standardized abp chart deck template

8
Standardized ABP Chart Deck Template Gas Turbine Engines High Speed Air Breathing Propulsion Air Breathing Propulsion Systems Integration 12/06/2010 J.W. Hamstra , (817) 655-8894, [email protected]

Upload: hagen

Post on 06-Jan-2016

36 views

Category:

Documents


3 download

DESCRIPTION

Standardized ABP Chart Deck Template. J.W. Hamstra , (817) 655-8894, [email protected]. 12/06/2010. Gas Turbine Engines. High Speed Air Breathing Propulsion. Air Breathing Propulsion Systems Integration. Motivation For A Standardized Chart Deck. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Standardized ABP Chart Deck Template

Standardized ABP Chart Deck Template

Gas Turbine Engines High SpeedAir Breathing Propulsion

Air Breathing Propulsion Systems Integration

12/06/2010

J.W. Hamstra , (817) 655-8894, [email protected]

Page 2: Standardized ABP Chart Deck Template

Motivation For A Standardized Chart Deck

• Make More Efficient Use Of Joint TC Meeting Opportunities Current Reporting Format: Free-Form Presentations From 3 TCs + 3 Service

Subcommittees + 2 Conference Subcommittees Proposed Format: 1 Chart For Each TC/Subcommittee With Backup Materials

(From Dedicated TC/SC Meetings) Linked In As Necessary

• Eliminate Redundant Reporting Of Information By Assigning Specific Responsibility For Discussion Of EachTopic

• Create Time For Special Topics, Guest Speakers, Etc.• Allow Use Of Identical Charts In Different Venues (i.e. P&E Group Meeting &

ABP Dinner Meeting)• Action: Review Proposed Standardized Format And Provide

Recommendations Back To JWH General Comments On This Approach – Like It, Hate It,… Specific Comments On Proposed Formats, Division of Reporting (i.e. Some Redundancy On

Conference Statistics, Engine Design Competition Under Education), Etc.)2

Page 3: Standardized ABP Chart Deck Template

3

Gas Turbine Engines Technical Committee

Chair: Dr. Jane Doe Phone: 123-456-7890Email: [email protected]

Vice Chair: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

Update as of: 12/03/2010

Membership Profile

Government: 12Industry: 13Academia: 15Total: 40

U.S. 33International: 2Associate: 5Total: 40

Member: 15Assoc Fellow: 22Fellow: 2Non-member: 1Total: 40

Recent Conference Performance

Initiatives & PlansAbstracts Received: 60Abstracts Accepted: 50

Sessions: 10Withdrawals/No-Shows: 6

Issues / Help Needed

ASM 2010 JPC 2010

Abstracts Received: 60Abstracts Accepted: 50

Sessions: 10Withdrawals/No-Shows: 6

• Problem #1• Problem #2

Accomplishments / Status

AIAA Propulsion and Energy Group, Air Breathing Propulsion BranchAir Breathing Propulsion Systems Integration TC

High Speed Air Breathing Propulsion TCGas Turbine Engines TC

• Top level statement blah blah blah blah blah blah etc. etc.

• Etc• Etc

– 2’nd level statement blah blah blah• Third level statement

• Top level statement blah blah blah blah blah blah etc. etc. (ECD 3/1/11)

• Etc• Etc

– 2’nd level statement blah blah blah blah b• Third level statement

Page 4: Standardized ABP Chart Deck Template

4

Aerospace Sciences Meeting Subcommittee

Three Year Conference Performance

Other Accomplishments / New Initiatives

• Top level statement blah blah blah blah blah blah etc. etc.

• Etc• Etc

– 2’nd level statement blah blah blah• Third level statement

• Top level statement blah blah blah blah blah blah etc. etc. (ECD 3/1/11)

• Etc• Etc

– 2’nd level statement blah blah blah blah b• Third level statement

AIAA Propulsion and Energy Group, Air Breathing Propulsion BranchAir Breathing Propulsion Systems Integration TC

High Speed Air Breathing Propulsion TCGas Turbine Engines TC

Current/Next Event Notes

Issues / Help needed

• Problem #1• Problem #2

Chair: Dr. Jane Doe Phone: 123-456-7890 Email: [email protected]

GTE: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

Update as of: 12/03/2010

HS ABP: Mr. Jim Bob Phone: 123-456-7890Email: [email protected]

ABPSI: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

ABPABPABPABP

2009 2010 2011 Total

GTE XX / YY XX / YY XX / YY XX / YY

HS XX / YY XX / YY XX / YY XX / YY

PSI XX / YY XX / YY XX / YY XX / YY

Total XX / YY XX / YY XX / YY XX / YY

Abstracts Accepted/Sessions:

• Comment 1• Comment 2

Page 5: Standardized ABP Chart Deck Template

5

Honors & Awards Subcommittee

Recurring Honors & Awards Summary

New Initiatives & Plans

• Top level statement blah blah blah blah blah blah etc. etc.

• Etc• Etc

– 2’nd level statement blah blah blah• Third level statement

• Top level statement blah blah blah blah blah blah etc. etc. (ECD 3/1/11)

• Etc• Etc

– 2’nd level statement blah blah blah blah b• Third level statement

AIAA Propulsion and Energy Group, Air Breathing Propulsion BranchAir Breathing Propulsion Systems Integration TC

High Speed Air Breathing Propulsion TCGas Turbine Engines TC

Accomplishments / Status

Issues / Help needed

• Problem #1• Problem #2

Chair: Dr. Jane Doe Phone: 123-456-7890 Email: [email protected]

GTE: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

Update as of: 12/03/2010

HS ABP: Mr. Jim Bob Phone: 123-456-7890Email: [email protected]

ABPSI: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

2010 ABP Career Achievement: Mr. Somebody, from somewhere.

2010 Gordon C. Oates Graduate Student: Ms. Somebody, from somewhere.

• GTE : J.J. Smith, University of Somewhere, AIAA-10-1234, “A highly unusual engine concept for burning lots of gas”

• HS ABP: • ABP Systems Integration:

2010 TC Best Papers:

ABPABPABPABP

Page 6: Standardized ABP Chart Deck Template

Education Subcommittee

Recurring Education Activities

New Initiatives & Plans

Accomplishments / Status

Issues / Help needed

• Problem #1• Problem #2

Chair: Dr. Jane Doe Phone: 123-456-7890 Email: [email protected]

GTE: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

Update as of: 12/03/2010

HS ABP: Mr. Jim Bob Phone: 123-456-7890Email: [email protected]

ABPSI: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

ABPABPABPABP

• Engine Design Competition• Point 1• Point 2

• Short Courses• Etc• Etc

• K-12

• Top level statement blah blah blah blah blah blah etc. etc.

• Etc• Etc

– 2’nd level statement blah blah blah• Third level statement

• Top level statement blah blah blah blah blah blah etc. etc. (ECD 3/1/11)

• Etc• Etc

– 2’nd level statement blah blah blah blah b• Third level statement

AIAA Propulsion and Energy Group, Air Breathing Propulsion BranchAir Breathing Propulsion Systems Integration TC

High Speed Air Breathing Propulsion TCGas Turbine Engines TC

6

Page 7: Standardized ABP Chart Deck Template

Communication Subcommittee

Recurring Communications Activities

New Initiatives & Plans

Accomplishments / Status

Issues / Help needed

• Problem #1• Problem #2

Chair: Dr. Jane Doe Phone: 123-456-7890 Email: [email protected]

GTE: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

Update as of: 12/03/2010

HS ABP: Mr. Jim Bob Phone: 123-456-7890Email: [email protected]

ABPSI: Mr. Jim Bob Phone: 123-456-7890 Email: [email protected]

ABPABPABPABP

• Websites• Point 1• Point 2

• News Letters• Etc• Etc

• Publicity• And so on

• Year In Review

• Top level statement blah blah blah blah blah blah etc. etc.

• Etc• Etc

– 2’nd level statement blah blah blah• Third level statement

• Top level statement blah blah blah blah blah blah etc. etc. (ECD 3/1/11)

• Etc• Etc

– 2’nd level statement blah blah blah blah b• Third level statement

AIAA Propulsion and Energy Group, Air Breathing Propulsion BranchAir Breathing Propulsion Systems Integration TC

High Speed Air Breathing Propulsion TCGas Turbine Engines TC

7

Page 8: Standardized ABP Chart Deck Template

Backup Material

8