hours
at the University of Alberta.
Stakeholder has a busy
schedule limiting availability
for meeting making efficiency
a priority.
Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): NO E-mail (Y/N) : YES
SWOT Analysis
Strengths: Experience with similar laboratory relocation will allows for better planning.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:A smooth transition into the new laboratory
Key StakeholderPriorities:
A fictional ergonomic laboratory
Principal Objective: Plan a functional laboratory and migration that meets the needs of the
researchers
Consequences Resulting From Missed Principal Objective: Loss of research time and
potential losses in research due to experimentation alterations and or delays. Long term
research inefficiency.
-
8/7/2019 Stakeholder register and analysis 1
11/19
(DNA
(DNA
Stakeholder Register/Analysis
Weakness
es:
Stakeholder group has a busy schedule and requires advanced notice to address
questions/concerns.
Opportuni
ties:Stands to benefit from project primarily through the gaining experience.
Threats: (DNA)
Stakeholder Influence On Project:
This stakeholder group will affect the scheduling of the project. They will, from a technical and
equipment perspective, inform the project team of what can and cant be done with the
resources available to them.
Stakeholder Name: Dr. Glen Thomas Key Stakeholder
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:
Key StakeholderPriorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective
-
8/7/2019 Stakeholder register and analysis 1
12/19
(DNA
Stakeholder Register/Analysis
(Y/N): NO
Interests: Dr. Glen Thomas is interested in minimizing the impact of the laboratory and
migration and the individuals that us the Mechanical Engineering building. He also interested in
what is required from him so he can find time to assist the team in the planning process. Dr.
Thomas would be interested in dealing with any discovered deficiencies with respect toinfrastructure to meet the needs of the researchers and professors.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
No communication is needed.
Details regarding the schedule
and plan will not to becommunicated.
In person Thursdays during
working hours at the
University of Alberta.
Stakeholder has a busy
schedule limiting availability
for meeting making efficiencya priority.
Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): YES E-mail (Y/N) : YES
SWOT Analysis
Strengths:Experience with similar laboratory relocation and with administration at the
University of Alberta.
Weakness
es:Bust Schedule.
Opportuni
ties:(DNA)
Threats: (DNA)
Stakeholder Influence On Project:
This stakeholder will have a minimal effect on the project provided that the rules and regulationsoutlined in the University Calendar are adhered to. He is willing to address any infrastructure
deficiencies that the project team encounters to provide researchers with the best possible lab.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
-
8/7/2019 Stakeholder register and analysis 1
13/19
(DNA
Stakeholder Register/Analysis
Stakeholder Name: Roger MarchandKey Stakeholder
(Y/N): NO
Interests: Roger Marchand interests include knowing well in advance specifics relating to the
logistics and scheduling of the movement of the large mill. He expects the scheduling will not
affect his ongoing commitments and activities.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
No communication is needed.
Some Details regarding the
schedule and be
communicated.
In person during working hours
at the University of Alberta.
Stakeholder has a busy
schedule limiting availability
for meeting making efficiency
a priority.Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): NO E-mail (Y/N) : YES
SWOT Analysis
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:
Key Stakeholder
Priorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective
-
8/7/2019 Stakeholder register and analysis 1
14/19
(DNA
(DNA
Stakeholder Register/Analysis
Strengths:
A great Deal of experience with similar laboratory relocation and with
administration at the University of Alberta. Roger Marchand will also be able to
provide attritional resources in the form of advice, personnel and equipment.
Weakness
es:Bust Schedule.
Opportuni
ties:(DNA)
Threats: (DNA)
Stakeholder Influence On Project:
This stakeholder will not affect the scheduling of the project. The scope of the project may
deviate somewhat based on the experience and recommendations of Roger Marchand. His
advice will determine some specific details regarding the organization of the new laboratory.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
Detailed Interests/Priorities Analysis (Key Stakeholders only) :Key Stakeholder
Interests:
Key Stakeholder
Priorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective
-
8/7/2019 Stakeholder register and analysis 1
15/19
(DNA(DNA
(DNA
Stakeholder Register/Analysis
Stakeholder Name: Professors Allocated Dr. Lipsetts OldLaboratory
Key Stakeholder
(Y/N): YES
Interests:The professors which need Dr. Lipsetts old laboratory space are primarily concerned
with scheduling. The space is to be provided according to the date agreed upon. The lab space is
also to be usable; it should retain its entire infrastructure and be ready to move.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
No communication for the
stakeholder has been
requested.
Avenues For Communication:Meeting (Y/N): NO Telephone (Y/N): NO E-mail (Y/N) : YES
SWOT Analysis
Strengths: (DNA)
Weakness
es:(DNA)
Opportunities: Stands to benefit from project by being provided with a clean ready to use lab.
Threats:Missing the relocation deadline could hinder other University research programs as
well as the stakeholders
Stakeholder Influence On Project:
The stakeholder influence on the project is minimal. The only affect is the state the old
laboratory must be left in as well as the delivery date of the old laboratory.
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
-
8/7/2019 Stakeholder register and analysis 1
16/19
(DNA (DNA
Stakeholder Register/Analysis
Key Stakeholder
Interests:The old lab space is clean and has all preexisting infrastructure
Key Stakeholder
Priorities: Schedule adherence.
Principal Objective: To relocate and setup a new laboratory according to the agreed upon
schedule
Consequences Resulting From Missed Principal Objective: Interruption to research, loss of
research time, and possible experimentation damage.
Stakeholder Name: Guests/Visitors To The MechanicalEngineering Building
Key Stakeholder
(Y/N): NO
Interests:This stakeholder group represents future students and their families as well as
potential investors and alumni. They are interested in viewing the building without being
hindered by the move. Visitor safety is paramount and will not be comprimesed.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
No communication is needed.
Details regarding the schedule
and plan will not need to be
communicated.
Avenues For Communication:
In Person Meeting (Y/N):
YESTelephone (Y/N): NO E-mail (Y/N) : NO
SWOT Analysis
Strengths: (DNA)
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
-
8/7/2019 Stakeholder register and analysis 1
17/19
(DNA
(DNA
Stakeholder Register/Analysis
Weakness
es:Stakeholder group may slowdown or interfere with migration.
Opportuni
ties:(DNA)
Threats:The migration involves heavy equipment and Guests/Visitors present a liability
when in the vicinity.
Stakeholder Influence On Project:
This stakeholder group will affect the scheduling of the project. I there is a major open night or
alumni function the move will need to be conducted around those events.
Stakeholder Name: Vendors and Suppliers Key Stakeholder
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:
Key StakeholderPriorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective
-
8/7/2019 Stakeholder register and analysis 1
18/19(DNA
(DNA
(DNA
(DNA
Stakeholder Register/Analysis
(Y/N): NO
Interests:This stakeholder group will be provide various materials and services and will need to
be informed of the schedule well in at advance to provide them with organizational time.
Stakeholder Communications Strategy:
Communication Needs: Meeting Preferences:Communication
Limitations:
No communication is needed.
Details regarding the schedule
and plan will be
communicated.
Avenues For Communication:
In Person Meeting (Y/N):
NOTelephone (Y/N): YES E-mail (Y/N) : YES
SWOT Analysis
Strengths:They will be able to provide suggestions and estimates for certain aspects of the
project.
Weakness
es:Associated cost may be outside of our working budget.
Opportuni
ties:To provide the mechanical engineering staff with future services
Threats: Schedule threatens this stakeholder group, advanced notice is required by them.
Stakeholder Influence On Project:
This stakeholder group will affect the scheduling of the project. Some of the services and
materials needed during the migration and lab setup may affect laboratory commissioning. The
scope may also be affected as their services may provide many of the new labs requirements.
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential.
Stakeholder Expectations Management (Key Stakeholders only):
-
8/7/2019 Stakeholder register and analysis 1
19/19
Stakeholder Register/Analysis
Notes: DNA represents does not apply, where information is limited, beyond the required scope and or deemed
inconsequential
Detailed Interests/Priorities Analysis (Key Stakeholders only) :
Key Stakeholder
Interests:
Key StakeholderPriorities:
Principal Objective:
Consequences Resulting From Missed Principal Objective