standard contract forum 26 september 2006 13.30 customer suite, bt centre, london
DESCRIPTION
. Standard Contract Forum 26 September 2006 13.30 Customer Suite, BT Centre, London. Standard Contract Forum Tuesday 26 Sept 2006. AGENDA Introduction and Notes of Previous Meeting Consult 21 Emergency Service (VOIP Originated Calls) Pathfinder/21CN and SIA Update - PowerPoint PPT PresentationTRANSCRIPT
www.btwholesale.com
.
Standard Contract Forum 26 September 2006
13.30Customer Suite, BT Centre, London
www.btwholesale.com
Standard Contract Forum Tuesday 26 Sept 2006
AGENDA
1 Introduction and Notes of Previous Meeting
2 Consult 21
3 Emergency Service (VOIP Originated Calls)
4 Pathfinder/21CN and SIA Update
5 STP Working
6 Review of New and Amended Schedules
7 Any Other Business
www.btwholesale.com
Consult21 Update
25/9/06
Agenda
Steering Board Agenda
RAG Update
Cost and Risk Management project: Update
Programme Progress
Consultations & Briefings
CP Engagement
Recent Announcements
Architecture & Framework Network Structure
Systems & Processes
Network Hooks
ProductsInterconnect & Portfolio
Broadband
Line Access
Point to Point
Conformance Testing Implementation & MigrationCommunications
Working Group Status
RAG September 2006
Network Structure
RAG Status Green
Key Issues (For Discussion)
None recorded
Key Milestones
August/September AchievementsResolved the approach to voice quality measurements to ascertain migration success to align with CT WG.
Draft top-level description of BT‘s NGN and a description of how products are supported and accessed.
Working though a potential issue with the use of Geographic Number Portability Databuild Information (PDI) tables.
Drafted top-level description of BT‘s NGN and a description of how products are supported and accessed
September/October Work planProgress inventory of the components of BT's NGN to sites, logical and topological relationships and seek indications of the type of network inventory data that will be needed to enable investment scenario planning.
Progress White Paper on network technical rules and guidelines for NGN voice interconnect (will be used to inform the revision of Annex A to the SIA)
Time (G) Cost (G) Quality (G)Customer
Sat. (G)Status: Information
(G)
Systems & Processes
RAG Status Green
Key Issues (For Discussion)
None recorded
Key Milestones
August/September Achievements
Presentation & discussion on how multi-party service provider scenarios will work – need for all of Industry to work together.
20CN vs. 21CN Systems flag requirement submitted to 21CN Project Control Board for consideration.
2nd Issue of Systems Roadmap consultation now closed – little feedback received.
September/October Work plan
NICC B2B group 18th September. Sub-Group to be held 15th September to more clearly define ToRs and boundaries between C21, NICC and 21CCE programmes.
Status: Time (G) Cost (G) Quality (G)Customer
Sat. (G)Information
(G)
N/W Hooks & Common Capabilities
RAG Status None
Key Issues (For Discussion)
Key Milestones
June/July Achievements
Working Group now closed.
Common Capability & BTW Products workshop agenda finalised. Date confirmed for 22/9/06..
Time Cost QualityCustomer
SatisfactionStatus: Information
Interconnect & Portfolio
RAG Status Green
Key Issues (For Discussion)Industry agreement to solution for PSTN Emulation outstanding
PSTN Emulation product delivery delayed to Mar 08 due to industry need for more time to agree preferred option
Final review of Obligatory products list required
Pathfinder product review criteria required
Timeline needed for VLAN (extension to Metronode) product
Product developments reviews required
Key Milestones
August/September AchievementsVIC product launched
All VIC contracts signed
2 Options for PSTN Emulation offered to industry for agreement
Jim Moulder (Global Crossing) nominated as co-chair
September/October Work plan•Issue Outline product description for each of the two PSTN Emulation options
•Use industry advocates and co-chair to drive industry agreement
Status: Time (G) Cost (G) Quality (G)Customer
Sat. (G)Information
(G)
Broadband (inc LLU)
RAG Status RedKey Issues (For
Discussion) If IPstream First goes ahead, Industry are very
concerned about IPstream migration (e.g. number of CBUK changes and impacts on their own systems and call centres)
Many customers require out of hours grooming especially for business customers and ask that this is considered.
Lack of commercial principles is a major issue for Industry as they try to make decisions on future suppliers and products.
w-BBC Consultation will have to be extended to November to take commercial considerations into account.
Key Milestones
September AchievementsWorking Group held on 5 September 31 attended from 16 Industry companies plus Ofcom, Openreach and BTW.
4 Broadband Condocs issues with closing dates from July 31st to September 4th.
Openreach presented their response to Industry on the LLU Condoc and closed the Consultation at BB/LLU WG. Work now continues at the IMWG BB Experts Sub-Group.
September/October Work planNext meeting is 9 October when Datastream and IPstream will close consultation with BTW responding to Industry on the Condocs (closed for Industry responses on 4 September).
W-BBC consultation will close at the 7 November meeting with future BB consultation will move to BAU forums.
Time (R) Cost (R) Quality (R)Customer
Sat. (R)Status: Information
(R)
Line Access
RAG Status: Green
Key IssuesCommunications with all BTW and openreach customers, including the 300 smallest. Openreach are organising 4 events to achieve this.
Voice Line Access needs more promotion within the CP customer base. An Openreach sponsored event is planned for BT Tower on 6 November.
Need to agree Standards for SIP-I in NICC and ETSI. (Voice Line Access)
Further work required in Network Structures and in BTW to support the network aspects of the VLA product.
Status:
Key Milestones
August/September AchievementsLine Access Working Group met on 12 September 2006. 11 Industry attendees and 1 Ofcom plus 5 BTW and Openreach. Voice Line Access Condoc issued and response period closed on 31 July with 3 replies.
VLA Bilaterals offered and one held with constructive feedback.
September/October Work planInitial consultation on VLA product has closed with only 3 replies.
Promote the VLA product at a re-launch event on 6 November at BT Tower
Set up experts sub-group to rewrite product description and customer proposition in advance of the 6 November
Next meetings on 30 October and 27 November 2006.
Time (G) Cost (G) Quality (G)Customer
Sat. (G)Information
(G)
Point to Point
RAG Status Amber
Key IssuesPlan of record for sub 2M products has not been amended
despite reminders.
Industry have concerns that sub 2M leased line developments are being given insufficient priority and resource.
Utility customers and other Infrastructure customers need info on alternative products before 2008 as they have long lead times.
TILLAP and TILLBP starting to tie in with other products
Time (R) Cost (A) Quality (A)Customer
Sat. (A)Status:
Key Milestones
August/September Achievements Working Group meeting held on 7 September, attended by 21 people, representing 8 CPs plus BTW and Openreach.
Presentations (a) TILLAP/TILLBP (b) MSIL
5 WES Condocs issued with good responses from Industry.
September/October Work PlanNext meeting 27 September 2006
Bilaterals continue with CPs and Utilities on Utility customer requirements in 21CN plus a presentation at ETUG on 2 October 2006.
Openreach to give final response and close consultation to the 5 WES Condocs.
Information(A)
Conformance Testing
RAG Status: Amber
Key Issues (For Discussion)
• More detail required on the trials identified in BT’s 21CN Implementation Strategy and Plan e.g. BB First Pilot
• Greater understanding and transparency on how Voice Quality will be assessed for Pathfinder [BRIEFING C21-CT-017 WILL DEAL]
Key MilestonesAugust/September AchievementsComplete definition of Service interoperability Test Schedule
Initial discussions undertaken on incorporation of Voice Quality assessment within Testing programme
Review CP Test facility Requirements and Test Request process
Created CPE Testing Experts forum
September/October Work planPublish Test Result policy & review process
Initiate Test Results Reviews
Publish TE Testing and Trials Briefings
Time (A) Cost (A) Quality (G)Customer
Sat. (G)Status: Information
(A)
Implementation & Migration
RAG Status Amber
Key Issues (For Discussion)
Framework required to facilitate planning for Tranche 2/3 of DLE to NGS migration
Lack of detail on Broadband First Pilot which will underpin BB migration Jul-Dec 2007
Further clarity needed on the Pathfinder Customer experience
Further clarity/discussion of impacts required on BB migration implementation
Issues with the National Migration plan have delayed formal issue
Key MilestonesAugust/September Achievements
Updated pathfinder definition Briefing published (IM-013) and reviewed at Pathfinder forum (8th August)
Publish Pathfinder Entry & Exit (following consultation)
Working group plan updated to align with Pathfinder Phase1A Entry
Process established for CP participation in development of SME/corporate end customers scenarios to aid migration preparation
Published design briefing for MCC
September/October Work plan
Commence planning for migration of emergency & critical services during Pathfinder
Publish updated Pathfinder Briefing prior to Pathfinder experts forum (19th Sept)
Publish Plan of Record at Issue Status (end Aug)
Time (A) Cost (A) Quality (G)Customer
Sat. (A)Status: Information
(A)
Migration Communications
RAG Status Green
Key Issues (For Discussion)
Proposal to inc end user cust sat questions in Carlson migration survey rejected by WG
Key Milestones
July/August Achievements
The comms group met 1st September, agreed that messaging sub-group will be discontinued. Future messaging output will be handled by the main WG. Extra meetings scheduled at Faraday to agree output from mass marketing campaign development by Carlson
Extra attendees recruited to WG to properly reflect industry inc. Clare Grant (Telewest), Jody Haskayne (Tiscali), Hamish McCleod (mobile broadband group)
August/September Work plan
Brand development on track, public launch event proposed for Oct 16th
Time (G) Cost (G) Quality (G)Customer
Sat. (G)Status: Information
(A)
Consultations Update – Sep SB
•Broadband Products
IPStream – 10 responses - 07/08/06 close (for responses)
Data stream – 3 responses – 04/09/06 close
w-BBC – 10 initial responses - 04/09/06 close (see commentary)
•Voice Line Access – 3 Responses – 31/08/06 close
•WES Products – 10 Responses – 15/09/06 close
•Systems Roadmap – 2 Responses – 11/09/06 close
•Critical numbers over VOIP – 0 Responses so far – 28/09/06 close
Briefings update –see: Meeting Planner & Consultation Information
Number Title - note shaded background = responses required, blue = new since last updateDate
Due/IssuedResponses
required (Y/N)
C21-BB-008 wBBC Consultation Status Aug-06 N
C21-CT-013 21CN Transfer Engineering Testing & Trials (PSTN/ISDN/WLR & LLU) Aug-06 Y
C21-CT-015 CP Test facility (Swansea) Aug-06 N
C21-CT-016 Voice Quality Assessment process Aug-06 Y
C21-IM-013 Pathfinder Definition & Approach Aug-06 N
C21-IM-016 Migration Command & Control - Design Briefing Aug-06 N
C21-IM-017 21CN Migration End Customer Experience - developing real life scenarios Aug-06 N
C21-IP-013 VIC Overflow Billing Materiality Assessment Timeline proposal Aug-06 N
C21-IP-015 NGN Call Conveyance PSTN Emulation Commercial Consultation: BT’s Conclusions and Progress Report’ Aug-06 N
C21-MG-004 Steering Board Escalations Aug-06 N
C21-MG-005 Website – secure members area Aug-06 N
C21-NH-001 Closure of network hooks WG Aug-06 N
C21-CT-017 21CN test result review process Sep-06 N
C21-IM-018 21CN Migration - Tranfer Engineering Briefing (ISDN30) Sep-06 N
C21-IM-019 21CN Migration - Tranfer Engineering Briefing (Broadband) Sep-06 N
C21-MG-006 Managing Communication Provider Costs & Risk Sep-06 N
C21-MG-007 21CN National Migration Plan for PSTN Voice and IPstream Services Sep-06 N
C21-IP-016NGN Call Conveyance PSTN Emulation Commercial Consultation: Outline Product Descriptions for Interim Charging Sep-06 N
C21-MG-008 National Migration Plan - MSAN to Metro Node Parenting Sep-06 N
Customer Engagement Programme
Help required!
Large – Medium sized CPs
Not engaged or partially engaged
Heavy users of BT Systems
Major users of Voice, Broadband & Interconnect Portfolios
Actively target them for:
General updates
Pathfinder/Product impacts
www.btwholesale.com
Standard Contract Forum
26 September 2006
www.btwholesale.com
Mandy Wells
BT WholesaleOperator Assistance and Directory
Enquires Product Manager
Schedule 125CVoIP originated Emergency Calls
Schedule 125C – VoIP Originated Emergency Calls
With VoIP growing it’s important we think about Emergency Calls
BT would like to
• process VoIP originated Emergency calls the same as PSTN ones
• treat all Emergency calls to the same standard and quality
• convey all Emergency calls onto the relevant Emergency centre
• pass on correct, accurate address information to the Emergency Services
UK Emergency Service
BT PSTN Network
CP PSTN
Networks
BT or CP Operator Centres
Public networks
Ambulance
Fire
Coastguard
Emergency Calls
Networks
Originating calls
via VoIP
Police
BT and the Communication Providers need to work together
Communication Providers need to:
• Identify VoIP originated calls as such, by using the correct ii digits
• Provide the current Customer details for the Network Termination Point in Standard File Format
Any Questions?
www.btwholesale.com
Signalling Updates
•Change in Signalling Link Utilisation Policy.
•STP working in support of Next Generation Networks using C7 TDM interconnects to BT’s NGSs. (STP @ NGSs.)
www.btwholesale.com
Change in Signalling Link Utilisation Policy• SIA Annex A section 5.2.13 updated to show a Signalling Link
Set may be used to support:-
up to 64 x 2 Mbit/s Interconnect Links where such Signalling Link Set is comprised of two Signalling Links.
up to 128 x 2 Mbit/s Interconnect Links where such Signalling Link Set is comprised of four Signalling Links.
up to 128 x 2 Mbit/s Interconnect Links where such Signalling Link Set is comprised of two Signalling Links and the average link set loading does not exceed 20%.
• CPs can request rearrangement from 4 to 2 Signalling Links via existing ACO process.
• TAMs will receive reports to show if average peak link set loading has exceeded 20%.
• CPs should refer to Interconnect Briefing 06040 issued.
• Change is with effect from 18th September 2006.
www.btwholesale.com
STP at NGSs (1)•CPs requested to interconnect their NGNs to BT's NGSs.
•CPs NGN networks need to be configured for STP signalling for TDM voice routes.
•Based upon existing STP service.
•SIA Annex A section 5.2.13 and Appendix E to be updated.
•CPs can request service via existing ACO process.
•Launch target date is 2nd October 2006.
www.btwholesale.com
Standard Contract Forum 26 September 2006
Keith Mitchinson
26 September 06
www.btwholesale.com
Standard Contract Forum 26 September 2006
DLE CLOSURE/21CN – SIA IMPACT: CONTENT
SPECIFIC CUSTOMERS: DLE-RELATED
• VIC Schedule 131
• System Alteration Side Letter agreements for DLE- interconnected CPs
SPECIFIC CUSTOMERS: SPECIAL PRODUCTS
• new draft FRIACO Schedule; CPS/SAD draft Schedule and policy briefing in preparation - talk to CPs concerned
www.btwholesale.com
Standard Contract Forum 26 September 2006
DLE CLOSURE/21CN – SIA IMPACT: CONTENT(CONT)
INDUSTRY GENERIC:
• Annex A - new para 3.4
• Annex D - revised “BT DLE” definition; new "BT Virtual DLE", "EBC Matrix" and "VIC"
• Schedule 01 - new para 12.17 (VIC impact)
• Schedule 130 - new para 9.15 (VIC impact)
• Schedules 101/105/106/141 - largely DLE closure impact
www.btwholesale.com
Standard Contract Forum 26 September 2006
DLE CLOSURE/21CN – SIA IMPACT: PROCESS
• Preliminary Notice - Interconnect Notification and SCF brief
• General Notice - Interconnect Notification, SCF brief and SIA paragraph 28 notices
• Update SIA Reference Offer
• Seek to avoid a special Supplemental (though option if particularly required); include as part of next supplemental
www.btwholesale.com
Standard Contract Forum 26 September 2006
SIA CONTRACT DOCUMENTATION
NEW SCHEDULE :
• 125C Emergency Service(VoIP Originated Emergency Call)
REVISED DOCUMENTS:
• Annex A
• 152 Supply of BT Phone Books
• 393 Operator FRIACO IP Network Calls at BT DLEs