Page 1: Standard for Contractor Performance Reports

Standard for Professional Service Provider

Performance Reports for Professional Services

in Engineering and Construction Works

(14 May 2015)

Construction Industry Development Board

Pretoria

Tel: 012 343 7136 or 012 481 9030

Page 2: Standard for Contractor Performance Reports

Fax: 012 343 7153

E-mail: [email protected]

Page 3: Standard for Contractor Performance Reports

Standard for Professional Service Provider Performance Reports for

Professional Services in Engineering and Construction Works

1 Scope ______________________________________________________________________________________1

2 Terms and Definitions ____________________________________________________________________2

3 Requirements _____________________________________________________________________________2

3.1 Submission of Professional Service Provider Performance Reports _________________________ 2 3.2 Completion of Professional Service Provider Performance Reports ________________________ 3 3.3 Right of Reply / Appeal _____________________________________________________________________ 3 3.4 Interim Professional Service Provider Performance Reports ________________________________ 3

Annex 1 PSP Performance Report _____________________________________________________________6

Annex 2 Interim PSP Performance Report - Architect (Normal Services) ________________ 10

Annex 3 Interim PSP Performance Report - Architect (Principal Agent)) ________________ 15

Annex 4 Interim PSP Performance Report - Civil Engineer (Normal Services) __________ 21

Annex 5 Interim PSP Performance Report - Construction H&S Agent) __________________ 30

Annex 6 Interim PSP Performance Report - Construction Project Manager _____________ 39

Annex 7 Interim PSP Performance Report - EE (Normal Services) _______________________ 49

Annex 8 Interim PSP Performance Report - Landscape Architect ________________________ 58

Annex 9 Interim PSP Performance Report – ME (Normal Services) ______________________ 66

Annex 10 Interim PSP Performance Report - QS (Normal Services) _____________________ 75

Annex 11 Interim PSP Performance Report – QS (Principal Consultant) _________________ 81

Annex 12 Interim PSP Performance Report – QS (Principal Agent) ______________________ 86

Annex 13 Interim PSP Performance Report – QS (Project Monitor) ______________________ 92

Annex 14 Interim PSP Performance Report – SE (Engineering Projects) _________________ 97

Annex 15 Interim PSP Performance Report – SE (Building Projects) ____________________ 106

Annex 16 Interim PSP Performance Report - CE, EE, ME and SE (Principal Consultant)115

Annex 17 Interim PSP Performance Report - CE, EE, ME and SE (Principal Agent) ____ 121

Annex 18 Interim PSP Performance Report – AR, CE, EE, ME, SE, CP, LA and QS (Planning,

Studies, Investigations, and Assessments) _________________________________________________ 126

Page 4: Standard for Contractor Performance Reports

1

Standard for Professional Service Provider Performance Reports for

professional services in engineering and construction works

1 Scope

This standard for professional service provider (PSP) performance reports provides for a uniform and

consistent method of assessment of the performance of a PSP with respect to the following

performance criteria:

time management;

management of resources;

co-operative relations; and

standard of service.

Subject to sufficient PSP performance reports being available, PSP performance reports can be used,

amongst others, for the purpose of managing procurement risks through:

assessing the suitability of PSP for pre-qualification, selective tender lists or expressions of interest;

and

adjudication for the award of a contract.

PSP performance reports also allow for the PSP to benchmark its performance against national norms

– thus encouraging performance improvement.

This standard sets out:

the process and responsibilities by which the PSP performance report is to be completed; and

the information required.

The standard is applicable to PSPs that will carry out professional services on construction and

building projects within the following Professional Service Disciplines:

Designation Professional Service Discipline

AR Architecture

BS Building Services

CE Civil Engineering

including environmental,

geotechnical and transportation

engineering

CH Construction Health and Safety

CP Construction Project Management

EE Electrical Engineering

LA Landscape Architecture

ME Mechanical Engineering

QS Quantity Surveying

SE Structural Engineering

SS Specialist Engineering Services

Page 5: Standard for Contractor Performance Reports

2

2 Terms and Definitions

For the purposes of this document, the following terms and definitions apply:

client: “client” means a person, body or organ of state who enters into a contract to procure

construction works; (cidb Act)

completion: completion in a professional services contract means:

a) cidb Standard Professional Services Contract: the date when the Employer considers that the works have

been completed in accordance with the contract,

b) NEC3 Professional Services Contract: when the consultant (PSP) has done all the work which the scope states

he has to do by the completion date and corrected defects which would have prevented the employer from

using the services and others from doing their work.

completion date: is the completion date unless later changed in accordance with the contract (NEC)

Construction Industry Development Board (CIDB): the board established in terms of the

Construction Industry Development Board Act of 2000 (Act 38 of 2000)

contract: the contract signed by the parties (cidb),

contract price: The price to be paid for the performance of the services in accordance with the

pricing data (cidb)

employer: The contracting party named in the contract who employs the service provider (cidb)

employer's representative: person authorized to represent the employer and named as such in the

contract data

services: the services defined in the scope of services to be performed by the consultant (PSP) in

accordance with the agreement which comprise normal services, additional services and exceptional

services

Professional service provider: the contracting party named in the contract data who is employed by

the employer to perform the services described in the contract and legal successors to the service

provider and legally permitted assignees (cidb)

Subcontractor (subconsultant): A person or body corporate who enters into a subcontract with the

service provider to perform part of the services (NEC – is a person or organisation who has a contract

with the Consultant (PSP) to provide part of the services)

reporting officer: employer’s representative or his/her delegated representative that is authorized to

complete the contractor performance reports on behalf of the employer

3 Requirements

3.1 Submission of Professional Service Provider Performance Reports

Completed PSP performance reports (see Annex 1) must be submitted by the reporting officer to the

employer’s representative:

Page 6: Standard for Contractor Performance Reports

3

i) where no dispute exists, within 15 days of the date of completion of a contract; or

ii) where a dispute exists, within 15 days of the date of receipt of the outcome of the dispute (see

Item 3.3).

NOTE: Other than for interim PSP performance reports (Item 3.4), PSP performance reports should only be

completed for contracts which reach completion. Subject to the CID Regulations, where a contract is terminated

or abandoned due to poor or non-performance of a PSP, such performance must be recorded on the CIDB

Register of Professional Service Providers.

3.2 Completion of Professional Service Provider Performance Reports

The reporting officer is responsible for the completion of the PSP performance reports on behalf of

the employer on completion of the PSP’s contract. To be in a position to make factual assessments

against the evaluation criteria in the PSP performance report on the PSP’s performance, the reporting

officer must:

be experienced in the management of PSPs; and

have frequent and direct liaison with the PSP.

Taking cognizance of the time requirements of Item 3.1, each PSP performance report must be

discussed with the PSP, who must be given the opportunity to comment on the assessment. The

reporting officer must respond to any issues raised by the PSP in writing, and the PSP’s comments and

the written response by the reporting officer must form part of the PSP performance report. The PSP

performance report must then be signed-off by the employer’s representative.

The PSP performance reports must be signed off by the reporting officer, the PSP and the employer’s

representative.

3.3 Right of Reply / Appeal

Where significant differences of opinion exist between the reporting officer and the PSP which cannot

be resolved by the parties, the PSP has the opportunity to an independent review of the PSP

performance report by a mutually agreed adjudicator, as stipulated in the contract.

The resulting PSP performance report after adjudication must be signed by the adjudicator and

witnessed by the reporting officer and the PSP.

The reporting officer will forward this copy of the PSP performance report to the employer.

3.4 Interim Professional Service Provider Performance Reports

Interim PSP performance reports (see Annex 2 to Annex 18) should be completed for each PSP

engaged by the employer for each stage of the project, and should a project stage be longer than

three months than a PSP performance report needs to be completed every three months. The

appropriate PSP performance report must be completed for each PSP engaged by the employer as set

out below.

If a PSP has been appointed by the employer to act as:

Page 7: Standard for Contractor Performance Reports

4

i) Architectural Professional (AR) - normal services1, Annex 2 shall apply;

ii) Architect (AR) - Principal Agent2, Annex 3 shall apply;

iii) Civil Engineer (CE) - normal services3, Annex 4 shall apply;

iv) Construction Health and Safety Agent (CH) - normal services4, Annex 5 shall apply;

v) Construction Project Manager (CP) - normal services5, Annex 6 shall apply;

vi) Electrical Engineer (EE) - normal services6, Annex 7 shall apply;

vii) Landscape Architect (LA) - normal services7, Annex 8 shall apply;

viii) Mechanical Engineer (ME) - normal services8, Annex 9 shall apply;

ix) Quantity Surveyor (QS) - normal services9, Annex 10 shall apply;

x) Quantity Surveyor (QS) - Principal Consultant10

, Annex 11 shall apply;

xi) Quantity Surveyor (QS) - Principal Agent11

, Annex 12 shall apply;

xii) Quantity Surveyor (QS) - Project Monitor12

, Annex 13 shall apply;

xiii) Structural Engineer (SE), (Engineering Projects) - normal services13

, Annex 14 shall apply;

xiv) Structural Engineer (SE), (Building Projects) - normal services14

, Annex 15 shall apply;

xv) CE, EE, ME and SE - Principal Consultant (Engineering Management Services)15

, Annex 16 shall

apply;

xvi) CE, EE, ME and SE - Principal Agent16

, Annex 17 shall apply;

1 South African Council for the Architectural Profession. (2011). Annual Update of the Professional Fees

Guideline Issued in terms of Section 34(2) of the Architectural Profession Act No. 44 of 2000. Board Notice

194 of 2011. Government Gazette. (No.34788). 2 PROCSA (2013). Client/Consultant Professional Services Agreement. Matrix, Scope of Services by Stage by

Discipline. Code 3101. Edition 3.1. 3 Engineering Council of South Africa. (2013). Guideline of Services and Processes for Estimating Fees for

Persons Registered in terms of the Engineering Profession Act, 2000. Board Notice 46 of 2013. Government

Gazette. (Vol. 582, No.37102). 4 The South African Council for the Project and Construction Management Professions. Registration Rules for

Construction Health and Safety Agents in terms of Section 18(1)(c) of the Project and Construction

Management Professions Act, 2000. http://www.sacpcmp.org.za/construction-health-safety/284-chs-agent 5 The South African Council for the Project and Construction Management Professions. (2011). Guideline

Scope of Services and Recommended Guideline of Fees for Persons Registered in terms of the Project and

Construction Management Professions Act, 2000. Board Notice 202 of 2011. Government Gazette.

(No.34585). 6 Engineering Council of South Africa. (2013). Guideline of Services and Processes for Estimating Fees for

Persons Registered in terms of the Engineering Profession Act, 2000. Board Notice. 46 of 2013. Government

Gazette. (Vol. 582, No.37102). 7 South African Council for the Landscape Architectural Profession. (2011). Amended Landscape Architectural

Work Stages.

http://web.vdw.co.za/Portals/22/Documents/Downloads/SACLAPamendedworkstagesJan2011.pdf 8 Engineering Council of South Africa. (2013). Guideline of Services and Processes for Estimating Fees for

Persons Registered in terms of the Engineering Profession Act, 2000. Board Notice 46 of 2013. Government

Gazette. (Vol. 582, No.37102). 9 The South African Council for the Quantity Surveying Profession. 2013 Tariff of Professional Fees Schedule.

Guideline Tariff of Professional Fees in Respect of Services Rendered by a Quantity Surveyor in Private

Practice. http://c.ymcdn.com/sites/www.sacqsp.org.za/resource/collection/62E54748-385B-4597-A72A-

4BD2F97D3641/2013_Guideline_Tariff_of_Professional_Fees.pdf 10

Ibid. 11

Ibid. 12

Ibid. 13

Engineering Council of South Africa. (2013). Guideline of Services and Processes for Estimating Fees for

Persons Registered in terms of the Engineering Profession Act, 2000. Board Notice 46 of 2013. Government

Gazette. (Vol. 582, No.37102). 14

Ibid. 15

Ibid. 16

Ibid.

Page 8: Standard for Contractor Performance Reports

5

xvii) AR, CE, EE, ME, SE, CP, LA and QS - Planning, Studies, Investigations, and Assessments17

, Annex

18 shall apply;

17

Ibid.

Page 9: Standard for Contractor Performance Reports

6

Annex 1 PSP Performance Report

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Project initiation Y N

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

ISSUE OF A PSP PERFORMANCE REPORT

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 10: Standard for Contractor Performance Reports

7

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Aggregate = Sub - total / 4

coordination of interfaces N/A -1 0

Sum

Aggregate

MANAGEMENT OF RESOURSES

skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

Sub - total

ability to meet programmed milestones

timely allocation of appropriate resources to

critical activities

overall progress of the work

timely submission of progress reports

2

-1 0 2

N/A -1

1

N/A -1 0 1

N/A 1

N/A

N/A

-1

0 1 2

N/A -1 0 1 2

N/A

N/A

-1 1 2

-1

1 2

-1 0

0

1 2

Aggregate = Sub - total / 5

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

CO-OPERATIVE RELATIONSHIPS

Sub - total

N/A -1 0

Aggregate

Sub - total

Aggregate = Sub - total / 4

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A

C

response to problems and changing

circumstances

Aggregate

1 2

appropriateness of skills and experience of

personnel assigned to the work

adequacy of the number of personnel

assigned to the work

TIME MANAGEMENT

20% of composite evaluation (0.2 x aggregate) A

Sum

2

N/A -1 0 1 2

-1 0 1

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

1 2

response to instruction

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A

10% of composite evaluation (0.1 x aggregate)

-1 0

2

B10% of composite evaluation (0.1 x aggregate)

Sum

Page 11: Standard for Contractor Performance Reports

8

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Aggregated score for Stage 0 - Project Initiation (WaS0) only OR

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

STANDARD OF SERVICE (Overall)

STANDARD OF SERVICE (Stages + Overall)

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

STANDARD OF SERVICE (Stages)

WaS1

Aggregate = Sub - total / 3

A + B + C + D

60% of composite evaluation (0.6 x Diii) D

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/A WaS0Stage 0 – Project initiation

N/A

N/A

N/A

Stage 6 - Close-Out

WaS5Stage 5- Construction

N/A

WaS4

WaS3

WaS2

adherence to budget N/A

Stage 1 - Inception

Stage 2 - Concept and Viability

Stage 3- Design Development

Stage 4 - Documentation and Procurement

WaS6

Aggregate

reviews and reports delivered in accordance

with the briefN/A

X

Diii = D(i) + D(ii) Diii

Sum

D(ii)(Dii) 25% Weighted aggregate of standard of service (0.25 x Aggregate score)

Sub - total

-1 0 1 2

1 2-1 0

N/A

N/A

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

compliance with brief N/A -1 0 1 2

Aggregated score

STANDARD OF SERVICE (All Stages)

Page 12: Standard for Contractor Performance Reports

9

Name of Employer's Representative Title Initials Surname

Designation

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date Y Y Y Y - M M - D D

I agree disagree

Signature

Name of Adjudicator Title Initials Surname

Designation

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date Y Y Y Y - M M - D D

Signature

Employer's Rating PSP's Rating Adjudication

Time Management

Management of Resources

Co-operative Relationships

Standard of Service

Signature

Date Y Y Y Y - M M - D D

Y Y Y Y - M M - D D

Date Y Y Y Y - M M - D D

On behalf of the PSP, I note the outcome of the Adjudication process

On behalf of the employer, I note the outcome of the Adjudication process

Signature; PSP's Representative

with the Reporting Officer's Assessment of the PSP Assessment Report

Section G: Adjudicator's Information (If Applicable)

Section H: Outcome of Adjudication (If Applicable)

Section F: Employer's Representative Information

I, the undersigned warrant that:

I am duly authorised to act as an adjudicator;

In my opinion, the outcome of this adjudication represents a fair outcome.

Signature; Employer's

Representative

Page 13: Standard for Contractor Performance Reports

10

Annex 2 Interim PSP Performance Report - Architect (Normal Services)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (ARCHITECT)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 14: Standard for Contractor Performance Reports

11

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Sub - total

Aggregate = Sub - total / 4

coordination of interfaces N/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

2

N/A -1 0 1 2

-1 0 1 2

timely submission of progress reports

overall progress of the work

N/A -1 0 1

adequacy of the number of personnel

assigned to the work

timely allocation of appropriate resources to

critical activities

ability to meet programmed milestones

TIME MANAGEMENT

N/A -1 0 1 2

N/A

Aggregate = Sub - total / 4

Sub - total Sum

Aggregate

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

N/A -1 0 1 2

Sum

Aggregate

CO-OPERATIVE RELATIONSHIPS

N/A -1 0 1 2

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

B

1 2N/A

N/A -1 0 1 2

N/A

N/A -1 0 1 2

-1 0

response to problems and changing

circumstances

Aggregate

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

0 1 2

Section D: PSP Performance Information

Standard

well above

the

acceptable

standard of

performance

Definition

10% of composite evaluation (0.1 x aggregate)

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Sub - total Sum

response to instruction

general cooperation and responsiveness,

adherence to commitments

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

-1

Evaluation Criteria Grading

20% of composite evaluation (0.2 x aggregate) A

10% of composite evaluation (0.1 x aggregate)

C

Aggregate = Sub - total / 5

Page 15: Standard for Contractor Performance Reports

12

Continued over

Incorporate and coordinate the other

consultants designs into building design

1 2

-1Review the design and consult with local and

statutory authorities

N/A -1

Confirm the scope and complexity N/A -1 0

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

0 1 2

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Agree the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

-1 0 1 2

Check for conformity of the concept with the

rights to the use of the landN/A -1

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

Scope of services

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

Assist in developing a clear project brief N/A

0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

Sum of activity assessments (Stage 2) Sum

Review anticipated cost of the project N/A -1

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Standard

well above

the

acceptable

standard of

performance

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Evaluation Criteria Grading

Advise on rights, constraints, consents and

approvalsN/A -1 0 1 2

Assist client with project budgetary

constraintsN/A -1 0 1 2

Advise on the other consultants and services

requiredN/A -1 0 1 2

Advise client on methods of contracting N/A -1 0 1 2

Draft project programme N/A -1 0 1 2

Prepare an initial design and advise on

technical and functional characteristics of

design

N/A -1 0 1 2

0 1 2

Select general construction materials and

intended servicesN/A -1 0 1 2

Clarify and confirm the project space norms

to optimise functional and operational

efficiency in terms of scale and relationships

of areas

1 2

Develop the design, construction system,

materials and components N/A -1 0 1 2

N/A 0

N/A -1 0

Review the design, costing and programmes

with the consultantsN/A -1 0

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 1) WaS1

15% Weighted aggregate of Stages (0.15 x Aggregate score for Stage 2) WaS2

20% Weighted aggregate of Stages (0.2 x Aggregate score for Stage 3) WaS3

2

1 2

1

Page 16: Standard for Contractor Performance Reports

13

WaS4 = Sum for Stage 4 (WaS4.1+WaS4.2) WaS4

1 2

Obtain offers for the execution of the works N/A

Prepare contract documentation and arrange

signing of contractN/A -1 0

Evaluate offers and recommend on award of

contractN/A

2

Aggregate

1 2

-1 0 1 2

Aggregate score (Stage 4.1) = Sum of activity assessments / number of assessed activities

-1 0

20% Weighted aggregate of Stages (0.2 x Aggregate score for Stage 4.1)

Obtain client's authority to prepare

documents to procure offers for the

execution of the works

N/A -1 0 1

2

Review costing and programme with

consultantsN/A -1 0 1 2

Prepare specifications for the works and

agree construction quality standards with

other consultants

N/A

Co-ordinate technical documentation with the

consultants and complete primary co-

ordination

N/A -1 0

1

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

N/A -1

0 1 2

-1 0

STANDARD OF SERVICE (Stage 5- Construction)

Aggregate

Aggregate score (Stage 4.2) = Sum of activity assessments / number of assessed activities Aggregate

Scope of services

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities

Sum of activity assessments (Stage 4.2) Sum

Scope of services

1 2

WaS4.1

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Standard

well above

the

acceptable

standard of

performance

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Evaluation Criteria Grading

Carry out contract administration

procedures delegated by the principal agent

in terms of the contract

N/A -1

Administer and perform the duties and

obligations assigned to the principal agentN/A -1 0 1 2

0 1 2

Issue construction documentation in

accordance with the documentation and

construction programme

N/A -1 0 1 2

Give possession of site to contractor

Check and approve subcontract shop

drawings for design intent complianceN/A -1 0 1 2

Inspect the works for conformity to contract

documentation N/A -1 0 1 2

Issue certificate of practical completion N/A -1 0 1 2

Assist in obtaining statutory certificates N/A -1 0 1 2

10% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 4.2) WaS4.2

27% Weighted aggregate of Stages (0.27 x Aggregate score for Stage 5) WaS5

Stage 4.1 - Prepare documentation sufficient for local authority submission

Stage 4.2 - Complete construction documentation and proceed to call for tenders

Obtain client's authority and submit

documents for approval N/A -1 0 1 2

Sum of activity assessments (Stage 4.1) Sum

Page 17: Standard for Contractor Performance Reports

14

Continued over

SumSub - total

D60% of composite evaluation (0.6 x D(iii))

XA + B + C + D

Aggregated score

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score)

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

adherence to budget N/A -1 0 1 2

compliance with brief N/A -1 0 1 2

Scope of services

Facilitate project close-out, prepare

necessary documentation for completion,

handover and operation of project

N/A -1 0

STANDARD OF SERVICE (Stage 6 - Close-Out)

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Standard

well above

the

acceptable

standard of

performance

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

Evaluation Criteria Grading

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

D(ii)

Diii = D(i) + D(ii) D(iii)

STANDARD OF SERVICE (Stages)

STANDARD OF SERVICE (Overall)

STANDARD OF SERVICE (Stages + Overall)

1 2

1 2

Receive comment and approve relevant

payment valuations and completion

certificates

N/A -1 0 1 2

3% Weighted aggregate of Stages (0.03 x Aggregate score for Stage 6) WaS6

Prepare and/or procure as-built drawings

and technical and contractual undertakings

by contractor and sub-contractors

N/A -1 0

Page 18: Standard for Contractor Performance Reports

15

Annex 3 Interim PSP Performance Report - Architect (Principal Agent))

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (ARCHITECT - PRINCIPAL AGENT)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 19: Standard for Contractor Performance Reports

16

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

N/A -1 0 1 2

N/A -1 0 1 2

0 1 2

N/A -1 0 1 2

Sub - total

Aggregate = Sub - total / 2

Sum

Aggregate

ability to meet programmed milestones

timely allocation of appropriate resources to

critical activities

overall progress of the work

timely submission of progress reports

N/A -1

N/A -1 0 1 2

N/A -1 0 1 2

Aggregate

N/A -1 0 1 2

Sum

Aggregate = Sub - total / 5

Sub - total

N/A -1 0 1 2

N/A -1 0 1 2

2

N/A -1 0 1 2

N/A -1 0 1

TIME MANAGEMENT

CO-OPERATIVE RELATIONSHIPS

response to problems and changing

circumstances

response to instruction

general cooperation and responsiveness,

adherence to commitments

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

MANAGEMENT OF RESOURCES

Aggregate = Sub - total / 4

Sub - total

appropriateness of skills and experience of

personnel assigned to the work

Sum

Aggregate

adequacy of the number of personnel

assigned to the work

B

Skill and commitment in management of

subconsultants and other suppliersN/A

20% of composite evaluation (0.2 x aggregate) A

10% of composite evaluation (0.1 x aggregate)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

-1

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Section D: PSP Performance Information

Evaluation Criteria Grading

0 1 2

coordination of interfaces N/A -1 0 1 2

10% of composite evaluation (0.1 x aggregate) C

Page 20: Standard for Contractor Performance Reports

17

Continued over

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 3) WaS3

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 4) WaS4

Coordinate and assemble the contract

documentation for signatureN/A -1 0 1 2

Agree the format and procedures for

monitoring and control by the quantity

surveyor of the cost of the works

N/A -1 0 1 2

Manage procurement process and

recommend contractors for approval

by the client

N/A -1 0 1 2

Advise the client in conjunction with the other

consultants on the appropriate insurancesN/A -1 0 1 2

Prepare and agree the procurement

programmeN/A -1 0 1 2

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Recommend and agree procurement

strategy for contractors, subcontractors and

suppliers with the client and the other

consultants

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 3- Design Development)

Prepare, coordinate, agree and monitor a

detailed design and documentation

programme

N/A -1 0 1 2

Scope of services

No services N/A

N/A

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

Scope of services

STANDARD OF SERVICE (Stage 1 - Inception)

No services

Scope of services

AggregateAggregate score (Stage 3) = Sum of activity assessments / number of assessed activities

Sum of activity assessments (Stage 4)

SumSum of activity assessments (Stage 3)

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Page 21: Standard for Contractor Performance Reports

18

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 5) WaS5

Facilitate and expedite receipt of occupation

certificatesN/A -1 0 1 2

Coordinate, monitor and issue practical

completion lists and the certificate of

practical completion

N/A -1 0 1 2

Prepare and submit progress reports N/A -1 0 1 2

Monitor preparation of financial control

reports by the other consultantsN/A -1 0 1 2

Receive, review and adjudicate any

contractual claimsN/A -1 0 1 2

Monitor, review, approve and issue

certificatesN/A -1 0 1 2

Establish procedures for monitoring scope

and cost variationsN/A -1 0 1 2

Monitor preparation of the environmental

management plan by the environmental

consultant

N/A -1 0 1 2

Monitor preparation and auditing of the

contractor’s health and safety plan and

approval thereof by the health and

safety consultant

N/A -1 0 1 2

Agree quality assurance procedures and

monitor implementation thereof by

the other consultants and the contractors

N/A -1 0 1 2

Receive, coordinate and monitor approval of

all contract documentation provided by

contractor(s)

N/A -1 0 1 2

Adjudicate entitlements that arise from

changes required to the construction

programme

N/A -1 0 1 2

Regularly monitor performance of the

contractor against the construction

programme

N/A -1 0 1 2

Review, approve and monitor the preparation

of the construction programme by the

contractor

N/A -1 0 1 2

Conduct and record regular site meetings N/A -1 0 1 2

Instruct the contractor on behalf of the client

to appoint subcontractorsN/A -1 0 1 2

Agree and monitor issue and distribution of

construction documentationN/A -1 0 1 2

-1 0 1 2

Establish construction documentation issue

processN/A -1 0 1 2

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 5- Construction)

Arrange site handover to the contractor N/A

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Page 22: Standard for Contractor Performance Reports

19

Continued over

Continued over

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 6) WaS6

Prepare and present the project close-out

reportN/A

XA + B + C + D

AggregateAggregate = Sub - total / 3

D(iii) = D(i) + D(ii)

60% of composite evaluation (0.6 x D(iii))

SumSub - total

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

adherence to budget N/A -1 0 1 2

-1 0 1 2

Manage agreement of final account(s) N/A -1 0 1 2

Issue completion certificates N/A -1 0 1 2

Monitor, review and issue payment

certificatesN/A -1 0 1 2

Manage procurement of outstanding

statutory certificatesN/A -1 0 1 2

Manage preparation of as-built drawings and

documentationN/A -1 0 1 2

Manage procurement of operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Sum of activity assessments (Stage 6) Sum

STANDARD OF SERVICE (Stage 6 - Close-Out)

Coordinate and monitor rectification of

defectsN/A -1 0 1 2

Scope of services

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Sum of Weighted Aggregate of Stages (WaS3+WaS4+WaS5+WaS6) Wa

Aggregated score

D(iii)

D

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

D(ii)

STANDARD OF SERVICE (Stages)

STANDARD OF SERVICE (Overall)

STANDARD OF SERVICE (Stages + Overall)

(Dii) 25% Weighted aggregate of standard of service

compliance with brief N/A -1 0 1 2

Page 23: Standard for Contractor Performance Reports

20

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Section E: PSP / JV Information

Name of Main PSP

Page 24: Standard for Contractor Performance Reports

21

Annex 4 Interim PSP Performance Report - Civil Engineer (Normal Services)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT - CIVIL ENGINEER

Section A: Employer Information

Section B: Contract Data

Please indicate the project stage

for which assessment is made

Section C: Reporting Officer's Information

Page 25: Standard for Contractor Performance Reports

22

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

A

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely submission of progress reports N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate)

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

response to instruction N/A -1 0 1 2

response to problems and changing

circumstancesN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

Page 26: Standard for Contractor Performance Reports

23

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

Assist in developing a clear project brief N/A -1 0 1 2

Attend the project initiation meetings N/A -1 0 1 2

Advise on the procurement policy for

the projectN/A -1 0 1 2

Advise on rights, constraints, consents and

approvalsN/A -1 0 1 2

Define the services and scope of work

requiredN/A -1 0 1 2

Conclude the terms of the agreement with

the clientN/A -1 0 1 2

Inspect site and advise on the necessary

surveys, analyses, tests and site or other

investigations where such information will be

required for Stage2 including the availability

and location of infrastructure and services

N/A -1 0 1 2

Determine availability of data, drawings and

plans relating to the projectN/A -1 0 1 2

Advise on criteria that could influence project

lifecycle cost significantlyN/A -1 0 1 2

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 1) WaS1

Page 27: Standard for Contractor Performance Reports

24

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

Agree the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

Establish concept design criteria N/A -1 0 1 2

Prepare initial concept design and related

documentationN/A -1 0 1 2

Advise the client regarding further surveys,

analyses, tests and investigations which may

be required

N/A -1 0 1 2

Establish regulatory authorities’ requirements

and incorporate into the designN/A -1 0 1 2

Refine and assess concept design to ensure

conformance with all regulatory requirements

and consents

N/A -1 0 1 2

Establish access, utilities, services and

connections required for the designN/A -1 0 1 2

Coordinate design interfaces with the other

consultants N/A -1 0 1 2

Prepare preliminary process designs,

preliminary designs, and related

documentation for approval by authorities

and client suitable for costing

N/A -1 0 1 2

Provide cost estimates and comment on life

cycle costs as requiredN/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 0 1 2

Sum of activity assessments (Stage 2) Sum

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

25% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 2) WaS2

Page 28: Standard for Contractor Performance Reports

25

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

Incorporate the client’s and authorities’

detailed requirements into the design N/A -1 0 1 2

Incorporate the other consultants’ designs

and requirements into the design N/A -1 0 1 2

Prepare design development drawings

including draft technical details and

specifications

N/A -1 0 1 2

Review and evaluate design and outline

specifications and exercise cost control N/A -1 0 1 2

Prepare detailed estimates of construction

cost N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

other consultants

N/A -1 0 1 2

Submit necessary design documentation to

local authorities for approval N/A -1 0 1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

25% Weighted aggregate of Stages (0.3 x Aggregate score for Stage 3) WaS3

Page 29: Standard for Contractor Performance Reports

26

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

Attend design and consultants meetings N/A -1 0 1 2

Prepare specifications and preambles for the

worksN/A -1 0 1 2

Accommodate services design N/A -1 0 1 2

Check cost estimates and adjust the design

documents if necessary to remain within the

budget

N/A -1 0 1 2

Formulate the procurement strategy for

contractors or assist the principal consultant

where relevant

N/A -1 0 1 2

Prepare documentation for contractor

procurementN/A -1 0 1 2

Review design, drawings and schedules for

compliance with the approved budgetN/A -1 0 1 2

Call for tendersand/or negotiation of prices

and/or assist the principal consultant where

relevant

N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

the other consultants

N/A -1 0 1 2

Evaluate tenders N/A -1 0 1 2

Prepare contract documentation for signiture N/A -1 0 1 2

Assist in pricing, documentation and tender

evaluation as required when detailed

services for these activities are provided by

others

N/A -1 0 1 2

Assess samples and products for

compliance and design intent N/A -1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

15% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 4) WaS4

Page 30: Standard for Contractor Performance Reports

27

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

Attend the site handover N/A -1 0 1 2

Issue construction documentation in

accordance with the documentation

schedule

N/A -1 0 1 2

Carry out contract administration procedures

in terms of the contractN/A -1 0 1 2

Prepare schedules of predicted cash flow N/A -1 0 1 2

Proactively prepare estimates for proposed

variations for client decision making N/A -1 0 1 2

Attend regular site, technical and progress

meetingsN/A -1 0 1 2

Review contractor's quality control

programme, advise and agree on Quality

Assurance Plan

N/A -1 0 1 2

Inspect works for quality and conformity to

contract documentationN/A -1 0 1 2

Review outputs of quality assurance

procedures and advise contractor and client

on adequacy and need for additional

controls, inspections and testing

N/A -1 0 1 2

Adjudicate and resolve financial claims by

contractor(s) N/A -1 0 1 2

Assist in the resolution of contractual claims

by the contractorN/A -1 0 1 2

Establish and maintain a financial control

system N/A -1 0 1 2

Clarify details and descriptions during

construction as required N/A -1 0 1 2

Prepare valuations for payment certificates

to be issued by the principal agent N/A -1 0 1 2

Instruct,witness and review of all tests and

mock-ups carried out both on and off the siteN/A -1 0 1 2

Check and approve contractor drawings for

design intentN/A -1 0 1 2

Update and issue drawings register N/A -1 0 1 2

Issue contract instructions as and

when requiredN/A -1 0 1 2

Review and comment on operation and

maintenance manuals, guarantees,

certificates and warranties

N/A -1 0 1 2

Inspect the works and issue practical

completion and defects listsN/A -1 0 1 2

Arranging for the delivery of all test

certificates, statutory and other approvals, as-

built drawings and operating manuals

N/A -1 0 1 2

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

25% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 5) WaS5

Page 31: Standard for Contractor Performance Reports

28

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 6 - Close-Out)

Scope of services

Inspect and verify rectification of defects N/A -1 0 1 2

Receive, comment and approve relevant

payment valuations and completion

certificates

N/A -1 0 1 2

Facilitate and/or procure final operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Prepare and/or procure as-built drawings

and documentationN/A -1 0 1 2

Conclude final account(s) N/A -1 0 1 2

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

STANDARD OF SERVICE (Stages)

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

adherence to budget N/A -1 0 1 2

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x D(iii)) D

Aggregated score

A + B + C + D X

Page 32: Standard for Contractor Performance Reports

29

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Page 33: Standard for Contractor Performance Reports

30

Annex 5 Interim PSP Performance Report - Construction H&S Agent)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (CONSTRUCTION H&S AGENT)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 34: Standard for Contractor Performance Reports

31

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

0 1 2

10% of composite evaluation (0.1 x aggregate)

10% of composite evaluation (0.1 x aggregate)

0 1 2

TIME MANAGEMENT

0 1 2

N/A -1 0 1 2

0 1 2

N/A -1 0 1 2

timely submission of progress reports

overall progress of the work

timely allocation of appropriate resources to

critical activities

ability to meet programmed milestones N/A -1

N/A -1

MANAGEMENT OF RESOURCES

Aggregate = Sub - total / 4

Sub - total Sum

Aggregate

2

20% of composite evaluation (0.2 x aggregate)

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1

Sum

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 2

coordination of interfaces N/A

0 1 2

Sub - total

adequacy of the number of personnel

assigned to the work

Aggregate

N/A -1

1

-1

1 2

Aggregate = Sub - total / 4

1 2

general cooperation and responsiveness,

adherence to commitments

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

CO-OPERATIVE RELATIONSHIPS

1 2

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0

N/A -1 0

N/A -1 0

Aggregate

response to problems and changing

circumstances

response to instruction

N/A -1 0 1 2

N/A -1

Aggregate = Sub - total / 5

Sub - total Sum

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Section D: PSP Performance Information

Evaluation Criteria Grading

A

B

C

Page 35: Standard for Contractor Performance Reports

32

Continued over

Identify construction project health and safety

risk profileN/A -1 0 1 2

Advise the client on the adequacy of health

and safety competency and resources of the

other consultants

N/A -1 0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

Define the consultant’s scope of work and

services N/A -1 0 1 2

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Advise on the necessary surveys, analyses,

tests and site or other investigations where

such information will be required for the next

stage of project

N/A -1 0 1 2

Conclude the terms of the agreement with

the client N/A -1 0 1 2

1 2

Attend the project initiation meetings N/A -1 0 1 2

Scope of services

Assist in developing a clear project brief N/A -1 0

STANDARD OF SERVICE (Stage 1 - Inception)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

10% Weighted aggregate of Stages (0.10 x Aggregate score for Stage 1) WaS1

Page 36: Standard for Contractor Performance Reports

33

Continued over

Monitor the implementation of the appropriate

specialists' health and safety plans, including

periodic audits

N/A -1 0 1 2

Assess and approve the appropriate

specialists health and safety plansN/A -1 0 1 2

Advise the client on the adequacy of the

health and safety competency and resources

of the appropriate specialists

N/A -1 0 1 2

Advise on preliminary cost

estimates/budgets for construction project

health and safety

N/A -1 0 1 2

Sum of activity assessments (Stage 2) Sum

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 0 1 2

Advise and agree with the other consultants

regarding the project CHS requirements and

related design risk management process

N/A -1 0 1 2

Agree the format and procedures for CHS

control N/A -1 0 1 2

Prepare the draft CHS specification N/A -1 0 1 2

Assist the clientand principal consultant in

the procurement of the necessary and

appropriate specialist(s), including a clear

definition of their roles, responsibilities and

liabilities

N/A -1 0 1 2

Prepare draft baseline risk assessment N/A -1 0 1 2

2

Review, update and agree the project CHS

complexity profile and prepare the CHS

policy for the project

N/A -1 0 1 2

N/A -1 0 1 2

Review and evaluate design concepts and

advise on CHS in conjunction with the other

consultants

N/A -1 0 1

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Agree the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Attend design and consultants' meetings

10% Weighted aggregate of Stages (0.10 x Aggregate score for Stage 2) WaS2

Page 37: Standard for Contractor Performance Reports

34

Continued over

0 1 2

Monitor the implementation of necessary

construction health and safety plans,

including periodic audits for early works

N/A -1 0 1 2

2

Advise designers of their health and safety

legal liabilities and responsibilities for

constructability, maintainability and

operationability of the structure

N/A -1 0 1 2

Finalise the construction project health and

safety risk profileN/A -1 0 1

Assess and approve necessary construction

project health and safety plans for early

works

N/A -1

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 0 1 2

Assist the cost consultants with detailed

information for cost estimates/budgets N/A -1 0 1 2

Agree on a format for the CHS file for the

project N/A -1 0 1 2

Identify and implement precautions

necessary for CHS control and update CHS

specification

N/A -1 0 1 2

Monitor the integration of the CHS aspects

during the design process and finalise

baseline risk assessment

N/A -1 0 1 2

Manage, coordinate, integrate and record the

design risk management process with the

other consultant(s) in a sequence to suit the

documentation programme

N/A -1 0 1 2

Attend design and consultants meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 3- Design Development)

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

25% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 3) WaS3

Page 38: Standard for Contractor Performance Reports

35

Continued over

Prepare construction project health and

safety mobilisation and access plans for the

construction work

N/A -1 0 1 2

Assist the cost consultant in the finalisation

of the construction project health and safety

cost estimate/budget

N/A -1 0 1 2

2

Participate in construction project tender

clarification meetingsN/A -1 0 1 2

Assist in developing a clear construction

project health and safety procurement

process

N/A -1 0 1

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

Sum of activity assessments (Stage 4) Sum

Assess samples, mockups and products for

CHS compliance N/A -1 0 1 2

Assist with the preparation of contract

documentation for signature N/A -1 0 1 2

Assist with the evaluation of tenders and

verify the contractor(s) competencies,

knowledge and resources to carry out the

works safely

N/A -1 0 1 2

Prepare CHS documentation for submission

to authorities N/A -1 0 1 2

Provide and record CHS risk information to

the principal consultant and the other

consultants

N/A -1 0 1 2

Prepare CHS tender specification and

integrate with the procurement

documentation

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Attend design and consultants meetings N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

10% Weighted aggregate of Stages (0.10 x Aggregate score for Stage 4) WaS4

Page 39: Standard for Contractor Performance Reports

36

Continued over

Sum of activity assessments (Stage 5) Sum

0 1 2

Prepare and maintain the consolidated health

and safety fileN/A -1 0 1 2

Audit compliance with the CHS plan and brief

the project management team and

contractor(s) following site audits

Prepare the structure commissioning health

and safety plansN/A -1

Facilitate construction health and safety

system and plans reviews for continual

improvement

N/A -1

Monitor the compilation of the CHS file and

verify maintenance of same by the

contractor(s)

N/A -1

Prepare revised construction project health

and safety risk profile, specifications and

cost estimates/budgets where there is scope

of work changes

N/A -1 0 1 2

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

0 1

N/A -1 0 1 2

2

0 1 2

Monitor design risk management N/A -1 0 1 2

Attend regular site, technical and progress

meetings N/A -1 0 1 2

Attend the site handover N/A -1 0 1 2

2

Submit necessary documentation to

authorities and facilitate permits that may be

required to commence the works

N/A -1 0 1 2

Perform incident and accident investigations

where necessaryN/A -1 0 1 2

Scope of services

Monitor the implementation of the CHS

plan(s) in accordance with the CHS

specification and recommend stop orders

where necessary

N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

40% Weighted aggregate of Stages (0.40 x Aggregate score for Stage 5) WaS5

STANDARD OF SERVICE (Stage 5- Construction)

Assess and approve the contractor(s) CHS

plans N/A -1 0 1

Conduct safety management system audits N/A -1 0 1 2

Page 40: Standard for Contractor Performance Reports

37

Continued over

Cancel all construction project health and

safety legal appointmentsN/A -1 0 1 2

D(iii) = D(i) + D(ii)

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score)

D(i)

Aggregate

D(ii)

Aggregate = Sub - total / 3

reviews and reports delivered in accordance

with the brief

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa)

SumSub - total

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

XA + B + C + D

N/A -1 0 1 2

Aggregated score

D60% of composite evaluation (0.6 x D(iii))

D(iii)

adherence to budget N/A -1 0 1 2

compliance with brief N/A -1 0 1 2

Prepare the CHS close out report N/A -1 0 1 2

Prepare CHS operations and maintenance

report N/A -1 0 1 2

STANDARD OF SERVICE (Stage 6 - Close-Out)

Review, discuss and approve the CHS file

with the contractor(s) and manage the CHS

during the defects liability period

N/A -1 0 1 2

Scope of services

STANDARD OF SERVICE (Stages)

STANDARD OF SERVICE (Stages + Overall)

STANDARD OF SERVICE (Overall)

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

Page 41: Standard for Contractor Performance Reports

38

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Name of Joint Venture Partner

Section E: PSP / JV Information

Name of Main PSP

Page 42: Standard for Contractor Performance Reports

39

Annex 6 Interim PSP Performance Report - Construction Project Manager

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

Please indicate the project stage

for which assessment is made

INTERIM PSP PERFORMANCE REPORT (PROJECT MANAGER)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Page 43: Standard for Contractor Performance Reports

40

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Sum

N/A

N/A -1 0 1 2

Aggregate

N/A -1 0 1

N/A -1 0 1 2

N/A -1 0 1 2

-1 0 1 2

Sum

Aggregate

Sub - total

Average = Sub - total / 5

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

2

general cooperation and responsiveness,

adherence to commitments

response to instruction

response to problems and changing

circumstancesN/A -1 10

N/A

-1

2

Sum

N/A -1 0 1 2

-1 1

2

2

2

1

1

1

10% of composite evaluation (0.1 x aggregate) B

Aggregate

N/A

TIME MANAGEMENT

MANAGEMENT OF RESOURCES

ability to meet programmed milestones

timely allocation of appropriate resources to

critical activities

overall progress of the work

timely submission of progress reports

Sub - total

Aggregate = Sub - total / 4

20% of composite evaluation (0.2 x aggregate) A

adequacy of the number of personnel

assigned to the work

N/A -1

CO-OPERATIVE RELATIONSHIPS

appropriateness of skills and experience of

personnel assigned to the work0 1 2

0

N/A -1

N/A -1 0

0

0

N/A

Evaluation Criteria

Section D: PSP Performance Information

Poor

(-1)

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces 2

10% of composite evaluation (0.1 x aggregate)

Sub - total

Aggregate = Sub - total / 4

C

Page 44: Standard for Contractor Performance Reports

41

Continued over

10% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 1) WaS1

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Aggregate

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities

N/A 10 2-1Facilitate client approval of all Stage 1

documentation

2

N/A

N/A

N/A

N/A -1 0

0

0 1

Establish client's procurement policy for

project0

Manage the integration of the preliminary

design to form the basis for the initial viability

assessment of the project

Establish in conjunction with client, other

consultants and all relevant authorities, site

characteristics, rights and constraints for

proper design of intended project

-1

0 1

Assist the client in procurement of necessary

and appropriate consultants including clear

definition of their roles and responsibilities

-1

-1

2

1 2N/A

N/A

2

STANDARD OF SERVICE (Stage 1 - Inception)

0Facilitate development of clear project brief -1

Poor

(-1)N/A

Evaluation Criteria

Scope of services

1

2

1-1

Prepare, coordinate and monitor a project

initiation programme1 2

Facilitate the preparation of the Preliminary

Viability Assessment of the projectN/A -1 0 1 2

Page 45: Standard for Contractor Performance Reports

42

Continued over

10% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 2) WaS2

Sum of activity assessments (Stage 2) Sum

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

Prepare and co-ordinate an indicative project

documentation and construction programme

programme

Manage and integrate the concept and

feasibility documentation for presentation to

the client for approval

-1N/A

Facilitate client approval of all Stage 2

documentation

Agree format and procedures for cost

control and reporting by the other

consultants

N/A

1 2N/A

0

-1

0 1 2

-1

0 1

Advise the client on the requirement to

appoint a health and safety consultant

2

N/A

Scope of services

N/A 21

Assist the client in procurement of the

other consultants2

1

-1 0

0 2

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

N/A

-1

Communicate the project brief to the other

consultants and monitor the development of

the concept and feasibility within the agreed

brief

-1

Co-ordinate and integrate the income stream

requirements of the client into the concept

design and feasibility

N/A -1

Poor

(-1)N/A

Evaluation Criteria

0 1 2

-1Manage and monitor the preparation of the

project costing by other consultantsN/A

0 1

0

1 2

Page 46: Standard for Contractor Performance Reports

43

Continued over

Monitor the cost control by the cost

consultants to verify progressive design

compliance with approved budget

25% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 3) WaS3

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Facilitate and monitor timeous technical

coordination of design by design team

-1

N/A

N/A

0 1

1

Facilitate client approval of all Stage 3

documentation

Sum of activity assessments (Stage 3) Sum

Establish and co-ordinate the formal and

informal communication structure,

processes and procedures for the design

development of the project

Prepare, coordinate, agree and monitor the

design and documentation programme

Conduct and record the appropriate planning,

co-ordination and management meetings

Facilitate input required by health and

safety consultant

0

0

0

1

1

2

2

1Facilitate design reviews for compliance

and cost control-1

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

1

0

0

2

2

-1 1

1

2

2

-1 0

0

Establish responsibilities and monitor the

information flow between the design team,

including the cost consultants.

N/A

N/A

-1 0

N/A

N/A

-1

-1

Manage and monitor the timeous submission

by the design team of all plans and

documentation to obtain the necessary

statutory approvals

N/A

Scope of services

-1

-1

STANDARD OF SERVICE (Stage 3- Design Development)

Assist the client in the procurement of the

necessary other consultants including the

clear definition of their roles and

responsibilities

N/A -1 0

Poor

(-1)N/A

Evaluation Criteria

1 2

Manage, co-ordinate and integrate the design

by the consultants in a sequence to suit the

project design, documentation programme

and quality requirements.

N/A -1 0 1 2

2

2

Facilitate any input from the design

consultants required by Construction

Manager on constructability.

N/A -1 0 1 2

N/A

N/A

1 2

Monitor the preparation by the cost

consultants of cost estimates, budgets, and

cost reports

N/A -1 0 1 2

Page 47: Standard for Contractor Performance Reports

44

Continued over

10% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 4) WaS4

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Select, recommend and agree procurement

strategy for contractors, subcontractors and

suppliers with the client and the other

consultants

Prepare and agree the procurement

programme

Facilitate and monitor the preparation by the

Health and Safety Consultant of the Health

and Safety Specification for the project

2

2

2

1

1

1

20 1

Advise the client in conjunction with the other

consultants on the appropriate insurances

required for the implementation of the project

Monitor the reconciliation by the cost

consultants of the tender prices with the

project budget

Agree the format and procedures for

monitoring of cost control by the cost

consultants of the cost of the works

2

2

2

0

0N/A

N/A

1

1

1

0

-1

-1

-1

-1

-1

-1

0

0

Sum of activity assessments (Stage 4)

Facilitate client approval of the tender

recommendation(s).N/A -1 0 1

0

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

-1

N/A

N/A

N/A

N/A

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

Scope of services

Coordinate and monitor preparation of

procurement documentation by other

consultants in accordance with the project

procurement programme

N/A

Poor

(-1)N/A

Evaluation Criteria

Manage procurement process and

recommend contractors for approval by the

client

N/A -1 0 1 2

2

Sum

Page 48: Standard for Contractor Performance Reports

45

Continued over

-1 0 1 2

Monitor preparation of the environmental

management plan by the environmental

consultant

N/A -1 0 1 2

Monitor the auditing of the contractor's health

and safety plan by the health and safety

consultant

N/A

2

2

1

1

Facilitate site handover to the contractor

Agree and monitor the Construction

Documentation Schedule for timeous

delivery of required information to the

contractors

0

0

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

-1

N/A

N/A

-1

Poor

(-1)N/A

Evaluation Criteria

Appoint contractor(s) on behalf of the client

including the finalization of all agreements.N/A -1 0 1 2

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

Instruct the contractor on behalf of the client

to appoint subcontractorsN/A -1 0 1 2

Receive, coordinate, review and obtain

approval of all contract documentation

provided by contractor, subcontractors and

suppliers for compliance

N/A -1 0 1 2

Monitor the ongoing projects insurance

requirementsN/A -1 0 1 2

Establish and co-ordinate the formal and

informal communication structure and

procedures for the construction process

N/A -1 0 1 2

Conduct and record regular site meetings N/A -1 0 1 2

Monitor, review and approve the preparation

of the construction programme by the

contractor

N/A -1 0 1 2

Regularly monitor performance of the

contractor against the contract programme N/A -1 0 1 2

Review and adjudicate circumstances and

entitlements that arise from changes

required to the contract programme

N/A -1 0 1 2

Monitor preparation and auditing of the

contractor’s health and safety plan and

approval thereof by the health and safety

consultant

N/A -1 0 1 2

Monitor the compliance by the contractors of

the requirements of the health and safety

consultant

N/A -1 0 1 2

Monitor the production of the health and

safety file by the health and safety consultant

and contractors

N/A -1 0 1 2

Establish the construction information

distribution proceduresN/A -1 0 1 2

Page 49: Standard for Contractor Performance Reports

46

Continued over

Aggregate

Monitor the execution by the contractors of

the defect items to achieve Works

Completion.

WaS5

Facilitate and co-ordinate adequate access

with the occupant for the rectification of

defects by the contractors

N/A

40% Weighted aggregate of Stages (0.4 x Aggregate score for Stage 5)

-1

-1

-1N/A

Monitor preparation of monthly cost control

reports by cost consultants

Monitor long lead items and off-site

production by the contractors and suppliers

Prepare and submit monthly progress

reports including submission to client

Manage, co-ordinate and monitor all

necessary testing and commissioning by

consultants and contractors

Coordinate, monitor and issue practical

completion lists and completion certificate(s)

Co-ordinate and monitor the preparation and

issue of the Works Completion List by the

consultants to the contractors.

N/A

21

1

1

Manage the review and approval of all

necessary shop details and product propriety

information by the design consultants

Establish procedures for monitoring,

controlling and agreeing all scope and cost

variations

Agree quality assurance procedures and

monitor implementation thereof by the other

consultants and the contractors

Monitor, review, approve and certify monthly

progress payments

Receive, review and adjudicate any

contractual claims

N/A

2

2

2

2

2

2

2

2

2

2

2

0

1

1

1

1

1 2

21

1

0

1

1

1

10

0

Expedite, review and monitor the timeous

issue of construction information to the

contractors

0

0

0

N/A

0

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

0

0

0

-1

-1

N/A

-1

-1

0

0

0

N/A

N/A

-1

N/A

N/A

-1

-1

-1

-1

N/A

-1

-1

N/A

N/A

N/A

SumSum of activity assessments (Stage 5)

Poor

(-1)N/A

Evaluation Criteria

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities

Page 50: Standard for Contractor Performance Reports

47

Continued over

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

N/A 0

STANDARD OF SERVICE (Stage 6 - Close-Out)

2

STANDARD OF SERVICE (Stages + Overall)

0

N/A

Diii = D(i) + D(ii)

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa)

Sub - total

D(iii)

1

N/A

-1

N/A

Aggregate

adherence to budget

D(ii)(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score)

0

0

Sum of activity assessments (Stage 6) Sum

N/A -1

D

Aggregated score

Co-ordinate and monitor rectification of

defects during defects liability period

STANDARD OF SERVICE (Stages)

Scope of services

0

1

2

60% of composite evaluation (0.6 x D(iii))

Sum

X

Aggregate score = Sub - total / 3

A + B + C + D

Issue completion certificates N/A -1

Definition

Grading

Excellent(2)Good

(1)Adequate (0)

Well below

the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Poor

(-1)N/A

Evaluation Criteria

-1

-1

1

1

2

STANDARD OF SERVICE (Overall)

1compliance with brief

1

2

2

2

0

D(i)

1

2

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

-1

0reviews and reports delivered in accordance

with the briefN/A

-1

-1

Co-ordinate, monitor and issue the Final

Completion Defects list and Certificate of

Final Completion.

Prepare and present the project close-out

report

Manage, co-ordinate and expedite the

preparation and agreement of final

account(s) with contractors

N/A

0 1 2

2

Manage preparation of as-built drawings and

design documentationN/A -1 0 1 2

2

Manage procurement of outstanding

statutory certificatesN/A -1 0 1 2

Manage the finalization of the health and

safety file for submission to the clientN/A -1 0 1

Manage procurement of operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1

Page 51: Standard for Contractor Performance Reports

48

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Contact Person

Designation

Registration Number

Professional Registration Body

Name of Joint Venture Partner

with the Performance Assessment by the Reporting Officer

Name of Joint Venture Partner

Name of Joint Venture Partner

Section E: PSP / JV Information

Name of Main PSP

Page 52: Standard for Contractor Performance Reports

49

Annex 7 Interim PSP Performance Report - EE (Normal Services)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT - ELECTRICAL ENGINEER

Section A: Employer Information

Section B: Contract Data

Please indicate the project stage

for which assessment is made

Section C: Reporting Officer's Information

Page 53: Standard for Contractor Performance Reports

50

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

A

Sub - total Sum

Aggregate = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

response to problems and changing

circumstancesN/A -1 0 1 2

response to instruction N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

coordination of interfaces N/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate)

MANAGEMENT OF RESOURCES

timely submission of progress reports N/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Section D: PSP Performance Information

Page 54: Standard for Contractor Performance Reports

51

Continued over

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 1) WaS1

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Advise on criteria that could influence project

lifecycle cost significantlyN/A -1 0 1 2

Determine availability of data, drawings and

plans relating to the projectN/A -1 0 1 2

Inspect site and advise on the necessary

surveys, analyses, tests and site or other

investigations where such information will be

required for Stage2 including the availability

and location of infrastructure and services

N/A -1 0 1 2

Conclude the terms of the agreement with

the clientN/A -1 0 1 2

Define the services and scope of work

requiredN/A -1 0 1 2

Advise on rights, constraints, consents and

approvalsN/A -1 0 1 2

Advise on the procurement policy for

the projectN/A -1 0 1 2

Attend the project initiation meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

Assist in developing a clear project brief N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Page 55: Standard for Contractor Performance Reports

52

Continued over

Sum of activity assessments (Stage 2) Sum

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

15% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 2) WaS2

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 0 1 2

Provide cost estimates and comment on life

cycle costs as requiredN/A -1 0 1 2

Prepare preliminary process designs,

preliminary designs, and related

documentation for approval by authorities

and client suitable for costing

N/A -1 0 1 2

Coordinate design interfaces with the other

consultants N/A -1 0 1 2

Establish access, utilities, services and

connections required for the designN/A -1 0 1 2

Refine and assess concept design to ensure

conformance with all regulatory requirements

and consents

N/A -1 0 1 2

Establish regulatory authorities’ requirements

and incorporate into the designN/A -1 0 1 2

Advise the client regarding further surveys,

analyses, tests and investigations which may

be required

N/A -1 0 1 2

Prepare initial concept design and related

documentationN/A -1 0 1 2

Establish concept design criteria N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

Agree the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Page 56: Standard for Contractor Performance Reports

53

Continued over

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

20% Weighted aggregate of Stages (0.3 x Aggregate score for Stage 3) WaS3

Submit necessary design documentation to

local authorities for approval N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

other consultants

N/A -1 0 1 2

Prepare detailed estimates of construction

cost N/A -1 0 1 2

Review and evaluate design and outline

specifications and exercise cost control N/A -1 0 1 2

Prepare design development drawings

including draft technical details and

specifications

N/A -1 0 1 2

Incorporate the other consultants’ designs

and requirements into the design N/A -1 0 1 2

Incorporate the client’s and authorities’

detailed requirements into the design N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Page 57: Standard for Contractor Performance Reports

54

Continued over

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

20% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 4) WaS4

Assess samples and products for

compliance and design intent N/A -1 0 1 2

Assist in pricing, documentation and tender

evaluation as required when detailed

services for these activities are provided by

others

N/A -1 0 1 2

Prepare contract documentation for signiture N/A -1 0 1 2

Evaluate tenders N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

the other consultants

N/A -1 0 1 2

Call for tendersand/or negotiation of prices

and/or assist the principal consultant where

relevant

N/A -1 0 1 2

Review design, drawings and schedules for

compliance with the approved budgetN/A -1 0 1 2

Prepare documentation for contractor

procurementN/A -1 0 1 2

Formulate the procurement strategy for

contractors or assist the principal consultant

where relevant

N/A -1 0 1 2

Check cost estimates and adjust the design

documents if necessary to remain within the

budget

N/A -1 0 1 2

Accommodate services design N/A -1 0 1 2

Prepare specifications and preambles for the

worksN/A -1 0 1 2

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

Attend design and consultants meetings N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Page 58: Standard for Contractor Performance Reports

55

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

35% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 5) WaS5

Arranging for the delivery of all test

certificates, statutory and other approvals, as-

built drawings and operating manuals

N/A -1 0 1 2

Inspect the works and issue practical

completion and defects listsN/A -1 0 1 2

Review and comment on operation and

maintenance manuals, guarantees,

certificates and warranties

N/A -1 0 1 2

Issue contract instructions as and

when requiredN/A -1 0 1 2

Update and issue drawings register N/A -1 0 1 2

Check and approve contractor drawings for

design intentN/A -1 0 1 2

Instruct,witness and review of all tests and

mock-ups carried out both on and off the siteN/A -1 0 1 2

Prepare valuations for payment certificates

to be issued by the principal agent N/A -1 0 1 2

Clarify details and descriptions during

construction as required N/A -1 0 1 2

Establish and maintain a financial control

system N/A -1 0 1 2

Assist in the resolution of contractual claims

by the contractorN/A -1 0 1 2

Adjudicate and resolve financial claims by

contractor(s) N/A -1 0 1 2

Review outputs of quality assurance

procedures and advise contractor and client

on adequacy and need for additional

controls, inspections and testing

N/A -1 0 1 2

Inspect works for quality and conformity to

contract documentationN/A -1 0 1 2

Review contractor's quality control

programme, advise and agree on Quality

Assurance Plan

N/A -1 0 1 2

Attend regular site, technical and progress

meetingsN/A -1 0 1 2

Proactively prepare estimates for proposed

variations for client decision making N/A -1 0 1 2

Prepare schedules of predicted cash flow N/A -1 0 1 2

Carry out contract administration procedures

in terms of the contractN/A -1 0 1 2

Issue construction documentation in

accordance with the documentation

schedule

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

Attend the site handover N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Page 59: Standard for Contractor Performance Reports

56

Continued over

STANDARD OF SERVICE (Stage 6 - Close-Out)

Scope of services

Inspect and verify rectification of defects N/A -1 0 1 2

Receive, comment and approve relevant

payment valuations and completion

certificates

N/A -1 0 1 2

Facilitate and/or procure final operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Prepare and/or procure as-built drawings

and documentationN/A -1 0 1 2

Conclude final account(s) N/A -1 0 1 2

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

STANDARD OF SERVICE (Stages)

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

adherence to budget N/A -1 0 1 2

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x D(iii)) D

Aggregated score

A + B + C + D X

Page 60: Standard for Contractor Performance Reports

57

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Section F: Notes

Page 61: Standard for Contractor Performance Reports

58

Annex 8 Interim PSP Performance Report - Landscape Architect

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (LANDSCAPE ARCHITECT)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 62: Standard for Contractor Performance Reports

59

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

2

C10% of composite evaluation (0.1 x aggregate)

Sum

Aggregate

2

N/A -1 0 1

A

20% of composite evaluation (0.1 x aggregate) B

Skill and commitment in management of

subconsultants and other suppliersN/A 1 2

MANAGEMENT OF RESOURCES

Aggregate = Sub - total / 4

Sub - total

0 1 2

N/A -1 0 1 2

-1

timely submission of progress reports

overall progress of the work

N/A -1 0 1 2

timely allocation of appropriate resources to

critical activities

ability to meet programmed milestones

TIME MANAGEMENT

N/A -1 0 1 2

N/A

Aggregate = Sub - total / 4

Sub - total Sum

Aggregate

0 1 2appropriateness of skills and experience of

personnel assigned to the work

20% of composite evaluation (0.2 x aggregate)

N/A

adequacy of the number of personnel

assigned to the work

coordination of interfaces N/A -1 0 1

-1 0

-1

N/A -1 0 1 2

2

-1 0 1 2

N/A -1 0 1 2general cooperation and responsiveness,

adherence to commitments

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

CO-OPERATIVE RELATIONSHIPS

N/A -1 0 1 2

N/A

Aggregate (C) = Sub - total / 5

Sub - total Sum

Aggregate

response to problems and changing

circumstances

response to instruction N/A -1 0 1

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Section D: PSP Performance Information

Evaluation Criteria

Page 63: Standard for Contractor Performance Reports

60

Continued over

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Advise on appropriate financial design criteria N/A -1 0 1 2

Advise on the necessary surveys, analyses,

tests and/or other investigations where such

information will be required

N/A -1 0 1 2

Determine availability of data, drawings and

plans relating to the project N/A -1 0 1 2

Define the consultant’s scope of work and

servicesN/A -1 0 1 2

Advise on the other consultants and services

required N/A -1 0 1 2

Advise on rights, constraints, consents and

approvals N/A -1 0 1 2

Advise on the procurement policy for the

projectN/A -1 0 1 2

0 1 2

Attend the project initiation meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

Assist in developing a clear project brief N/A -1

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 1) WaS1

Page 64: Standard for Contractor Performance Reports

61

Continued over

2

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

Obtain project specific requirements from

the local and/or other authorities in order to

ensure conformity with requirements

N/A -1 0 1

Sum of activity assessments (Stage 3) Sum

Liaise, cooperate and provide necessary

information to the client, principal consultant,

principal agent and other consultants

N/A -1 0 1 2

Prepare detailed estimates of construction

costs N/A -1 0 1 2

Review and evaluate design and outline

specifications and exercise cost controlN/A -1 0 1 2

Prepare design development drawings

including draft technical details and outline

specifications

N/A -1 0 1 2

Incorporate and coordinate the other

consultants’ designs into the landscape

design

N/A -1 0 1 2

Incorporate the client’s detailed requirements

into the landscape design N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 3- Design Development)

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria

15% Weighted aggregate of Stages (0.15 x Aggregate score for Stage 3) WaS3

Page 65: Standard for Contractor Performance Reports

62

Continued over

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

Assess samples and products for

compliance and design intent N/A -1 0 1 2

Assist with the preparation of contract

documentation for signature N/A -1 0 1 2

Assist with evaluation of tenders N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant,

principal agent and the other consultants

N/A -1 0 1 2

Assist the principal consultant with calling for

tenders and/or negotiation of prices N/A -1 0 1 2

Prepare documentation for contractor

procurement N/A -1 0 1 2

Review working drawings for compliance

with the approved budget N/A -1 0 1 2

Assist the principal consultant in formulation

of procurement strategy for contractors N/A -1 0 1 2

Check cost estimate and adjust documents

if necessary to remain with budget N/A -1 0 1 2

Coordinate services and prepare necessary

services coordination drawings N/A -1 0 1 2

Prepare specifications for the works and

agree preambles N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Assist with local and/or other authority

submission(s) N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria

30% Weighted aggregate of Stages (0.30 x Aggregate score for Stage 4) WaS4

Page 66: Standard for Contractor Performance Reports

63

Continued over

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

Sum of activity assessments (Stage 5) Sum

Assist in obtaining statutory approvals where

requiredN/A -1 1 2

Inspect the works and issue completion and

defects lists N/A -1 0 1 2

0

Review and comment on operations and

maintenance manuals, guarantees,

certificates and warranties

N/A -1 0 1 2

Issue contract instructions as and when

required N/A -1 0 1 2

Update and issue the drawings register N/A -1 0 1 2

Check and approve subcontract drawings for

design intent N/A -1 0 1 2

Witness and review all tests and mock-ups

carried out both on and off site N/A -1 0 1 2

Approve valuations for payment N/A -1 0 1 2

Prepare valuations for payment certificates N/A -1 0 1 2

Clarify details and descriptions during

implementation as required N/A -1 0 1 2

Establish and maintain cost control system N/A -1 0 1 2

Assist in the resolution of contractual clams

by the contractor N/A -1 0 1 2

Adjudicate and resolve financial claims by

contractor(s) N/A -1 0 1 2

Inspect the works for conformity to contract

documentation N/A -1 0 1 2

Attend regular site, technical and progress

meetings N/A -1 0 1 2

Prepare pro-active estimates for proposed

variations for client decision making N/A -1 0 1 2

Prepare schedules of predicted cash flow N/A -1 0 1 2

Carry out contract administration procedures

delegated by the principal agent in terms of

the contract

N/A -1 0 1 2

0 1 2

Issue landscape documentation in

accordance with the documentation

programme

N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria

-1

32% Weighted aggregate of Stages (0.32 x Aggregate score for Stage 5) WaS5

STANDARD OF SERVICE (Stage 5- Construction)

Attend the site handover N/A

Page 67: Standard for Contractor Performance Reports

64

Continued over

Diii = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x D(iii)) D

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

Prepare and/or procure as-built drawings

and documentation N/A -1 0

XA + B + C + D

Aggregated score

AggregateAggregate = Sub - total / 3

SumSub - total

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

adherence to budget N/A -1 0 1 2

compliance with brief N/A -1 0 1 2

1 2

Prepare and/or procure operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Advise on soft landscape maintenance N/A -1 0 1 2

Approve relevant payment valuations and

completion certificates N/A -1 0 1 2

Prepare valuation for payment N/A -1 0 1 2

STANDARD OF SERVICE (Stage 6 - Close-Out)

Inspect and verify rectification of defects N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

STANDARD OF SERVICE (Stages)

STANDARD OF SERVICE (Overall)

STANDARD OF SERVICE (Stages + Overall)

Evaluation Criteria

3% Weighted aggregate of Stages (0.03 x Aggregate score for Stage 6) WaS6

Page 68: Standard for Contractor Performance Reports

65

over

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

with the Performance Assessment by the Reporting Officer

Section E: PSP / JV Information

Name of Main PSP

Contact Person

Designation

Professional Registration Body

Registration Number

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Page 69: Standard for Contractor Performance Reports

66

Annex 9 Interim PSP Performance Report – ME (Normal Services)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT - MECHANICAL ENGINEER

Section A: Employer Information

Section B: Contract Data

Please indicate the project stage

for which assessment is made

Section C: Reporting Officer's Information

Page 70: Standard for Contractor Performance Reports

67

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

A

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely submission of progress reports N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate)

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

response to instruction N/A -1 0 1 2

response to problems and changing

circumstancesN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

Page 71: Standard for Contractor Performance Reports

68

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

Assist in developing a clear project brief N/A -1 0 1 2

Attend the project initiation meetings N/A -1 0 1 2

Advise on the procurement policy for

the projectN/A -1 0 1 2

Advise on rights, constraints, consents and

approvalsN/A -1 0 1 2

Define the services and scope of work

requiredN/A -1 0 1 2

Conclude the terms of the agreement with

the clientN/A -1 0 1 2

Inspect site and advise on the necessary

surveys, analyses, tests and site or other

investigations where such information will be

required for Stage2 including the availability

and location of infrastructure and services

N/A -1 0 1 2

Determine availability of data, drawings and

plans relating to the projectN/A -1 0 1 2

Advise on criteria that could influence project

lifecycle cost significantlyN/A -1 0 1 2

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 1) WaS1

Page 72: Standard for Contractor Performance Reports

69

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

Agree the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

Establish concept design criteria N/A -1 0 1 2

Prepare initial concept design and related

documentationN/A -1 0 1 2

Advise the client regarding further surveys,

analyses, tests and investigations which may

be required

N/A -1 0 1 2

Establish regulatory authorities’ requirements

and incorporate into the designN/A -1 0 1 2

Refine and assess concept design to ensure

conformance with all regulatory requirements

and consents

N/A -1 0 1 2

Establish access, utilities, services and

connections required for the designN/A -1 0 1 2

Coordinate design interfaces with the other

consultants N/A -1 0 1 2

Prepare preliminary process designs,

preliminary designs, and related

documentation for approval by authorities

and client suitable for costing

N/A -1 0 1 2

Provide cost estimates and comment on life

cycle costs as requiredN/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 0 1 2

Sum of activity assessments (Stage 2) Sum

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

15% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 2) WaS2

Page 73: Standard for Contractor Performance Reports

70

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

Incorporate the client’s and authorities’

detailed requirements into the design N/A -1 0 1 2

Incorporate the other consultants’ designs

and requirements into the design N/A -1 0 1 2

Prepare design development drawings

including draft technical details and

specifications

N/A -1 0 1 2

Review and evaluate design and outline

specifications and exercise cost control N/A -1 0 1 2

Prepare detailed estimates of construction

cost N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

other consultants

N/A -1 0 1 2

Submit necessary design documentation to

local authorities for approval N/A -1 0 1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

20% Weighted aggregate of Stages (0.3 x Aggregate score for Stage 3) WaS3

Page 74: Standard for Contractor Performance Reports

71

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

Attend design and consultants meetings N/A -1 0 1 2

Prepare specifications and preambles for the

worksN/A -1 0 1 2

Accommodate services design N/A -1 0 1 2

Check cost estimates and adjust the design

documents if necessary to remain within the

budget

N/A -1 0 1 2

Formulate the procurement strategy for

contractors or assist the principal consultant

where relevant

N/A -1 0 1 2

Prepare documentation for contractor

procurementN/A -1 0 1 2

Review design, drawings and schedules for

compliance with the approved budgetN/A -1 0 1 2

Call for tendersand/or negotiation of prices

and/or assist the principal consultant where

relevant

N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

the other consultants

N/A -1 0 1 2

Evaluate tenders N/A -1 0 1 2

Prepare contract documentation for signiture N/A -1 0 1 2

Assist in pricing, documentation and tender

evaluation as required when detailed

services for these activities are provided by

others

N/A -1 0 1 2

Assess samples and products for

compliance and design intent N/A -1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

20% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 4) WaS4

Page 75: Standard for Contractor Performance Reports

72

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

Attend the site handover N/A -1 0 1 2

Issue construction documentation in

accordance with the documentation

schedule

N/A -1 0 1 2

Carry out contract administration procedures

in terms of the contractN/A -1 0 1 2

Prepare schedules of predicted cash flow N/A -1 0 1 2

Proactively prepare estimates for proposed

variations for client decision making N/A -1 0 1 2

Attend regular site, technical and progress

meetingsN/A -1 0 1 2

Review contractor's quality control

programme, advise and agree on Quality

Assurance Plan

N/A -1 0 1 2

Inspect works for quality and conformity to

contract documentationN/A -1 0 1 2

Review outputs of quality assurance

procedures and advise contractor and client

on adequacy and need for additional

controls, inspections and testing

N/A -1 0 1 2

Adjudicate and resolve financial claims by

contractor(s) N/A -1 0 1 2

Assist in the resolution of contractual claims

by the contractorN/A -1 0 1 2

Establish and maintain a financial control

system N/A -1 0 1 2

Clarify details and descriptions during

construction as required N/A -1 0 1 2

Prepare valuations for payment certificates

to be issued by the principal agent N/A -1 0 1 2

Instruct,witness and review of all tests and

mock-ups carried out both on and off the siteN/A -1 0 1 2

Check and approve contractor drawings for

design intentN/A -1 0 1 2

Update and issue drawings register N/A -1 0 1 2

Issue contract instructions as and

when requiredN/A -1 0 1 2

Review and comment on operation and

maintenance manuals, guarantees,

certificates and warranties

N/A -1 0 1 2

Inspect the works and issue practical

completion and defects listsN/A -1 0 1 2

Arranging for the delivery of all test

certificates, statutory and other approvals, as-

built drawings and operating manuals

N/A -1 0 1 2

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

35% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 5) WaS5

Page 76: Standard for Contractor Performance Reports

73

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 6 - Close-Out)

Scope of services

Inspect and verify rectification of defects N/A -1 0 1 2

Receive, comment and approve relevant

payment valuations and completion

certificates

N/A -1 0 1 2

Facilitate and/or procure final operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Prepare and/or procure as-built drawings

and documentationN/A -1 0 1 2

Conclude final account(s) N/A -1 0 1 2

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

STANDARD OF SERVICE (Stages)

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

adherence to budget N/A -1 0 1 2

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x D(iii)) D

Aggregated score

A + B + C + D X

Page 77: Standard for Contractor Performance Reports

74

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Page 78: Standard for Contractor Performance Reports

75

Annex 10 Interim PSP Performance Report - QS (Normal Services)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

Please indicate the project stage

for which assessment is made

INTERIM PSP PERFORMANCE REPORT (QUANTITY SURVEYOR)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Page 79: Standard for Contractor Performance Reports

76

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

TIME MANAGEMENT

N/A -1 0 1

0

-1 0 1 2

Sub - total

Aggregate = Sub - total / 4

Sum

Aggregate

timely submission of progress reports

overall progress of the work

Aggregate = Sub - total / 4

Sub - total

adequacy of the number of personnel

assigned to the work

2

ability to meet programmed milestones

Sum

Aggregate

2

N/A

1-1N/A

timely allocation of appropriate resources to

critical activitiesN/A

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

CO-OPERATIVE RELATIONSHIPS

N/A -1

-1 0 1

2

2

0 1 2

1 2

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1

0 1

N/A -1 0

2

1 2

N/A

general cooperation and responsiveness,

adherence to commitments

-1 0 1 2

N/A -1

coordination of interfaces N/A -1 0

Excellent(2)

Definition

Sum

1 2

1

Standard

well above

the

acceptable

standard of

performance

Aggregate = Sub - total / 5

Sub - total

Aggregate

response to problems and changing

circumstances

response to instruction

N/A -1 0

2

Grading

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)

C

Skill and commitment in management of

subconsultants and other suppliers

Section D: PSP Performance Information

Evaluation Criteria

20% of composite evaluation (0.2 x aggregate) A

10% of composite evaluation (0.1 x aggregate) B

10% of composite evaluation (0.1 x aggregate)

-1 0N/A

MANAGEMENT OF RESOURCES

Page 80: Standard for Contractor Performance Reports

77

Continued over

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

Sum of activity assessments (Stage 2) Sum

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

1 2

Audit space allocation against the initial brief N/A -1 0 1 2

0

Prepare preliminary and elemental or

equivalent estimates of construction

cost

N/A -1 0 1 2

Receive relevant data and cost estimates

from the other consultantsN/A -1 0 1 2

Review and evaluate design concepts and

advise on viability in conjunction with the

other consultants

N/A -1 0 1 2

2

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Agree the documentation programme with

the principal consultant and the other

consultants

Attend design and consultants' meetings N/A -1 0 1 2

Scope of services

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Advise on appropriate financial design criteria N/A -1 0 1 2

Advise on economic factors affecting the

projectN/A -1 0 1 2

Conclude the terms of the agreement with

the clientN/A -1 0 1 2

Define the quantity surveyor's scope of work

and servicesN/A -1 0 1 2

Advise on other consultants and

services requiredN/A -1 0 1 2

2

Assist in developing a clear project brief N/A -1

Advise on the procurement policy for

the projectN/A -1 0 1 2

N/A -1 0 1

Scope of services

Attend the project initiation meetings N/A -1 0 1

Excellent(2)

Definition

STANDARD OF SERVICE (Stage 1 - Inception)

0 1 2

Standard

well above

the

acceptable

standard of

performance

Grading

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)

Evaluation Criteria

2.5% Weighted aggregate of Stages (0.025 x Aggregate score for Stage 1) WaS1

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 2) WaS2

Assisting the client in preparing a financial

viability report

Page 81: Standard for Contractor Performance Reports

78

Continued over

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 1 20

Sum of activity assessments (Stage 3) Sum

Assist with the preparation of contract

documentation for signatureN/A -1 0 1 2

Assist with financial evaluation of tenders N/A -1 0 1 2

Assist the principal consultant with calling of

tenders and/or negotiation of pricesN/A -1 0 1 2

Prepare documentation for both principal and

subcontract procurementN/A -1 0 1 2

Review working drawings for compliance

with the approved budget of construction

cost and/or financial viability

N/A -1 0 1 2

Assist the principal consultant in the

formulation of the procurement strategy for

contractors, subcontractors and suppliers

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Attend design and consultants' meetings N/A -1 0 1 2

Scope of services

Comment on space and accommodation

allowances and prepare an area scheduleN/A -1 0 1 2

Assist the client in reviewing the financial

viability report N/A -1 0 1 2

Prepare detailed estimates of construction

costN/A -1 0 1 2

Receive relevant data and cost estimates

from the other consultants N/A -1 0 1 2

Review and evaluate design and outline

specifications and exercise cost control in

conjunction with the other consultants

N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 3- Design Development)

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Scope of services

Excellent(2)

Definition

Standard

well above

the

acceptable

standard of

performance

Grading

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)

Evaluation Criteria

7.5% Weighted aggregate of Stages (0.075 x Aggregate score for Stage 3) WaS3

35% Weighted aggregate of Stages (0.35 x Aggregate score for Stage 4) WaS4

Page 82: Standard for Contractor Performance Reports

79

Continued over

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

Conclude final account(s) N/A -1 0

Sum of activity assessments (Stage 5) Sum

Prepare final account(s) for the works on a

progressive basisN/A -1

XA + B + C + D

Aggregated score

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score)

adherence to budget N/A

AggregateAggregate = Sub - total / 3

D(ii)

D(iii) = D(i) + D(ii)

SumSub - total

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

-1 0 1 2

compliance with brief N/A -1 0 1 2

1 2

STANDARD OF SERVICE (Stage 6 - Close-Out)

Prepare valuation for payment certificates to

be issued by the principal agentN/A -1 0 1 2

Scope of services

1 2

Prepare valuations for payment certificates

to be issued by the principal agentN/A -1 0 1 2

0

Establish and maintain a financial control

systemN/A -1 0 1 2

Assist in the resolution of contractual claims

by the contractor(s)N/A -1 0 1 2

Adjudicate and resolve financial claims by

the contractor(s)N/A -1 0 1 2

Attend regular site, technical and progress

meetingsN/A -1 0 1 2

Prepare pro-active estimates for proposed

variations for client decision makingN/A -1 0 1 2

0 1 2

Scope of services

Prepare schedules of predicted cash flow N/A -1 0 1 2

Excellent(2)

Definition

Standard

well above

the

acceptable

standard of

performance

Grading

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)

Evaluation Criteria

D(iii)

60% of composite evaluation (0.6 x D(iii)) D

STANDARD OF SERVICE (Stages)

STANDARD OF SERVICE (Overall)

STANDARD OF SERVICE (Stages + Overall)

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

45% Weighted aggregate of Stages (0.45 x Aggregate score for Stage 5) WaS5

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

STANDARD OF SERVICE (Stage 5- Construction)

Attend the site handover N/A -1

Page 83: Standard for Contractor Performance Reports

80

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Name of Joint Venture Partner

Name of Joint Venture Partner

with the Performance Assessment by the Reporting Officer

Contact Person

Designation

Professional Registration Body

Registration Number

Name of Joint Venture Partner

Section E: PSP / JV Information

Name of Main PSP

Page 84: Standard for Contractor Performance Reports

81

Annex 11 Interim PSP Performance Report – QS (Principal Consultant)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (PRINCIPAL CONSULTANT - QUANTITY SURVEYOR)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 85: Standard for Contractor Performance Reports

82

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely submission of progress reports N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate) A

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

response to instruction N/A -1 0 1 2

response to problems and changing

circumstancesN/A -1 0 1 2

Sub - total Sum

Average = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

Page 86: Standard for Contractor Performance Reports

83

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

Co-ordinate concept and viability

documentation for presentation to the client

for approval

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

Facilitate in developing a clear project brief N/A -1 0 1 2

Establish procurement policy for the project N/A -1 0 1 2

Assist client in procurement of necessary

and approprate consultants, definition of their

roles and responsibilities

N/A -1 0 1 2

Establish with client, other consultants and

relevant authorities site characteristics,

rights and constraints for proper design of

project

N/A -1 0 1 2

Define the principal consultant’s and other

professional consultants' scope of work and

services

N/A -1 0 1 2

Conclude the terms of the client/principal

consultant and other professional

consultants' professional service

agreements with the client

N/A -1 0 1 2

Facilitate a schedule of required consents

and approvalsN/A -1 0 1 2

Prepare, co-ordinate and monitor project

initiation programmeN/A -1 0 1 2

Facilitate client approval of all Stage 1

documentationN/A -1 0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

25% Weighted aggregate of Stages (0.25 x aggregate score for Stage 1) WaS1

Assist client in procurement of other

consultantsN/A -1 0 1 2

Advice client on appointment of health and

safety consultantN/A -1 0 1 2

Communicate project brief to other

consultants and monitor development of

concept and viability

N/A -1 0 1 2

Agree format and procedures for cost control

and reporting by other consultantsN/A -1 0 1 2

Prepare a documentation programme and

indicative construction programmeN/A -1 0 1 2

Facilitate approval of concept and viability by

the client N/A -1 0 1 2

Facilitate for approval of concept and viability

by statutory bodiesN/A -1 0 1 2

Sum of activity assessments (Stage 2) Sum

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

25% Weighted aggregate of Stages (0.25 x aggregate score for Stage 2) WaS2

Page 87: Standard for Contractor Performance Reports

84

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

Agree and implement communication

processes and procedures for design

development of project

N/A -1 0 1 2

Assist client in procurement of necessary

other professional consultants with clear

definition of their roles and responsibilities

N/A -1 0 1 2

Conduct and record consultants' and

management meetingsN/A -1 0 1 2

Facilitate input required by health and safety

consultantN/A -1 0 1 2

Facilitate design reviews for compliance and

cost controlN/A -1 0 1 2

Facilitate timeous technical co-ordination N/A -1 0 1 2

Facilitate client approval of all Stage 3

documentationN/A -1 0 1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

25% Weighted aggregate of Stages (0.25 x aggregate score for Stage 3) WaS3

Co-ordinate and monitor of procurement

documentation by consultants in

accordance with project procurement

programme

N/A -1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

25% Weighted aggregate of Stages (0.25 x aggregate score for Stage 4) WaS4

STANDARD OF SERVICE (Stage 6 - Close-Out)

Scope of services

No services N/A

STANDARD OF SERVICE (Stages)

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4) Wa

No services N/A

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

adherence to budget N/A -1 0 1 2

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x Diii) D

Aggregated score

A + B + C + D X

Page 88: Standard for Contractor Performance Reports

85

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Page 89: Standard for Contractor Performance Reports

86

Annex 12 Interim PSP Performance Report – QS (Principal Agent)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (PRINCIPAL AGENT - QUANTITY SURVEYING)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 90: Standard for Contractor Performance Reports

87

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely submission of progress reports N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate) A

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

response to instruction N/A -1 0 1 2

response to problems and changing

circumstancesN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

Page 91: Standard for Contractor Performance Reports

88

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

No services N/A

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

No services N/A

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

Prepare, coordinate, agree and monitor a

detailed design and documentation

programme

N/A -1 0 1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

7.5% Weighted aggregate of Stages (0.075 x aggregate score for Stage 3) WaS3

Recommend and agree procurement

strategy for contractors, subcontractors and

suppliers with the client and the other

consultants

N/A -1 0 1 2

Prepare and agree the procurement

programmeN/A -1 0 1 2

Advise the client in conjunction with the other

consultants on the appropriate insurancesN/A -1 0 1 2

Manage procurement process and

recommend contractors for approval

by the client

N/A -1 0 1 2

Agree the format and procedures for

monitoring and control by the quantity

surveyor of the cost of the works

N/A -1 0 1 2

Coordinate and assemble the contract

documentation for signatureN/A -1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

7.5% Weighted aggregate of Stages (0.075 x aggregate score for Stage 4) WaS4

Page 92: Standard for Contractor Performance Reports

89

Monitor preparation of final account(s) N/A -1 0 1 2

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

Arrange site handover to the contractor N/A -1 0 1 2

Establish construction documentation issue

processN/A -1 0 1 2

Agree and monitor issue and distribution of

construction documentationN/A -1 0 1 2

Instruct the contractor on behalf of the client

to appoint subcontractorsN/A -1 0 1 2

Conduct and record regular site meetings N/A -1 0 1 2

Review, approve and monitor the preparation

of the construction programme by the

contractor

N/A -1 0 1 2

Regularly monitor performance of the

contractor against the construction

programme

N/A -1 0 1 2

Adjudicate entitlements that arise from

changes required to the construction

programme

N/A -1 0 1 2

Receive, coordinate and monitor approval of

all contract documentation provided by

contractor(s)

N/A -1 0 1 2

Agree quality assurance procedures and

monitor implementation thereof by

the other consultants and the contractors

N/A -1 0 1 2

Monitor preparation and auditing of the

contractor’s health and safety plan and

approval thereof by the health and

safety consultant

N/A -1 0 1 2

Monitor preparation of the environmental

management plan by the environmental

consultant

N/A -1 0 1 2

Establish procedures for monitoring scope

and cost variationsN/A -1 0 1 2

Monitor, review, approve and issue

certificatesN/A -1 0 1 2

Receive, review and adjudicate any

contractual claimsN/A -1 0 1 2

Monitor preparation of financial control

reports by the other consultantsN/A -1 0 1 2

Prepare and submit progress reports N/A -1 0 1 2

Coordinate, monitor and issue practical

completion lists and the certificate of

practical completion

N/A -1 0 1 2

Facilitate and expedite receipt of occupation

certificatesN/A -1 0 1 2

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

70% Weighted aggregate of Stages (0.70 x aggregate score for Stage 5) WaS5

Page 93: Standard for Contractor Performance Reports

90

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 6 - Close-Out)

Scope of services

Coordinate and monitor rectification of

defectsN/A -1 0 1 2

Manage procurement of operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Manage preparation of as-built drawings and

documentationN/A -1 0 1 2

Manage procurement of outstanding

statutory certificatesN/A -1 0 1 2

Monitor, review and issue payment

certificatesN/A -1 0 1 2

Issue completion certificates N/A -1 0 1 2

Manage agreement of final account(s) N/A -1 0 1 2

Prepare and present the project close-out

reportN/A -1 0 1 2

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stages)

Sum of Weighted Aggregate of Stages (WaS3+WaS4+WaS5+WaS6) Wa

15% Weighted aggregate of Stages (0.15 x aggregate score for Stage 6) WaS6

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

adherence to budget N/A -1 0 1 2

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

STANDARD OF SERVICE (Stages + Overall)

Diii = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x Diii) D

Aggregated score

A + B + C + D X

Page 94: Standard for Contractor Performance Reports

91

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Page 95: Standard for Contractor Performance Reports

92

Annex 13 Interim PSP Performance Report – QS (Project Monitor)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (PROJECT MONITOR - QUANTITY SURVEYOR)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 96: Standard for Contractor Performance Reports

93

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely submission of progress reports N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate) A

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

response to instruction N/A -1 0 1 2

response to problems and changing

circumstancesN/A -1 0 1 2

Sub - total Sum

Average = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

Page 97: Standard for Contractor Performance Reports

94

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

2

Attending technical and progress meetings

as may be deemed necessary

0 1 2

N/A -1 0

-1 0 1 2

0 1 2

Commenting on estimates of project cost

and financial viability reports prepared by

others and providing such other cost advice

as may reasonably be required

N/A -1

Commenting on estimates of project cost

and financial viability reports prepared by

others and providing such other cost advice

as may reasonably be required

N/A -1

Attending technical and progress meetings

as may be deemed necessary

Sum of activity assessments (Stage 2)

Commenting on fee proposals submitted by

the professional consultantsN/A

0 1 2

Commenting on fee proposals submitted by

any further professional consultantsN/A -1 0 1 2

Commenting on the Stage 3 deliverables

provided by the professional consultantsN/A -1 0 1 2

Sum

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

N/A -1 0 21

Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

Receiving commission/instruction from client

to establish his requirements and advising on

various courses of action and procedures to

suit particular requirements of project

N/A -1 0 1

1 2

Commenting on fee proposals submitted by

professional consultantsN/A -1 0 1 2

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

Attending technical and progress meetings

as may be deemed necessaryN/A

0 1 2

-1

10% Weighted aggregate of Stages (0.10 x aggregate score for Stage 3) WaS3

0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

Commenting on the Stage 2 deliverables

provided by the professional consultants

Sum of activity assessments (Stage 3)

Commenting on Stage 1 deliverables

provided by professional consultants

2.5% Weighted aggregate of Stages (0.025 x aggregate score for Stage 1) WaS1

5% Weighted aggregate of Stages (0.05 x aggregate score for Stage 2) WaS2

N/A -1

N/A -1

Page 98: Standard for Contractor Performance Reports

95

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

0 1 2

Commenting on contract documentation,

including priced bills of quantities where

applicable, prior to signing of the contract

N/A -1 0 1 2

2

Commenting on the Stage 4 deliverables

provided by the professional consultantsN/A -1 0 1 2

Commenting on tender reports and

recommendationsN/A -1

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

Commenting on procurement procedures

and documentation prior to calling for tenders

or negotiating

N/A -1 0 1

Attending technical and progress meetings

as may be deemed necessaryN/A -1 0 1 2

Commenting on the financial and contractual

aspects of claims between the client and the

contractor, excluding services related to

mediation, arbitration and litigation

N/A -1 0 1 2

Commenting on the Stage 5 deliverables

provided by the professional consultantsN/A -1 0 1 2

Commenting on tender reports and

recommendations for subcontractsN/A -1 0 1 2

Commenting on financial control reports and

cash flow schedulesN/A -1 0 1 2

Advising the client on payment certificates

prior to issuingN/A -1 0 1 2

Attending management/financial meetings N/A -1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

17.5% Weighted aggregate of Stages (0.175 x aggregate score for Stage 4) WaS4

Attending site, technical and progress

meetings as may be deemed necessaryN/A -1 0 1 2

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 6 - Close-Out)

Scope of services

50% Weighted aggregate of Stages (0.50 x aggregate score for Stage 5) WaS5

Advising the client on the acceptability of the

final accountN/A -1 0 1 2

Advising the client on the final payment

certificate prior to issuingN/A -1 0 1 2

Commenting on the Stage 6 deliverables

provided by the professional consultantsN/A -1 0 1 2

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

15% Weighted aggregate of Stages (0.15 x aggregate score for Stage 6) WaS6

Page 99: Standard for Contractor Performance Reports

96

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x Diii) D

Aggregated score

A + B + C + D

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Page 100: Standard for Contractor Performance Reports

97

Annex 14 Interim PSP Performance Report – SE (Engineering Projects)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (STRUCTURAL ENGINEER - ENGINEERING PROJECTS)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 101: Standard for Contractor Performance Reports

98

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

A

1 2

1 2

1 2

TIME MANAGEMENT

1 2

ability to meet programmed milestones N/A -1 0

N/A -1 0

N/A -1 0

Sub - total

Aggregate = Sub - total / 4

overall progress of the work

timely allocation of appropriate resources to

critical activities

N/A -1 0

Sum

Aggregate

timely submission of progress reports

N/A -1 0 1 2

MANAGEMENT OF RESOURCES

20% of composite evaluation (0.2 x aggregate)

Sub - total Sum

Aggregate

adequacy of the number of personnel

assigned to the work

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

Aggregate = Sub - total / 4

2

CO-OPERATIVE RELATIONSHIPS

1 2

N/A -1 0 1 2

1 2

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitments

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0

N/A -1 0

Aggregate = Sub - total / 5

Sub - total Sum

Aggregate

response to problems and changing

circumstances

response to instruction

N/A -1 0 1

0 1 2

coordination of interfaces N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Section D: PSP Performance Information

Skill and commitment in management of

subconsultants and other suppliersN/A -1

Evaluation Criteria Grading

10% of composite evaluation (0.1 x aggregate) B

10% of composite evaluation (0.1 x aggregate) C

Page 102: Standard for Contractor Performance Reports

99

Continued over

Advise on criteria that could influence project

lifecycle cost significantlyN/A -1 0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Determine availability of data, drawings and

plans relating to the projectN/A -1 0 1 2

Inspect site and advise on the necessary

surveys, analyses, tests and site or other

investigations where such information will be

required for Stage2 including the availability

and location of infrastructure and services

N/A -1 0 1 2

Conclude the terms of the agreement with

the clientN/A -1 0 1 2

Define the services and scope of work

requiredN/A -1 0 1 2

2

Advise on rights, constraints, consents and

approvalsN/A -1 0 1 2

N/A -1 0 1 2

Advise on the procurement policy for

the projectN/A -1 0 1

STANDARD OF SERVICE (Stage 1 - Inception)

Assist in developing a clear project brief N/A -1 0 1 2

Scope of services

Attend the project initiation meetings

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

WaS15% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 1)

Page 103: Standard for Contractor Performance Reports

100

Continued over

Provide cost estimates and comment on life

cycle costs as requiredN/A -1 0 1 2

Establish regulatory authorities’ requirements

and incorporate into the designN/A -1 0 1 2

0

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

Sum of activity assessments (Stage 2) Sum

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

1 2

Prepare preliminary process designs,

preliminary designs, and related

documentation for approval by authorities

and client suitable for costing

N/A -1 0 1 2

N/A -1

Coordinate design interfaces with the other

consultants N/A -1 0 1 2

Establish access, utilities, services and

connections required for the designN/A -1 0 1 2

Refine and assess concept design to ensure

conformance with all regulatory requirements

and consents

N/A -1 0 1 2

Advise the client regarding further surveys,

analyses, tests and investigations which may

be required

N/A -1 0 1 2

Prepare initial concept design and related

documentationN/A -1 0 1 2

Establish concept design criteria N/A -1 0 1 2

2

Scope of services

Attend design and consultants' meetings N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

25% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 2) WaS2

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Agree the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1

Page 104: Standard for Contractor Performance Reports

101

Continued over

Prepare detailed estimates of construction

cost N/A -1 0 1 2

Review and evaluate design and outline

specifications and exercise cost control N/A -1 0 1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

Submit necessary design documentation to

local authorities for approval N/A -1 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

other consultants

N/A -1 0 1 2

0

Prepare design development drawings

including draft technical details and

specifications

N/A -1 0 1 2

Incorporate the other consultants’ designs

and requirements into the design N/A -1 0 1 2

Incorporate the client’s and authorities’

detailed requirements into the design N/A -1 0 1 2

Attend design and consultants' meetings N/A -1 0 1 2

STANDARD OF SERVICE (Stage 3- Design Development)

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

30% Weighted aggregate of Stages (0.3 x Aggregate score for Stage 3) WaS3

Page 105: Standard for Contractor Performance Reports

102

Continued over

Sum

1

0 1 2

Sum of activity assessments (Stage 4)

Prepare contract documentation for signiture N/A -1 0 1 2

Evaluate tenders N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

the other consultants

N/A -1 0 1 2

Review design, drawings and schedules for

compliance with the approved budgetN/A -1 0 1 2

Check cost estimates and adjust the design

documents if necessary to remain within the

budget

N/A -1 0 1 2

Accommodate services design N/A -1 0 1 2

Prepare specifications and preambles for the

worksN/A -1 0 1 2

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Attend design and consultants meetings N/A -1 0 1 2

Scope of services

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

10% Weighted aggregate of Stages (0.1 x Aggregate score for Stage 4) WaS4

Call for tendersand/or negotiation of prices

and/or assist the principal consultant where

relevant

N/A -1 0 1 2

2

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

0

Assist in pricing, documentation and tender

evaluation as required when detailed

services for these activities are provided by

others

N/A -1

Assess samples and products for

compliance and design intent N/A -1

Formulate the procurement strategy for

contractors or assist the principal consultant

where relevant

N/A -1 0 1 2

Prepare documentation for contractor

procurementN/A -1 0 1 2

Page 106: Standard for Contractor Performance Reports

103

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

Sum of activity assessments (Stage 5) Sum

Arranging for the delivery of all test

certificates, statutory and other approvals, as-

built drawings and operating manuals

N/A -1 0 1 2

Inspect the works and issue practical

completion and defects listsN/A -1 0 1 2

Review and comment on operation and

maintenance manuals, guarantees,

certificates and warranties

N/A -1 0 1 2

Issue contract instructions as and

when requiredN/A -1 0 1 2

Update and issue drawings register N/A -1 0 1 2

2

2

Check and approve contractor drawings for

design intentN/A -1 0 1 2

Clarify details and descriptions during

construction as required N/A -1 0 1 2

1 2

N/A -1 0 1 2

-1 0 1

0

2

Attend regular site, technical and progress

meetingsN/A -1 0 1 2

N/A -1

-1

Carry out contract administration procedures

in terms of the contractN/A -1 0 1

Issue construction documentation in

accordance with the documentation

schedule

N/A -1 1 2

0 1 2

Proactively prepare estimates for proposed

variations for client decision making

N/A -1 0 1 2

Review outputs of quality assurance

procedures and advise contractor and client

on adequacy and need for additional

controls, inspections and testing

Inspect works for quality and conformity to

contract documentationN/A -1 0

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

2

25% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 5) WaS5

STANDARD OF SERVICE (Stage 5- Construction)

Attend the site handover N/A

Prepare schedules of predicted cash flow N/A -1 0 1

Scope of services

N/A -1 0

Review contractor's quality control

programme, advise and agree on Quality

Assurance Plan

1 2

0 1

2

1 2

10

2

Assist in the resolution of contractual claims

by the contractor

Adjudicate and resolve financial claims by

contractor(s) N/A

Establish and maintain a financial control

system N/A -1 0

Prepare valuations for payment certificates

to be issued by the principal agent N/A -1

Instruct,witness and review of all tests and

mock-ups carried out both on and off the siteN/A -1 0 1

Page 107: Standard for Contractor Performance Reports

104

Continued over

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

Conclude final account(s) N/A -1 0

Aggregate

X

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

60% of composite evaluation (0.6 x D(iii))

Sum

D(iii) = D(i) + D(ii) D(iii)

A + B + C + D

Aggregated score

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

0 1 2

adherence to budget N/A -1 0 1 2

1 2

Facilitate and/or procure final operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Prepare and/or procure as-built drawings

and documentationN/A

Receive, comment and approve relevant

payment valuations and completion

certificates

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 6 - Close-Out)

Inspect and verify rectification of defects N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

D

STANDARD OF SERVICE (Stages)

STANDARD OF SERVICE (Overall)

STANDARD OF SERVICE (Stages + Overall)

Sub - total

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

compliance with brief N/A -1

Aggregate = Sub - total / 3

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

-1 0 1 2

Scope of services

Page 108: Standard for Contractor Performance Reports

105

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

with the Performance Assessment by the Reporting Officer

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Name of Joint Venture Partner

Page 109: Standard for Contractor Performance Reports

106

Annex 15 Interim PSP Performance Report – SE (Building Projects)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Y N

Y N

Y N

Y N

Y N

Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT (STRUCTURAL ENGINEER - BUILDING PROJECTS)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Concept and viability

Inception

Design Development

Documentation and procurement

Construction

Close-out

Please indicate the project stage

for which assessment is made

Page 110: Standard for Contractor Performance Reports

107

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

A

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely submission of progress reports N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate)

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 2 Aggregate

10% of composite evaluation (0.1 x aggregate) B

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

response to instruction N/A -1 0 1 2

response to problems and changing

circumstancesN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

Page 111: Standard for Contractor Performance Reports

108

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

Assist in developing a clear project brief N/A -1 0 1 2

Attend the project initiation meetings N/A -1 0 1 2

Advise on the procurement policy for

the projectN/A -1 0 1 2

Advise on rights, constraints, consents and

approvalsN/A -1 0 1 2

Define the services and scope of work

requiredN/A -1 0 1 2

Conclude the terms of the agreement with

the clientN/A -1 0 1 2

Inspect site and advise on the necessary

surveys, analyses, tests and site or other

investigations where such information will be

required for Stage2 including the availability

and location of infrastructure and services

N/A -1 0 1 2

Determine availability of data, drawings and

plans relating to the projectN/A -1 0 1 2

Advise on criteria that could influence project

lifecycle cost significantlyN/A -1 0 1 2

Provide necessary information within the

agreed scope of the project to the other

consultants

N/A -1 0 1 2

Sum of activity assessments (Stage 1) Sum

Aggregate score (Stage 1) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 1) WaS1

Page 112: Standard for Contractor Performance Reports

109

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

Agree the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Attend design and consultants meetings N/A -1 0 1 2

Establish concept design criteria N/A -1 0 1 2

Prepare initial concept design and related

documentationN/A -1 0 1 2

Advise the client regarding further surveys,

analyses, tests and investigations which may

be required

N/A -1 0 1 2

Establish regulatory authorities’ requirements

and incorporate into the designN/A -1 0 1 2

Refine and assess concept design to ensure

conformance with all regulatory requirements

and consents

N/A -1 0 1 2

Establish access, utilities, services and

connections required for the designN/A -1 0 1 2

Coordinate design interfaces with the other

consultants N/A -1 0 1 2

Prepare preliminary designs and related

documentation for approval by authorities

and the client and suitable for costing

N/A -1 0 1 2

Provide cost estimates and comment on life

cycle costs as requiredN/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 0 1 2

Sum of activity assessments (Stage 2) Sum

Aggregate score (Stage 2) = Sum of activity assessments / number of assessed activities Aggregate

20% Weighted aggregate of Stages (0.2 x Aggregate score for Stage 2) WaS2

Page 113: Standard for Contractor Performance Reports

110

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

Review the documentation programme with

the principal consultant and the other

consultants

N/A -1 0 1 2

Attend design and consultants meetings N/A -1 0 1 2

Incorporate the client’s and authorities’

detailed requirements into the design N/A -1 0 1 2

Incorporate the other consultants’ designs

and requirements into the design N/A -1 0 1 2

Prepare design development drawings

including draft technical details and

specifications

N/A -1 0 1 2

Review and evaluate design and outline

specifications and exercise cost control N/A -1 0 1 2

Prepare detailed estimates of construction

cost N/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the client, principal consultant

and other consultants

N/A -1 0 1 2

Submit necessary design documentation to

local authorities for approval N/A -1 0 1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

30% Weighted aggregate of Stages (0.3 x Aggregate score for Stage 3) WaS3

Page 114: Standard for Contractor Performance Reports

111

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/A -1 0 1 2Assist the principal consultant with calling of

tenders and/or negotiation of prices

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

Attend design and consultants meetings N/A -1 0 1 2

Prepare specifications and preambles for the

worksN/A -1 0 1 2

Accommodate designs by other consultants N/A -1 0 1 2

Check cost estimate and adjust the design

documents if necessary to remain within the

budget

N/A -1 0 1 2

Review design, working drawings for

compliance with the approved budgetN/A -1 0 1 2

Liaise, cooperate and provide necessary

information to the principal consultant and

the other consultants

N/A -1 0 1 2

Assist with evaluation of tenders N/A -1 0 1 2

Assist with preparation of the contract

documentation for signatureN/A -1 0 1 2

Assess samples and products for

compliance and design intent N/A -1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

15% Weighted aggregate of Stages (0.15 x Aggregate score for Stage 4) WaS4

Assist in pricing, documentation and tender

evaluation as required when detailed

services for these activities are provided by

others

N/A -1 0 1 2

Page 115: Standard for Contractor Performance Reports

112

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 5- Construction)

Scope of services

Attend the site handover N/A -1 0 1 2

Issue construction documentation in

accordance with the documentation

programme

N/A -1 0 1 2

Carry out contract administration

procedures delegated by the principal agent

in terms of the contract

N/A -1 0 1 2

Attend regular site, technical and progress

meetingsN/A -1 0 1 2

Inspect works for quality and conformity to

contract documentationN/A -1 0 1 2

Assist in the resolution of contractual claims

by the contractorN/A -1 0 1 2

Establish and maintain a financial control

system N/A -1 0 1 2

Witness and review of all tests and mock-

ups carried out both on and off the siteN/A -1 0 1 2

Check and approve contractor shop

drawings for design intentN/A -1 0 1 2

Update and issue drawings register N/A -1 0 1 2

Issue contract instructions as and

when requiredN/A -1 0 1 2

Review and comment on operation and

maintenance manuals, guarantees,

certificates and warranties

N/A -1 0 1 2

Inspect the works and issue practical

completion and defects listsN/A -1 0 1 2

Assist in obtaining statutory certificates N/A -1 0 1 2

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities Aggregate

25% Weighted aggregate of Stages (0.25 x Aggregate score for Stage 5) WaS5

Prepare schedules of estimated cash flow N/A -1 0 1 2

Proactively prepare estimates for proposed

variations for client decision making N/A -1 0 1 2

Review contractor's quality control

programme, advise and agree on Quality

Assurance Plan

N/A -1 0 1 2

Review outputs of quality assurance

procedures and advise contractor and client

on adequacy and need for additional

controls, inspections and testing

N/A -1 0 1 2

N/A -1 0 1 2Adjudicate and resolve financial claims by

contractor(s)

Clarify details and descriptions during

construction as required N/A -1 0 1 2

Prepare valuations for payment certificates

to be issued by the principal agent N/A -1 0 1 2

Page 116: Standard for Contractor Performance Reports

113

Continued over

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 6 - Close-Out)

Scope of services

Inspect and verify rectification of defects N/A -1 0 1 2

Receive, comment and approve relevant

payment valuations and completion

certificates

N/A -1 0 1 2

Facilitate and/or procure final operations and

maintenance manuals, guarantees and

warranties

N/A -1 0 1 2

Conclude final account(s) N/A -1 0 1 2

Sum of activity assessments (Stage 6) Sum

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

5% Weighted aggregate of Stages (0.05 x Aggregate score for Stage 6) WaS6

STANDARD OF SERVICE (Stages)

Sum of Weighted Aggregate of Stages (WaS1+WaS2+WaS3+WaS4+WaS5+WaS6) Wa

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

adherence to budget N/A -1 0 1 2

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x D(iii)) D

Aggregated score

A + B + C + D X

Prepare and/or procure as-built drawings

and documentationN/A -1 0 1 2

Page 117: Standard for Contractor Performance Reports

114

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Contact Person

Designation

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Name of Joint Venture Partner

Name of Joint Venture Partner

Page 118: Standard for Contractor Performance Reports

115

Annex 16 Interim PSP Performance Report - CE, EE, ME and SE (Principal

Consultant)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT ( PRINCIPAL CONSULTANT - ENGINEERING MANAGEMENT

SERVICES)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 119: Standard for Contractor Performance Reports

116

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Sub - total Sum

Average (C) = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

response to problems and changing

circumstancesN/A -1 0 1 2

response to instruction N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

coordination of interfaces N/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate) A

timely submission of progress reports N/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Section D: PSP Performance Information

Evaluation Criteria Grading

Page 120: Standard for Contractor Performance Reports

117

Continued over

Prepare, co-ordinate, agree and monitor a

detailed design and documentation

programme

-1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

Prepare and agree procurement programme

Advise client in conjunction with other

consultants on appropriate insurances

Manage procurement process and

recommended contractors for approval by

client

Agree format and procedures for monitoring

and control by quantity surveyor for cost of

the works

Co-ordinate and assemble contract

documentation for signature

0

N/A -1 0

N/A

1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

Recommend and agree procurement

strategy for contractors, subcontractors,

suppliers with client and other consultants

1

1 2

N/A -1 0 1 2

-1 0 1 2

2

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

N/A -1 0 1 2

N/A -1

N/A

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

No service N/A

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

No service N/A

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 3) WaS3

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 4) WaS4

N/A -1 0

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Page 121: Standard for Contractor Performance Reports

118

Continued over

Aggregate

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities

Co-ordinate, monitor and issue practical

completion lists and certificate of practical

completion

N/A -1 0 1 2

Prepare and submit progress reports N/A -1 0 1 2

Monitor preparation of financial control

reports by other consultantsN/A -1 0 1 2

Receive, review and adjudicate any

contractual claimsN/A -1 0 1 2

Monitor, review and approve cerificates N/A -1 0 1 2

Establish procedures for monitoring scope

and cost variationsN/A -1 0 1 2

Monitor preparation of environmental

management plan by environmental

consultant

N/A -1 0 1 2

Monitor preparation and auditing of

contractor's health and safety plan and

approval by health and safety consultant

N/A -1 0 1 2

Agree quality assurance procedures and

monitor implementation thereof by other

consultants and contractors

N/A -1 0 1 2

Receive, co-ordinate and monitor approval of

all contract documentation provided by

contractors(s)

N/A -1 0 1 2

Adjudicate entitlements arising from changes

required by construction programmeN/A -1 0 1 2

Regularly monitor performance of contractor

against construction programme N/A -1 0 1 2

Review, approve and monitor preparation of

construction programme by contractorN/A -1 0 1 2

Conduct and record regular site meetings N/A -1 0 1 2

Scope of services

Arrange site hand over to contractor

Establish construction documentation issue

process

Agree and monitor issue and distribution of

construction documentation

Instruct contractor on behalf of client to

appoint subcontractorsN/A -1 0 1 2

N/A -1 0 1 2

N/A -1 0 1 2

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 5- Construction)

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 5) WaS5

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Page 122: Standard for Contractor Performance Reports

119

Continued over

A + B + C + D X

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x Diii) D

Aggregated score

Sub - total Sum

Aggregate = Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

adherence to budget N/A -1 0 1 2

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

Aggregate score (Stage 6) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stages)

Sum of Weighted Aggregate of Stages (WaS3+WaS4+WaS5+WaS6) Wa

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa) D(i)

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 6) WaS6

0

N/A

1 2

Sum of activity assessments (Stage 6) Sum

1 2

Issue completion certificates

Manage agreement of final accounts

Prepare and manage project close-out report N/A -1 0

N/A -1

STANDARD OF SERVICE (Stage 6 - Close-Out)

N/A -1 0

Manage procurement of operations and

maintenance manuals, guarantees and

warranties

Manage preparation of as-built drawings and

documentation

Manage procurement of outstanding

statutory certificates

Monitor, review and issue payment

certificates1

-1 0 1 2

N/A

1 2

2

-1 0

N/A -1 0 1 2

-1 0 1 2

N/A

N/A -1 0 1 2

Scope of services

Co-ordinate and monitor rectification of

defects

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Page 123: Standard for Contractor Performance Reports

120

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Page 124: Standard for Contractor Performance Reports

121

Annex 17 Interim PSP Performance Report - CE, EE, ME and SE (Principal

Agent)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Inception Y N

Concept and viability Y N

Design Development Y N

Documentation and procurement Y N

Construction Y N

Close-out Y N

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT ( PRINCIPAL AGENT - ENGINEERING SERVICES)

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Please indicate the project stage

for which assessment is made

Page 125: Standard for Contractor Performance Reports

122

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Sub - total Sum

Average (C) = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

response to problems and changing

circumstancesN/A -1 0 1 2

response to instruction N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

10% of composite evaluation (0.1 x aggregate) B

coordination of interfaces N/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate) A

timely submission of progress reports N/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Section D: PSP Performance Information

Evaluation Criteria Grading

Page 126: Standard for Contractor Performance Reports

123

Continued over

Prepare, co-ordinate, agree and monitor a

detailed design and documentation

programme

-1 0 1 2

Sum of activity assessments (Stage 4) Sum

Aggregate score (Stage 4) = Sum of activity assessments / number of assessed activities Aggregate

Prepare and agree procurement programme

Advise client in conjunction with other

consultants on appropriate insurances

Manage procurement process and

recommended contractors for approval by

client

Agree format and procedures for monitoring

and control by quantity surveyor for cost of

the works

Co-ordinate and assemble contract

documentation for signature

0

N/A -1 0

N/A

1 2

Sum of activity assessments (Stage 3) Sum

Aggregate score (Stage 3) = Sum of activity assessments / number of assessed activities Aggregate

STANDARD OF SERVICE (Stage 4 - Documentation and Procurement)

Scope of services

Recommend and agree procurement

strategy for contractors, subcontractors,

suppliers with client and other consultants

1

1 2

N/A -1 0 1 2

-1 0 1 2

2

STANDARD OF SERVICE (Stage 3- Design Development)

Scope of services

N/A -1 0 1 2

N/A -1

N/A

STANDARD OF SERVICE (Stage 2 - Concept and Viability)

Scope of services

No service N/A

STANDARD OF SERVICE (Stage 1 - Inception)

Scope of services

No service N/A

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 3) WaS3

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 4) WaS4

N/A -1 0

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Page 127: Standard for Contractor Performance Reports

124

Continued over

Aggregate

Sum of activity assessments (Stage 5) Sum

Aggregate score (Stage 5) = Sum of activity assessments / number of assessed activities

Co-ordinate, monitor and issue practical

completion lists and certificate of practical

completion

N/A -1 0 1 2

Prepare and submit progress reports N/A -1 0 1 2

Monitor preparation of financial control

reports by other consultantsN/A -1 0 1 2

Receive, review and adjudicate any

contractual claimsN/A -1 0 1 2

Monitor, review and approve cerificates N/A -1 0 1 2

Establish procedures for monitoring scope

and cost variationsN/A -1 0 1 2

Monitor preparation of environmental

management plan by environmental

consultant

N/A -1 0 1 2

Monitor preparation and auditing of

contractor's health and safety plan and

approval by health and safety consultant

N/A -1 0 1 2

Agree quality assurance procedures and

monitor implementation thereof by other

consultants and contractors

N/A -1 0 1 2

Receive, co-ordinate and monitor approval of

all contract documentation provided by

contractors(s)

N/A -1 0 1 2

Adjudicate entitlements arising from changes

required by construction programmeN/A -1 0 1 2

Regularly monitor performance of contractor

against construction programme N/A -1 0 1 2

Review, approve and monitor preparation of

construction programme by contractorN/A -1 0 1 2

Conduct and record regular site meetings N/A -1 0 1 2

Scope of services

Arrange site hand over to contractor

Establish construction documentation issue

process

Agree and monitor issue and distribution of

construction documentation

Instruct contractor on behalf of client to

appoint subcontractorsN/A -1 0 1 2

N/A -1 0 1 2

N/A -1 0 1 2

N/A -1 0 1 2

STANDARD OF SERVICE (Stage 5- Construction)

(%) Weighted aggregate of Stages (% / 100 x aggregate score for Stage 5) WaS5

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Evaluation Criteria Grading

Page 128: Standard for Contractor Performance Reports

125

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Section E: PSP / JV Information

Name of Main PSP

Name of Joint Venture Partner

Page 129: Standard for Contractor Performance Reports

126

Annex 18 Interim PSP Performance Report – AR, CE, EE, ME, SE, CP, LA and QS

(Planning, Studies, Investigations, and Assessments)

Continued over

cidb Employer Number (if applicable)

Employer Name

cidb Contract Number (if applicable)

Contract Title

Completion Date Y Y Y Y M M D D

Organisation Name

Name of Reporting Officer Title Initials Surname

Designation

Professional Registration Body

Registration Number

e-mail

Mobile 0 - -

Office Telephone 0 - -

Date submitted to Employer Y Y Y Y - M M - D D

Signature

INTERIM PSP PERFORMANCE REPORT - PLANNING, STUDIES, INVESTIGATIONS & ASSESSMENTS

Section A: Employer Information

Section B: Contract Data

Section C: Reporting Officer's Information

Page 130: Standard for Contractor Performance Reports

127

Continued over

Please select the appropriate grading that reflect the PSP's performance on the project

Section D: PSP Performance Information

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

TIME MANAGEMENT

ability to meet programmed milestones N/A -1 0 1 2

timely allocation of appropriate resources to

critical activitiesN/A -1 0 1 2

overall progress of the work N/A -1 0 1 2

timely submission of progress reports N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 4 Aggregate

20% of composite evaluation (0.2 x aggregate) A

MANAGEMENT OF RESOURCES

appropriateness of skills and experience of

personnel assigned to the workN/A -1 0 1 2

adequacy of the number of personnel

assigned to the workN/A -1 0 1 2

Skill and commitment in management of

subconsultants and other suppliersN/A -1 0 1 2

coordination of interfaces N/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 2 Aggregate

10% of composite evaluation (0.1 x aggregate) B

CO-OPERATIVE RELATIONSHIPS

adoption and commitment to a cooperative

contracting approach with clients,

subconsultants, joint venture partners,

contractors and suppliers

N/A -1 0 1 2

commitment to resolving issues through

open and effective communication with a non-

adversarial approach

N/A -1 0 1 2

general cooperation and responsiveness,

adherence to commitmentsN/A -1 0 1 2

response to instruction N/A -1 0 1 2

response to problems and changing

circumstancesN/A -1 0 1 2

Sub - total Sum

Aggregate = Sub - total / 5 Aggregate

10% of composite evaluation (0.1 x aggregate) C

Page 131: Standard for Contractor Performance Reports

128

Evaluation Criteria Grading

N/APoor

(-1)Adequate (0)

Good

(1)Excellent(2)

Definition

Well below

the

acceptable

standard of

performance

Meets the

acceptable

standard of

performance

Standard

often

exceeds the

acceptable

standard of

performance

Standard

well above

the

acceptable

standard of

performance

STANDARD OF SERVICE (Stage 0 – Project initiation)

Scope of services

Consultation with the client or client's

authorized representativeN/A -1 0 1 2

Inspection of the site of the project N/A -1 0 1 2

Developing a scope of work where required N/A -1 0 1 2

Preliminary investigation, route location,

planning and a level of design appropriate to

allow decisions on feasibilitry and the

selection of the most desirable project option

N/A -1 0 1 2

Assessments of existing built environment

elements with a view to informing the project

options, the scope of work and how to

refurbish and/or integrate new works with

existing works

N/A -1 0 1 2

Consultation with authorities having rights or

powers of sanction as well as consultation

with the public and stakeholder groups

N/A -1 0 1 2

Advice to the client as to regulatory and

statutory requirements, including

environmental management and the need for

surveys, analyses, tests and site or other

investigations, as well as approvals, where

such are required for the completion of the

report, and arranging for these to be carried

out at the client's expense

N/A -1 0 1 2

Searching for, obtaining, investigating and

collating available data, drawings and plans

relating to the works

N/A -1 0 1 2

Investigating financial and economic

implications relating to the proposals or

feasibility studies

N/A -1 0 1 2

Sum of activity assessments (Stage 0) Sum

Aggregate score (Stage 0) = Sum of activity assessments / number of assessed activities Aggregate

100 % Weighted aggregate of Stages (0.100 x aggregate score for Stage 0) WaS0

STANDARD OF SERVICE (Stages)

Aggregated score Stage 0 (WaS0) Wa1

(Di) = 75% Sum of weighted aggregates for Stages (0.75 x Wa1) D(i)

STANDARD OF SERVICE (Overall)

compliance with brief N/A -1 0 1 2

adherence to budget N/A -1 0 1 2

reviews and reports delivered in accordance

with the briefN/A -1 0 1 2

Sub - total Sum

Aggregate= Sub - total / 3 Aggregate

(Dii) = 25% Weighted aggregate of standard of service (0.25 x Aggregate score) D(ii)

STANDARD OF SERVICE (Stages + Overall)

D(iii) = D(i) + D(ii) D(iii)

60% of composite evaluation (0.6 x D(iii)) D

Aggregated score

A + B + C + D X

Page 132: Standard for Contractor Performance Reports

129

Title Initials Surname

e-mail

Mobile 0 - -

Office Telephone 0 - -

I / we agree disagree

I / we appeal the Performance Assessment by the Reporting Officer Y N

Signature

Date Y Y Y Y - M M - D D

Section F: Notes

Section E: PSP / JV Information

Name of Main Consultant

Name of Joint Venture Partner

Name of Joint Venture Partner

Name of Joint Venture Partner

Contact Person

Designation

Professional Registration Body

Registration Number

with the Performance Assessment by the Reporting Officer